Prior art keywords
sets
groups
group
hanging
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020248027.3U
Other languages
Chinese (zh)
Inventor
王秀亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020248027.3U priority Critical patent/CN211619779U/en
Application granted granted Critical
Publication of CN211619779U publication Critical patent/CN211619779U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to the technical field of high-altitude material conveying, in particular to a high-altitude material conveying device for buildings; the lifting device comprises a cotter pin, one side of the cotter pin is fixedly connected with a connecting shaft, the connecting shaft is respectively connected with two groups of steel wire ropes, and the other ends of the two groups of steel wire ropes are both connected with an electric rotating shaft; still include the detection case, the gag lever post, the connecting block, first cover spring and jib, detection case bottom center vertically is provided with first logical groove, first logical inslot side is rotatable to be fixed with first ball group, still include the shielding plate, elastic rod and second cover spring, the detection case left side transversely is provided with the second and leads to the groove, the rotatable second ball group that is fixed with in second logical inslot side, the elastic rod right side vertically is provided with the third and leads to the groove, the rotatable third ball group that is fixed with of third through inslot lateral wall, be connected with the extension board between two sets of elevator motor, still include the buffer board, the scalable nest of tubes of third and third cover spring group.

Description

High-altitude object conveying device for building
Technical Field
The utility model relates to a technical field of high altitude send the thing specifically is a thing device is sent in high altitude for building.
Background
As is well known, the high-altitude object conveying device for the building is used for carrying out high-altitude transportation on material objects in the building process so as to better carry out subsequent use, and is widely used in the field of high-altitude transportation;
the prior chinese utility model patent with application number "CN 201620911356.5" discloses "a high-altitude transportation device based on steel rope", which is roughly described as: the lifting device comprises a split pin, a steel rope hole is formed in the split pin, a connecting shaft is fixedly connected to one side of the split pin, the hook is installed at the bottom end of the split pin, the hanging device is sleeved on the surface of the steel rope through the steel rope hole, the two groups of steel rope are respectively connected with two groups of steel rope, the other ends of the two groups of steel rope are respectively connected with an electric rotating shaft, and the other ends of the two groups of electric rotating shafts are respectively installed on the surfaces of the two groups of lifting rods;
the utility model discloses a buffering sponge layer prevents to hit and destroys two sets of lifter, utilizes two sets of electronic rotation axis to contract wire rope simultaneously to realize high altitude transportation work, simple and convenient, and can fully practice thrift the electric energy, utilize two sets of elevator motor to adjust the transportation height simultaneously, satisfy the transportation needs of co-altitude;
the discovery in using of current utility model, when the heavy object that the steel cable bore is overweight, can not conveniently remind the staff, easily lead to the steel cable to damage and break even, use the reliability relatively poor, and then make its practicality lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a thing device is sent in high altitude for building, its when the heavy object that the steel cable bore is overweight, can conveniently remind the staff, slow down the steel cable and damage rupture even, it is relatively poor to improve the reliability, and then improves its practicality.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a high-altitude material conveying device for buildings comprises two groups of lifting rods, a hanging device, a hook and a steel rope, wherein two ends of the steel rope are respectively connected to the top ends of the two groups of lifting rods, the inner sides of the two groups of lifting rods are respectively provided with a buffer sponge layer, the bottom ends of the two groups of lifting rods are respectively provided with a lifting motor, the hanging device comprises a split pin, a steel rope hole is formed in the split pin, one side of the split pin is fixedly connected with a connecting shaft, the hanging device is sleeved on the surface of the steel rope through the steel rope hole, the connecting shaft is respectively connected with two groups of steel ropes, the other ends of the two groups; the detection box is arranged at the bottom end of the cotter pin, a detection cavity is arranged in the detection box, the limiting rod and the suspender are respectively connected with the top end and the bottom end of the connecting block, a first through groove is longitudinally arranged in the center of the bottom end of the detection box, a first ball group is rotatably fixed on the inner side of the first through groove, the bottom end of the suspender passes through the first ball group and extends to the lower part of the detection box, the first spring is sleeved on the outer side of the suspender, the top end of the first spring is connected with the bottom end of the connecting block, the bottom end of the first spring is connected with the inner bottom side wall of the detection box, the detection box further comprises a shielding plate, a spring rod and a second spring, a second through groove is transversely arranged on the left side of the detection box, a second ball group is rotatably fixed on the inner side of the second through groove, the left end of the spring rod is connected with the shielding plate, the right end of the spring rod passes through the second ball, and rotatable third ball group that is fixed with in third T inslot lateral wall, the gag lever post top passes third ball group and stretches out to the bouncing rod top, the second cover spring suit is in the bouncing rod outside, the second cover spring left end is connected with the shielding plate, the second cover spring bottom is connected with the detection case left side, be connected with the extension board between two sets of elevator motor, still include the buffer board, the scalable nest of tubes of third and third cover spring group top all are connected with the buffer board bottom, the scalable nest of tubes of third and third cover spring group bottom all are connected with the extension board top, the scalable nest of tubes of third suit is in the scalable nest of tubes outside of tubes of third.
Preferably, still including hanging case, two sets of screwed pipes, two sets of threaded rods and two sets of locating pieces, the inside chamber of placing that is provided with of hanging case, the intercommunication of hanging case top is provided with places the mouth, both sides all are provided with the bearing frame around in the hanging case to all rotatable being fixed with ball bearing in two sets of bearing frames, the outer end of two sets of screwed pipes respectively with two sets of ball bearing interference fit, two sets of threaded rods outer end insert respectively and spiral shell dress to two sets of screwed pipes inside respectively, two sets of threaded rods inner respectively with two sets of locating piece outside connections.
Preferably, the lifting box further comprises two sets of outer connecting rods, two sets of fourth set springs, two sets of fourth telescopic pipes and two sets of inner connecting rods, the outer ends of the two sets of outer connecting rods are respectively arranged on the front side and the rear side in the lifting box, one ends of the two sets of fourth set springs are respectively connected with the two sets of outer connecting rods, the other ends of the two sets of fourth set springs are respectively connected with the two sets of inner connecting rods, one ends of the two sets of fourth telescopic pipes are respectively connected with the two sets of outer connecting rods, the other ends of the two sets of fourth telescopic pipes are respectively connected with the two sets of inner connecting rods, the two sets of fourth set springs are respectively sleeved on the outer sides of the two.
Preferably, the device further comprises two sets of fifth spring sets, two sets of fifth telescopic tube sets and two sets of adjusting block sets, one ends of the two sets of fifth spring sets are respectively installed inside the two sets of positioning blocks, the other ends of the two sets of fifth spring sets are respectively connected with the two sets of adjusting block sets, one ends of the two sets of fifth telescopic tube sets are respectively installed inside the two sets of positioning blocks, the other ends of the two sets of fifth telescopic tube sets are respectively connected with the two sets of adjusting block sets, and the two sets of fifth spring sets are respectively sleeved outside the two sets of fifth telescopic tube sets.
Preferably, the jib bottom is connected with the spliced pole, and the couple is installed in the spliced pole bottom, still includes two sets of connection ropes, two sets of rings and two sets of rings down, and two sets of rings down are installed respectively in the spliced pole left and right sides and hanging box top left and right sides down to two sets of rings that go up, and two sets of connection rope bottoms all are provided with solid fixed ring, and two sets of solid fixed rings snare is fixed in two sets of rings department down respectively, and two sets of connection rope tops all are provided with the lifting hook, and two sets.
Preferably, still include support column and light sense night-light, the support column right side is connected with the detection case left side, and the light sense night-light is installed at the support column left end, and the light sense night-light is located the positive left side of sheltering from the board.
