CN211547724U - Waterborne deviation-rectifying type pile driving mechanism - Google Patents
Waterborne deviation-rectifying type pile driving mechanism Download PDFInfo
- Publication number
- CN211547724U CN211547724U CN201922190447.0U CN201922190447U CN211547724U CN 211547724 U CN211547724 U CN 211547724U CN 201922190447 U CN201922190447 U CN 201922190447U CN 211547724 U CN211547724 U CN 211547724U
- Authority
- CN
- China
- Prior art keywords
- horizontal pole
- pile
- hole
- bolt
- deviation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a formula of can rectifying on water pile mechanism, including the plummer, the montant is installed through the bolt in the plummer left side, the welding of montant left side has first horizontal pole, the welding of first horizontal pole left end has the fixed plate, the pneumatic cylinder is installed through the bolt to the fixed plate left end, the welding of the output shaft lower extreme of pneumatic cylinder has the pile hammer, the second horizontal pole is installed through the pivot rotation in first horizontal pole below, second horizontal pole left end integrated into one piece has first arc piece, second arc piece is installed through the bolt to first arc piece front end, and this scheme is fixed with the stake through first arc piece and second arc piece, ensures that the direction of pile can not the deviation through installing two sets of first arc pieces and second arc piece, easy operation, convenient to use is worth promoting.
Description
Technical Field
The utility model relates to a pile technical field specifically is a formula pile driving mechanism can rectify on water.
Background
Piling means: the pile foundation is a deep foundation formed by the pile and a pile top bearing platform, the pile is divided into a friction pile and an end bearing pile according to the stress condition, the friction pile utilizes the friction between the pile wall and surrounding silt to bear the weight of an upper building structure, and the end bearing pile is used for driving the pile into a solid underground stratum and transmitting the load of the upper building structure to the solid stratum through the pile body.
Traditional pile driving needs other personnel to assist and right the stake, drives the ground part into with the stake earlier through the pile hammer, and supplementary staff can leave, and this kind of operating method is very dangerous, leads to the fact the injury to auxiliary staff easily, and pile driving direction is unstable moreover, can beat askew the condition and take place.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a formula of rectifying pile mechanism on water to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a formula of can rectifying on water pile mechanism, includes the plummer, the montant is installed through the bolt in the plummer left side, the welding of montant left side has first horizontal pole, the welding of first horizontal pole left end has the fixed plate, the pneumatic cylinder is installed through the bolt to the fixed plate left end, the welding of the output shaft lower extreme of pneumatic cylinder has the pile hammer, the second horizontal pole is installed through the pivot rotation in first horizontal pole below, second horizontal pole left end integrated into one piece has first arc piece, the second arc piece is installed through the bolt to first arc piece front end.
Preferably, the bottom of the bearing table is rotatably provided with a roller.
Preferably, the second diagonal rod is welded between the right end of the bearing platform and the right side of the upper end of the vertical rod, and the first diagonal rod is welded between the top of the left end of the first transverse rod and the left side of the upper end of the vertical rod.
Preferably, the number of the second cross rods is two, and the second cross rods are rotatably arranged at the left ends of the vertical rods through rotating shafts.
Preferably, the welding of montant left end has the fixed block, the fixed block is provided with four, the fixed block is installed respectively the upper end and the lower extreme of second horizontal pole.
Preferably, a second through hole is vertically formed in the upper end of the fixing block, a first through hole is vertically formed in the right end of the second cross rod, the second through hole is connected with the first through hole in a rotating mode through the rotating shaft, and circular blocks are welded to the upper end and the lower end of the rotating shaft.
Preferably, a third through hole is vertically formed in the left side of the first through hole, a fourth through hole is vertically formed in the left side of the second through hole, a bolt is inserted between the third through hole and the fourth through hole, and the lower end of the bolt is fixed through a bolt.
Preferably, the center of an included angle between the first arc-shaped block and the second arc-shaped block and the center of the pile hammer are on the same vertical line.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the pile is fixed through the first arc-shaped block and the second arc-shaped block, and deviation can not occur in the direction of piling by installing the two sets of first arc-shaped blocks and the second arc-shaped block.
2. Can rotate through the second horizontal pole, first arc piece and second arc piece can adapt to the stake of multiple diameter, and it has the bolt to peg graft between second horizontal pole and the fixed block, can be fixed with the second horizontal pole, prevents that the second horizontal pole from rotating.
3. Simple operation, convenient use and worth popularizing.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of a second cross bar of the present invention.
Fig. 3 is a schematic view of the fixing block and the vertical rod of the present invention.
Fig. 4 is a schematic view of the connection between the second cross bar and the vertical bar of the present invention.
In the figure: 1. a bearing table; 2. a vertical rod; 3. a first cross bar; 4. a fixing plate; 5. a hydraulic cylinder; 6. an output shaft; 7. a pile hammer; 8. a second cross bar; 9. a first arc-shaped block; 10. a second arc-shaped block; 11. a connecting rod; 12. a roller; 13. a first diagonal member; 14. a second diagonal member; 15. a first through hole; 16. a second through hole; 17. a rotating shaft; 18. a bolt; 19. a fixed block; 20. a circular block; 21. a third through hole; 22. and a fourth via.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The same reference numbers in different drawings identify the same or similar elements; it should be further understood that terms such as "first," "second," "third," "upper," "lower," "front," "rear," "inner," "outer," "end," "portion," "section," "width," "thickness," "zone," and the like, may be used solely for convenience in reference to the figures and to aid in describing the invention, and are not intended to limit the invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a formula of can rectifying on water pile mechanism, includes plummer 1, for the pile driver removal of convenience, plummer 1 bottom is rotated and is installed gyro wheel 12.
For the convenience of installing hydraulic cylinder 5, montant 2 is installed through the bolt in plummer 1 left side, and the welding of 2 left sides of montant has first horizontal pole 3, and the welding of 3 left ends of first horizontal pole has fixed plate 4, and pneumatic cylinder 5 is installed through the bolt in 4 left ends of fixed plate, and the welding of 6 lower extremes of output shaft of pneumatic cylinder 5 has pile hammer 7.
In order to install second horizontal pole 8, first horizontal pole 3 below is rotated through pivot 17 and is installed second horizontal pole 8, and second horizontal pole 8 is equipped with two one on the other, and second horizontal pole 8 rotates through pivot 17 and installs the left end at montant 2.
For convenient with the stake fixed, 8 left ends integrated into one piece of second horizontal pole have first arc piece 9, second arc piece 10 is installed through the bolt to first arc piece 9 front end, can carry out the dismouting with second arc piece 10 through the bolt elasticity, pull down second arc piece 10 earlier, laminate stake and first arc piece 9, rethread bolt is connected second arc piece 10 and first arc piece 9, first arc piece 9 and second arc piece 10 only need with the stake contact, with the vertical fixed of stake, need not press from both sides very tightly, avoid pressing from both sides too closely, when pneumatic cylinder 5 does the striking to the stake, hardly bump down the stake.
In order to stabilize the vertical rod 2, a second inclined rod 14 is welded between the right end of the bearing platform 1 and the right side of the upper end of the vertical rod 2, a first inclined rod 13 is welded between the top of the left end of the first cross rod 3 and the left side of the upper end of the vertical rod 2, the triangle is stable, and the vertical rod 2 is fixed on two sides of the vertical rod 2 through the first inclined rod 13 and the second inclined rod 14 and is more stable.
In order to install second horizontal pole 8 between fixed block 19, the welding of 2 left ends of montants has fixed block 19, and fixed block 19 is provided with four, and fixed block 19 installs respectively in the upper end and the lower extreme of second horizontal pole 8.
In order to rotate fixed block 19 and second through-hole 16 and link, 19 vertical second through-hole 16 of having seted up in the upper end of fixed block, 8 right-hand members of second horizontal pole are vertical to have seted up first through-hole 15, second through-hole 16 and first through-hole 15 rotate through pivot 17 to be connected, circular block 20 has all been welded to the upper end and the lower extreme of pivot 17, second horizontal pole 8 can rotate, first arc piece 9 and second arc piece 10 can adapt to the stake of multiple diameter, there is bolt 18 through the grafting, can be fixed second horizontal pole 8, prevent that second horizontal pole 8 from rotating.
In order to prevent the second cross rod 8 from shaking leftwards and rightwards when the pile is driven, the third through hole 21 is vertically formed in the left side of the first through hole 15, the fourth through hole 22 is vertically formed in the left side of the second through hole 16, the bolt 18 is inserted between the third through hole 21 and the fourth through hole 22, the lower end of the bolt 18 is fixed through a bolt, the bolt 18 is inserted after the pile position is fixed, the bolt 18 is fixed through a bolt, and therefore the second cross rod 8 cannot shake leftwards and rightwards.
In order to enable the pile hammer 7 to accurately drive the pile into the ground, the center of the included angle between the first arc-shaped block 9 and the second arc-shaped block 10 is on a vertical line with the center of the pile hammer 7.
The working principle is as follows: the method comprises the following steps:
at first, can carry out the dismouting with second arc piece 10 through the bolt elasticity, second arc piece 10 is pulled down earlier, laminate stake and first arc piece 9, rethread bolt is connected second arc piece 10 and first arc piece 9, first arc piece 9 and second arc piece 10 only need contact with the stake, it is vertical fixed with the stake, need not press from both sides tightly, avoid pressing from both sides too closely, when pneumatic cylinder 5 is the striking to the stake, hardly down the stake striking, start hydraulic cylinder 5, the output shaft 6 up-and-down motion of pneumatic cylinder 5, thereby drive pile hammer 7 up-and-down motion and strike the stake, after driving the stake into ground, loosen the bolt between first arc piece 9 and the second arc piece 10 again, part from the stake.
Consequently, this scheme, it is fixed with the stake through first arc piece 9 and second arc piece 10, ensure the direction of pile through installing two sets of first arc pieces 9 and second arc piece 10 and can not appear the deviation, can rotate through second horizontal pole 8, first arc piece 9 and second arc piece 10 can adapt to the stake of multiple diameter, there is bolt 18 through pegging graft, can be fixed with second horizontal pole 8, prevent that second horizontal pole 8 from rotating, and is easy to operate, convenient to use, be worth promoting.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a formula of rectifying pile mechanism on water, includes plummer (1), its characterized in that: montant (2) are installed through the bolt in plummer (1) left side, montant (2) left side welding has first horizontal pole (3), the welding of first horizontal pole (3) left end has fixed plate (4), pneumatic cylinder (5) are installed through the bolt to fixed plate (4) left end, the welding of output shaft (6) lower extreme of pneumatic cylinder (5) has pile hammer (7), rotate through pivot (17) below first horizontal pole (3) and install two second horizontal poles (8), second horizontal pole (8) left end integrated into one piece has first arc piece (9), second arc piece (10) are installed through the bolt to first arc piece (9) front end.
2. The marine deviation-rectifying pile-driving mechanism according to claim 1, wherein: the bottom of the bearing table (1) is rotatably provided with a roller (12).
3. The marine deviation-rectifying pile-driving mechanism according to claim 1, wherein: the welding has second down tube (14) between plummer (1) right-hand member and montant (2) upper end right side, first horizontal pole (3) left end top with it has first down tube (13) to weld between montant (2) upper end left side.
4. The marine deviation-rectifying pile-driving mechanism according to claim 1, wherein: two second horizontal pole (8) are all installed through pivot (17) rotation one on the other the left end of montant (2).
5. The marine deviation-rectifying pile-driving mechanism according to claim 1, wherein: montant (2) left end welding has fixed block (19), fixed block (19) are provided with four, fixed block (19) are installed respectively the upper end and the lower extreme of second horizontal pole (8).
6. The above-water deviation-correctable piling mechanism of claim 5, wherein: second through-hole (16) have vertically been seted up to fixed block (19) upper end, first through-hole (15) have vertically been seted up to second horizontal pole (8) right-hand member, second through-hole (16) with first through-hole (15) pass through pivot (17) rotate the connection, circular block (20) have all been welded to the upper end and the lower extreme of pivot (17).
7. The above-water deviation-correctable piling mechanism of claim 6, wherein: a third through hole (21) is vertically formed in the left side of the first through hole (15), a fourth through hole (22) is vertically formed in the left side of the second through hole (16), a bolt (18) is inserted between the third through hole (21) and the fourth through hole (22), and the lower end of the bolt (18) is fixed through a bolt.
8. The marine deviation-rectifying pile-driving mechanism according to claim 1, wherein: the center of an included angle between the first arc-shaped block (9) and the second arc-shaped block (10) and the center of the pile hammer (7) are on a vertical line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922190447.0U CN211547724U (en) | 2019-12-10 | 2019-12-10 | Waterborne deviation-rectifying type pile driving mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922190447.0U CN211547724U (en) | 2019-12-10 | 2019-12-10 | Waterborne deviation-rectifying type pile driving mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211547724U true CN211547724U (en) | 2020-09-22 |
Family
ID=72505061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922190447.0U Active CN211547724U (en) | 2019-12-10 | 2019-12-10 | Waterborne deviation-rectifying type pile driving mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211547724U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113529716A (en) * | 2021-07-15 | 2021-10-22 | 闵瑞 | Positioning base device of hydraulic clamp for overwater steel pile |
-
2019
- 2019-12-10 CN CN201922190447.0U patent/CN211547724U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113529716A (en) * | 2021-07-15 | 2021-10-22 | 闵瑞 | Positioning base device of hydraulic clamp for overwater steel pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211547724U (en) | Waterborne deviation-rectifying type pile driving mechanism | |
CN208395818U (en) | A kind of mounting device of high speed highway guardrail upright post | |
CN214245731U (en) | Underwater concrete pouring pile body construction structure | |
CN206987509U (en) | Supply line's electric pole plants lever apparatus | |
CN206706774U (en) | Larsen steel plate matches somebody with somebody i shaped steel foundation ditch sealing support system | |
CN211395670U (en) | Piling device for building construction | |
CN115142418B (en) | Non-vibration tube drawing anti-cage device for immersed tube filling pile and construction method thereof | |
CN207846395U (en) | A kind of quick roller-compactor in house construction engineering ground | |
CN212336021U (en) | Portable pile driver for constructional engineering | |
CN106351269B (en) | A kind of static press piling device and operating method suitable for transmission tower foundation correction | |
CN215105223U (en) | Device for reinforcing and treating liquefied foundation | |
CN114855772A (en) | Dual-purpose jacking equipment for inclined and straight piles | |
CN210975799U (en) | Double-spraying double-shaft oblique cement-soil stirring and profile steel inserting integrated equipment | |
CN210658376U (en) | Deep foundation pit supporting structure | |
CN210210259U (en) | Knocking device for civil engineering | |
JP2006291643A (en) | Pile driving machine and method for using pile driving machine | |
CN220246917U (en) | Steel pipe pile driving device | |
JP2002327434A (en) | Concrete pile and its manufacturing method and leader device | |
CN105970959A (en) | Pile driver special for building | |
CN218540679U (en) | Foundation pile driver with stable structure for harbor civil engineering pile driver | |
CN213682100U (en) | Pile driver for civil engineering | |
CN114032896B (en) | Construction device matched with pickaxe machine for piling | |
CN213538960U (en) | Pile driver for bridge building | |
CN212742524U (en) | Civil engineering is with pile equipment | |
CN220598423U (en) | Alignment fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |