CN211623316U - Be used for engineering geological investigation drilling equipment - Google Patents

Be used for engineering geological investigation drilling equipment Download PDF

Info

Publication number
CN211623316U
CN211623316U CN202020184526.0U CN202020184526U CN211623316U CN 211623316 U CN211623316 U CN 211623316U CN 202020184526 U CN202020184526 U CN 202020184526U CN 211623316 U CN211623316 U CN 211623316U
Authority
CN
China
Prior art keywords
drilling
geological exploration
engineering geological
piece
drilling equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020184526.0U
Other languages
Chinese (zh)
Inventor
刘鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020184526.0U priority Critical patent/CN211623316U/en
Application granted granted Critical
Publication of CN211623316U publication Critical patent/CN211623316U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the technical field of the geological exploration, especially, be used for engineering geological exploration drilling equipment, the camera includes a supporting plate, the support column is installed on the top of backup pad. Set up on the central line of two tracks through the motor case, run through runner and motor case through the pivot, can make the runner rotate through the pivot with the output of motor case, surface through the track is provided with the arch of unsmooth form, can have fine ground ability of grabbing with drilling equipment, non-skid, rotation through the runner makes the track along with rotating, thereby make the convenient light more of equipment transport, save staff's working strength, through the erection joint of backup pad and support column and the setting of hydraulic pump, can stop drilling equipment in the top that needs exploration, pass through hydraulic pump and ground contact with support column and backup pad, drilling equipment's firm has been guaranteed, make connecting piece and mounting fixed mounting through the bolt, the convenience is dismantled drilling member installation.

Description

Be used for engineering geological investigation drilling equipment
Technical Field
The utility model belongs to the technical field of the geological exploration, concretely relates to be used for engineering geological exploration drilling equipment.
Background
Whether there is mineral resources in order to investigate the underground, need use drilling equipment to drill the sample, judge underground mineral composition through investigation soil sample, current drilling equipment drills into certain degree of depth to the underground earlier when using mostly, mention more than the ground with drill bit and soil sample again, thereby take out soil sample, put into the drill bit after taking out soil sample again, thereby continue to the underground boring, this process is wasted time and energy, not only make the cycle of probing prolong greatly, and the cost of investigation has further been improved, it is comparatively inconvenient when in-service use. Geological exploration is investigation and research activities of surveying and detecting geology through various means and methods, determining a proper bearing stratum, determining a foundation type according to the foundation bearing capacity of the bearing stratum and calculating foundation parameters. The mineral deposit with industrial significance is found in mineral product general survey, mineral product reserves and geological data required by mine construction design are provided for finding out the quality and quantity of mineral products and technical conditions of mining and utilization, most of the existing geological exploration equipment for investigation and research on geological conditions such as rocks, strata, structures, mineral products, hydrology, landforms and the like in a certain area is large in size, inconvenient to carry and inconvenient to construct, the working strength of constructors is increased, parts are easy to damage during carrying, the service life of the equipment is shortened, the equipment cannot be simply fixed during mounting, and sometimes needs to be fixed by manpower.
However, the existing engineering geological exploration equipment is fixedly arranged above the position to be explored, is not easy to carry and install, and increases the working strength of workers.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a be used for engineering geology investigation drilling equipment has solved the problem of transport difficulty.
In order to achieve the above object, the utility model provides a following technical scheme: a drilling device for engineering geological exploration comprises a supporting plate, wherein a supporting column is installed at the top end of the supporting plate, a connecting plate is installed at the top end of the supporting column, a hydraulic pump is installed at the top end of the connecting plate, a placing table is installed on one side of the connecting plate, a connecting column is installed at the bottom of the placing table, a motor box is installed at the bottom of the connecting column, a rotating shaft penetrates through the motor box, a rotating wheel is connected to one end of the rotating shaft, a crawler belt is connected to the outer portion of the rotating wheel, a fixing member is installed at the top of the placing table, a limiting member penetrates through the fixing member, a telescopic column is installed through the limiting member, a fixing plate is installed at the bottom of the fixing member, a supporting table is arranged on one side of the fixing plate, a, the bottom of fixed plate is provided with into native piece, the inside of mounting is provided with the bolt, the inside of bolt is provided with the connecting piece.
Preferably, the cross section of the fixing plate is U-shaped, and four symmetrical soil penetrating members are arranged at the bottom of the fixing plate.
Preferably, the number of the support columns is four, and the support columns are matched with the hydraulic pump and are evenly arranged around the placing table through the connecting plate.
Preferably, the motor box is arranged on the central line of the two crawler belts, and the surfaces of the crawler belts are provided with concave-convex bulges.
Preferably, the drilling member is provided with a screw thread on the outside and a hollow inside.
Preferably, the bolt penetrates through the connecting piece and the fixing piece, and one end of the bolt is provided with a matched screw cap.
Compared with the prior art, the beneficial effects of the utility model are that:
set up on the central line of two tracks through the motor case, run through runner and motor case through the pivot, can make the runner rotate through the pivot with the output of motor case, surface through the track is provided with the arch of unsmooth form, can have fine ground ability of grabbing with drilling equipment, non-skid, rotation through the runner makes the track along with rotating, thereby make the convenient light more of equipment transport, save staff's working strength, through the erection joint of backup pad and support column and the setting of hydraulic pump, can stop drilling equipment in the top that needs exploration, pass through hydraulic pump and ground contact with support column and backup pad, drilling equipment's firm has been guaranteed, make connecting piece and mounting fixed mounting through the bolt, the convenience is dismantled drilling member installation.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a complete structural schematic diagram of the present invention;
FIG. 2 is a front view structure diagram of the present invention;
FIG. 3 is a side view structure diagram of the present invention;
fig. 4 is a top view structure diagram of the present invention.
In the figure: 1, supporting a plate; 2, supporting columns; 3, connecting a plate; 4, a hydraulic pump; 5, placing a table; 6, a telescopic column; 7, a motor; 8, supporting the table; 9 a drilling member; 10 fixing the plate; 11 a motor case; 12 tracks; 13, a soil-entering part; 14 rotating wheels; 15, bolts; 16 connecting pieces; 17 a fixing member; 18 connecting columns; 19 a rotating shaft; 20 define a member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides the following technical solutions: a drilling device for engineering geological exploration comprises a supporting plate 1, a supporting column 2 is installed at the top end of the supporting plate 1, a connecting plate 3 is installed at the top end of the supporting column 2, a hydraulic pump 4 is installed at the top end of the connecting plate 3, a placing table 5 is installed on one side of the connecting plate 3, a connecting column 18 is installed at the bottom of the placing table 5, a motor box 11 is installed at the bottom of the connecting column 18, a rotating shaft 19 penetrates through the motor box 11, one end of the rotating shaft 19 is connected with a rotating wheel 14, a crawler 12 is connected to the outside of the rotating wheel 14, a fixing piece 17 is installed at the top of the placing table 5, a limiting piece 20 penetrates through the inside of the fixing piece 17, a telescopic column 6 penetrates through the inside of the limiting piece 20, a fixing plate 10 is installed at the bottom of the fixing piece 17, a supporting, the bottom of the fixed plate 10 is provided with an earth-penetrating member 13, the inside of the fixed member 17 is provided with a bolt 15, and the inside of the bolt 15 is provided with a connecting member 16.
In the embodiment, the motor box 11 is arranged on the central line of the two crawler belts 12, the rotating wheel 14 and the motor box 11 are penetrated through by the rotating shaft 19, the output end of the motor box 11 can rotate the rotating wheel 14 through the rotating shaft 19, the surface of the crawler 12 is provided with concave-convex bulges, the drilling equipment has good gripping ability and is not easy to slip, the track 12 rotates along with the rotation of the rotating wheel 14, thereby leading the equipment to be more convenient and easier to carry and saving the working strength of workers, and through the installation and the connection of the supporting plate 1 and the supporting column 2 and the arrangement of the hydraulic pump 4, the drilling equipment can be stopped above the position to be explored, the supporting column 2 and the supporting plate 1 are contacted with the ground through the hydraulic pump 4, the stability of the drilling equipment is ensured, the connecting piece 16 is fixedly arranged with the fixing piece 17 through the bolt 15, and the drilling piece 9 is convenient to assemble and disassemble.
Specifically, the cross section of the fixing plate 10 is U-shaped, four symmetrical soil-penetrating pieces 13 are arranged at the bottom of the fixing plate 10, the fixing plate 10 is stable through the soil-penetrating pieces 13, and the drilling piece 9 is not easy to shake during working.
Specifically, the quantity of support column 2 is four, support column 2 and hydraulic pump 4 looks adaptation pass through connecting plate 3 and evenly set up around placing platform 5, through the erection joint of backup pad 1 with support column 2 and the setting of hydraulic pump 4, can stop the drilling equipment in the top that needs the exploration, pass through hydraulic pump 4 with backup pad 1 with support column 2 and ground contact, guaranteed drilling equipment's firm.
Specifically, the motor box 11 is arranged on the central line of the two tracks 12, the surface of each track 12 is provided with concave-convex protrusions, and the concave-convex protrusions are arranged on the surface of each track 12, so that the drilling equipment can be well grabbed and is not easy to slip.
Specifically, the outside of boring element 9 is provided with a thread shape, and the inside of boring element 9 is provided with a hollow, and the hollow is opened through the inside of boring element 9, so that a part of soil can be collected inside boring element 9 entering the earth surface for exploration.
Specifically, the bolt 15 penetrates through the connecting piece 16 and the fixing piece 17, and one end of the bolt 15 is provided with a screw cap matched with the bolt, so that the connecting piece 16 and the fixing piece 17 are fixedly installed through the bolt 15, and the drilling piece 9 is convenient to install and detach.
The utility model discloses a theory of operation and use flow: the utility model discloses install the back, when using, through motor case 11 setting on two track 12 central lines, run through runner 14 and motor case 11 through pivot 19, can make runner 14 rotate through pivot 19 with motor case 11's output, be provided with the arch of unsmooth form through the surface of track 12, can have fine ability of grabbing ground with the drilling equipment, difficult skidding, rotation through runner 14 makes track 12 along with rotating.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A drilling equipment for engineering geological exploration, comprising a support plate (1), a support column (2) is installed on the top end of the support plate (1), characterized in that: the top end of the supporting column (2) is provided with a connecting plate (3), the top end of the connecting plate (3) is provided with a hydraulic pump (4), one side of the connecting plate (3) is provided with a placing table (5), the bottom of the placing table (5) is provided with a connecting column (18), the bottom of the connecting column (18) is provided with a motor box (11), a rotating shaft (19) penetrates through the inside of the motor box (11), one end of the rotating shaft (19) is connected with a rotating wheel (14), the outside of the rotating wheel (14) is connected with a crawler belt (12), the top of the placing table (5) is provided with a fixing piece (17), the inside of the fixing piece (17) is provided with a limiting piece (20) in a penetrating manner, the inside of the limiting piece (20) is provided with a telescopic column (6) in a penetrating manner, the bottom of the fixing piece (17) is, the top of brace table (8) is provided with motor (7), the output of motor (7) is connected with drilling spare (9), the bottom of fixed plate (10) is provided with into native piece (13), the inside of mounting (17) is provided with bolt (15), the inside of bolt (15) is provided with connecting piece (16).
2. A drilling apparatus for engineering geological exploration, according to claim 1, characterized in that: the cross section of the fixing plate (10) is U-shaped, and four symmetrical soil-penetrating pieces (13) are arranged at the bottom of the fixing plate (10).
3. A drilling apparatus for engineering geological exploration, according to claim 1, characterized in that: the quantity of support column (2) is four, support column (2) and hydraulic pump (4) looks adaptation pass through connecting plate (3) and evenly set up around placing platform (5).
4. A drilling apparatus for engineering geological exploration, according to claim 1, characterized in that: the motor box (11) is arranged on the central line of the two crawler belts (12), and concave-convex bulges are arranged on the surfaces of the crawler belts (12).
5. A drilling apparatus for engineering geological exploration, according to claim 1, characterized in that: the exterior of the drilling member (9) is provided in a threaded shape and the interior of the drilling member (9) is provided in a hollow shape.
6. A drilling apparatus for engineering geological exploration, according to claim 1, characterized in that: the bolt (15) penetrates through the connecting piece (16) and the fixing piece (17), and one end of the bolt (15) is provided with a screw cap matched with the screw cap.
CN202020184526.0U 2020-02-19 2020-02-19 Be used for engineering geological investigation drilling equipment Expired - Fee Related CN211623316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020184526.0U CN211623316U (en) 2020-02-19 2020-02-19 Be used for engineering geological investigation drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020184526.0U CN211623316U (en) 2020-02-19 2020-02-19 Be used for engineering geological investigation drilling equipment

Publications (1)

Publication Number Publication Date
CN211623316U true CN211623316U (en) 2020-10-02

Family

ID=72618677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020184526.0U Expired - Fee Related CN211623316U (en) 2020-02-19 2020-02-19 Be used for engineering geological investigation drilling equipment

Country Status (1)

Country Link
CN (1) CN211623316U (en)

Similar Documents

Publication Publication Date Title
CN206348169U (en) A kind of sampler used for geological prospecting
CN210427082U (en) Geological exploration sampling device
CN211819382U (en) Sampling device for prospecting
CN205936594U (en) Three -dimensional geological data gathers portable equipment with transmission
CN211042775U (en) Sampler for geological environment monitoring
CN104343383A (en) Drilling device for earthen archaeological site
CN211623316U (en) Be used for engineering geological investigation drilling equipment
CN203891877U (en) Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine
CN212007009U (en) Hydraulic ring geological crack measuring device
CN210533752U (en) Geotechnical engineering reconnaissance broken rock coring device
CN105275388A (en) Drilling equipment for building pile foundation with square cross section
CN210858581U (en) Geological drilling rig for geological survey of coal mine
CN218265893U (en) Drilling and digging device for geological exploration
CN214097445U (en) Mine geological environment monitoring device
CN213980782U (en) Multi-functional geological survey probing device
CN214471881U (en) Hydraulic ring geological survey sampling equipment
CN211950529U (en) Mining well support frame
CN112664136A (en) Drilling platform for geological exploration
CN206220849U (en) A kind of water exploring drill machine
CN214787177U (en) Coal mine geological drilling device
CN206769812U (en) A kind of coalfield prospecting probing guiding mechanism
CN216110561U (en) But quick assembly disassembly's drilling equipment for geological exploration
CN206784471U (en) Water Conservancy Survey is with quickly filling out pit device
CN205297358U (en) Rig and boring tower device thereof
CN217269982U (en) Novel geological survey probing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201002

Termination date: 20210219