CN211620551U - 一种带内部冷却水槽冷却壁装置 - Google Patents

一种带内部冷却水槽冷却壁装置 Download PDF

Info

Publication number
CN211620551U
CN211620551U CN201922253682.8U CN201922253682U CN211620551U CN 211620551 U CN211620551 U CN 211620551U CN 201922253682 U CN201922253682 U CN 201922253682U CN 211620551 U CN211620551 U CN 211620551U
Authority
CN
China
Prior art keywords
cooling
cooling water
wall
cooling wall
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922253682.8U
Other languages
English (en)
Inventor
经文波
经薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baise University
Original Assignee
Baise University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baise University filed Critical Baise University
Priority to CN201922253682.8U priority Critical patent/CN211620551U/zh
Application granted granted Critical
Publication of CN211620551U publication Critical patent/CN211620551U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Blast Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

本实用新型是一种带内部冷却水槽冷却壁装置,属于钢铁冶金炼铁高炉冷却领域,解决原有冷却壁中冷却水管与基体材料之间的隔热层影响冷却壁热传导性能和冷却效果问题。本实用新型包括:冷却壁、螺栓孔、冷却水进水管、冷却水槽、冷却水出水管、冷却壁镶砖。浇注前预设冷却壁内外部模具,在浇注后清除冷却壁内外部模具,形成带内部冷却水槽冷却壁装置,冷却比(冷却水槽横截面周长/冷却水槽平均间距)大于2.0,浇铸后冷却壁内表面镶砖,并安装冷却水进出水管。生产时使冷却水槽中的冷却水与冷却壁直接接触,消除了原有冷却壁中冷却水管与基体材料之间的隔热层,提高了冷却壁热传导性能和冷却能力,进一步保护冷却壁和炉体,延长一代高炉寿命。

Description

一种带内部冷却水槽冷却壁装置
技术领域
本实用新型是属于钢铁冶金领域高炉冷却用的一种带内部冷却水槽冷却壁装置。
背景技术
冷却壁是高炉内部的冷却设备,置于炉壳与炉衬之间,主要材质为铸铁,铸钢或铜,通常内部用冷却水管。冷却壁浇注过程中,冷却水管与基体材料之间的熔合性差,导致二者之间不能很好地融和在一起,存在一定的间隙,犹如一道隔热层,降低了冷却壁热传导性能和冷却能力。生产过程中冷却壁热负荷增大,而冷却壁冷却能力不足,冷却壁冷却强度不能满足高炉冶炼强度的要求易损坏,从而影响一代高炉寿命。
发明内容
本实用新型是一种带内部冷却水槽冷却壁装置,解决原有冷却壁中冷却水管与基体材料之间的隔热层影响冷却壁热传导性能和冷却效果问题。本实用新型包括:冷却壁、螺栓孔、冷却水进水管、冷却水槽、冷却水出水管、冷却壁镶砖。浇注前预设冷却壁内外部模具,在浇注后清除冷却壁内外部模具,形成带内部冷却水槽冷却壁装置,冷却比(冷却水槽横截面周长/冷却水槽平均间距)大于2.0,浇铸后冷却壁内表面镶砖,并安装冷却水进出水管。生产时使冷却水槽中的冷却水与冷却壁直接接触,消除了原有冷却壁中冷却水管与基体材料之间的隔热层,提高了冷却壁热传导性能和冷却能力,进一步保护冷却壁和炉体,从而延长一代高炉寿命。
附图说明
图1是一种带内部冷却水槽冷却壁装置。
其中:1.冷却壁,2.螺栓孔,3.冷却水进水管,4.冷却水槽,5.冷却水出水管,6.冷却壁镶砖
具体实施方式
本实用新型的目的是通过如下具体方式实现:
(1)加工高800~2000mm、宽400~1600mm、厚250~350mm镶嵌式冷却壁1所用的浇铸模具。
(2)浇铸前在浇铸模具内埋设预定尺寸的内部冷却水槽4模具,通水水槽截面尺寸为60×60,隔板厚度20mm,水槽距外表面100mm,距侧面50mm。冷却比(冷却水槽横截面周长/冷却水槽平均间距)大于2.0。
(3)预留固定冷却壁用的4个孔径40mm螺栓孔2。
(4)完成浇铸冷却壁1,材质为铸铁、铸钢、铜;
(5)清除冷却壁内外部模具,形成带内部冷却水槽4冷却壁;
(6)冷却壁内表面镶砖6。
(7)在冷却壁内部空腔水槽进出口端安装冷却水进水管3、冷却水出水管5;
(8)安装到高炉炉壳的内表面上预定位置,使冷却水进出水管与外部冷却水进出水管连接。生产时使冷却水与冷却壁直接接触,消除了原冷却水管与基体材料之间的一道隔热层。提高了冷却壁热传导性能和冷却能力,使冷却壁冷却强度满足高炉冶炼强度的要求,降低冷却壁本体温度,有利于形成稳定渣皮,进一步保护冷却壁和炉体,从而延长一代高炉寿命。

Claims (1)

1.一种带内部冷却水槽冷却壁装置,其特征在于,包括:冷却壁(1)、螺栓孔(2)、冷却水进水管(3)、冷却水槽(4)、冷却水出水管(5)、冷却壁镶砖(6),本装置浇铸成型;冷却壁(1)高800~2000mm、宽400~1600mm、厚250~350mm;冷却水槽(4)通水水槽截面尺寸为60×60mm,隔板厚度20mm,水槽距外表面100mm,距侧面50mm,冷却比即冷却水槽横截面周长与冷却水槽平均间距之比大于2.0;冷却壁4个螺栓孔(2)孔径40mm。
CN201922253682.8U 2019-12-16 2019-12-16 一种带内部冷却水槽冷却壁装置 Expired - Fee Related CN211620551U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922253682.8U CN211620551U (zh) 2019-12-16 2019-12-16 一种带内部冷却水槽冷却壁装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922253682.8U CN211620551U (zh) 2019-12-16 2019-12-16 一种带内部冷却水槽冷却壁装置

Publications (1)

Publication Number Publication Date
CN211620551U true CN211620551U (zh) 2020-10-02

Family

ID=72629592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922253682.8U Expired - Fee Related CN211620551U (zh) 2019-12-16 2019-12-16 一种带内部冷却水槽冷却壁装置

Country Status (1)

Country Link
CN (1) CN211620551U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561501A (zh) * 2022-01-21 2022-05-31 中冶华天工程技术有限公司 强化冷却的高炉冷却壁

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561501A (zh) * 2022-01-21 2022-05-31 中冶华天工程技术有限公司 强化冷却的高炉冷却壁
CN114561501B (zh) * 2022-01-21 2023-09-29 中冶华天工程技术有限公司 强化冷却的高炉冷却壁

Similar Documents

Publication Publication Date Title
CN103464735B (zh) 提高冶炼钢包使用效率的方法及其高寿命低材耗冶炼钢包
CN105177203A (zh) 一种高炉的冷却壁及其制造方法
CN211620551U (zh) 一种带内部冷却水槽冷却壁装置
CN101873733B (zh) 矿热炉用导电铜颚板
CA2361570C (en) Casting mould for manufacturing a cooling element and cooling element made in said mould
CN102393144B (zh) 一种埋双层纯铜管铸铜水套制造方法
KR20040072726A (ko) 야금로용 냉각판 및 이러한 냉각판의 제조 방법
CN203076574U (zh) 一种钢水包浇注渣线衬层
JP5817959B2 (ja) 竪型炉の炉底耐火物の内張り構造
CN102179491B (zh) 一种连铸中间包盖用吹氩预制件
CN216441619U (zh) 一种铜合金浇注组合锭模
CN211866588U (zh) 一种包底呈阶梯状的钢包
CN205020772U (zh) 外开槽圆钢锭模
CN203437633U (zh) 一种无座砖钢包
CN216115361U (zh) 冶炼炉出渣口保护装置及含有该装置的冶炼炉
CN211204899U (zh) 一种富氧侧吹炉熔池长寿铸铜水套
CN215879858U (zh) 一种锡加热保温装置
CN213841788U (zh) 一种mpr炉渣区冷却机构
CN213041007U (zh) 一种6t真空感应炉打制炉衬时所使用铜熔模
CN213113395U (zh) 一种熔融还原炉与前置出铁炉的连通装置
CN203454782U (zh) 一种出钢嘴用炉门砖
CN219683941U (zh) 一种钢包上水口砖及机构
CN215593111U (zh) 一种混铁炉侧兑铁口预制块
CN212720799U (zh) 一种焊接结构的p-s转炉炉口结构
CN211438081U (zh) 一种包底

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201002

Termination date: 20211216