CN112627364A - Waterproof building net for sponge city planning and construction - Google Patents

Waterproof building net for sponge city planning and construction Download PDF

Info

Publication number
CN112627364A
CN112627364A CN202011390708.4A CN202011390708A CN112627364A CN 112627364 A CN112627364 A CN 112627364A CN 202011390708 A CN202011390708 A CN 202011390708A CN 112627364 A CN112627364 A CN 112627364A
Authority
CN
China
Prior art keywords
soft board
seat
board
rubber
vertical shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011390708.4A
Other languages
Chinese (zh)
Other versions
CN112627364B (en
Inventor
朱建建
张晓鸿
王新
王海波
闫辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Water Conservancy Vocational College
Original Assignee
Shandong Water Conservancy Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Water Conservancy Vocational College filed Critical Shandong Water Conservancy Vocational College
Priority to CN202011390708.4A priority Critical patent/CN112627364B/en
Publication of CN112627364A publication Critical patent/CN112627364A/en
Application granted granted Critical
Publication of CN112627364B publication Critical patent/CN112627364B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor

Abstract

The invention provides a building waterproof network for sponge city planning construction, which comprises: compared with the prior art, the invention has the following beneficial effects that: through set up a rubber soft board before the mainboard of waterproof usefulness to set up two buffer gear on the rubber soft board, can effectively cushion the impact force of water to the mainboard, prevent that the mainboard from being soaked by the water for a long time and erode and cause the loss.

Description

Waterproof building net for sponge city planning and construction
Technical Field
The invention belongs to the field of waterproof equipment, and particularly relates to a building waterproof network for sponge city planning construction.
Background
At present, a sponge city is a new generation city rain and flood management concept, which means that the city can have good elasticity in the aspects of adapting to environmental changes and coping with natural disasters caused by rainwater like a sponge, and can also be called as a water elasticity city.
However, the common waterproof construction methods include structural waterproof and material waterproof, and the existing building waterproof net is designed in a single-layer plate shape, so that the structure is simple, the elasticity is poor, the shock resistance is poor, the building waterproof net is easy to wear under the long-term washing of a water body, the surface layer is easy to fall off, and the use is influenced.
Therefore, there is a need for a waterproof structure that can mitigate the impact force of a body of water.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a building waterproof network for sponge city planning construction, so as to solve the problems in the background technology.
The technical scheme of the invention is realized as follows: a building waterproof net for sponge city planning construction, comprising: mainboard, first shrink seat, second shrink seat, rubber soft board, fixed establishment, first buffer gear and second buffer gear, fixed establishment includes upper end fixer, lower extreme fixer, vertical axis, cylinder, gyro wheel, axle sleeve and minor axis, first buffer gear includes PMKD, short spring, closing plate, first round bar, sealing piston, connection closing plate and second round bar second buffer gear is including buffering fixing base, fixed mounting panel, elastic seal cover, long spring, movable mounting panel and buffering movable seat.
As a preferred embodiment, the upper end and the lower end of the inside of the main board are both provided with an oil passage, the upper end and the lower end of the inside of the main board are both provided with an end cavity, the left end and the right end of the oil passage are respectively communicated with one end cavity, the front end of the oil passage is communicated with the front surface of the main board, the front end of the oil passage is provided with a limiting shoulder, lubricating oil is filled in the oil passage, the first buffer mechanism is arranged in the oil passage during actual use, and when a water body impacts a rubber soft board, the first buffer mechanism is pressed in and pushed out in the oil passage to do repeated motion.
As a preferred embodiment, the second shrink seat has been seted up inside the soft board slide, the soft board slide is linked together with the left surface of second shrink seat, the shrink chamber has been seted up to the inside of second shrink seat, sets up second buffer gear in the shrink intracavity when the in-service use, and when the water impacted the rubber soft board, the rubber soft board was expanded to both ends about by the punching press, and both ends are at the soft board slide and shrink intracavity and are the repetitive motion about the rubber soft board.
As a preferred embodiment, the front surface and the rear surface of the upper end of the soft rubber plate are provided with top end sliding grooves, the front surface and the rear surface of the lower end of the soft rubber plate are provided with bottom end sliding grooves, when the soft rubber plate is actually used, the rollers of the fixing mechanism are arranged in the top end sliding grooves and the bottom end sliding grooves, when a water body impacts the soft rubber plate, the soft rubber plate is stamped to be unfolded towards the left end and the right end, and the top end sliding grooves and the bottom end sliding grooves of the soft rubber plate move repeatedly along the outer surfaces of the rollers.
In a preferred embodiment, in the fixing mechanism, the upper end retainer is located above the lower end retainer, the lower surface of the upper end fixer is provided with a front seat and a rear seat, a short shaft is arranged in the front seat, a roller is movably arranged on the short shaft through a bearing, the upper end of the short shaft is provided with a shaft sleeve, the rear seat is provided with a vertical shaft, the lower end of the vertical shaft is arranged on the lower fixer, a roller is arranged on the vertical shaft, a roller is movably arranged at the upper end of the vertical shaft through a bearing, a shaft sleeve is arranged at the upper end of the vertical shaft, the lower end of the vertical shaft is movably provided with a roller through a bearing, the lower end of the vertical shaft is provided with a shaft sleeve, when the water body impacts the rubber soft board, the upper end and the lower end of the rubber soft board push the upper end fixator and the lower end fixator to move repeatedly in the oil duct along the front-back direction.
As a preferred embodiment, the upper end and the lower extreme of vertical axis are rolled there is the top external screw thread, the upper end and the lower extreme of vertical axis are equipped with the bearing installation section, the upper end and the lower extreme of vertical axis are equipped with the installation screw thread section, the surface of installation screw thread section is rolled there is the external screw thread, the centre of vertical axis is equipped with the jackshaft section, movable mounting has the cylinder on the jackshaft section, and when in actual use, when the water was strikeed the rubber soft board, movable mounting supported on the rear surface of rubber soft board when the water moved to the rubber soft board on the epaxial cylinder of vertical axis.
As a preferred embodiment, in the first buffer mechanism, a fixed base plate is fixedly installed in the end cavity, a short spring is fixedly installed on the rear surface of the fixed base plate, a sealing plate is fixedly installed at the rear end of the short spring, a first round rod is fixedly installed on the rear surface of the sealing plate, the first round rod is located in the oil duct, a sealing piston is fixedly installed at the rear end of the first round rod, a connecting sealing plate is arranged in the oil duct, the front end of the connecting sealing plate is connected with an upper end fixer, a second round rod is respectively installed at the left end and the right end of the rear surface of the connecting sealing plate, and the sealing piston is fixedly installed at the rear end of the second round rod.
As an preferred embodiment, among the second buffer gear, buffering fixing base fixed mounting is in the shrink intracavity, the left end fixed mounting of buffering fixing base has fixed mounting panel, fixed mounting panel's left end fixed mounting has long spring, the left end fixed mounting of long spring has movable mounting panel, movable mounting panel fixed mounting is on buffering the sliding seat, the buffering sliding seat is located the shrink intracavity, install the elasticity sealed cowling between fixed mounting panel and the movable mounting panel, long spring is located the inside of elasticity sealed cowling, and when the in-service use, the water is when the rubber soft board strikes, along with the repetitive motion of rubber soft board, long spring is compressed repeatedly, and buffering sliding seat and movable mounting panel are the repetitive motion along left right direction in the shrink intracavity.
After the technical scheme is adopted, the invention has the beneficial effects that: through set up a rubber soft board before the mainboard of waterproof usefulness to set up two buffer gear on the rubber soft board, can effectively cushion the impact force of water to the mainboard, prevent that the mainboard from being soaked by the water for a long time and erode and cause the loss.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of a building waterproof network for planning and construction of a sponge city.
Fig. 2 is a top view of the schematic internal structure of the main board of the waterproof network of the building for planning and construction of the sponge city.
Fig. 3 is a front view of a rubber soft board of a building waterproof net for planning and building a sponge city according to the invention.
Fig. 4 is a left side view of a rubber soft board of a building waterproof net for planning and building a sponge city according to the invention.
Fig. 5 is a schematic structural diagram of a fixing mechanism of a building waterproof network for planning and construction of a sponge city.
Fig. 6 is a schematic structural diagram of a vertical shaft of a building waterproof net for planning and construction of a sponge city.
Fig. 7 is a partial schematic view of a first buffer mechanism of a building waterproof network for planning and construction of a sponge city according to the invention.
Fig. 8 is a partial schematic view of a second buffer mechanism of the building waterproof network for planning and construction of the sponge city.
In the figure, 1-main board, 2-first contraction seat, 3-second contraction seat, 4-rubber soft board, 5-fixing mechanism, 6-first buffer mechanism, 7-second buffer mechanism, 11-oil channel, 12-end cavity, 13-limit shoulder, 31-soft board slideway, 32-contraction cavity, 41-top end chute, 42-bottom end chute, 51-upper end fixer, 511-rear seat, 512-front seat, 52-lower end fixer, 53-vertical shaft, 531-top end external screw thread, 532-bearing mounting section, 533-mounting screw thread section, 534-middle shaft section, 54-roller, 55-roller, 56-shaft sleeve, 57-short shaft, 61-fixing bottom board, 62-short spring, 63-sealing plate, 64-a first round rod, 65-a sealing piston, 66-a connecting sealing plate, 67-a second round rod, 71-a buffer fixed seat, 72-a fixed mounting plate, 73-an elastic sealing cover, 74-a long spring, 75-a movable mounting plate and 76-a buffer movable seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 and fig. 2, the present invention provides a technical solution: a building waterproof net for sponge city planning construction, comprising: the main board 1, the first contraction seat 2, the second contraction seat 3, the soft rubber board 4, the fixing mechanism 5, the first buffer mechanism 6 and the second buffer mechanism 7, the fixing structure comprises an upper end fixer 51, a lower end fixer 52, a vertical shaft 53, a roller 54, a roller 55, a shaft sleeve 56 and a short shaft 57, the first buffer mechanism 6 comprises a fixed bottom board 61, a short spring 62, a sealing board 63, a first round rod 64, a sealing piston 65, a connecting sealing board 66 and a second round rod 67, the second buffer mechanism 7 comprises a buffer fixing seat 71, a fixed mounting plate 72, an elastic sealing cover 73, a long spring 74, a movable mounting plate 75 and a buffer movable seat 76.
Referring to fig. 2, the upper end and the lower end of the inside of the main board 1 are both provided with an oil channel 11, the upper end and the lower end of the inside of the main board 1 are both provided with an end cavity 12, the left end and the right end of the oil channel 11 are respectively communicated with one end cavity 12, the front end of the oil channel 11 is communicated with the front surface of the main board 1, the front end of the oil channel 11 is provided with a limiting shoulder 13, lubricating oil is filled in the oil channel 11, the first buffer mechanism 6 is arranged in the oil channel 11 during actual use, when a water body impacts the soft rubber plate 4, the first buffer mechanism 6 is pressed in and pushed out of the oil channel 11 to move repeatedly, the limiting shoulder 13 blocks the connecting sealing plate 66 during the movement of the first buffer mechanism 6, the first buffer mechanism 6 is prevented from being pushed out of the oil.
Referring to fig. 8, a soft board slide 31 is disposed inside the second retraction seat 3, the soft board slide 31 is communicated with the left surface of the second retraction seat 3, a retraction cavity 32 is disposed inside the second retraction seat 3, the second buffer mechanism 7 is disposed in the retraction cavity 32 during actual use, when a water body impacts the soft rubber board 4, the impact force causes the soft rubber board 4 to be punched and unfolded towards the left and right ends, the left and right ends of the soft rubber board 4 move repeatedly in the soft board slide 31 and the retraction cavity 32, and repeatedly extrude the long spring 74, the long spring 74 drives the soft rubber board 4 to perform transverse stretching and retracting motions repeatedly, so that the impact force of the water body is absorbed and converted into a driving force for elastic deformation of the soft rubber board 4, thereby achieving a buffering effect.
Referring to fig. 3 and 4, the front surface and the rear surface of the upper end of the soft rubber plate 4 are provided with top end chutes 41, the front surface and the rear surface of the lower end of the soft rubber plate 4 are provided with bottom end chutes 42, the rollers 55 of the fixing mechanism 5 are disposed in the top end chutes 41 and the bottom end chutes 42 during actual use, when a water body impacts the soft rubber plate 4, the soft rubber plate 4 is punched to expand towards the left and right ends, the top end chutes 41 and the bottom end chutes 42 of the soft rubber plate 4 repeatedly move along the outer surfaces of the rollers 55, and the soft rubber plate 4 is elastically deformed to absorb the impact force of the water body.
Referring to fig. 5, in the fixing mechanism 5, the upper end fixer 51 is located above the lower end fixer 52, the lower surface of the upper end fixer 51 is provided with a front seat 512 and a rear seat 511, a short shaft 57 is installed in the front seat 512, a roller 55 is movably installed on the short shaft 57 through a bearing, a shaft sleeve 56 is installed at the upper end of the short shaft 57, a vertical shaft 53 is installed on the rear seat 511, the lower end of the vertical shaft 53 is installed on the lower fixer, a roller 54 is installed on the vertical shaft 53, a roller 55 is movably installed at the upper end of the vertical shaft 53 through a bearing, a shaft sleeve 56 is installed at the upper end of the vertical shaft 53, a roller 55 is movably installed at the lower end of the vertical shaft 53 through a bearing, a shaft sleeve 56 is installed at the lower end of the vertical shaft 53, the flexible rubber plate 4 is fixed through the fixing mechanism 5 during actual use, when a water body impacts the flexible rubber plate 4, the upper end and the lower end of the flexible rubber, meanwhile, the roller 54 on the vertical shaft 53 will abut against the rear surface of the flexible rubber sheet 4 when the flexible rubber sheet 4 is pressed and deformed, so as to prevent the flexible rubber sheet 4 from excessively deforming and falling off from the fixing mechanism 5, thereby playing a supporting role.
Referring to fig. 6, the upper end and the lower end of the vertical shaft 53 are rolled with top external threads 531, the upper end and the lower end of the vertical shaft 53 are provided with bearing installation sections 532, the upper end and the lower end of the vertical shaft 53 are provided with installation thread sections 533, the outer surfaces of the installation thread sections 533 are rolled with external threads, the middle of the vertical shaft 53 is provided with a middle shaft section 534, and a roller 54 is movably installed on the middle shaft section 534, when in actual use, a water body impacts the soft rubber plate 4, the roller 54 movably installed on the vertical shaft 53 abuts against the rear surface of the soft rubber plate 4 when the soft rubber plate 4 moves, so that the roller 54 rotates and rolls along with the movement of the soft rubber plate 4, and simultaneously supports the soft rubber plate 4.
Referring to fig. 7, in the first buffer mechanism 6, a fixed base plate 61 is fixedly installed in an end cavity 12, a short spring 62 is fixedly installed on the rear surface of the fixed base plate 61, a sealing plate 63 is fixedly installed at the rear end of the short spring 62, a first round rod 64 is fixedly installed on the rear surface of the sealing plate 63, the first round rod 64 is located in an oil duct 11, a sealing piston 65 is fixedly installed at the rear end of the first round rod 64, a connecting sealing plate 66 is arranged in the oil duct 11, the front end of the connecting sealing plate 66 is connected with an upper end fixer 51, a second round rod 67 is respectively installed at the left end and the right end of the rear surface of the connecting sealing plate 66, a sealing piston 65 is fixedly installed at the rear end of the second round rod 67, when a water body impacts a soft rubber plate 4 during actual use, the first buffer mechanism 6 repeatedly moves in the oil duct 11 in the front-back direction, so as to convert the impact force of the water body into, and a hydraulic mechanism is formed by the oil duct 11, the lubricating oil and the sealing piston 65, so that the impact force of the water body is absorbed and converted continuously, the buffering effect is realized, and the main board 1 is protected from being washed away by the water body for a long time.
Referring to fig. 8, in the second buffer mechanism 7, a buffer fixed seat 71 is fixedly installed in a contraction cavity 32, a fixed installation plate 72 is fixedly installed at the left end of the buffer fixed seat 71, a long spring 74 is fixedly installed at the left end of the fixed installation plate 72, a movable installation plate 75 is fixedly installed at the left end of the long spring 74, the movable installation plate 75 is fixedly installed on a buffer movable seat 76, the buffer movable seat 76 is located in the contraction cavity 32, an elastic sealing cover 73 is installed between the fixed installation plate 72 and the movable installation plate 75, the long spring 74 is located inside the elastic sealing cover 73, when in actual use, when a water body impacts the rubber soft plate 4, the long spring 74 is repeatedly compressed along with the repeated movement of the rubber soft plate 4, the buffer movable seat 76 and the movable installation plate 75 do repeated movement in the contraction cavity 32 in the left-right direction, and the long spring 74 absorbs and converts the elastic potential energy of the long, when the long spring 74 is restored, the elastic potential energy is converted into the kinetic energy of the transverse contraction of the rubber soft plate 4, so that the effects of absorbing, converting and releasing the impact force of the water body are realized, and the buffering function is realized.
As an embodiment of the present invention: in practical use, the first buffer mechanism 6 is firstly arranged in the oil duct 11, the second buffer mechanisms 7 are respectively arranged in the first contraction seat 2 and the second contraction seat 3, then the fixing mechanism 5 is arranged on the connecting sealing plate 66 of the first buffer mechanism 6, then the soft rubber plate 4 is arranged, the left end of the soft rubber plate 4 is fixed on the second buffer mechanism 7 in the first contraction seat 2, the right end of the soft rubber plate 4 is fixed on the second buffer mechanism 7 in the second contraction seat 3, and simultaneously the roller 55 on the upper end fixer 51 of the fixing mechanism 5 is ensured to be clamped into the top end sliding groove 41 of the soft rubber plate 4, and the roller 55 on the lower end fixer 52 of the fixing mechanism 5 is ensured to be clamped into the bottom end sliding groove 42 of the soft rubber plate 4;
when the water body washes the main board 1, the water body directly impacts the front surface of the soft rubber board 4, under the action of the impact force, the convex part of the initial position on the soft rubber board 4 bears the impact force, the impact force pushes the soft rubber board 4 to move backwards, the soft rubber board 4 pushes the first buffer mechanism 6 to move backwards through the fixing mechanism 5, the two second round rods 67 of the first buffer mechanism 6 push and press lubricating oil in the oil channel 11 through the sealing pistons 65, so that the impact force is converted into the thrust force of the second round rods 67, the lubricating oil pushes the two sealing pistons 65 on the two second round rods 67 of the first buffer mechanism 6 on the part, close to the main board 1, of the initial position on the soft rubber board 4 to move under the action of the thrust, the part, close to the main board 1, on the soft rubber board 4 is pushed out to receive the impact force of the water body, and simultaneously the soft rubber board 4 bends and fluctuates along the front-back direction, the rubber soft board 4 extends and contracts along the left and right directions under the action of the top end sliding chute 41, the bottom end sliding chute 42 and the roller 55, so that partial impact force of the water body is dispersed to the left and right sides along the surface of the rubber soft board 4, and the second buffer mechanism 7 performs left and right telescopic motion, so that the partial impact force of the water body is slowly released, the working load of the first buffer mechanism 6 is reduced, and a more efficient buffer effect is achieved;
when larger solid objects such as stones, rubbles and the like exist in the water body, the solids impact the rubber soft board 4 along with the flow of the water body, the first buffer mechanism 6 and the second buffer mechanism 7 can absorb the impact force, and the rubber soft board 4 protects the main board 1 from being directly impacted by the solids, so that the buffering effect is achieved.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (8)

1. The utility model provides a waterproof net of building towards sponge city planning construction which characterized in that includes: mainboard (1), first shrink seat (2), second shrink seat (3), rubber soft board (4), fixed establishment (5), first buffer gear (6) and second buffer gear (7), fixed establishment includes upper end fixer (51), lower extreme fixer (52), vertical axis (53), cylinder (54), gyro wheel (55), axle sleeve (56) and minor axis (57), first buffer gear (6) are including PMKD (61), short spring (62), closing plate (63), first round bar (64), sealing piston (65), connect closing plate (66) and second round bar (67), second buffer gear (7) are including buffering fixing base (71), fixed mounting panel (72), elastic seal cover (73), long spring (74), movable mounting panel (75) and buffering movable seat (76).
2. The sponge city planning construction-oriented building waterproof net of claim 1, characterized in that: oil duct (11) have all been seted up to inside upper end and inside lower extreme of mainboard (1), end chamber (12) have all been seted up to inside upper end and the lower extreme of mainboard (1), the left end and the right-hand member of oil duct (11) are linked together with an end chamber (12) respectively, the front end of oil duct (11) is linked together with the front surface of mainboard (1), the front end of oil duct (11) is equipped with spacing convex shoulder (13), be equipped with lubricating oil in oil duct (11), set up first buffer gear (6) in oil duct (11) when using practically, when the water impacted soft board of rubber (4), first buffer gear (6) were impressed, was released in oil duct (11) and is the repetitive motion.
3. The sponge city planning construction-oriented building waterproof net of claim 1, characterized in that: soft board slide (31) have been seted up to second shrink seat (3) inside, soft board slide (31) are linked together with the left surface of second shrink seat (3), shrink chamber (32) have been seted up to the inside of second shrink seat (3), set up second buffer gear (7) in shrink chamber (32) when in actual use, and when the water was strikeed soft board (4), soft board of rubber (4) was expanded to both ends about by the punching press, and both ends are the repetitive motion in soft board slide (31) and shrink chamber (32) about soft board of rubber (4).
4. The sponge city planning construction-oriented building waterproof net of claim 1, characterized in that: top spout (41) have been seted up to the front surface and the rear surface of rubber soft board (4) upper end, bottom spout (42) have been seted up to the front surface and the rear surface of rubber soft board (4) lower extreme, set up gyro wheel (55) of fixed establishment (5) in top spout (41) and bottom spout (42) when in-service use, when the water strikes rubber soft board (4), rubber soft board (4) are launched to controlling both ends by the punching press, top spout (41) and bottom spout (42) of rubber soft board (4) are along the surface repetitive motion of gyro wheel (55).
5. The sponge city planning construction-oriented building waterproof net of claim 1, characterized in that: in the fixing mechanism (5), the upper end fixer (51) is located above the lower end fixer (52), the lower surface of the upper end fixer (51) is provided with a front seat (512) and a rear seat (511), a short shaft (57) is installed in the front seat (512), a roller (55) is installed on the short shaft (57) through a bearing movable mounting, a shaft sleeve (56) is installed at the upper end of the short shaft (57), a vertical shaft (53) is installed on the rear seat (511), the lower end of the vertical shaft (53) is installed on the lower fixer, a roller (54) is installed on the vertical shaft (53), a roller (55) is installed at the upper end of the vertical shaft (53) through a bearing movable mounting, a shaft sleeve (56) is installed at the upper end of the vertical shaft (53), a roller (55) is installed at the lower end of the vertical shaft (53) through a bearing movable mounting, a shaft sleeve (56) is installed at the lower end of the, when the water-cooled type oil duct is in actual use, the rubber soft board (4) is fixed through the fixing mechanism (5), and when water impacts the rubber soft board (4), the upper end and the lower end of the rubber soft board (4) push the upper end fixator (51) and the lower end fixator (52) to move repeatedly in the oil duct (11) along the front-back direction.
6. The sponge city planning construction-oriented building waterproof net of claim 5, wherein: the utility model discloses a rubber soft board, including vertical shaft (53), the upper end of vertical shaft (53) and lower extreme roll and have top end external screw thread (531), the upper end and the lower extreme of vertical shaft (53) are equipped with bearing installation section (532), the upper end and the lower extreme of vertical shaft (53) are equipped with installation screw thread section (533), the surface of installation screw thread section (533) is rolled and is had the external screw thread, the centre of vertical shaft (53) is equipped with middle shaft section (534), movable mounting has cylinder (54) on middle shaft section (534), and when in actual use, water was assaulted rubber soft board (4), cylinder (54) movable mounting on vertical shaft (53) supported on the rear surface of rubber soft board (4) when rubber soft board (4) moved.
7. The sponge city planning construction-oriented building waterproof net of claim 1, characterized in that: in the first buffer mechanism (6), a fixed base plate (61) is fixedly installed in an end cavity (12), a short spring (62) is fixedly installed on the rear surface of the fixed base plate (61), a sealing plate (63) is fixedly installed at the rear end of the short spring (62), a first round rod (64) is fixedly installed on the rear surface of the sealing plate (63), the first round rod (64) is located in an oil duct (11), a sealing piston (65) is fixedly installed at the rear end of the first round rod (64), a connecting sealing plate (66) is arranged in the oil duct (11), the front end of the connecting sealing plate (66) is connected with an upper end fixer (51), a second round rod (67) is installed at the left end and the right end of the rear surface of the connecting sealing plate (66) respectively, and a sealing piston (65) is fixedly installed at the rear end of the second round rod (67), when the water body impacts the rubber soft plate (4) in actual use, the first buffer mechanism (6) moves repeatedly in the oil duct (11) along the front-back direction.
8. The sponge city planning construction-oriented building waterproof net of claim 1, characterized in that: in second buffer gear (7), buffering fixing base (71) fixed mounting is in shrink chamber (32), the left end fixed mounting of buffering fixing base (71) has fixed mounting board (72), the left end fixed mounting of fixed mounting board (72) has long spring (74), the left end fixed mounting of long spring (74) has movable mounting board (75), movable mounting board (75) fixed mounting is on buffering movable seat (76), buffering movable seat (76) are located shrink chamber (32), install elasticity sealed cowling (73) between fixed mounting board (72) and movable mounting board (75), long spring (74) are located the inside of elasticity sealed cowling (73), and when the in-service use, the water is when impacting rubber soft board (4), along with the repetitive motion of rubber soft board (4), long spring (74) are compressed repeatedly, the buffer movable seat (76) and the movable mounting plate (75) do repeated movement in the left-right direction in the contraction cavity (32).
CN202011390708.4A 2020-12-02 2020-12-02 Waterproof building net for sponge city planning and construction Active CN112627364B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011390708.4A CN112627364B (en) 2020-12-02 2020-12-02 Waterproof building net for sponge city planning and construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011390708.4A CN112627364B (en) 2020-12-02 2020-12-02 Waterproof building net for sponge city planning and construction

Publications (2)

Publication Number Publication Date
CN112627364A true CN112627364A (en) 2021-04-09
CN112627364B CN112627364B (en) 2021-11-12

Family

ID=75307729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011390708.4A Active CN112627364B (en) 2020-12-02 2020-12-02 Waterproof building net for sponge city planning and construction

Country Status (1)

Country Link
CN (1) CN112627364B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090000214A1 (en) * 2007-02-01 2009-01-01 Newman Stanley Integrated, high strength, lightweight, energy efficient building structures
DE102007037476A1 (en) * 2007-08-08 2009-04-23 Adam Gillich Flexible wall covering for building, providing protection against flooding by high water level, comprises plastic tarpaulin anchored-down in surrounding trench
US20160076268A1 (en) * 2013-05-09 2016-03-17 Floodbreak, Llc Self-actuating flood guard
CN208267150U (en) * 2018-04-04 2018-12-21 广州城建职业学院 A kind of construction wall with water-proof function
WO2019217902A1 (en) * 2018-05-11 2019-11-14 Ghw Solutions, Llc Systems and methods for flood prevention and pest control
CN210713354U (en) * 2019-09-18 2020-06-09 刘军超 Waterproof structure of building wall
CN210737804U (en) * 2019-09-11 2020-06-12 陈凯斌 Waterproof building net for sponge city planning and construction
CN211396309U (en) * 2019-11-20 2020-09-01 广东康君实业发展有限公司 Waterproof roofing structure of building
CN211665964U (en) * 2019-11-20 2020-10-13 玉环市建筑设计院有限公司 Building waterproof board for sponge city planning construction

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090000214A1 (en) * 2007-02-01 2009-01-01 Newman Stanley Integrated, high strength, lightweight, energy efficient building structures
DE102007037476A1 (en) * 2007-08-08 2009-04-23 Adam Gillich Flexible wall covering for building, providing protection against flooding by high water level, comprises plastic tarpaulin anchored-down in surrounding trench
US20160076268A1 (en) * 2013-05-09 2016-03-17 Floodbreak, Llc Self-actuating flood guard
CN208267150U (en) * 2018-04-04 2018-12-21 广州城建职业学院 A kind of construction wall with water-proof function
WO2019217902A1 (en) * 2018-05-11 2019-11-14 Ghw Solutions, Llc Systems and methods for flood prevention and pest control
CN210737804U (en) * 2019-09-11 2020-06-12 陈凯斌 Waterproof building net for sponge city planning and construction
CN210713354U (en) * 2019-09-18 2020-06-09 刘军超 Waterproof structure of building wall
CN211396309U (en) * 2019-11-20 2020-09-01 广东康君实业发展有限公司 Waterproof roofing structure of building
CN211665964U (en) * 2019-11-20 2020-10-13 玉环市建筑设计院有限公司 Building waterproof board for sponge city planning construction

Also Published As

Publication number Publication date
CN112627364B (en) 2021-11-12

Similar Documents

Publication Publication Date Title
CN209429304U (en) A kind of double rank sliding friction dampers of brace type
CN112627364B (en) Waterproof building net for sponge city planning and construction
CN108443395A (en) A kind of parallel buffer of double rods and its application
CN116770978B (en) Antidetonation steel construction
CN213836346U (en) Reinforcing device with anti-seismic structure for bridge
CN211200285U (en) Protection device is used in sluice pier construction
CN210800077U (en) Sealed effectual control valve for water conservancy water and electricity
CN216304555U (en) Dykes and dams for hydraulic engineering with buffer function
CN113323534B (en) Steel supporting structure for shock protection
CN214579835U (en) Boats and ships electrical equipment damping device
CN213142895U (en) Anti-collision device for bridge pier
CN213926838U (en) Novel spring structure
CN110480613B (en) Multi-degree-of-freedom hydraulic artificial muscle workbench
CN114197677A (en) Viscous damper based on displacement amplification
CN211228987U (en) Anti-collision device for shockproof joints of house building
CN208268305U (en) A kind of antidetonation device for exploitated ore machinery
CN207839125U (en) A kind of underwater pollutant cutting and grinding device for hydraulic engineering
CN217028268U (en) Protection canopy for building engineering
CN219754953U (en) Damping structure of front hydraulic cylinder
CN219432760U (en) Water supply and drainage construction pipe
CN113685616B (en) Pipeline strutting arrangement is used in subway antidetonation construction
CN218374511U (en) Viscous damper supporting structure for damping of public building
CN219118077U (en) High pile wharf structure
CN211082962U (en) Flap valve for environmental protection system
CN215590968U (en) Protection device in ship repair dock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant