CN211643451U - Waste material clearing device for civil engineering - Google Patents

Waste material clearing device for civil engineering Download PDF

Info

Publication number
CN211643451U
CN211643451U CN202020177719.3U CN202020177719U CN211643451U CN 211643451 U CN211643451 U CN 211643451U CN 202020177719 U CN202020177719 U CN 202020177719U CN 211643451 U CN211643451 U CN 211643451U
Authority
CN
China
Prior art keywords
fixedly connected
base
fixed
civil engineering
waste material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020177719.3U
Other languages
Chinese (zh)
Inventor
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020177719.3U priority Critical patent/CN211643451U/en
Application granted granted Critical
Publication of CN211643451U publication Critical patent/CN211643451U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a waste material clearing device for civil engineering, including base, year workbin, handrail and movable wheel, the top fixedly connected with supporting shoe of base, and the inside swing joint of supporting shoe has the spliced pole, the bottom fixedly connected with movable wheel of base, one side of base is provided with fixed knot and constructs, the one end fixedly connected with connecting block of base, and the one end fixedly connected with handrail of connecting block, the inside of base is provided with the structure of unloading. The utility model discloses a be provided with fixed knot structure in one side of base and fly leaf, and the installation piece is fixed on the base, and the joint hook is fixed on the fly leaf, and the atress piece passes through the gim peg to be fixed and can lift in a flexible way on the installation piece, lifts the handle and drives the atress piece activity to can drive solid fixed ring buckle on the joint hook, this setting can make the fly leaf open and fixed, and fixed knot structure's setting makes the device unload more conveniently, and is clean more convenient.

Description

Waste material clearing device for civil engineering
Technical Field
The utility model relates to a clean technical field of civil engineering specifically is a waste material clearing device for civil engineering.
Background
The civil engineering is to survey, design, plan, construct and so on the region by using equipment and materials before the engineering construction, also refers to the engineering of constructing the ground, underground or water area, when the project construction, a large amount of waste materials are generated, in order to follow the principle of environmental protection, the waste materials need to be cleaned and transported in a centralized way, but the prior waste material cleaning and transporting device for the civil engineering has many problems or defects:
firstly, after the traditional waste material clearing device for civil engineering is used, the cleaning of the interior of the clearing device is troublesome, so that the device is not beneficial to cleaning;
secondly, the conventional waste material clearing device for civil engineering wastes time and labor when discharging the waste materials, so that the working efficiency of the device is poor;
thirdly, when the conventional waste material clearing device for civil engineering is cleared, the waste material generated by engineering has large damage to the interior of the device due to weak internal strength, so that the service life of the device is poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a waste material clearing device for civil engineering to what provide is unfavorable for in solving above-mentioned background art clean, the not good and not good problem of life of work efficiency.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a waste material clearing device for civil engineering, includes the base, carries workbin, handrail and movable wheel, the top fixedly connected with supporting shoe of base, and the inside swing joint of supporting shoe has the spliced pole, the bottom fixedly connected with movable wheel of base, one side of base is provided with fixed knot constructs, the one end fixedly connected with connecting block of base, and the one end fixedly connected with handrail of connecting block, the inside of base is provided with the structure of unloading, the one end fixedly connected with of spliced pole carries the workbin, and carries one side fixedly connected with loose axle of workbin, the inside swing joint of loose axle has the fly leaf, the inside of carrying the workbin is provided with additional strengthening.
Preferably, fixed knot constructs's inside has set gradually atress piece, solid fixed ring, joint hook, gim peg, installation piece and handle, one side fixedly connected with base of installation piece, one side fixedly connected with fly leaf of joint hook, the inside of the piece of installing runs through there is the gim peg, and the one end and the other end swing joint of gim peg have the atress piece.
Preferably, the inside swing joint of atress piece has solid fixed ring, and solid fixed ring's top swing joint has the joint hook, the bottom fixedly connected with handle of atress piece.
Preferably, the inside of the structure of unloading has set gradually fixed block, linking piece, telescopic link and mounting groove, the bottom fixed connection of fixed block has the case of carrying, the mounting groove sets up in the inside of base, the inside swing joint of fixed block has the linking piece.
Preferably, the bottom end of the connecting block is fixedly connected with a telescopic rod, an installation groove is formed in the outer side of the telescopic rod, and the bottom end of the telescopic rod is fixedly connected with a base.
Preferably, reinforcing plate, cavity and strengthening rib have set gradually in additional strengthening's inside, the bottom fixed connection of reinforcing plate has the bin of carrying, the inside of reinforcing plate is provided with the cavity, and the inside fixedly connected with strengthening rib of cavity, the strengthening rib is evenly distributed in the inside of cavity.
Compared with the prior art, the beneficial effects of the utility model are that: this waste material clearing device for civil engineering is rational in infrastructure, has following advantage:
(1) the fixed structure is arranged on one side of the base and one side of the movable plate, the mounting block is fixed on the base, the clamping hook is fixed on the movable plate, the stress block is fixed on the mounting block through the fixing bolt and can be flexibly lifted, the lifting handle drives the stress block to move, so that the fixing ring can be driven to be clamped on the clamping hook, the movable plate can be opened and fixed through the arrangement, and the device is more convenient to unload and clean due to the arrangement of the fixed structure;
(2) the discharging structure is arranged in the base, the telescopic rod can be controlled to stretch by adjusting the control box, the telescopic rod jacks the connecting block when lifted, the upper end of the connecting block is connected with the fixed block, and the top end of the fixed block is fixedly provided with the material carrying box, so that the lifting angle of the material carrying box is driven, waste materials in the device are discharged under the action of the gravitational force, the time and the labor are saved, and the working efficiency of the device is higher due to the arrangement of the discharging structure;
(3) through set up additional strengthening on the inside bottom plate of carrying the workbin, and the inside cavity that is provided with of reinforcing plate, the strengthening rib is the water vertical state and fixes in the inside of cavity, and the strengthening rib is evenly distributed in the cavity simultaneously, and the reinforcing plate has strengthened the bearing capacity who carries the inside bottom plate of workbin, and the setting up of strengthening rib strengthens the intensity and the toughness of reinforcing plate, has further strengthened the bearing capacity of bottom plate, and additional strengthening's setting makes device life longer.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a front view of the fixing structure of the present invention;
FIG. 3 is a schematic view of the front cross-sectional structure of the discharging structure of the present invention;
fig. 4 is an enlarged schematic structural diagram of a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a support block; 3. connecting columns; 4. a fixed structure; 401. a stress block; 402. a fixing ring; 403. clamping hooks; 404. a fixing bolt; 405. mounting blocks; 406. a grip; 5. a movable plate; 6. a movable shaft; 7. a material loading box; 8. a handrail; 9. connecting blocks; 10. a discharging structure; 1001. a fixed block; 1002. a joining block; 1003. a telescopic rod; 1004. mounting grooves; 11. a movable wheel; 12. a reinforcing structure; 1201. a reinforcing plate; 1202. a cavity; 1203. and (5) reinforcing ribs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a waste material clearing device for civil engineering, which comprises a base 1, a material loading box 7, a handrail 8 and a movable wheel 11, wherein the top end of the base 1 is fixedly connected with a supporting block 2, and the inside of the supporting block 2 is movably connected with a connecting column 3, the bottom end of the base 1 is fixedly connected with a movable wheel 11, one side of the base 1 is provided with a fixed structure 4, the inside of the fixed structure 4 is sequentially provided with a stress block 401, a fixed ring 402, a clamping hook 403, a fixed bolt 404, an installation block 405 and a handle 406, one side of the installation block 405 is fixedly connected with the base 1, one side of the clamping hook 403 is fixedly connected with a movable plate 5, the inside of the installation block 405 is penetrated with the fixed bolt 404, one end and the other end of the fixing bolt 404 are movably connected with a stress block 401, the interior of the stress block 401 is movably connected with a fixing ring 402, the top end of the fixing ring 402 is movably connected with a clamping hook 403, and the bottom end of the stress block 401 is fixedly connected with a handle 406;
specifically, as shown in fig. 1 and fig. 2, in use, the fixing structure 4 is arranged on one side of the base 1 and the movable plate 5, the mounting block 405 is fixed on the base 1, the clamping hook 403 is fixed on the movable plate 5, the stress block 401 is fixed on the mounting block 405 through the fixing bolt 404 and can be flexibly lifted, the lifting handle 406 drives the stress block 401 to move, so that the fixing ring 402 can be driven to be clamped on the clamping hook 403, the movable plate 5 can be opened and fixed through the arrangement, and the arrangement of the fixing structure 4 enables the device to be more convenient to unload and clean;
one end of the base 1 is fixedly connected with a connecting block 9, one end of the connecting block 9 is fixedly connected with a handrail 8, a discharging structure 10 is arranged inside the base 1, a fixing block 1001, a connecting block 1002, an expansion link 1003 and a mounting groove 1004 are sequentially arranged inside the discharging structure 10, the bottom end of the fixing block 1001 is fixedly connected with a material loading box 7, the mounting groove 1004 is arranged inside the base 1, the inside of the fixing block 1001 is movably connected with the connecting block 1002, the bottom end of the connecting block 1002 is fixedly connected with an expansion link 1003, the outer side of the expansion link 1003 is provided with the mounting groove 1004, and the bottom end of the expansion link 1003 is fixedly;
specifically, as shown in fig. 1 and 3, when the device is used, the discharging structure 10 is arranged inside the base 1, the adjusting control box can control the telescopic rod 1003 to stretch and retract, the telescopic rod 1003 pushes the connecting block 1002 when lifted, the upper end of the connecting block 1002 is connected with the fixed block 1001, and the top end of the fixed block 1001 is fixed with the material loading box 7, so that the material loading box 7 is driven to lift by an angle, waste materials in the device are discharged under the action of earth gravity, time and labor are saved, and the working efficiency of the device is higher due to the arrangement of the discharging structure 10;
one end of the connecting column 3 is fixedly connected with a material loading box 7, one side of the material loading box 7 is fixedly connected with a movable shaft 6, the interior of the movable shaft 6 is movably connected with a movable plate 5, the interior of the material loading box 7 is provided with a reinforcing structure 12, the interior of the reinforcing structure 12 is sequentially provided with a reinforcing plate 1201, a cavity 1202 and reinforcing ribs 1203, the bottom end of the reinforcing plate 1201 is fixedly connected with the material loading box 7, the interior of the reinforcing plate 1201 is provided with the cavity 1202, the interior of the cavity 1202 is fixedly connected with the reinforcing ribs 1203, and the reinforcing ribs 1203 are uniformly distributed in the cavity 1202;
specifically, as shown in fig. 1 and 4, in use, by arranging the reinforcing structure 12 on the inner bottom plate of the material loading box 7, and arranging the cavity 1202 inside the reinforcing plate 1201, the reinforcing ribs 1203 are fixed inside the cavity 1202 in a water-perpendicular state, and the reinforcing ribs 1203 are uniformly distributed in the cavity 1202, the reinforcing plate 1201 enhances the bearing capacity of the inner bottom plate of the material loading box 7, the strength and toughness of the reinforcing plate 1201 are enhanced by the arrangement of the reinforcing ribs 1203, the bearing capacity of the bottom plate is further enhanced, and the service life of the device is longer due to the arrangement of the reinforcing structure 12.
The working principle is as follows: when the device is used, firstly, the fixing structure 4 is arranged on one side of the base 1 and the movable plate 5, the mounting block 405 is fixed on the base 1, the clamping hook 403 is fixed on the movable plate 5, the stress block 401 is fixed on the mounting block 405 through the fixing bolt 404 and can be flexibly lifted, the lifting handle 406 drives the stress block 401 to move, so that the fixing ring 402 can be driven to be clamped on the clamping hook 403, the movable plate 5 can be opened and fixed through the arrangement, and the device is more convenient to unload and clean due to the arrangement of the fixing structure 4;
secondly, the discharging structure 10 is arranged in the base 1, the telescopic rod 1003 can be controlled to stretch and retract by adjusting the control box, the telescopic rod 1003 pushes the connecting block 1002 when lifted, the upper end of the connecting block 1002 is connected with the fixed block 1001, and the top end of the fixed block 1001 is fixedly provided with the material loading box 7, so that the material loading box 7 is driven to lift by an angle, waste materials in the device are discharged under the action of gravity, time and labor are saved, and the working efficiency of the device is higher due to the arrangement of the discharging structure 10;
finally, through setting up additional strengthening 12 on the inside bottom plate of carrying workbin 7, and the inside cavity 1202 that is provided with of reinforcing plate 1201, strengthening rib 1203 is the water vertical state and fixes in the inside of cavity 1202, strengthening rib 1203 is evenly distributed in cavity 1202 simultaneously, reinforcing plate 1201 has strengthened the bearing capacity of carrying workbin 7 inside bottom plate, the setting up of strengthening rib 1203 strengthens the intensity and the toughness of reinforcing plate 1201, the bearing capacity of bottom plate has further been strengthened, additional strengthening 12's setting makes device life longer.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a waste material clearing device for civil engineering, includes base (1), carries workbin (7), handrail (8) and activity wheel (11), its characterized in that: the utility model discloses a portable electronic device, including base (1), top fixedly connected with supporting shoe (2), and the inside swing joint of supporting shoe (2) has spliced pole (3), the bottom fixedly connected with running wheel (11) of base (1), one side of base (1) is provided with fixed knot constructs (4), the one end fixedly connected with connecting block (9) of base (1), and the one end fixedly connected with handrail (8) of connecting block (9), the inside of base (1) is provided with unloading structure (10), the one end fixed connection of spliced pole (3) has workbin (7), and carries one side fixedly connected with loose axle (6) of workbin (7), the inside swing joint of loose axle (6) has fly leaf (5), the inside of workbin (7) is provided with additional strengthening (12).
2. The waste material clearing device for civil engineering work of claim 1, characterized in that: the inside of fixed knot structure (4) has set gradually atress piece (401), solid fixed ring (402), joint hook (403), gim peg (404), installation piece (405) and handle (406), one side fixedly connected with base (1) of installation piece (405), one side fixedly connected with fly leaf (5) of joint hook (403), the inside of installing piece (405) is run through has gim peg (404), and the one end and the other end swing joint of gim peg (404) have atress piece (401).
3. The waste material clearing device for civil engineering work of claim 2, characterized in that: the inside swing joint of atress piece (401) has solid fixed ring (402), and the top swing joint of solid fixed ring (402) has joint hook (403), the bottom fixedly connected with handle (406) of atress piece (401).
4. The waste material clearing device for civil engineering work of claim 1, characterized in that: the inside of structure (10) of unloading has set gradually fixed block (1001), links up piece (1002), telescopic link (1003) and mounting groove (1004), the bottom fixed connection of fixed block (1001) has a workbin (7), mounting groove (1004) set up in the inside of base (1), the inside swing joint of fixed block (1001) has links up piece (1002).
5. The waste material clearing device for civil engineering work of claim 4, characterized in that: the bottom end of the connecting block (1002) is fixedly connected with an expansion rod (1003), an installation groove (1004) is formed in the outer side of the expansion rod (1003), and a base (1) is fixedly connected to the bottom end of the expansion rod (1003).
6. The waste material clearing device for civil engineering work of claim 1, characterized in that: the reinforced structure is characterized in that a reinforced plate (1201), a cavity (1202) and reinforcing ribs (1203) are sequentially arranged inside the reinforced structure (12), a loading box (7) is fixedly connected to the bottom end of the reinforced plate (1201), the cavity (1202) is arranged inside the reinforced plate (1201), the reinforcing ribs (1203) are fixedly connected inside the cavity (1202), and the reinforcing ribs (1203) are uniformly distributed inside the cavity (1202).
CN202020177719.3U 2020-02-17 2020-02-17 Waste material clearing device for civil engineering Expired - Fee Related CN211643451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020177719.3U CN211643451U (en) 2020-02-17 2020-02-17 Waste material clearing device for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020177719.3U CN211643451U (en) 2020-02-17 2020-02-17 Waste material clearing device for civil engineering

Publications (1)

Publication Number Publication Date
CN211643451U true CN211643451U (en) 2020-10-09

Family

ID=72684725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020177719.3U Expired - Fee Related CN211643451U (en) 2020-02-17 2020-02-17 Waste material clearing device for civil engineering

Country Status (1)

Country Link
CN (1) CN211643451U (en)

Similar Documents

Publication Publication Date Title
CN211643451U (en) Waste material clearing device for civil engineering
CN101503168B (en) Sling cart for fully-mechanized mining working surface push conveyer
CN209837140U (en) Manual hole digging pile construction device
CN213914718U (en) Efficient sand screening equipment for civil engineering
CN203049587U (en) Multifunctional concrete storehouse surface placing boom
CN209114490U (en) A kind of hydraulic template trolley pouring concrete suitable for side slope protection Vierendeel girder
CN111441412A (en) Dredging pretreatment device and dredging robot
CN213892565U (en) Loader for building engineering
CN210098179U (en) Sand screening installation
CN201305415Y (en) Fully-mechanized mining working surface scraper conveyor sling cart
CN211444939U (en) Foundation pit earthwork outward transportation equipment
CN217461508U (en) Cement hanging flower basket device for building engineering construction
CN212924061U (en) Mining well-bucket with automatic emptying function
CN221072626U (en) Bored pile head cleaning equipment
CN212479280U (en) Reinforced support for coal mining
CN110980504A (en) A turn over sediment soil collecting box for super deep shaft construction vertical transport system
CN216997320U (en) Prefabricated T roof beam template dismouting hoist
CN210854299U (en) Concrete prefabricated section handling device
CN217894978U (en) Movable hoisting device
CN216342152U (en) Portal type hole bottom accumulated slag cleaning device based on TBM synchronous lining construction
CN215258680U (en) Unloader on loader with adjustable
CN209277557U (en) Assembly type waste tank can be had enough to meet the need
CN2510614Y (en) Truck-mounted multi-purpose engineering drill rig
CN211817831U (en) Scaffold for construction of subway tunnel main body structure
CN215055297U (en) A reserve template for main equipment basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009