CN211646527U - Channel construction desilting ship - Google Patents
Channel construction desilting ship Download PDFInfo
- Publication number
- CN211646527U CN211646527U CN201921179045.4U CN201921179045U CN211646527U CN 211646527 U CN211646527 U CN 211646527U CN 201921179045 U CN201921179045 U CN 201921179045U CN 211646527 U CN211646527 U CN 211646527U
- Authority
- CN
- China
- Prior art keywords
- cabin
- winch
- ship
- hull
- control room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 238000000576 coating method Methods 0.000 claims abstract description 5
- 210000000078 claw Anatomy 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000004809 Teflon Substances 0.000 claims description 3
- 229920006362 Teflon® Polymers 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000010802 sludge Substances 0.000 claims 3
- 239000011248 coating agent Substances 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 108010066278 cabin-4 Proteins 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009916 joint effect Effects 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a channel construction desilting ship, including hull and main control room, the hull includes silt cabin, rudder cabin, ballast tank and cabin, its characterized in that from the bow to the stern in proper order: the utility model discloses a desilting device, including hull, silt cabin, inlet and outlet, the hull top is close to bow department and is equipped with the desilting device, silt cabin top is equipped with into mud mouth, the inlet passes through hose connection in desilting device, desilting device one side is equipped with first winch, the pulley of installation on the winch passes through wire rope connection jib, the pulley hangs in the desilting device through wire rope, the hull top is located and is equipped with hoisting platform between master control room and the winch. This practicality has following advantage: not only can some to the silt in the river course clear up, can also make things convenient for the location to snatch, the multi-angle is diversified snatchs, easy operation, easy storage, can prevent the wearing and tearing of gripper through wear-resistant coating, increase of service life more is applicable to the complicated changeable aquatic production operation construction requirement of target.
Description
Technical Field
The utility model relates to a boats and ships technical field specifically indicates a channel construction desilting ship.
Background
Along with the progress and development of society and science and technology, the requirement for construction on water is higher and higher, usually before channel engineering construction, the silt in the river course is cleared up, and the desilting ship for dredging channel construction at present adopts metal dredging head to carry out desilting under water, not only need carry out the desilting engineering, still need to snatch the operation with some places that the relative position is more complicated around the channel, the condition is changeable. The chinese invention patent No. CN205475393U discloses a dredging boat for channel construction, which can only perform dredging operation, but cannot meet the requirement of multi-angle and multi-directional grabbing.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome above technical problem, provide a channel construction desilting ship.
For solving the technical problem, the utility model provides a technical scheme is a channel construction desilting ship, including hull and main control room, the hull includes silt cabin, rudder cabin, ballast tank and cabin, its characterized in that from the bow to the stern in proper order: the utility model discloses a desilting device, including hull top, silt cabin top, inlet and outlet, dredging device, rope connection jib, hoisting machine, storage bin, locating pile, hoisting platform, hoisting machine, dredging device, hoisting machine, storage bin, locating pile, dredging device, hoisting machine, storage bin, dredging device, hoisting machine, storage bin, locating pile, dredging device, hoisting machine, dredging device, hoisting machine.
Preferably, the hoisting platform comprises a rotary base and a base, a fixed seat and a second winch are arranged on the base, a support arm connected with the second winch is arranged on the fixed seat, grabbing equipment is arranged on the support arm, the support arm is connected with the fixed seat and the grabbing equipment through a rotary joint, and the grabbing equipment comprises a hydraulic telescopic arm and a spherical manipulator.
Preferably, four mechanical claws are arranged on the spherical mechanical arm, and the inner sides of the mechanical claws are coated with Teflon wear-resistant coatings.
Preferably, the spherical manipulator is connected with the hydraulic telescopic arm through a spherical joint capable of rotating at multiple angles.
Compared with the prior art, the utility model have following advantage: not only can some to the silt in the river course clear up, can also make things convenient for the location to snatch, the multi-angle is diversified snatchs, easy operation, easy storage, can prevent the wearing and tearing of gripper through wear-resistant coating, increase of service life more is applicable to the complicated changeable aquatic production operation construction requirement of target.
Drawings
Fig. 1 is the utility model discloses a channel construction desilting ship structure sketch map.
Fig. 2 is the utility model discloses a channel construction desilting ship's structure plan view.
Fig. 3 is the utility model discloses a ball-type manipulator structure sketch map of channel construction desilting ship.
As shown in the figure: 1. the device comprises a hull, 2, a main control room, 3, a silt cabin, 4, a rudder cabin, 5, a ballast cabin, 6, a cabin, 7, a desilting device, 8, a silt inlet, 9, a hose, 10, a first winch, 11, a steel wire rope, 12, a suspender, 13, a pulley, 14, a hoisting platform, 15, a storage tank, 16, a positioning pile, 17, a rotating base, 18, a base, 19, a fixed base, 20, a second winch, 21, a support arm, 22, a grabbing device, 23, a rotating joint, 24, a hydraulic telescopic arm, 25, a spherical manipulator, 26 and a mechanical claw.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
With reference to the attached drawings, the channel construction desilting ship comprises a ship body 1 and a main control room 2, wherein the ship body 1 sequentially comprises a silt cabin 3, a rudder cabin 4, a ballast cabin 5 and a cabin 6 from the bow to the stern, and is characterized in that: 1 top of hull is close to bow department and is equipped with dredging device 7, 3 tops in silt cabin are equipped with into mud mouth 8, it connects in dredging device 7 through hose 9 to advance mud mouth 8, dredging device 7 one side is equipped with first hoist engine 10, first hoist engine 10 passes through the pulley 13 of installation on 11 connection jibs of wire rope 12, pulley 13 hangs in dredging device 7 through wire rope 11, 1 top of hull is located and is equipped with hoisting platform 14 between master-control room 2 and the first hoist engine 10, 1 top of hull is located and is equipped with bin 15 between master-control room 2 and hoisting platform 14, 1 top of hull is located and is equipped with guide pile 16 between master-control room 2 and the bin 15.
The hoisting platform 14 comprises a rotating base 17 and a base 18, a fixed base 19 and a second winch 20 are arranged on the base 18, a support arm 21 connected with the second winch 20 is arranged on the fixed base 19, grabbing equipment 22 is arranged on the support arm 21, the support arm 21 is connected with the fixed base 19 and the grabbing equipment 22 through a rotating joint 23, and the grabbing equipment 22 comprises a hydraulic telescopic arm 24 and a spherical manipulator 25.
The spherical manipulator 25 is provided with four mechanical claws 26, and the inner sides of the mechanical claws 26 are coated with Teflon wear-resistant coatings.
The spherical manipulator 25 is connected with the hydraulic telescopic arm 24 through a spherical joint capable of rotating at multiple angles.
The utility model discloses an operating personnel controls first winch in the master control room, and the wire rope that loosens transfers the desilting device to the silt face, and operating personnel starts the desilting device in the master control room, and the desilting device begins to inhale silt, discharges the silt that inhales into the silt cabin; can also be through master control room control hoist and mount platform, the base can be rotatory under rotating base's effect, and through support arm and second hoist engine cooperation activity, four gripper can be more convenient stable snatch multiple material, and can the multi-angle diversified snatch under spherical joint's effect, article snatch the back and can pass through spherical joint, realize the fixed point under the mating reaction of rotary joint and support arm and put in, the bin is used for depositing the material of snatching, do benefit to the channel operation construction very much.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.
Claims (4)
1. The utility model provides a channel construction desilting ship, includes hull (1) and main control room (2), hull (1) includes silt cabin (3), rudder cabin (4), ballast tank (5) and cabin (6) from the bow to the stern in proper order, its characterized in that: a dredging device (7) is arranged at the top of the ship body (1) close to the bow, a sludge inlet (8) is arranged at the top of the sludge cabin (3), the sludge inlet (8) is connected with the dredging device (7) through a hose (9), a first winch (10) is arranged on one side of the dredging device (7), the first winch (10) is connected with a pulley (13) arranged on a suspender (12) through a steel wire rope (11), the pulley (13) is hung on the dredging device (7) through a steel wire rope (11), a hoisting platform (14) is arranged between the main control room (2) and the first winch (10) at the top of the ship body (1), a storage box (15) is arranged between the main control room (2) and the hoisting platform (14) at the top of the ship body (1), and a positioning pile (16) is arranged between the main control room (2) and the storage box (15) at the top of the ship body (1).
2. The dredging ship for channel construction according to claim 1, wherein: the hoisting platform (14) comprises a rotating base (17) and a base (18), a fixed seat (19) and a second winch (20) are arranged on the base (18), a support arm (21) connected with the second winch (20) is arranged on the fixed seat (19), grabbing equipment (22) is arranged on the support arm (21), the support arm (21) is connected with the fixed seat (19) and the grabbing equipment (22) through a rotating joint (23), and the grabbing equipment (22) comprises a hydraulic telescopic arm (24) and a spherical manipulator (25).
3. The dredging ship for channel construction according to claim 2, wherein: four mechanical claws (26) are arranged on the spherical manipulator (25), and the inner sides of the mechanical claws (26) are coated with Teflon wear-resistant coatings.
4. The dredging ship for channel construction according to claim 2, wherein: the spherical manipulator (25) is connected with the hydraulic telescopic arm (24) through a spherical joint capable of rotating at multiple angles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921179045.4U CN211646527U (en) | 2019-07-25 | 2019-07-25 | Channel construction desilting ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921179045.4U CN211646527U (en) | 2019-07-25 | 2019-07-25 | Channel construction desilting ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211646527U true CN211646527U (en) | 2020-10-09 |
Family
ID=72682022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921179045.4U Expired - Fee Related CN211646527U (en) | 2019-07-25 | 2019-07-25 | Channel construction desilting ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211646527U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115126030A (en) * | 2022-07-13 | 2022-09-30 | 昆明捷程桩工有限责任公司 | Underwater dredging movable multifunctional operation platform and operation mode |
-
2019
- 2019-07-25 CN CN201921179045.4U patent/CN211646527U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115126030A (en) * | 2022-07-13 | 2022-09-30 | 昆明捷程桩工有限责任公司 | Underwater dredging movable multifunctional operation platform and operation mode |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104002932B (en) | Marine fault boats and ships are carried out the ship type of rapid uplift maintenance | |
CN108502110B (en) | Drop tube stone throwing ship | |
CN204078021U (en) | Marine fault boats and ships are carried out to the new herbicide of rapid uplift maintenance | |
CN102139750A (en) | Underwater object lifting device | |
KR100397362B1 (en) | Ships for the production and / or loading / unloading and transportation of hydrocarbons from offshore areas and for carrying out oil well operations | |
CN214451663U (en) | Overwater pole type equipment system | |
CN211646527U (en) | Channel construction desilting ship | |
Ishiguro et al. | Development of the pilot system for test of excavating and ore lifting of seafloor polymetallic sulfides | |
CN104097750B (en) | A kind of multi-functional repair and maintenance ship | |
JP2016067249A (en) | Recovery device and method for floating fish reef | |
CN202186494U (en) | Diving support ship with detachable type positioning anchor rack | |
US3187447A (en) | Dredge with nozzle means for mixing air and water before emission thereof from said nozzle | |
CN109372047A (en) | A kind of three way ropes position system suitable for cutter suction dredger | |
CN113772044A (en) | Offshore single-point mooring replacement and maintenance method | |
CN203186550U (en) | Multifunctional maintenance vessel | |
CN207049436U (en) | Siphon piping slideway platform for lining | |
CN209099428U (en) | A kind of three way ropes position system of cutter suction dredger | |
CN209099429U (en) | A kind of three way ropes position system applied to cutter suction dredger | |
CN206623969U (en) | A kind of water-jet extra large cable fishing device | |
CN208181366U (en) | A kind of cable ship moving device | |
AU745877B2 (en) | Floating loading hose | |
CN205931171U (en) | Novel multi -functional automatic barge | |
CN218909565U (en) | Buoy installation tool suitable for narrow sea pipe operation line | |
CN218317228U (en) | Construction equipment suitable for underwater equipment is buried underground | |
CN214401939U (en) | Cutter suction ship convenient for butt joint of stern tube and self-floating tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201009 |