CN211646718U - Assembled steel construction building top layer beam column connecting piece - Google Patents
Assembled steel construction building top layer beam column connecting piece Download PDFInfo
- Publication number
- CN211646718U CN211646718U CN201922445024.9U CN201922445024U CN211646718U CN 211646718 U CN211646718 U CN 211646718U CN 201922445024 U CN201922445024 U CN 201922445024U CN 211646718 U CN211646718 U CN 211646718U
- Authority
- CN
- China
- Prior art keywords
- steel
- bolt
- locking mechanism
- link
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model belongs to the technical field of the building technique and specifically relates to an assembled steel construction building top layer beam column connecting piece, including the link, the both sides of link are all connected on the steel column through fixed establishment, two sets of backup pads of fixedly connected with in the link, two reinforcing plates of fixedly connected with between two sets of backup pads, movable groove has been seted up between two reinforcing plates, all be equipped with the spread groove between every group backup pad and the link, movable groove intercommunication spread groove, the girder steel has been placed in the spread groove, threaded hole has all been seted up to the both sides of link, every screw hole all is connected with locking mechanism, screw hole is all passed through to every locking mechanism's one end, locking mechanism runs through girder steel and backup. The utility model discloses simple structure is worth promoting.
Description
Technical Field
The utility model relates to a building technical field especially relates to an assembled steel construction building top layer beam column connecting piece.
Background
With the development of modern industrial technology, the building can be manufactured in batches like machine production, and only prefabricated building components are transported to a construction site to be assembled. The steel frame that present factory building adopted the steel construction is mostly set up, and the speed of setting up is worn, and the installation of being convenient for and dismantlement exist between the beam column that has now that the erection joint intensity is weak, the poor problem of reliability, have caused the situation that can't use by a large scale.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the weak shortcoming of connected node intensity among the prior art, and the assembled steel construction building top layer beam column connecting piece that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an assembled steel construction building top layer beam column connecting piece, includes the link, the both sides of link are all connected on the steel column through fixed establishment, two sets of backup pads of fixedly connected with in the link, and are two sets of two reinforcing plates of fixedly connected with between the backup pad, two movable groove has been seted up between the reinforcing plate, every group the backup pad with all be equipped with the spread groove between the link, movable groove intercommunication the spread groove, the girder steel has been placed in the spread groove, threaded hole has all been seted up to the both sides of link, every the screw hole all is connected with locking mechanism, every locking mechanism's one end all passes through the screw hole, locking mechanism runs through in proper order the girder steel with the backup pad.
Preferably, the fixing mechanism includes a fixing plate, the fixing plate is fixed to the connecting frame, one side of the fixing plate contacts with the steel column, a first bolt is fixedly connected to the fixing plate, one end of the first bolt penetrates through the fixing plate and the steel column in sequence, and one end of the first bolt is connected with a first nut in a threaded manner.
Preferably, the connecting frame and the supporting plate are of an integral structure.
Preferably, the two sets of support plates are parallel to each other.
Preferably, the locking mechanism comprises a second bolt, the second bolt is located in the threaded hole, one end of the second bolt penetrates through the steel beam and the supporting plate in sequence, and one end of the second bolt is in threaded connection with a second nut.
Preferably, both sides of the reinforcing plate are fixedly connected with reinforcing ribs.
The utility model provides an assembled steel construction building top layer beam column connecting piece, beneficial effect lies in:
through fixed plate, first bolt and first nut structure, through first bolt and first nut, fix the fixed plate on the steel column, it is fixed with the link, connect the girder steel through the spread groove, second bolt and second nut fix the girder steel in the backup pad, and steel column and girder steel junction intensity are big, the good reliability.
Drawings
Fig. 1 is a schematic structural view of an assembly type steel structure building top beam column connecting piece provided by the utility model;
fig. 2 is a schematic diagram of a right-side view structure of the fabricated steel structure building top beam-column connecting piece provided by the utility model;
fig. 3 is the utility model provides an assembled steel construction building top layer beam column connecting piece overlook the schematic structure.
In the figure: the steel column fixing device comprises a connecting frame 1, a fixing plate 2, a first bolt 3, a steel column 4, a first nut 5, a supporting plate 6, a connecting groove 7, a movable groove 8, a threaded hole 9, a reinforcing plate 10, a second bolt 11, a second nut 12, a steel beam 13 and a reinforcing rib 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1-3, an assembled steel construction building top layer beam column connecting piece, including link 1, the both sides of link 1 all connect on steel column 4 through fixed establishment, two sets of backup pad 6 of fixedly connected with in the link 1, the effect of backup pad 6 is to support girder steel 13, two sets of backup pad 6 are parallel to each other, link 1 and backup pad 6 structure as an organic whole, two reinforcing plates 10 of fixedly connected with between two sets of backup pad 6, the effect of reinforcing plate 10 is the support intensity of enhancement backup pad 6, the equal fixedly connected with strengthening rib 14 in both sides of reinforcing plate 10, the effect of strengthening rib 14 is the hardness that strengthens reinforcing plate 10.
Example 2
Referring to fig. 1-3, as another preferred embodiment of the present invention, the difference from embodiment 1 lies in that the fixing mechanism includes a fixing plate 2, the fixing plate 2 is fixed on the connecting frame 1, one side of the fixing plate 2 contacts with a steel column 4, a first bolt 3 is fixedly connected to the fixing plate 2, the fixing plate 2 is fixed by the first bolt 3, one end of the first bolt 3 sequentially penetrates through the fixing plate 2 and the steel column 4, one end of the first bolt 3 is connected with a first nut 5, the first nut 5 is used for locking the first bolt 3, so that the steel column 4 is tightly attached to the fixing plate 2, and the connecting frame 1 is fixed.