(III) advantageous effects
Compared with the prior art, the utility model provides a thing device is sent in high altitude for building possesses following beneficial effect: the material article can be hung through the suspender, when the suspender does not bear the material article, the shielding plate is manually extruded to enable the elastic rod to be in contact with the right side wall in the detection box under the action of the second set of springs, the top end of the limiting rod passes through the third through groove under the action of the first set of springs, the first set of springs are in a stretching state under the action of the elastic coefficient of the first set of springs, then the material article is gradually added and placed, the suspender is pulled to move downwards by the material to enable the first set of springs to slowly retract until the first set of springs are extruded, when the material is overweight, the suspender is pulled to be the lowest by the material, the top end of the limiting rod is pulled out from the third through groove to the lower side, the shielding plate is popped out leftwards under the action of the second set of springs at the moment, when the heavy object borne by the steel rope is overweight, the working personnel can be conveniently reminded, the damage and even breakage of the steel rope is reduced, the reliability, The elastic rod and the limiting rod slide more smoothly, the third set of spring group drives the buffer plate to buffer in the moment of careless dropping of transported materials and articles, the use reliability is improved, and the third set of spring group is assisted by the third telescopic pipe group to be difficult for distortion and deformation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the hanging cage;
FIG. 3 is an enlarged view of a portion A of FIG. 1;
FIG. 4 is an enlarged view of a portion B of FIG. 1;
in the figure: 1. a lifting rod; 2. hooking; 3. a steel cord; 4. a lifting motor; 5. an electric rotating shaft; 6. a detection box; 7. a limiting rod; 8. connecting blocks; 9. a first set of springs; 10. a boom; 11. a shielding plate; 12. a spring rod; 13. a second set of springs; 14. a support plate; 15. a buffer plate; 16. a third set of spring sets; 17. hanging a box; 18. a threaded pipe; 19. a threaded rod; 20. positioning blocks; 21. a fourth set of springs; 22. a fifth spring set; 23. adjusting the block group; 24. connecting columns; 25. connecting ropes; 26. an upper hanging ring; 27. a lower lifting ring; 28. a fixing ring; 29. a hook; 30. a support pillar; 31. a light-sensitive night light; 32. and a cotter pin.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model discloses a high altitude delivery device for building, including two sets of lifter 1, linkage, couple 2 and steel cable 3, two ends of steel cable 3 are connected respectively at two sets of lifter 1 tops, two sets of lifter 1 inboard all is provided with the buffering sponge layer, elevator motor 4 is all installed to two sets of lifter 1 bottoms, linkage includes split pin 32, the inside steel cable hole that is provided with of split pin 32, split pin 32 one side fixedly connected with connecting axle, linkage is through the steel cable hole cover on steel cable 3 surface, the connecting axle is connected with two sets of wire rope respectively, two sets of wire rope other ends all are connected with electric rotating shaft 5, two sets of electric rotating shaft 5 other ends are installed respectively on two sets of lifter 1 surfaces; the detection box comprises a detection box 6, a limiting rod 7, a connecting block 8, a first sleeve spring 9 and a hanging rod 10, wherein the detection box 6 is arranged at the bottom end of a cotter pin 32, a detection cavity is arranged in the detection box 6, the limiting rod 7 and the hanging rod 10 are respectively connected with the top end and the bottom end of the connecting block 8, a first through groove is longitudinally arranged at the center of the bottom end of the detection box 6, a first ball group is rotatably fixed on the inner side of the first through groove, the bottom end of the hanging rod 10 penetrates through the first ball group and extends to the lower part of the detection box 6, the first sleeve spring 9 is sleeved on the outer side of the hanging rod 10, the top end of the first sleeve spring 9 is connected with the bottom end of the connecting block 8, the bottom end of the first sleeve spring 9 is connected with the inner bottom side wall of the detection box 6, the detection box further comprises a baffle plate 11, a spring rod 12 and a second sleeve spring 13, a second through groove is transversely arranged on the left side of the detection box 6 and rotatably fixed on the, a third through groove is longitudinally arranged on the right side of the elastic rod 12, a third ball group is rotatably fixed on the inner side wall of the third through groove, the top end of the limiting rod 7 penetrates through the third ball group and extends to the position above the elastic rod 12, a second spring 13 is sleeved on the outer side of the elastic rod 12, the left end of the second spring 13 is connected with a baffle plate 11, the bottom end of the second spring 13 is connected with the left side of the detection box 6, a support plate 14 is connected between the two groups of lifting motors 4, the detection box further comprises a buffer plate 15, a third telescopic tube group and a third spring group 16, the top ends of the third telescopic tube group and the third spring group 16 are both connected with the bottom end of the buffer plate 15, the bottom ends of the third telescopic tube group and the third spring group 16 are both connected with the top end of the support plate 14, the third spring group 16 is sleeved on the outer side of the third telescopic tube group and can hang material articles through the suspender 10, when the suspender 10 does not carry the material articles, the suspender 11 manually extrudes the baffle plate, at the moment, the top end of the limiting rod 7 passes through the third through groove under the action of the first set spring 9, under the action of the elastic coefficient of the first set spring 9, the first set spring 9 is in a stretching state, then material objects are added and released a little by a little, the material pulls the suspender 10 to move downwards so that the first set spring 9 slowly retracts until extrusion is carried out, when the material is overweight, the material pulls the suspender 10 to the lowest, the top end of the limiting rod 7 is pulled out to the lower side from the third through groove, at the moment, the shielding plate 11 is popped out leftwards under the action of the second set spring 13, when the heavy object carried by the steel rope 3 is overweight, the working personnel can be conveniently reminded, the damage and even breakage of the steel rope 3 are reduced, the reliability is improved, and the practicability is improved, the first ball group, the second ball group and the third ball group respectively assist the suspender 10, the elastic rod 12 and the limiting rod 7 to slide more smoothly, the third set spring group 16 drives the, the use reliability is improved, and the third telescopic pipe group assists the third spring group 16 not to be easily distorted and deformed.
The hanging box comprises a hanging box 17, two groups of threaded pipes 18, two groups of threaded rods 19 and two groups of positioning blocks 20, a placing cavity is arranged inside the hanging box 17, a placing opening is formed in the top end of the hanging box 17 in a communicated mode, bearing seats are arranged on the front side and the rear side inside the hanging box 17 and can be fixed with ball bearings in a rotating mode, the outer ends of the two groups of threaded pipes 18 are in interference fit with the two groups of ball bearings respectively, the outer ends of the two groups of threaded rods 19 are inserted into and screwed into the inner ends of the two groups of threaded pipes 18 respectively, the inner ends of the two groups of threaded rods 19 are connected with the outer sides of the two groups of positioning blocks 20 respectively, articles which are not easy to hang can be placed conveniently through the hanging box 17, meanwhile, the two groups of threaded pipes 18 are rotated manually to drive the two groups of positioning blocks 20 to move, Two sets of fourth set springs 21, two sets of fourth telescopic tubes and two sets of internal connecting rods, wherein the outer ends of the two sets of external connecting rods are respectively arranged at the front side and the rear side in the hanging box 17, one ends of the two sets of fourth set springs 21 are respectively connected with the two sets of external connecting rods, the other ends of the two sets of fourth set springs 21 are respectively connected with the two sets of internal connecting rods, one ends of the two sets of fourth telescopic tubes are respectively connected with the two sets of external connecting rods, the other ends of the two sets of fourth telescopic tubes are respectively connected with the two sets of internal connecting rods, the two sets of fourth set springs 21 are respectively sleeved at the outer sides of the two sets of fourth telescopic tubes, the two sets of internal connecting rods are respectively arranged at the outer ends of the two sets of positioning blocks 20, when the two sets of positioning blocks 20 are assisted to move forwards and backwards through the two sets of fourth set springs 21, the threaded, the clamp is characterized by further comprising two groups of fifth spring groups 22, two groups of fifth telescopic tube groups and two groups of adjusting block groups 23, wherein one ends of the two groups of fifth spring groups 22 are respectively arranged on the inner sides of the two groups of positioning blocks 20, the other ends of the two groups of fifth spring groups 22 are respectively connected with the two groups of adjusting block groups 23, one ends of the two groups of fifth telescopic tube groups are respectively arranged on the inner sides of the two groups of positioning blocks 20, the other ends of the two groups of fifth telescopic tube groups are respectively connected with the two groups of adjusting block groups 23, the two groups of fifth spring groups 22 are respectively sleeved on the outer sides of the two groups of fifth telescopic tube groups, the clamp can conveniently clamp articles by driving the two groups of adjusting block groups 23 through the two groups of fifth spring groups 22, the clamp is more stable, the fifth telescopic tube groups assist the fifth spring groups 22 to be not easy to distort and deform, the bottom end, Two groups of upper rings 26 and two groups of lower rings 27, two groups of upper rings 26 and two groups of lower rings 27 are respectively arranged at the left and right sides of the connecting column 24 and the left and right sides of the top end of the hanging box 17, two groups of connecting ropes 25 are respectively provided with fixing rings 28 at the bottom ends, two groups of fixing rings 28 are respectively fixed at the two groups of lower rings 27 in a sleeving manner, two groups of connecting ropes 25 are respectively provided with lifting hooks 29 at the top ends, two groups of lifting hooks 29 are respectively hooked at the two groups of upper rings 26 and can be conveniently transported through the mutual matching of the hanging hooks 2 and the hanging box 17, the design that the two groups of lifting hooks 29 are respectively hooked at the two groups of upper rings 26 is convenient for the increase and disassembly of the hanging box 17, the use is more convenient, the device also comprises a supporting column 30 and a light sensing night lamp 31, the right side of the supporting column 30 is connected with the left side of the detection box 6, the light sensing night lamp 31 is arranged, light sense night-light 31 lights, more conveniently makes the staff notice, and light sense night-light 31 is the common electrical part in market, only needs to connect according to the instruction manual electricity of buying back together when using back and can use, and right side induction end and power module also belong to its from taking the part, so no longer describe here.
In the description, it should be noted that the installation manner, the connection manner, or the setting manner of all the above-mentioned components are all welding, riveting, or other common mechanical manners, wherein slidable/rotatable fixation means that the components do not fall off in a sliding/rotatable state, sealed communication means that two connecting pieces are communicated and simultaneously sealed, and the specific structures, models, and coefficient indexes of all the components are all self-contained technologies, as long as the beneficial effects can be achieved, all the above-mentioned power utilization modules and power utilization devices are common electric devices in the market, when the power utilization modules and the power utilization devices are bought for use, the power utilization modules and the power utilization devices can be used only by being electrically connected with each other according to the usage instruction purchased from the market, and the control module is a common self-contained module, so that the description is not repeated, and the terms "include", "include" or any other variants thereof are intended to cover non, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A high-altitude material conveying device for buildings comprises two groups of lifting rods (1), a hanging device, a hook (2) and steel ropes (3), wherein two ends of each steel rope (3) are respectively connected to the top ends of the two groups of lifting rods (1), the inner sides of the two groups of lifting rods (1) are respectively provided with a buffer sponge layer, the bottom ends of the two groups of lifting rods (1) are respectively provided with a lifting motor (4), the hanging device comprises a cotter pin (32), a steel rope hole is formed in the cotter pin (32), one side of the cotter pin (32) is fixedly connected with a connecting shaft, the hanging device is sleeved on the surface of each steel rope (3) through the steel rope hole, the connecting shaft is respectively connected with two groups of steel ropes, the other ends of the two groups of steel ropes are respectively connected with; the method is characterized in that: the detection box comprises a detection box (6), a limiting rod (7), a connecting block (8), a first spring set (9) and a hanging rod (10), wherein the detection box (6) is arranged at the bottom end of a cotter pin (32), a detection cavity is arranged in the detection box (6), the limiting rod (7) and the hanging rod (10) are respectively connected with the top end and the bottom end of the connecting block (8), a first through groove is longitudinally formed in the center of the bottom end of the detection box (6), a first ball group is rotatably fixed on the inner side of the first through groove, the bottom end of the hanging rod (10) penetrates through the first ball group and extends to the lower part of the detection box (6), the first spring set (9) is sleeved on the outer side of the hanging rod (10), the top end of the first spring set (9) is connected with the bottom end of the connecting block (8), the bottom end of the first spring set (9) is connected with the inner bottom side wall of the detection box (6), the detection box further comprises a shielding plate (11), a spring rod, a second ball group is rotatably fixed on the inner side of the second through groove, the left end of the elastic rod (12) is connected with the baffle plate (11), the right end of the elastic rod (12) passes through the second ball group and extends into the detection box (6), a third through groove is longitudinally arranged on the right side of the elastic rod (12), a third ball group is rotatably fixed on the inner side wall of the third through groove, the top end of the limiting rod (7) passes through the third ball group and extends above the elastic rod (12), a second spring set (13) is sleeved on the outer side of the elastic rod (12), the left end of the second spring set (13) is connected with the baffle plate (11), the bottom end of the second spring set (13) is connected with the left side of the detection box (6), a support plate (14) is connected between two groups of lifting motors (4), the elevator further comprises a buffer plate (15), a third telescopic pipe group and a third spring set (16), and the top ends of the third telescopic pipe set and the third spring set (16) are connected with the bottom end of the buffer plate, the bottom ends of the third telescopic pipe group and the third spring group (16) are connected with the top end of the support plate (14), and the third spring group (16) is sleeved on the outer side of the third telescopic pipe group.
2. The high-altitude material conveying device for the building as claimed in claim 1, wherein: still including hanging case (17), two sets of screwed pipe (18), two sets of threaded rod (19) and two sets of locating piece (20), it places the chamber to hang the inside being provided with of case (17), it is provided with and places the mouth to hang case (17) top intercommunication, both sides all are provided with the bearing frame around in hanging case (17), and all rotatable be fixed with ball bearing in two sets of bearing frames, the outer end of two sets of screwed pipe (18) respectively with two sets of ball bearing interference fit, inside two sets of threaded rod (19) outer end inserted respectively and spiral shell dress to two sets of screwed pipe (18) inner, two sets of threaded rod (19) inner is connected with two sets of locating piece (20) outsides respectively.
3. The high-altitude object conveying device for the building as claimed in claim 2, wherein: the two-set four-way telescopic pipe is characterized by further comprising two sets of outer connecting rods, two sets of fourth set springs (21), two sets of fourth telescopic pipes and two sets of inner connecting rods, the outer ends of the two sets of outer connecting rods are respectively arranged on the front side and the rear side in the hanging box (17), one ends of the two sets of fourth set springs (21) are respectively connected with the two sets of outer connecting rods, the other ends of the two sets of fourth set springs are respectively connected with the two sets of inner connecting rods, the other ends of the two sets of fourth telescopic pipes are respectively connected with the two sets of inner connecting rods, the two sets of fourth set springs (21) are respectively sleeved on the outer sides of the two sets of fourth telescopic pipes, and the two sets of inner connecting rods are respectively arranged at the.
4. The high-altitude material conveying device for the building as claimed in claim 3, wherein: still include two sets of fifth cover spring group (22), two sets of scalable nest of tubes of fifth and two sets of regulation block group (23), two sets of fifth cover spring group (22) one end is installed respectively in two sets of locating pieces (20) inboards, two sets of fifth cover spring group (22) other ends are connected with two sets of regulation block group (23) respectively, two sets of fifth scalable nest of tubes one end is installed respectively in two sets of locating pieces (20) inboards, two sets of fifth scalable nest of tubes other ends are connected with two sets of regulation block group (23) respectively, two sets of fifth cover spring group (22) suit respectively in two sets of fifth scalable nest of tubes outsides.
5. The high-altitude material conveying device for the building as claimed in claim 4, wherein: the bottom end of the suspender (10) is connected with a connecting column (24), the hook (2) is installed at the bottom end of the connecting column (24), the hanging device further comprises two groups of connecting ropes (25), two groups of upper hanging rings (26) and two groups of lower hanging rings (27), the two groups of upper hanging rings (26) and the two groups of lower hanging rings (27) are respectively installed at the left side and the right side of the connecting column (24) and the left side and the right side of the top end of the hanging box (17), the bottom ends of the two groups of connecting ropes (25) are respectively provided with a fixing ring (28), the two groups of fixing rings (28) are respectively fixed at the two groups of lower hanging rings (27), the top ends of the two groups of connecting ropes (.
6. The high-altitude material conveying device for the building as claimed in claim 5, wherein: still include support column (30) and light sense night-light (31), support column (30) right side and detection case (6) left side are connected, and light sense night-light (31) are installed in support column (30) left end, and light sense night-light (31) are located shielding plate (11) just left side.
CN202020248027.3U 2020-03-03 2020-03-03 High-altitude object conveying device for building Expired - Fee Related CN211619779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020248027.3U CN211619779U (en) 2020-03-03 2020-03-03 High-altitude object conveying device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020248027.3U CN211619779U (en) 2020-03-03 2020-03-03 High-altitude object conveying device for building

Publications (1)

Publication Number Publication Date
CN211619779U true CN211619779U (en) 2020-10-02

Family

ID=72620087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020248027.3U Expired - Fee Related CN211619779U (en) 2020-03-03 2020-03-03 High-altitude object conveying device for building

Country Status (1)

Country Link
CN (1) CN211619779U (en)

Similar Documents

Publication Publication Date Title
CN106737628A (en) A kind of flexible charging robot driven based on rope
CN101912672B (en) Deep well rescue device
CN105398990B (en) Electric power angle steel tower auxiliary lifting apparatus
CN208120434U (en) A kind of collapsible transport device of cable production
CN206310359U (en) Powered reels lifter and its lifting lamp
CN211619779U (en) High-altitude object conveying device for building
CN201293268Y (en) Solar energy headlamp lever
CN201190443Y (en) Embraced Bar special for tower set
CN109850745B (en) Curtain wall glass mounting and hanging device
CN212669055U (en) Tire handling equipment of tire processing usefulness
CN106907596B (en) Multi-stage nodal nested mobile lighting system
CN115582846A (en) Modular hot-line work robot
CN213983454U (en) Self-locking power-off lifting device
CN108695771A (en) Transmission line of electricity OPGW optical cable preformed armor rods install Special-purpose lifting tool
CN209193362U (en) A kind of cradle for constructional engineering being convenient for material transportation
CN204624991U (en) The quick suspender of a kind of Novel motor stator winding
CN209778134U (en) Electric hoist with overload protection function
CN104290644A (en) Pneumatic lifting movable lighting light projection vehicle
CN206927506U (en) A kind of balance crane of crane
CN208479033U (en) Transmission line of electricity OPGW optical cable preformed armor rods install Special-purpose lifting tool
CN214031617U (en) Adjustable lifting machine aircraft nose structure
CN207192681U (en) A kind of adjustable erecting device of decoration element
CN219606824U (en) Solar street lamp convenient to wire
CN208253351U (en) Three arm observation lamp of darkroom
CN217046425U (en) Electric explosion-proof manipulator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201002