CN211623495U - Tunnel construction is with crossing broken drainage device that takes of fault - Google Patents

Tunnel construction is with crossing broken drainage device that takes of fault Download PDF

Info

Publication number
CN211623495U
CN211623495U CN201922052307.7U CN201922052307U CN211623495U CN 211623495 U CN211623495 U CN 211623495U CN 201922052307 U CN201922052307 U CN 201922052307U CN 211623495 U CN211623495 U CN 211623495U
Authority
CN
China
Prior art keywords
fault
drainage
tunnel construction
drainage device
drain box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922052307.7U
Other languages
Chinese (zh)
Inventor
郝建财
王永刚
贺中
林志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Original Assignee
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Haiwei Engineering Construction Co Ltd of FHEC of CCCC filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201922052307.7U priority Critical patent/CN211623495U/en
Application granted granted Critical
Publication of CN211623495U publication Critical patent/CN211623495U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a tunnel construction used fault breaking belt drainage device, which comprises a vault, side walls are arranged at two sides of the lower end of the vault, an inverted arch is arranged between the lower ends of two groups of side walls, a layer of waterproof board is laid at the lower end of the vault, two ends of the waterproof board are communicated with a drainage pipe, the lower end of the drainage pipe is communicated with a drainage box, a collection cavity is arranged at the upper side inside the drainage box, a filter screen is fixedly connected inside the drainage box, the upper end of the filter screen is slidably connected with a shovel plate, the lower end of the drainage box is provided with a water outlet, the water outlet is communicated with a drainage ditch, the drainage ditch is arranged at two ends of the inverted arch, through arranging a waterproof baffle between the side walls and the drainage box, the damage of water in the drainage ditch to the side walls is reduced, the strength of the side walls is ensured, the waterproof board can lead accumulated water into the drainage box through the drainage pipe and is, meanwhile, impurities on the filter screen can be removed through the shovel plate.

Description

Tunnel construction is with crossing broken drainage device that takes of fault
Technical Field
The utility model relates to a tunnel construction technical field specifically is a broken drainage device that takes of fault is used in tunnel construction.
Background
Tunnels are engineering structures buried in the ground and are a form of human use of underground space. The tunnel can be divided into a traffic tunnel, a hydraulic tunnel, a municipal tunnel and a mine tunnel. In 1970, the international economic cooperation and development organization held a tunnel conference which integrates various factors, and the definition of the tunnel is as follows: "a cavity with a cross section area larger than 2 square meters is built under the ground by any method according to a specified shape and size in a certain application. "
The stability of the surrounding rock of the tunnel is a very important problem in the tunneling process, and particularly the stability of the surrounding rock in a fault fracture zone section needs to be paid attention. The construction method of the existing tunnel in the fault fracture zone section comprises the following steps: drilling holes in the broken loose rock mass in advance, driving a small guide pipe into the holes, pressing and injecting grout with gelling property, quickly permeating the grout into the broken loose rock mass in a vein shape under the action of grouting pressure, discharging air and water in the grout, and cementing and gelling the broken loose rock mass to form a consolidated body which has certain strength, impermeability and water resistance and takes the grout as a framework, so that the integrity, impermeability and stability of the surrounding rock are improved; the leading small pipe shed and the consolidation body form a shell with certain strength, and excavation supporting construction is carried out under the protection of the shell. In the construction process, because surrounding rocks in fault fracture zones are broken and weak, underground water is abundant, and the surrounding rocks are soaked for a long time, collapse or instability of the surrounding rocks and supports is easily caused. In order to realize drainage, a small guide pipe is used for grouting and water plugging, a drilled drainage hole is enriched in bottom water, and the small guide pipe is arranged; and a drainage ditch is arranged at the side wall, and water in the vault and the side wall is led to the drainage ditch.
Drainage device among the prior art is when using, and the construction makes during debris can drop the escape canal, because the water velocity in the escape canal is slow, can not in time rush out debris, causes the escape canal to block up easily to influence the drainage effect, the escape canal of side wall department is nearer apart from the side wall simultaneously, and the water in the escape canal soaks very easily in the side wall, soaks the intensity that reduces the side wall through long-time, influences the safety in the tunnel work progress even.
Based on this, the utility model designs a broken drainage device that takes of fault is used in tunnel construction to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a broken drainage device of taking of fault is used in tunnel construction, with the drainage device among the prior art who proposes in solving above-mentioned background art when using, the construction makes debris can drop in the escape canal, because the water velocity in the escape canal is slow, can not in time rush out debris, cause the escape canal easily to block up, thereby influence drainage effect, the escape canal of boundary wall department is nearer apart from the boundary wall simultaneously, water in the escape canal soaks the boundary wall very easily, through the intensity of long-time infiltration reduction boundary wall, influence the safe problem in the tunnel work progress even.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a tunnel construction is used to cross broken drainage device that takes of fault, includes the vault, vault lower extreme both sides are equipped with the side wall, and are two sets of be equipped with the invert between the side wall lower extreme, the one deck waterproof board has been laid to the vault lower extreme, the waterproof board both ends communicate in the drain pipe, the drain pipe lower extreme communicates in the drain box, two sets of side wall bottoms are located to the drain box, the inside upside of drain box is equipped with collects the chamber, the inside fixedly connected with filter screen of drain box, filter screen upper end sliding connection has the shovel board, the delivery port has been seted up to the drain box lower extreme, the delivery port communicates in the escape canal, the both ends of invert are seted up in the.
Preferably, one end of the drainage box close to the side wall is fixedly connected with a waterproof partition plate.
Preferably, a baffle is arranged at the upper end of one side of the collecting cavity connected with the filter screen, and a movable door is arranged at the outer side end of the collecting cavity.
Preferably, the shovel board is close to the equal fixedly connected with pull rod in one end both sides of collecting the chamber, the pull rod runs through baffle and drain tank in proper order and extends to the drain tank outside, two sets of the pull rod is located the both ends of the one end fixed connection and the holding rod in the drain tank outside.
Preferably, a sealing ring is arranged at the connecting end of the pull rod and the baffle.
Preferably, the shovel board and the inner wall end of the drainage box are movably connected with a telescopic rod, a compression spring is sleeved on the telescopic rod, and two ends of the compression spring are respectively and fixedly connected to the shovel board and the inner wall end of the drainage box.
Preferably, the both ends of the shovel plate are fixedly connected with sliding blocks, and the inner wall of the drainage box is provided with sliding grooves matched with the sliding blocks.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a set up waterproof baffle between side wall and drain box, reduced the damage of water in the escape canal to the side wall, guaranteed the intensity of side wall, the waterproof board can pass through the leading-in drain box of drain pipe with ponding to in the drainage canal of discharging after the filtration of filter screen, prevent in the escape canal impurity too much cause the jam, the impurity of accessible shovel board on to the filter screen is clear away simultaneously.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1-the structure of the present invention is schematically shown;
FIG. 2 is a schematic view showing an internal structure of the drain tank of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the grip of FIG. 1 according to the present invention;
fig. 4-schematic view of the shovel plate connection structure of fig. 2 according to the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1-vault, 2-side wall, 3-inverted arch, 4-waterproof board, 5-drain pipe, 6-drain box, 7-collection chamber, 8-filter screen, 9-shovel board, 10-water outlet, 11-drain ditch, 12-waterproof baffle, 13-baffle, 14-pull rod, 15-holding rod, 16-sealing ring, 17-telescopic rod, 18-compression spring, 19-slide block and 20-chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a tunnel construction is with crossing broken drainage device in area of fault, including vault 1, 1 lower extreme both sides of vault are equipped with side wall 2, be equipped with invert 3 between 2 lower extremes of two sets of side walls, one deck waterproof board 4 has been laid to 1 lower extreme of vault, 4 both ends of waterproof board communicate in drain pipe 5, 5 lower extremes of drain pipe communicate in drain box 6, 2 bottoms of two sets of side walls are located to drain box 6, 6 inside upsides of drain box are equipped with collects chamber 7, 6 inside fixedly connected with filter screens 8 of drain box, 8 upper end sliding connection of filter screen have shovel board 9, delivery port 10 has been seted up to 6 lower extremes of drain box, delivery port 10 communicates in escape canal 11, escape canal 11 sets up the both ends of invert 3.
Wherein, the one end fixedly connected with waterproof baffle 12 that drain tank 6 is close to side wall 2 can prevent that partial water from soaking in side wall 2, reduces the intensity of side wall 2 after long-time soaking. The upper end of one side that collects chamber 7 and filter screen 8 and link to each other is equipped with baffle 13, collects chamber 7 outside end and has seted up the dodge gate, and the dodge gate is convenient clears up the impurity in collecting chamber 7. Shovel board 9 is close to the equal fixedly connected with pull rod 14 in one end both sides of collecting chamber 7, pull rod 14 runs through baffle 13 and drain box 6 in proper order and extends to the drain box 6 outside, two sets of pull rods 14 are located the both ends of the one end fixed connection in the drain box 6 outside and holding rod 15, accessible holding rod 15 stimulates pull rod 14, make pull rod 14 drive baffle 13 and shovel board 9 simultaneously and remove, shovel board 9 can clear away filter screen 8 upper end impurity, and remove it to collecting chamber 7 in, prevent filter screen 8's jam. And a sealing ring 16 is arranged at the connecting end of the pull rod 14 and the baffle 13, so that the sealing property is enhanced. Shovel board 9 and 6 inner wall end swing joint of drain box have telescopic link 17, and the cover is equipped with compression spring 18 on the telescopic link 17, and compression spring 18 both ends difference fixed connection is in shovel board 9 and 6 inner wall ends of drain box, and compression spring 18 and telescopic link 17 can make shovel board 9 return fast after the pulling to make baffle 13 seal filter screen 8 upper end one side. The equal fixedly connected with slider 19 in shovel board 9 both ends, 6 inner walls of drainage box offer with slider 19 mutually supported's spout 20, through slider 19 and spout 20 mutually supporting, can prescribe a limit to the position of shovel board 9, prevent the skew.
One specific application of this embodiment is: when using, during the drain pipe 5 at both ends can be introduced with the water in the broken area of tunnel fault to waterproof board 4, thereby get into in the drain box 6 through drain pipe 5, the water that flows out passes through filter screen 8 and flows into escape canal 11 from delivery port 10, the impurity of aquatic then stays on filter screen 8, when impurity on filter 8 reaches basis weight, the accessible sets up pressure sensor and detects, can artifically through holding rod 15 with two sets of pull rods 14 outwards pulling, thereby drive shovel board 9 and then the removal of baffle 13, and then shovel board 9 can drive the impurity on the filter screen 8 to collecting chamber 7 in, avoid blockking up filter screen 8, accessible dodge gate clears up the impurity in collecting chamber 7 after the completion.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (7)

1. The utility model provides a tunnel construction is used fault fracture area drainage device, includes vault (1), its characterized in that: vault (1) lower extreme both sides are equipped with side wall (2), and are two sets of be equipped with invert (3) between side wall (2) lower extreme, one deck waterproof board (4) have been laid to vault (1) lower extreme, waterproof board (4) both ends communicate in drain pipe (5), drain pipe (5) lower extreme communicates in drain box (6), two sets of side wall (2) bottom are located in drain box (6), the inside upside of drain box (6) is equipped with collects chamber (7), the inside fixedly connected with filter screen (8) of drain box (6), sliding connection has shovel board (9) in filter screen (8) upper end, delivery port (10) have been seted up to drain box (6) lower extreme, delivery port (10) communicate in escape canal (11), the both ends of invert (3) are seted up in escape canal (11).
2. The fault-broken zone drainage device for tunnel construction according to claim 1, wherein: one end of the drainage box (6) close to the side wall (2) is fixedly connected with a waterproof partition plate (12).
3. The fault-broken zone drainage device for tunnel construction according to claim 1, wherein: a baffle (13) is arranged at the upper end of one side of the collecting cavity (7) connected with the filter screen (8), and a movable door is arranged at the outer side end of the collecting cavity (7).
4. The fault-broken zone drainage device for tunnel construction according to claim 3, wherein: shovel board (9) are close to the equal fixedly connected with pull rod (14) in one end both sides of collecting chamber (7), pull rod (14) run through baffle (13) and drain box (6) in proper order and extend to the drain box (6) outside, and are two sets of pull rod (14) are located the both ends of the one end fixed connection and holding rod (15) in the drain box (6) outside.
5. The fault-broken zone drainage device for tunnel construction according to claim 4, wherein: and a sealing ring (16) is arranged at the connecting end of the pull rod (14) and the baffle (13).
6. The fault-broken zone drainage device for tunnel construction according to claim 4, wherein: shovel board (9) and water drainage tank (6) inner wall end swing joint have telescopic link (17), the cover is equipped with compression spring (18) on telescopic link (17), compression spring (18) both ends difference fixed connection is in shovel board (9) and water drainage tank (6) inner wall end.
7. The fault-broken zone drainage device for tunnel construction according to claim 1, wherein: the equal fixedly connected with slider (19) in shovel board (9) both ends, spout (20) of mutually supporting with slider (19) are seted up to drain box (6) inner wall.
CN201922052307.7U 2019-11-25 2019-11-25 Tunnel construction is with crossing broken drainage device that takes of fault Active CN211623495U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922052307.7U CN211623495U (en) 2019-11-25 2019-11-25 Tunnel construction is with crossing broken drainage device that takes of fault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922052307.7U CN211623495U (en) 2019-11-25 2019-11-25 Tunnel construction is with crossing broken drainage device that takes of fault

Publications (1)

Publication Number Publication Date
CN211623495U true CN211623495U (en) 2020-10-02

Family

ID=72626494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922052307.7U Active CN211623495U (en) 2019-11-25 2019-11-25 Tunnel construction is with crossing broken drainage device that takes of fault

Country Status (1)

Country Link
CN (1) CN211623495U (en)

Similar Documents

Publication Publication Date Title
CN205895312U (en) Be used for rich irrigated land section tunnel water handling system
CN103696803B (en) Be used for mine underground tailings cemented filling barricade device
CN208328950U (en) A kind of In-pit water drainage friction pile suitable for dregs loose structure slope
CN203730057U (en) Extraction tube device for coal seam gas
CN206722878U (en) A kind of mining light-duty filling counterfort
CN107035401A (en) A kind of abandoned mine fire damp administers new technology
CN102979535A (en) Drain-type pipe piece for tunnel lining
CN101881181A (en) Mine goaf tailing-filled concrete enclosing wall
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN103321233B (en) The preparation method of groundwater resources retracting device in landslide deep layer draining and sliding mass
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN211623495U (en) Tunnel construction is with crossing broken drainage device that takes of fault
CN107165671A (en) A kind of tailing-filled overall height dehydration barricade
CN114108609A (en) Goaf multistage subsection precise filling deep pile-forming construction process and method
CN105484791B (en) A kind of synthesis sluicings of tunnel, depressurizes construction method at precipitation
CN110925018B (en) Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN105672370B (en) A kind of underground engineering water pressure control system
CN208749373U (en) A kind of Tunnel Gushing disposal plant
CN207092124U (en) Retaining wall structure
CN203008104U (en) Plastic drainage blind ditch
CN205917644U (en) Well is enclosed to rapid Assembly formula
CN202991057U (en) Pipe piece for a water release type tunnel lining
CN213296362U (en) Landslide grouting reinforcement drainer
CN210421133U (en) Pile plate type retaining wall greening drainage system

Legal Events

Date Code Title Description
GR01 Patent grant