CN211571685U - Concrete pouring processing device for collapse position of wall of diaphragm wall - Google Patents

Concrete pouring processing device for collapse position of wall of diaphragm wall Download PDF

Info

Publication number
CN211571685U
CN211571685U CN201922233639.5U CN201922233639U CN211571685U CN 211571685 U CN211571685 U CN 211571685U CN 201922233639 U CN201922233639 U CN 201922233639U CN 211571685 U CN211571685 U CN 211571685U
Authority
CN
China
Prior art keywords
wall
plate body
isolation plate
collapse
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922233639.5U
Other languages
Chinese (zh)
Inventor
刘小军
肖银平
胡玉天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zetong Waterworks Construction Co ltd
Original Assignee
Beijing Zetong Waterworks Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zetong Waterworks Construction Co ltd filed Critical Beijing Zetong Waterworks Construction Co ltd
Priority to CN201922233639.5U priority Critical patent/CN211571685U/en
Application granted granted Critical
Publication of CN211571685U publication Critical patent/CN211571685U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a concrete pouring processing device for the collapse position of the wall of a diaphragm wall, which relates to the technical field of underground diaphragm wall construction, and the technical scheme comprises a reinforcement cage structure, wherein the reinforcement cage structure comprises two layers of reinforcement sheet units and H-shaped steel positioned at two side ends, and also comprises a separation plate body which can cover a collapse area and a plurality of supports which are arranged at intervals and are used for supporting the separation plate body to form a concrete protection layer together with a reinforcement sheet; the isolation plate body is located at the groove wall close to the side of the foundation pit, and the isolation plate body and the support are fixed on the main reinforcement of the reinforcement cage. After the steel reinforcement cage is transferred, the division board body will collapse the district and cover, in the cavity that the concrete that has prevented to pour pours into and collapses, when treating the foundation ditch excavation, the division board body is demolishd in step to guaranteed the level and smooth of the foundation ditch inner wall that the diaphragm wall formed, prevented the appearance of protrusion concrete structure, avoided the influence to follow-up construction.

Description

Concrete pouring processing device for collapse position of wall of diaphragm wall
Technical Field
The utility model relates to an underground continuous wall construction technical field, in particular to concrete placement processing apparatus that diaphragm wall cell wall collapses.
Background
At present, in underground engineering construction, a diaphragm wall is widely used as a foundation pit supporting measure, and structural construction is carried out after earth inside the diaphragm wall is excavated (see fig. 1). During the construction of the underground diaphragm wall, due to various geological conditions, grooving process level, an underground diaphragm wall supporting form and the like, a groove wall collapse phenomenon (as shown in figure 2) often occurs, and particularly in the construction of a T-shaped underground diaphragm wall (as shown in figure 3), an L-shaped underground diaphragm wall (as shown in figure 4) and a cross-shaped underground diaphragm wall (as shown in figure 5), the groove wall collapse is easily caused due to the local reasons of soil pressure and stress, so that after the concrete of the underground diaphragm wall is poured, the subsequent structural construction is influenced by the concrete protruding from the exposed surface of the excavation of a foundation pit, the chiseling is difficult, the construction period is delayed and the like.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, one of the purposes of the utility model aims at providing a ground is wall cell wall concrete placement processing apparatus that collapses, its advantage is that ground after can preventing to pour is wall even and is formed convex concrete structure, prevents to influence the construction of follow-up structure.
The above object of the present invention can be achieved by the following technical solutions: the steel reinforcement cage structure comprises two layers of steel reinforcement sheet units, H-shaped steel positioned at two side ends, an isolation plate body capable of covering a collapse area and a plurality of supports which are arranged at intervals and used for supporting the isolation plate body to form a concrete protection layer together with a steel reinforcement net sheet; the isolation plate body is located at the groove wall close to the side of the foundation pit, and the isolation plate body and the support are fixed on the main reinforcement of the reinforcement cage.
Through the technical scheme, after the reinforcement cage is placed downwards, the collapse area is covered by the isolation plate body, so that poured concrete is prevented from being poured into the collapsed cavity, and when a foundation pit is excavated, the isolation plate body is synchronously removed, so that the flatness of the inner wall of the foundation pit formed by the underground diaphragm wall is ensured, a protruding concrete structure is prevented, and the influence on subsequent construction is avoided; the setting of support has guaranteed the protective layer thickness of mixing ground even wall reinforcing bar, causes the reinforcing bar to leak outward after avoiding the foundation ditch excavation, influences the structural strength of ground even wall.
The utility model discloses further set up to: the support is the steel sheet of a few font, two otic placodes of a few font steel sheet with main muscle welding, mainboard and division board laminating.
Through above-mentioned technical scheme, the simple workable of nearly font plate structure, the mainboard can provide great holding surface, forms firm structure after otic placode and the main muscle welding, has effectively guaranteed the thickness of protective layer.
The utility model discloses further set up to: the isolation plate body is bound and fixed on the main reinforcement of the reinforcement cage by an iron wire.
Through the technical scheme, the temporary fixing of the isolation plate body and the reinforcement cage is realized, and the isolation plate body is convenient to remove during foundation pit excavation.
The utility model discloses further set up to: the surface of division plate body is provided with many fixed steel bars, and the iron wire passes the division plate body and is connected the back with fixed steel bar and main muscle, and fixed steel bar compresses tightly the division plate body on the support.
Through above-mentioned technical scheme, the fixed steel bar makes the division board body more firm with being connected of steel reinforcement cage, effectively prevents the deformation of division board in the work progress moreover.
The utility model discloses further set up to: the isolation plate body is a bamboo plywood.
Through the technical scheme, the bamboo plywood is low in cost, high in strength and economical.
The utility model discloses further set up to: the coverage area of the isolation plate body exceeds the edge of the collapse area by not less than 1 m.
Through above-mentioned technical scheme, seal the collapse area completely, prevent that the concrete from getting into the collapse area from the edge of division board.
The utility model discloses further set up to: the plurality of brackets are arranged in a plum blossom shape.
Through the technical scheme, the stress of the isolation plate body is more uniform.
The utility model discloses further set up to: and the collapse part of the groove wall far away from the foundation pit is also provided with an isolation plate body and a support.
Through above-mentioned technical scheme, prevent that the concrete from getting into the collapse area of keeping away from the foundation ditch side, cause the waste of concrete.
To sum up, the utility model discloses following beneficial effect has:
1. the bamboo plywood covers the collapse area, prevents poured concrete from being poured into the collapsed cavity, and saves the concrete.
2. When the foundation pit is excavated, the bamboo plywood is removed synchronously, so that the flatness of the inner wall of the foundation pit formed by the diaphragm wall is ensured, the occurrence of a protruding concrete structure is prevented, and the influence on subsequent construction is avoided;
3. the setting of support has guaranteed the protective layer thickness of mixing ground even wall reinforcing bar, causes the reinforcing bar to leak outward after avoiding the foundation ditch excavation, influences the structural strength of ground even wall. The bamboo plywood is firmer due to the arrangement of the reinforcing steel bars, and deformation failure in the construction process is avoided.
Drawings
FIG. 1 is a schematic diagram of a construction structure in a foundation pit after the construction is completed;
FIG. 2 is a schematic view of the wall collapse of the diaphragm wall;
FIG. 3 is a schematic view of the collapse of the groove wall at the corner of the T-shaped diaphragm wall;
FIG. 4 is a schematic view of the collapse of the wall of the corner of the L-shaped diaphragm wall;
FIG. 5 is a schematic view of the collapse of the wall of the corner of the cruciform diaphragm wall;
FIG. 6 is a schematic structural view of the present invention;
FIG. 7 is a schematic view showing the structure of a steel plate bracket in a shape of Chinese character 'ji';
fig. 8 is a top view of the present invention in a slot of a diaphragm wall.
Reference numerals: 1. a reinforcing steel bar sheet unit; 2. h-shaped steel; 3. an isolation plate body; 4. a support; 41. an ear plate; 42. a main board; 5. fixing the steel bars; 6. and (4) iron wires.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides a ground is wall cell wall concrete placement processing apparatus that collapses, combines fig. 6 and fig. 8 to show, including the steel reinforcement cage structure of ground connecting wall, the steel reinforcement cage structure includes two-layer reinforcing bar piece unit 1 and the H shaped steel 2 that is located both sides end, still include with can cover the division plate body 3 in the district that collapses and a plurality of interval sets up be used for supporting division plate body 3 and make its and reinforcing bar net piece between form the support 4 of concrete protection layer. The plurality of brackets 4 are arranged in a quincuncial shape with a distance of 1-1.5m, and the brackets 4 are n-shaped steel plates with a thickness of 4mm (refer to fig. 7). Two ear plates 41 of the U-shaped steel plate are welded with the main reinforcement of the reinforcement cage. The division board is the bamboo offset plate of 12mm thick that the polylith is spliced each other, laminates at the surface of the mainboard 42 of the nearly font steel sheet. The coverage range of the isolation plate exceeds the edge of the collapse area by not less than 1 m. The surface of bamboo plywood is provided with many fixed steel bar 5 of diameter 12mm side by side, and 8 # iron wires 6 pass the bamboo plywood and are connected the back with fixed steel bar 5 and main muscle, and fixed steel bar 5 compresses tightly the bamboo plywood on support 4. The fixing points of the No. 8 iron wire 6 can also be arranged in a quincunx shape, and the distance between the fixing points is 1-1.5 m.
The whole construction process is as follows:
step 1, after the underground diaphragm wall is grooved, a groove wall detector is used for detecting the collapse position, the collapse area and the shape of the groove wall of the excavation surface;
step 2, welding n-shaped steel plate supports 4 at intervals on the corresponding positions of the underground wall-connected reinforcement cage body relative to the collapse of the groove wall on the reinforcement cage, and covering and fixing the reinforcement cage by bamboo plywood, wherein the coverage range of the bamboo plywood exceeds the collapse edge by not less than 1 m; and a reinforcing fixed steel bar 5 with the diameter of 12mm and arranged outside the bamboo plywood is firmly bound with the main reinforcement of the reinforcement cage by using a No. 8 iron wire 6.
Step 3, hanging the reinforcement cage body fixed with the bamboo plywood in the slot hole;
and 4, completing concrete pouring of the diaphragm wall, and removing the bamboo plywood along with the earthwork excavation in the foundation pit.
Likewise, the division plate 3 and the support 4 are also arranged at the collapse point of the groove wall far away from the foundation pit.
Through above-mentioned technical scheme, the steel reinforcement cage is transferred the back, and the bamboo plywood will be collapsed the district and cover, has prevented that the concrete of pouring from pouring into in the cavity that collapses, has practiced thrift the concrete. When the foundation pit is excavated, the bamboo plywood is removed synchronously, so that the flatness of the inner wall of the foundation pit formed by the diaphragm wall is ensured, the occurrence of a protruding concrete structure is prevented, and the influence on subsequent construction is avoided; the setting of support 4 has guaranteed the protective layer thickness of thoughtlessly linking the wall reinforcing bar with earth, causes the reinforcing bar to leak outward after avoiding the foundation ditch excavation, influences the structural strength that links the wall with earth. The bamboo plywood is firmer due to the arrangement of the reinforcing steel bars, and deformation failure in the construction process is avoided.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a ground is wall cell wall concrete placement processing apparatus that collapses, includes the steel reinforcement cage structure of ground connecting wall, and the steel reinforcement cage structure includes two-layer reinforcing bar piece unit (1) and H shaped steel (2) that are located both sides end, characterized by: the concrete protection structure also comprises an isolation plate body (3) capable of covering the collapse area and a plurality of supports (4) which are arranged at intervals and used for supporting the isolation plate body (3) to form a concrete protection layer together with the reinforcing mesh; the isolation plate body (3) is located at the groove wall close to the side of the foundation pit, and the isolation plate body (3) and the support (4) are fixed on a main rib of the reinforcement cage.
2. The device for treating concrete pouring at the collapse position of the wall of the diaphragm wall as claimed in claim 1, which is characterized in that: the support (4) is a steel plate shaped like a Chinese character 'ji', two ear plates (41) of the steel plate shaped like a Chinese character 'ji' are welded with the main rib, and the main plate (42) is attached to the isolation plate.
3. The device for treating concrete pouring at the collapse position of the wall of the diaphragm wall as claimed in claim 2, wherein: the isolation plate body (3) is bound and fixed on the main reinforcement of the reinforcement cage by an iron wire (6).
4. The device for treating concrete pouring at the collapse position of the wall of the diaphragm wall as claimed in claim 3, wherein: the surface of the isolation plate body (3) is provided with a plurality of fixed steel bars (5), an iron wire (6) penetrates through the isolation plate body (3) to connect the fixed steel bars (5) with the main bars, and the fixed steel bars (5) compress the isolation plate body (3) on the support (4).
5. The device for treating concrete pouring at the collapse position of the wall of the diaphragm wall as claimed in claim 4, wherein: the isolation plate body (3) is a bamboo plywood.
6. The device for treating concrete pouring at the collapse position of the wall of the diaphragm wall as claimed in claim 1, which is characterized in that: the coverage range of the isolation plate body (3) exceeds the edge of the collapse area by not less than 1 m.
7. The device for treating concrete pouring at the collapse position of the wall of the diaphragm wall as claimed in claim 1, which is characterized in that: the plurality of brackets (4) are arranged in a plum blossom shape.
8. The device for treating concrete pouring at the collapse position of the wall of the diaphragm wall as claimed in claim 1, which is characterized in that: and the collapse part of the groove wall far away from the foundation pit is also provided with an isolation plate body (3) and a bracket (4).
CN201922233639.5U 2019-12-12 2019-12-12 Concrete pouring processing device for collapse position of wall of diaphragm wall Expired - Fee Related CN211571685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922233639.5U CN211571685U (en) 2019-12-12 2019-12-12 Concrete pouring processing device for collapse position of wall of diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922233639.5U CN211571685U (en) 2019-12-12 2019-12-12 Concrete pouring processing device for collapse position of wall of diaphragm wall

Publications (1)

Publication Number Publication Date
CN211571685U true CN211571685U (en) 2020-09-25

Family

ID=72536115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922233639.5U Expired - Fee Related CN211571685U (en) 2019-12-12 2019-12-12 Concrete pouring processing device for collapse position of wall of diaphragm wall

Country Status (1)

Country Link
CN (1) CN211571685U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565149A (en) * 2021-07-07 2021-10-29 深圳市中地建设工程有限公司 Leaking stoppage construction method by external bar planting method between piles
CN115369856A (en) * 2022-08-29 2022-11-22 中铁二十局集团南方工程有限公司 Super irrigation prevention device for underground continuous wall grooving construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565149A (en) * 2021-07-07 2021-10-29 深圳市中地建设工程有限公司 Leaking stoppage construction method by external bar planting method between piles
CN115369856A (en) * 2022-08-29 2022-11-22 中铁二十局集团南方工程有限公司 Super irrigation prevention device for underground continuous wall grooving construction

Similar Documents

Publication Publication Date Title
CN211571685U (en) Concrete pouring processing device for collapse position of wall of diaphragm wall
CN105064375B (en) Construction method of retaining and water stopping structure of foundation pit support
CN107740420A (en) Foundation ditch tears support and support replacement system and method open
CN201972155U (en) Topdown-construction-method foundation pit supporting structure of steel plate pile
CN106351343A (en) Basement outer wall waterproof protection structure capable of realizing synchronous crossing construction and construction method thereof
KR101082995B1 (en) Buried precast concrete wale for constructing basement wall and the method for constructing basement wall
CN106545019A (en) For the support-replacing system and construction method of stage differential style Underground Construction
CN104131576B (en) Construction method of impervious structure of waterproof curtain
CN103790393A (en) Construction method for integrated replacement of existing building structure
CN213539076U (en) Steel-wood template system of advanced water stop belt of ultrahigh underground outer wall post-cast strip
CN213538991U (en) Wall-penetrating connecting structure for front-supporting type grouting steel pipe
KR20120109418A (en) Inclined earth retaining structure method
CN102733398A (en) Combined recyclable supporting upright post in foundation pit support
CN107575025A (en) A kind of basement narrow space external wall construction structure and its construction method
CN109610516B (en) Basement exterior wall post-cast strip retaining wall construction method
CN204040042U (en) A kind of super large ultra-deep support with manually dug piles structure
JP6326294B2 (en) Construction method of earth retaining structure
CN201901876U (en) Steel sheet pile inversely-constructed foundation ditch supporting structure
CN213267905U (en) Box structure for building foundation pit construction support
CN205804365U (en) A kind of cap excavation method top board node structure
CN212248382U (en) Underground continuous wall seam water stopping device
CN205046549U (en) Prefabricated diaphragm wall unit and underground continuous wall
CN210827422U (en) Peripheral shallow structure foundation reinforced structure that buries of deep basal pit
CN209975481U (en) Assembled diversion channel of hydropower station
CN106759522A (en) A kind of the ground-connecting-wall G type joints and method of pre-buried repeatable Grouting Pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925