CN211647233U - Supporting device of assembled overhanging scaffold - Google Patents

Supporting device of assembled overhanging scaffold Download PDF

Info

Publication number
CN211647233U
CN211647233U CN201921821014.4U CN201921821014U CN211647233U CN 211647233 U CN211647233 U CN 211647233U CN 201921821014 U CN201921821014 U CN 201921821014U CN 211647233 U CN211647233 U CN 211647233U
Authority
CN
China
Prior art keywords
steel
pull rod
cantilever
spliced
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921821014.4U
Other languages
Chinese (zh)
Inventor
李迥
董春山
雷建
陈彦红
胡维腾
陈云
周丹静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sunyoung Construction Group Co ltd
Original Assignee
Sunyoung Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sunyoung Construction Group Co ltd filed Critical Sunyoung Construction Group Co ltd
Priority to CN201921821014.4U priority Critical patent/CN211647233U/en
Application granted granted Critical
Publication of CN211647233U publication Critical patent/CN211647233U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a supporting device of an assembled cantilever scaffold, which comprises a first pre-embedded anchoring part, a second pre-embedded anchoring part, a cantilever steel beam and a spliced diagonal draw bar; the cantilever steel beam comprises an I-shaped steel and a head steel plate, the head steel plate is welded at one end of the I-shaped steel, and the head steel plate is connected with the lower layer through a first pre-embedded anchoring part; a steel pipe for positioning and connecting the upright rod of the scaffold is arranged on the I-shaped steel; the I-shaped steel is provided with a bolt, the bolt is used for connecting a spliced diagonal draw bar, one end of the bolt is welded and fixed on a side wing plate of the I-shaped steel, and the bolt and the steel pipe are arranged in a staggered manner; one end of the spliced diagonal draw bar is fixed with the upper layer through the second pre-embedded anchoring part, and the other end of the spliced diagonal draw bar is connected with the bolt on the I-shaped steel, so that the other end of the spliced diagonal draw bar is connected with the I-shaped steel. The shaping processing and manufacturing of the cantilever type steel beam component are realized, no welding operation is carried out on a construction site, the processing and manufacturing quality of a welding joint is guaranteed, and the turnover use efficiency of the section steel cantilever beam is increased due to the use of the shaping component.

Description

Supporting device of assembled overhanging scaffold
Technical Field
The utility model relates to a building engineering field specifically, relates to an assembled scaffold frame's supporting arrangement that encorbelments.
Background
The overhanging scaffold mainly adopts the anchoring overhanging type steel beam on the floor surface of a structure, one part of the overhanging type steel beam is anchored in the floor, the other part of the overhanging type steel beam is overhanging outside the structure, and an enclosure form of the scaffold is built on the upper part of overhanging type steel, so that the overhanging type steel beam is the most important protection facility for building structure construction, and particularly, the overhanging type scaffold for high-rise building structure construction is more widely used and becomes one of the most important protection systems for high-rise building structure construction.
The cantilever type scaffold supporting system is mainly a cantilever scaffold system made of profile steel according to engineering requirements in the prior conventional method, cantilever profile steel is fixed by adopting pre-embedded 'n' -shaped round steel in a structural floor slab, and a part profile steel with large cantilever length is added with a welding groove steel inclined strut at the bottom close to the tail end of a cantilever beam so as to enhance the bending resistance of the cantilever beam, and a vertical pipe is erected and is generally temporarily spot-welded on the cantilever profile steel. This kind of scaffold frame requires anchor length not less than 1.25 times of the length of encorbelmenting according to the standard, consequently, the quantity of the shaped steel of encorbelmenting is great relatively, and one item of most one of this kind of scaffold frame is done simultaneously, scaffold frame supporting system constructs the accessory and recycles very seldom, the anchor of shaped steel outrigger is because pre-buried "nearly" font round steel in addition, the space is great, the shaped steel of encorbelmenting will be fixed, need fill in the wedge billet at pre-buried "nearly" font round steel top, it takes time to set up, the material is wasted charge, and material reuse efficiency and work efficiency are all relatively low, and shaped steel outrigger passes through inside and outside the floor, can influence the construction of.
At present, U bolts are embedded in cast-in-place concrete floors, customized steel sheets and fastening bolts are used as steel anchoring parts of cantilever steel sections, the cantilever scaffold is improved slightly, steel anchoring measures are improved slightly, but the cantilever scaffold still does not change the inner and outer sides of the outer wall of the floor, the construction of the outer wall and the floor partition wall of the two structures is influenced, the construction quality of the two structures is mainly reflected, the construction period of the whole two structures is influenced, and the construction process of the two structures of a project is not facilitated.
Also there is pre-buried in the structural formula of pulling up scaffold strutting arrangement that encorbelments at present, through the retrieval, chinese patent publication is CN 205777424U's utility model patent, discloses an anchor in the formula of pulling up scaffold strutting arrangement that encorbelments outside the structure, including pre-buried device, force I-steel roof beam, connecting plate, high strength bolt, go up pull rod device and top anchor system, pre-buried device be the steel embedded sleeve pipe of length with the wall thickness, force I-steel roof beam pass through high strength bolt anchor, high strength bolt passes and sets up in pre-buried cover intraductally, top anchor system is high strength bolt anchor, the tightening means of steel pull rod is that two-way turn buckle screws up, top anchor system position, the back sets up the steel backing plate. However, in the above patent, the wall-through bolt is adopted to anchor the bearing I-shaped steel and the upper pull rod, and the construction of the two structures is carried out before the scaffold is dismantled, and the wall-through bolt is adopted to influence the outer wall plugging construction in the outer wall construction, and meanwhile, the existence of the outer wall-through bolt hole can also become a hidden trouble point of outer wall leakage.
The application number is 201810588066.5, and the Chinese patent discloses an assembled steel cantilever scaffold and a construction method thereof, wherein the cantilever steel part comprises I-shaped steel, an end plate and a channel steel adjusting beam, one end of each of two channel steels of the channel steel adjusting beam is welded and fixed on the end plate, and the end plate and a building structure are fixed through split bolts and nuts; the pull rod assembly comprises a wall angle adjusting piece, an upper pull rod, a turn buckle and a lower pull rod, the wall angle adjusting piece and the building structure are fixedly connected through a split bolt and a nut, the wall angle adjusting piece and one end of the upper pull rod are connected through a bolt and a nut in a locking mode, the other end of the upper pull rod is connected with one end of the turn buckle in a threaded mode, the other end of the turn buckle is connected with one end of the lower pull rod in a threaded mode, and the other end of the lower pull rod is connected with the lug plate in a locking mode through a bolt and a nut. However, the above patent adopts the wall-through split bolt to suspend the anchoring piece of the cantilever steel and the outer end pull rod, the wall-through split bolt also affects the construction of the outer wall, and the bolt hole of the outer wall also becomes a major hidden trouble point of the leakage of the outer wall, so that the defect of affecting the construction quality of the outer wall exists.
SUMMERY OF THE UTILITY MODEL
To the defect among the prior art, the utility model aims at providing an assembled scaffold frame's of encorbelmenting supporting arrangement.
According to the utility model provides a supporting device of an assembled cantilever scaffold, the supporting device comprises a first pre-embedded anchoring part, a second pre-embedded anchoring part, a cantilever steel beam and a splicing type diagonal draw bar; wherein,
the first embedded anchoring part is arranged at the end part of the lower layer of the existing main body structure;
the second embedded anchoring part is arranged at the upper end part of the existing main body structure;
the cantilever steel beam comprises an I-shaped steel and a head steel plate, the head steel plate is welded at one end of the I-shaped steel, and the head steel plate is connected with the end part of the lower layer through the first embedded anchoring part;
the upper side wing plate of the I-shaped steel is provided with a steel pipe for positioning and connecting the scaffold upright rod;
bolts are arranged on the upper side wing plate of the I-shaped steel close to the outer end and used for connecting the spliced diagonal draw bars, one ends of the bolts are welded and fixed on the side wing plate, and the bolts and the steel pipes are arranged in a staggered mode;
the spliced diagonal draw bar is arranged above the cantilever steel beam, one end of the spliced diagonal draw bar is passed through the second pre-embedded anchoring piece and the upper end part of the cantilever steel beam are fixed, and the other end of the spliced diagonal draw bar is connected with the side wing plate of the I-shaped steel through the bolt.
Preferably, the first embedded anchoring part comprises a first L-shaped embedded part screw, a first gasket and a first fastening double nut, and the first gasket is arranged between the end socket steel plate and the first fastening double nut and used for increasing the contact area between the first fastening double nut and the end socket steel plate.
Preferably, two first bolt holes are symmetrically formed in two sides of the end socket steel plate web and used for being connected with the first embedded anchoring piece, and one end of the L-shaped embedded part screw penetrates through the first bolt holes and is fixed through the first fastening double nuts.
Preferably, the spliced diagonal draw bar is formed by splicing an upper section of draw bar, a lower section of draw bar and an adjusting middle section, wherein,
the upper end part of the upper section pull rod is provided with a second bolt hole which is used for connecting the second embedded anchoring piece;
a third bolt hole is formed in the lower end portion of the lower section pull rod and used for being connected with the bolt on the side wing plate of the I-shaped steel;
an adjustable bolt lock catch is arranged on the adjusting middle section;
the adjusting middle section is connected with the upper section pull rod and the lower section pull rod through the adjustable bolt lock catch respectively and is used for adjusting the length of the spliced type diagonal pull rod to ensure that the spliced type diagonal pull rod is in a stressed and tensioned state.
Preferably, the upper section pull rod is prefabricated by using bar steel, the upper end part of the upper section pull rod is a first rectangular plate-shaped part, and the second bolt hole is formed in the center of the first rectangular plate-shaped part;
the lower section pull rod is prefabricated by strip steel, the lower end portion of the lower section pull rod is a second rectangular plate-shaped component, and the third bolt hole is formed in the center of the second rectangular plate-shaped component.
Preferably, the adjusting middle section comprises two rectangular steel plates which are arranged face to face, two upper-section adjustable bolt locks and two lower-section adjustable bolt locks are arranged on the two rectangular steel plates and respectively penetrate through the two rectangular steel plates, so that a crack is formed between two opposite surfaces of the two rectangular steel plates, the upper-section pull rod and the lower-section pull rod are respectively inserted into two ends of the crack, the upper-section pull rod is connected with the upper-section adjustable bolt locks, and the lower-section pull rod is connected with the lower-section adjustable bolt locks.
Preferably, the second embedded anchor comprises a second L-shaped embedded part screw, a second gasket and a second fastening double nut, and the second gasket is arranged between the upper end of the upper section pull rod and the second fastening double nut and used for increasing the contact area between the second fastening double nut and the upper end of the upper section pull rod.
Preferably, the cantilever steel beam comprises a plurality of cantilever steel beams and a plurality of spliced diagonal draw bars; the number of the spliced diagonal draw bars is less than that of the cantilever steel beams.
Preferably, the diameter of the steel pipe is smaller than the diameter of the scaffold.
Compared with the prior art, the utility model discloses at least one kind's beneficial effect as follows has:
the utility model discloses above-mentioned device realized cantilever type girder steel component regularization processing preparation, respectively assemble the component and can be at the prefabricated processing in the mill, and the job site does not have the welding jobs, has guaranteed welded joint's processing preparation quality, and the use of regularization component has increased the turnover availability factor of shaped steel cantilever beam.
Furthermore, the first pre-embedded anchoring piece, the second pre-embedded anchoring piece and the profile steel are fixed in the device, so that the influence on the structural outer wall can be reduced, particularly, the plugging construction of the two structures is realized, and meanwhile, the hidden danger of water seepage after the conventional through-wall bolt hole is plugged in the prior art is avoided.
Further, the utility model discloses above-mentioned device each is assembled and is connected between the component more convenient, and on the other hand supporting outrigger length has reduced, and the conventional outrigger length of comparing is short a lot, and the weight of outrigger has alleviateed, alleviates the intensity of labour of workman's transport shaped steel outrigger, has improved the labor efficiency of the installation of each component in the supporting dress.
Further, the utility model discloses adopt concatenation formula diagonal draw bar among the above-mentioned device, it installs more conveniently, and the labour can be practiced thrift 30% in the building of same girth, supporting arrangement's installation, saves time 40%, and social is obvious.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a first pre-embedded anchor according to an embodiment of the present invention;
FIG. 3 is a cross-sectional view taken at A-A of FIG. 1;
fig. 4a is a schematic structural view of an upper segment link according to an embodiment of the present invention;
fig. 4b is a schematic structural view of a lower segment link according to an embodiment of the present invention;
fig. 4c is a schematic structural diagram of an adjusting middle section according to an embodiment of the present invention;
fig. 5 is a schematic structural view of an overhanging steel beam according to an embodiment of the present invention;
fig. 6 is a schematic perspective view of an embodiment of the present invention;
in the figure: the scaffold comprises I-shaped steel 1, bolts 2, steel pipes 3, end enclosure steel plates 4, spliced diagonal draw bars 5, upper section pull bars 5-1, lower section pull bars 5-2, adjusting middle sections 6, upper section adjustable bolt lock catches 6-1, lower section adjustable bolt lock catches 6-2, first L-shaped embedded part screw rods 7-1, first gaskets 7-2, first fastening double nuts 7-3, second L-shaped embedded part screw rods 8-1, second fastening double nuts 8-2, an upper layer 9-1 of a main body structure, a lower layer 9-2 of the main body structure and scaffold upright rods 10.
Detailed Description
The present invention will be described in detail with reference to the following embodiments. The following examples will assist those skilled in the art in further understanding the present invention, but are not intended to limit the invention in any way. It should be noted that various changes and modifications can be made by one skilled in the art without departing from the spirit of the invention. These all belong to the protection scope of the present invention.
Hereinafter, "first" and "second" are used merely for convenience of description, and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present embodiment, "a plurality" means two or more unless otherwise specified.
Referring to fig. 1, which is a schematic structural diagram of a supporting device of an assembled cantilever scaffold according to a preferred embodiment of the present invention, the supporting device includes two first pre-embedded anchors, two second pre-embedded anchors, a cantilever steel beam, and a spliced diagonal draw bar 5; the first pre-embedded anchoring piece is pre-embedded in reinforced concrete at the end part of a lower layer reinforced concrete structure 9-2 of the existing main body structure; the second pre-embedded anchoring piece is pre-embedded in reinforced concrete at the end part of the upper layer reinforced concrete structure 9-1 of the existing main body structure.
The cantilever steel beam comprises an I-steel 1 and an end socket steel plate 4, the end socket steel plate 4 is welded at one end of the I-steel 1, and the end socket steel plate 4 is connected with the end part of the lower layer reinforced concrete structure 9-2 through two first embedded anchoring parts.
The upper side wing plate of the I-steel 1 is provided with a steel pipe 3 for positioning and connecting the scaffold upright stanchion 10, the diameter of the steel pipe 3 is smaller than that of the scaffold upright stanchion 10, and the scaffold upright stanchion 10 is sleeved on the steel pipe 3.
During specific implementation, a plurality of steel pipes 3 are arranged at certain intervals along the length direction of the I-shaped steel 1, and the bottom ends of the steel pipes 3 are welded with the upper side wing plate of the I-shaped steel 1. As another preferred embodiment, a short steel pipe having a length of less than 100mm is used for the steel pipe 3. The bolt 2 is arranged at the position, close to the outer end, of the upper side wing plate of the I-shaped steel 1, the bolt 2 is used for being connected with the spliced diagonal draw bar 5, one end of the bolt 2 is welded and fixed on the side wing plate, and the bolt 2 and the steel pipe 3 are arranged on the upper side wing plate of the I-shaped steel 1 in a staggered mode.
The spliced diagonal draw bar 5 is arranged above the cantilever steel beam, one end of the spliced diagonal draw bar is fixed with the end part of the upper reinforced concrete structure 9-1 through the second pre-embedded anchoring part, the other end of the spliced diagonal draw bar 5 is connected with the side wing plate upper bolt 2 of the I-shaped steel 1 through bolting, and the other end of the spliced diagonal draw bar 5 is connected with the I-shaped steel 1.
Above-mentioned supporting arrangement has realized that all components all adopt the standard component form to assemble, and component easy dismounting, the length of the girder steel of encorbelmenting among the device compares conventional cantilever beam length of cantilever frame and is short a lot, when saving steel, component weight alleviates greatly, dismouting safety risk reduces, has reduced operating personnel's working strength simultaneously.
In other preferred embodiments, referring to fig. 2, the first embedment anchor includes a first L-shaped embedment screw 7-1, a first washer 7-2 and a first fastening double nut 7-3, the L-end of the first L-shaped embedment screw 7-1 is embedded in the reinforced concrete, and the straight section is threaded. The first gasket 7-2 is arranged between the end socket steel plate 4 and the first fastening double-screw 7-3 and used for increasing the contact area between the first fastening double-screw 7-3 and the end socket steel plate 4, so that the shearing force of the fastening force generated when the first fastening double-screw 7-3 fastens the end socket steel plate 4 is reduced, and the effect of protecting the end socket steel plate 4 is better achieved.
Referring to fig. 3, two first bolt holes are symmetrically formed in two sides of a web plate of the head steel plate 4 and used for connecting a first embedded anchor, in the specific implementation, the position of a first L-shaped embedded part screw 7-1 corresponds to the two first bolt holes of the head steel plate 4, and one end of the first L-shaped embedded part screw 7-1 penetrates through the first bolt holes and is fixed through a first fastening double nut 7-3.
In other preferred embodiments, referring to fig. 1, 4a, 4b and 4c, the spliced diagonal draw bar 5 is formed by splicing an upper section draw bar 5-1, a lower section draw bar 5-2 and an adjusting middle section 6, wherein the upper section draw bar 5-1 is made of strip steel, the upper end of the upper section draw bar 5-1 is provided with two second bolt holes, and the second bolt holes are used for connecting second pre-buried anchors; the lower section pull rod 5-2 is also made of strip steel, and a third bolt hole is formed in the lower end portion of the lower section pull rod 5-2 and used for being connected with a bolt 2 on a side wing plate of the I-steel 1; the adjusting middle section 6 is provided with an adjustable bolt lock catch, and the adjusting middle section 6 is respectively connected with the upper section pull rod 5-1 and the lower section pull rod 5-2 through the adjustable bolt lock catch and is used for adjusting the length of the spliced type diagonal draw bar 5 and ensuring that the spliced type diagonal draw bar 5 is in a stressed and tensioned state.
Referring to fig. 4a, the upper section pull rod 5-1 is made of strip steel, the upper end portion of the upper section pull rod 5-1 is a first rectangular plate-shaped part, two second bolt holes are formed in the center of the first rectangular plate-shaped part and used for connecting a second L-shaped embedded part screw 8-1, and one end of the second L-shaped embedded part screw 8-1 penetrates through the second bolt holes and is fixed through a second fastening double nut 8-2.
Referring to fig. 4b, the lower tie rod 5-2 is prefabricated by using a bar steel, the lower end of the lower tie rod 5-2 is a second rectangular plate-shaped member, and a third bolt hole is formed in the center of the second rectangular plate-shaped member.
The second embedded anchor comprises a second L-shaped embedded part screw 8-1, a second gasket and a second fastening double nut 8-2, the L end of the second L-shaped embedded part screw 8-1 is embedded in the reinforced concrete, and the straight section is threaded. In specific implementation, the position of the second L-shaped embedded part screw 8-1 corresponds to a second bolt hole at the upper end part of the upper section pull rod 5-1. The second gasket is arranged between the upper end part (rectangular plate-shaped component) of the upper section pull rod 5-1 and the second fastening double nut 8-2 and is used for increasing the contact area between the second fastening double nut 8-2 and the upper end part (rectangular plate-shaped component) of the upper section pull rod 5-1, so that the shearing force of the fastening force generated when the second fastening double nut 8-2 is fastened on the upper end part (rectangular plate-shaped component) can be reduced, and the effect of better protecting the upper end part rectangular plate-shaped component is achieved.
Referring to fig. 4c, the adjusting middle section 6 comprises two rectangular steel plates, the two rectangular steel plates are arranged face to face, two upper section adjustable bolt lock catches 6-1 and two lower section adjustable bolt lock catches 6-2 are arranged on the two rectangular steel plates, the upper section adjustable bolt lock catches 6-1 and the lower section adjustable bolt lock catches 6-2 respectively penetrate through the two rectangular steel plates, and a crack is formed between the two opposite surfaces of the two rectangular steel plates. An upper section pull rod 5-1 and a lower section pull rod 5-2 are respectively inserted from two ends of a crack, then the upper section pull rod 5-1 is connected with an upper section adjustable bolt lock catch 6-1, the lower section pull rod 5-2 is connected with a lower section adjustable bolt lock catch 6-2, and two rectangular steel plates are respectively fastened with the upper section pull rod 5-1 and the lower section pull rod 5-2 by adopting two adjustable bolt lock catches.
In other preferred embodiments, as shown in fig. 5 and 6, the supporting device includes a plurality of cantilever steel beams and a plurality of spliced diagonal braces, the number of the spliced diagonal braces being less than the number of the cantilever steel beams, for example: a plurality of steel beams of encorbelmenting are arranged at the interval on existing major structure, set up a concatenation formula diagonal draw bar on the steel beam of encorbelmenting at interval.
In the construction of a certain new high-rise building, for guarantee major structure construction safety and outer wall decoration construction, need adopt scaffold enclosure, ordinary floor scaffold receives the restriction of setting up the height can not satisfy major structure construction needs, consequently, need adopt the scaffold of encorbelmenting that sets up from low to high segmentation, refer to fig. 1, 5, fig. 6 and show, adopt the supporting arrangement of above-mentioned assembled scaffold of encorbelmenting in this construction, explain further the utility model discloses a structural feature. The specific construction can comprise the following steps:
firstly, carrying out plane arrangement and structural design of a supporting device according to the high-rise building structure design drawing, and carrying out safety analysis and calculation on the supporting device;
secondly, according to the design of the supporting device, preparing materials and processing and manufacturing corresponding components (cantilever steel beams, the spliced inclined pull rods 5 and the pre-buried anchoring pieces) in a factory, and transporting the components to a construction site in batches;
thirdly, pre-burying a first L-shaped pre-buried screw 7-1 of a first pre-buried anchoring piece before sealing the formwork of the floor structure concrete formwork according to the plane arrangement of the cantilever steel beams, and reliably fixing the pre-buried screw until the concrete pouring is finished;
fourthly, after the concrete strength reaches C10 or above, as shown in figure 5, installing a plurality of cantilever steel beams on the lower-layer concrete structure 9-2 at intervals, connecting the end socket steel plate 4 of each cantilever steel beam with the first pre-embedded L-shaped screw 7-1 of the first pre-embedded anchoring piece, and screwing the cantilever steel beams through first fastening double nuts 7-3 so as to anchor and install the cantilever steel beam profile steel;
fifthly, arranging the scaffold upright stanchions 10 at the positions of the steel pipes 3 at the tops of the overhanging steel beams, and directly sleeving the scaffold upright stanchions 10 on the steel pipes 3 to realize the position fixation of the scaffold steel pipes 3, wherein the scaffold upright stanchions 10 cannot generate deviation under the action of external force;
sixthly, pre-embedding a second L-shaped pre-embedded part screw 8-1 of a second pre-embedded anchoring part before pouring concrete of the upper layer reinforced concrete structure 9-1, and reliably fixing the second L-shaped pre-embedded part screw until the pouring of the concrete is finished;
seventhly, after the strength of the upper-layer concrete reaches above C10, connecting and installing the spliced diagonal draw bar 5, connecting the upper end part of the upper-section draw bar 5-1 with a second L-shaped embedded part screw rod, and screwing the upper-section draw bar 5-1 and the upper-layer concrete structure 9-1 through a second fastening double nut 8-2; the lower end part of the lower section pull rod 5-2 is connected with a bolt 2 on an upper side wing plate of the I-shaped steel 1 through the bolt 2, and therefore the reinforced upper pull rod is installed.
After above-mentioned step, accomplished the installation of the supporting device that the scaffold frame of encorbelmenting set up, operating personnel can carry out the setting up of the scaffold frame of encorbelmenting of this structure construction at the top of the scaffold frame of lower part, and the scaffold frame pole setting 10 of encorbelmenting, horizontal pole and auxiliary facilities demolish the completion back, and the girder steel of encorbelmenting can be demolishd to the bolt of can unscrewing on the top backing plate of lower part scaffold frame in standing, and each component of the corresponding supporting device of categorised recovery, component rate of recovery reuse is high, and the turnover.
In summary, in this embodiment, on one hand, the components are manufactured by shaping processing, so that the connection between the components is more convenient, on the other hand, the length of the supporting cantilever beam (cantilever steel beam) is reduced, the weight of the cantilever beam is reduced, the labor intensity of workers for carrying the section steel cantilever beam is reduced, the labor efficiency of installation of each component in the supporting device is improved, due to the adoption of the upper pull rod, the installation of the supporting device is more convenient than that of the lower supporting device, the labor force can be saved by 30%, the time can be saved by 40% for the building with the same perimeter, and the social benefit is obvious.
All the parts used in this document can be standard parts or common technologies, if not detailed, and can be purchased from the market, the specific connection mode of each part can be conventional means such as bolts, rivets and welding, etc., which are mature in the prior art, the machinery, parts and electrical equipment are conventional models in the prior art, and the circuit connection is conventional in the prior art, which is easy to be realized by those skilled in the art, and no specific description is given here.
The foregoing description of the specific embodiments of the invention has been presented. It is to be understood that the present invention is not limited to the specific embodiments described above, and that various changes and modifications may be made by those skilled in the art within the scope of the appended claims without departing from the spirit of the invention.

Claims (9)

1. The supporting device of the assembled cantilever scaffold is characterized by comprising a first pre-embedded anchoring piece, a second pre-embedded anchoring piece, a cantilever steel beam and a spliced diagonal draw bar; wherein,
the first embedded anchoring part is arranged at the end part of the lower layer of the existing main body structure;
the second embedded anchoring part is arranged at the upper end part of the existing main body structure;
the cantilever steel beam comprises an I-shaped steel and a head steel plate, the head steel plate is welded at one end of the I-shaped steel, and the head steel plate is connected with the end part of the lower layer through the first embedded anchoring part;
the upper side wing plate of the I-shaped steel is provided with a steel pipe for positioning and connecting the scaffold upright rod;
bolts are arranged on the upper side wing plate of the I-shaped steel close to the outer end and used for connecting the spliced diagonal draw bars, one ends of the bolts are welded and fixed on the side wing plate, and the bolts and the steel pipes are arranged in a staggered mode;
the spliced diagonal draw bar is arranged above the cantilever steel beam, one end of the spliced diagonal draw bar is passed through the second pre-embedded anchoring piece and the upper end part of the cantilever steel beam are fixed, and the other end of the spliced diagonal draw bar is connected with the side wing plate of the I-shaped steel through the bolt.
2. The supporting device of an assembled cantilever scaffold according to claim 1, wherein the first pre-buried anchor comprises a first L-shaped pre-buried part screw, a first gasket and a first fastening double nut, and the first gasket is arranged between the end socket steel plate and the first fastening double nut and used for increasing the contact area between the first fastening double nut and the end socket steel plate.
3. The supporting device of an assembled cantilever scaffold according to claim 2, wherein two first bolt holes are symmetrically formed on both sides of the head steel plate web for connecting the first embedded anchor, and one end of the L-shaped embedded part screw rod passes through the first bolt holes and is fixed by the first fastening double nut.
4. The supporting device of an assembled cantilever scaffold of claim 1, wherein the spliced diagonal draw bar is composed of an upper segment draw bar, a lower segment draw bar and an adjusting middle segment splice, wherein,
the upper end part of the upper section pull rod is provided with a second bolt hole which is used for connecting the second embedded anchoring piece;
a third bolt hole is formed in the lower end portion of the lower section pull rod and used for being connected with the bolt on the side wing plate of the I-shaped steel;
an adjustable bolt lock catch is arranged on the adjusting middle section;
the adjusting middle section is connected with the upper section pull rod and the lower section pull rod through the adjustable bolt lock catch respectively and is used for adjusting the length of the spliced type diagonal pull rod to ensure that the spliced type diagonal pull rod is in a stressed and tensioned state.
5. The supporting device of an assembled cantilever scaffold according to claim 4, wherein the upper section tie rod is prefabricated by using bar steel, the upper end of the upper section tie rod is a first rectangular plate-shaped member, and the second bolt hole is arranged at the center of the first rectangular plate-shaped member;
the lower section pull rod is prefabricated by strip steel, the lower end portion of the lower section pull rod is a second rectangular plate-shaped component, and the third bolt hole is formed in the center of the second rectangular plate-shaped component.
6. A supporting apparatus of a fabricated cantilever scaffold according to claim 4, the adjusting middle section comprises two rectangular steel plates which are arranged face to face, two upper-section adjustable bolt lock catches and two lower-section adjustable bolt lock catches are arranged on the two rectangular steel plates, the upper-section adjustable bolt lock catch and the lower-section adjustable bolt lock catch respectively penetrate through the two rectangular steel plates to form a crack between two opposite surfaces of the two rectangular steel plates, the upper section pull rod and the lower section pull rod are respectively inserted from two ends of the crack, the upper section pull rod is connected with the upper section adjustable bolt in a locking way, the lower section pull rod is connected with the lower section adjustable bolt through a lock catch, and the two rectangular steel plates are fastened with the upper section pull rod and the lower section pull rod through the upper section adjustable bolt lock catch and the lower section adjustable bolt lock catch respectively.
7. The supporting device of an assembled cantilever scaffold of claim 4, wherein the second pre-buried anchor comprises a second L-shaped pre-buried part screw, a second gasket and a second fastening double nut, the second gasket is arranged between the upper end of the upper section pull rod and the second fastening double nut for increasing the contact area between the second fastening double nut and the upper end of the upper section pull rod.
8. The supporting device of a fabricated cantilever scaffold according to any one of claims 1 to 7, comprising a plurality of cantilever steel beams and a plurality of spliced diagonal draw bars; the number of the spliced diagonal draw bars is less than that of the cantilever steel beams.
9. A support arrangement for a fabricated overhanging scaffold according to any one of claims 1 to 7 wherein the diameter of the steel tube is smaller than the diameter of the scaffold.
CN201921821014.4U 2019-10-28 2019-10-28 Supporting device of assembled overhanging scaffold Expired - Fee Related CN211647233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921821014.4U CN211647233U (en) 2019-10-28 2019-10-28 Supporting device of assembled overhanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921821014.4U CN211647233U (en) 2019-10-28 2019-10-28 Supporting device of assembled overhanging scaffold

Publications (1)

Publication Number Publication Date
CN211647233U true CN211647233U (en) 2020-10-09

Family

ID=72691103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921821014.4U Expired - Fee Related CN211647233U (en) 2019-10-28 2019-10-28 Supporting device of assembled overhanging scaffold

Country Status (1)

Country Link
CN (1) CN211647233U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725525A (en) * 2019-10-28 2020-01-24 舜元建设(集团)有限公司 Supporting device of assembled cantilever scaffold and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725525A (en) * 2019-10-28 2020-01-24 舜元建设(集团)有限公司 Supporting device of assembled cantilever scaffold and construction method thereof

Similar Documents

Publication Publication Date Title
CN109736353B (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN110725525A (en) Supporting device of assembled cantilever scaffold and construction method thereof
CN110306774B (en) Method and device for installing socket type cantilever scaffold
CN111236604A (en) Safe construction method for cantilever platform on cylinder main body structure
CN112144854A (en) Anchor pulling type section steel overhanging support operation scaffold combined system and construction method
CN105421748A (en) Anchoring device of cantilever scaffold
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN212535008U (en) Overhanging scaffold system
CN111472530A (en) Flower basket pull rod I-shaped steel cantilever bearing frame for constructional engineering and mounting method thereof
CN211647233U (en) Supporting device of assembled overhanging scaffold
CN114753610A (en) Construction method of basket type overhanging scaffold
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN213597442U (en) Elevator shaft template operation platform that encorbelments
CN115573513A (en) Bolt connection structure of precast beam and precast column and construction method
CN115637810A (en) Large-space special-shaped honeycomb aluminum plate ceiling structure and construction method
CN211691535U (en) Assembled platform of unloading of encorbelmenting
CN212336729U (en) Formwork supporting system
CN209837654U (en) Connecting structure of diagonal outer frame type scaffold
CN209907886U (en) Adjustable assembled stair construction platform
CN110952767A (en) Assembled bolt connection scaffold wall connecting piece and mounting method
CN111608376A (en) Comprehensive construction method for shaping component
CN220013390U (en) Sideslip-preventing double-jack type long cantilever bent cap template bracket system
CN215368613U (en) Shaped steel hangs outrigger external corner construction structures
CN213806532U (en) Wall connecting support and scaffold wall connecting device
CN212105058U (en) Assembled structure roofing cantilever frame device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009