Example 3
Referring to fig. 1-3, as another preferred embodiment of the present invention, the difference from embodiment 1 is that the locking mechanism includes a second bolt 11, the second bolt 11 is located in the threaded hole 9, one end of the second bolt 11 sequentially penetrates through the steel beam 13 and the supporting plate 6, one end of the second bolt 11 is threadedly connected to a second nut 12, the second bolt 11 penetrates through the steel beam 13, and is locked by the second nut 12 to fix the steel beam 13 on the supporting plate 6.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The assembly type steel structure building top beam column connecting piece comprises a connecting frame (1) and is characterized in that two sides of the connecting frame (1) are connected to a steel column (4) through fixing mechanisms, two groups of supporting plates (6) are fixedly connected in the connecting frame (1), two reinforcing plates (10) are fixedly connected between the two groups of supporting plates (6), a movable groove (8) is formed between the two reinforcing plates (10), a connecting groove (7) is formed between each group of supporting plates (6) and the connecting frame (1), the movable groove (8) is communicated with the connecting groove (7), a steel beam (13) is placed in the connecting groove (7), threaded holes (9) are formed in two sides of the connecting frame (1), each threaded hole (9) is connected with a locking mechanism, one end of each locking mechanism passes through the threaded hole (9), the locking mechanism penetrates through the steel beam (13) and the supporting plate (6) in sequence.
2. The assembly type steel structure building top beam-column connecting member according to claim 1, wherein the fixing mechanism comprises a fixing plate (2), the fixing plate (2) is fixed on the connecting frame (1), one side of the fixing plate (2) is in contact with the steel column (4), a first bolt (3) is fixedly connected to the fixing plate (2), one end of the first bolt (3) penetrates through the fixing plate (2) and the steel column (4) in sequence, and one end of the first bolt (3) is in threaded connection with a first nut (5).
3. An assembled steel structure building roof beam column connection according to claim 1, characterized in that the connection frame (1) and the support plate (6) are of one-piece construction.
4. An assembled steel structural building roof beam column connection according to claim 1, characterised in that the two sets of support plates (6) are parallel to each other.
5. An assembled steel structure building roof beam column connection according to claim 1, characterized in that the locking mechanism comprises a second bolt (11), the second bolt (11) is located in the threaded hole (9), one end of the second bolt (11) penetrates the steel beam (13) and the support plate (6) in sequence, and one end of the second bolt (11) is connected with a second nut (12) in a threaded manner.
6. An assembled steel structure building roof beam column connection according to claim 1, characterized in that reinforcing bars (14) are fixedly connected to both sides of the reinforcing plate (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922445024.9U CN211646718U (en) | 2019-12-30 | 2019-12-30 | Assembled steel construction building top layer beam column connecting piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922445024.9U CN211646718U (en) | 2019-12-30 | 2019-12-30 | Assembled steel construction building top layer beam column connecting piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211646718U true CN211646718U (en) | 2020-10-09 |
Family
ID=72701261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922445024.9U Active CN211646718U (en) | 2019-12-30 | 2019-12-30 | Assembled steel construction building top layer beam column connecting piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211646718U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112302175A (en) * | 2020-10-30 | 2021-02-02 | 梁国莉 | Beam column connecting structure for high-rise building steel reinforced concrete composite structure |
-
2019
- 2019-12-30 CN CN201922445024.9U patent/CN211646718U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112302175A (en) * | 2020-10-30 | 2021-02-02 | 梁国莉 | Beam column connecting structure for high-rise building steel reinforced concrete composite structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108661174B (en) | Discontinuous section column conversion node and construction method thereof | |
US8820012B2 (en) | Integrated localization steel frame used in lightweight steel building | |
CN203334425U (en) | Steel structure unit and steel structure system | |
CN211646718U (en) | Assembled steel construction building top layer beam column connecting piece | |
CN110630015A (en) | Large-span steel bar truss floor support plate assembled support and construction method | |
CN108589914B (en) | Self-resetting frame structure and construction method | |
CN211873032U (en) | Large-span regular splayed prestressed truss steel support | |
CN214994627U (en) | Space steel structure node | |
CN211816937U (en) | Assembled building frame | |
CN211774625U (en) | H-shaped steel and reinforced concrete column hinged joint | |
CN211690769U (en) | Steel structure supporting node component | |
CN212078336U (en) | T-shaped connecting structure of building top plate and building wallboard | |
CN110173058B (en) | Assembled composite two-stage energy dissipation damper | |
CN203879037U (en) | Inclined strut widening structure for reconstruction of in-use platform | |
CN112267562A (en) | Assembled steel truss beam column connection part | |
CN203859400U (en) | Bus framework for 110kV outdoor power distribution unit | |
CN108978890B (en) | Prefabricated main beam and secondary beam composite connection node and connection method thereof | |
CN207436260U (en) | The assembling type steel structure occlusion splicing system of node rigid connection | |
CN211312816U (en) | Assembled steel construction building fixed establishment | |
CN212772782U (en) | Variable steel frame for super high-rise building construction | |
CN105604254A (en) | Construction C-shaped steel | |
CN212053450U (en) | Steel construction assembled wallboard | |
CN211621607U (en) | Transverse connecting piece in prestressed truss type steel support | |
CN214575675U (en) | Reinforced structure of building reinforced concrete beam template | |
CN205527351U (en) | Be applied to hinged -support and tower crane of tower crane base girder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |