CN211817831U - Scaffold for construction of subway tunnel main body structure - Google Patents

Scaffold for construction of subway tunnel main body structure Download PDF

Info

Publication number
CN211817831U
CN211817831U CN202020018788.XU CN202020018788U CN211817831U CN 211817831 U CN211817831 U CN 211817831U CN 202020018788 U CN202020018788 U CN 202020018788U CN 211817831 U CN211817831 U CN 211817831U
Authority
CN
China
Prior art keywords
scaffold
construction
subway tunnel
frame body
scaffold frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020018788.XU
Other languages
Chinese (zh)
Inventor
包高强
祁智斌
吴祥
徐永彪
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, PowerChina 11th Bureau Engineering Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN202020018788.XU priority Critical patent/CN211817831U/en
Application granted granted Critical
Publication of CN211817831U publication Critical patent/CN211817831U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a scaffold frame for subway tunnel major structure construction, the scaffold frame body passes through chain fall and stiff end swing joint before the scaffold frame body, and the scaffold frame body comprises a plurality of horizontal poles and montant, is equipped with running gear and jack bottom the scaffold frame body, and running gear installs and locates at partial center montant bottom, jack upper end top are in the horizontal pole on, the chain fall can stimulate whole scaffold frame body and carry out the bulk movement in subway tunnel, a plurality of jack can support the scaffold frame body. The beneficial effects are as follows: the scaffold can keep wholly removing, reduces the scaffold and demolishs, transports, sets up artifical, material and the time consumption of in-process such as again, and its equipment is simple, with low costs, has guaranteed the progress that subway tunnel major structure scaffold set up, the effectual efficiency of construction that has improved.

Description

Scaffold for construction of subway tunnel main body structure
Technical Field
The utility model relates to a field of construction scaffold frame especially indicates a scaffold frame for subway tunnel major structure construction.
Background
The traditional scaffold erection construction of the main structure of the subway tunnel is to start erection construction after the floor concrete reaches the specified strength. The defects of the scaffold erection mode are as follows: firstly, the construction time required to be built is long, and the subsequent construction time is delayed; secondly, the material utilization rate is too low, and the time is consumed for dismantling, finishing and transporting; due to the fact that the construction period of the main subway structure is short, the construction progress of the main subway tunnel structure is influenced by the traditional construction method for building the main subway tunnel structure scaffold.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the problem that exists among the prior art, provide a scaffold frame for subway tunnel major structure construction.
The technical scheme of the utility model is realized like this:
a scaffold for subway tunnel body structure construction, comprising: the scaffold comprises a scaffold body, wherein the scaffold body consists of a plurality of cross rods and vertical rods, a walking device and a jack are arranged at the bottom of the scaffold body, the walking device is arranged at the bottom of the vertical rods deviated to the center, and the top ends of the jacks are propped against the cross rods; the walking device comprises two universal wheels, a fixing plate, a connecting plate and a pin shaft, wherein the fixing plate is symmetrical and welded at the lower end of the vertical rod, the two ends of the fixing plate are connected with one universal wheel through the pin shaft, the universal wheel is further provided with the connecting plate, the pin shaft is installed on the connecting plate, and the other end of the connecting plate is fixed on the other side of the universal wheel through the pin shaft.
Furthermore, the bottom of the vertical rod is also provided with a pin hole, and the pin hole is matched with the pin for use.
And furthermore, the scaffold body is movably connected with the fixed end through a chain block in front.
The utility model has the advantages that: the scaffold can keep moving integrally, so that the labor, material and time consumption in the processes of scaffold dismantling, transporting, re-erecting and the like is reduced, the equipment is simple, the cost is low, the erecting progress of the scaffold of the main structure of the subway tunnel is ensured, and the construction efficiency is effectively improved; the difficult problems of labor and material loss and long construction time in the existing subway tunnel main structure scaffold erection construction are solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the universal wheel when lowered;
FIG. 3 is a schematic view of the structure of the universal wheel when it is retracted.
In the figure: 1 scaffold frame body, 2 jacks, 3 running gear, 4 back chains, 5 stiff ends, 6 montants, 7 universal wheels, 8 fixed plates, 9 connecting plates, 10 pins, 11 round pin axles, 12 pinholes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1-3, the scaffold for construction of the main body structure of the subway tunnel comprises: the scaffold comprises a scaffold body 1, wherein the scaffold body 1 is movably connected with a fixed end 5 through a chain block 4 in front of the scaffold body 1, the scaffold body 1 is composed of a plurality of cross rods and vertical rods 6, a walking device 3 and a jack 2 are arranged at the bottom of the scaffold body 1, the walking device 3 is installed at the bottom of the vertical rod 6 deviated to a center, the upper end of the jack 2 is propped against the cross rods, the chain block 4 can pull the whole scaffold body 1 to move integrally in a subway tunnel, and the plurality of jacks 2 can support the scaffold body 1;
the walking device 3 comprises two universal wheels 7, fixing plates 8, connecting plates 9 and a pin shaft 11, the two fixing plates 8 are symmetrical and welded at the lower end of a vertical rod 6, two ends of each fixing plate 8 are connected with one universal wheel 7 through the pin shaft 11, the universal wheels 7 can rotate by taking the pin shaft 11 as a center, the connecting plates 9 installed by the pin shafts 11 are further arranged on the universal wheels 7, the other ends of the connecting plates 9 are fixed on the universal wheels 7 on the other side through pins 10, and when the universal wheels 7 are lowered, the two universal wheels 7 are vertically fixed at the bottom of the vertical rod 6 through the connecting plates 9 and the pins 10; the bottom of the vertical rod 6 is further provided with a pin hole 12, the pin hole 12 is matched with the pin 10 for use, when the universal wheel 7 is not used, the universal wheel 7 rotates upwards, and the connecting plate 9 is fixed in the pin hole 12 through the pin 10.
The walking device 3 that can receive and release for whole scaffold frame walking and fixed mounting are simple swift more, the effectual efficiency of construction that has improved.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (3)

1. A scaffold for subway tunnel body structure construction, comprising: the scaffold body, the scaffold body constitute its characterized in that by a plurality of horizontal poles and montant: the bottom of the scaffold body is provided with a walking device and a jack, the walking device is arranged at the bottom of the vertical rod deviated to the center, and the top end of the jack is propped against the cross rod; the walking device comprises two universal wheels, a fixing plate, a connecting plate and a pin shaft, wherein the fixing plate is symmetrical and welded at the lower end of the vertical rod, the two ends of the fixing plate are connected with one universal wheel through the pin shaft, the universal wheel is further provided with the connecting plate, the pin shaft is installed on the connecting plate, and the other end of the connecting plate is fixed on the other side of the universal wheel through the pin shaft.
2. The scaffold for construction of a main structure of a subway tunnel according to claim 1, wherein: the bottom of the vertical rod is also provided with a pin hole, and the pin hole is matched with the pin for use.
3. The scaffold for construction of a main structure of a subway tunnel according to claim 1, wherein: the scaffold body is movably connected with the fixed end through a chain block.
CN202020018788.XU 2020-01-06 2020-01-06 Scaffold for construction of subway tunnel main body structure Active CN211817831U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020018788.XU CN211817831U (en) 2020-01-06 2020-01-06 Scaffold for construction of subway tunnel main body structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020018788.XU CN211817831U (en) 2020-01-06 2020-01-06 Scaffold for construction of subway tunnel main body structure

Publications (1)

Publication Number Publication Date
CN211817831U true CN211817831U (en) 2020-10-30

Family

ID=73050282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020018788.XU Active CN211817831U (en) 2020-01-06 2020-01-06 Scaffold for construction of subway tunnel main body structure

Country Status (1)

Country Link
CN (1) CN211817831U (en)

Similar Documents

Publication Publication Date Title
CN105648924B (en) The construction method of multispan freely-supported steel truss girder bridge
CN108643938B (en) Smooth surface shotcrete supporting structure of deep coal mine tunnel and construction method thereof
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN109638720B (en) Spanning device of power transmission line
CN206143757U (en) It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN205314542U (en) Construction liquid die plate device that climbs
CN206942245U (en) Prefabricated case beam tie with reinforcing bar construction frame
CN211817831U (en) Scaffold for construction of subway tunnel main body structure
CN114182966B (en) Cantilever type unloading platform girder
CN214925418U (en) Prefabricated mould of vertical stair component
CN213867372U (en) Assembled bridge building butt-joint equipment
CN212428931U (en) Novel detachable cyclic utilization fills barricade and builds device
CN209816838U (en) A construction platform for pouring bored concrete pile concrete
CN110219416B (en) Precast concrete Y-shaped beam assembly and construction method thereof
CN204825924U (en) Square steel tube concrete waist rail
CN211949130U (en) Novel steel bar truss combined floor bearing plate
CN207332896U (en) Inverted arch self-anchored type Qu Mo
CN110629760A (en) Building template for reservoir dam
CN205521877U (en) City rail U type precast beam system beam supports
CN218563671U (en) Assembled utility tunnel major structure construction formwork trolley
CN212927021U (en) A formwork device for theater house lid
CN214530704U (en) Warehouse-dividing deep foundation pit supporting structure next to subway tunnel
CN211848957U (en) Sectional type I roof beam leveling side strutting arrangement
CN220301846U (en) Reinforcing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant