CN211541706U - Concrete curing room - Google Patents

Concrete curing room Download PDF

Info

Publication number
CN211541706U
CN211541706U CN201922248939.0U CN201922248939U CN211541706U CN 211541706 U CN211541706 U CN 211541706U CN 201922248939 U CN201922248939 U CN 201922248939U CN 211541706 U CN211541706 U CN 211541706U
Authority
CN
China
Prior art keywords
placing plate
board
placing
motor
curing room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922248939.0U
Other languages
Chinese (zh)
Inventor
梁多铭
李进
刘生和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Yushuo Commercial Concrete Co ltd
Original Assignee
Sichuan Yushuo Commercial Concrete Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Yushuo Commercial Concrete Co ltd filed Critical Sichuan Yushuo Commercial Concrete Co ltd
Priority to CN201922248939.0U priority Critical patent/CN211541706U/en
Application granted granted Critical
Publication of CN211541706U publication Critical patent/CN211541706U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a concrete curing room belongs to the concrete curing field, including setting up the multiunit mounting on the curing room inner wall, the mounting includes that the first board of placing that is parallel to each other, the board is placed to the second and the board is placed to the third, the first board of placing, the board is placed to the second and the board is placed along vertical direction interval setting to the third, the first board of placing height that places the board is higher than the second and places the board and the board is placed to the third, the first board of placing, the second is placed board and third and is placed board sliding connection on the inner wall of curing room body, the first board of placing and second place the board, the second is placed board and third and is placed and all be provided with between the board and be connected the rope, connect the both ends of rope respectively with the first board of placing, the board is placed to the second and the board fixed connection is placed to the third, this internal drive arrangement that is used for driving the first board. The utility model discloses have and be convenient for place the concrete test block and reduced staff intensity of labour's effect.

Description

Concrete curing room
Technical Field
The utility model belongs to the technical field of the technique of concrete curing and specifically relates to a concrete curing room is related to.
Background
With the continuous development of concrete technology and the use of high-performance concrete and additives, the attention degree of people on the long-term deformation performance of concrete materials is gradually improved, a plurality of testing indexes of the long-term performance of the concrete are gradually known, and the compressive strength of the concrete is obtained by detecting a concrete test block by a concrete compressive detection device. The concrete test block needs to be cured in a curing room for a specified time before the test block is tested for compressive strength.
The existing Chinese patent with the publication number of CN209350520U discloses a curing room convenient for taking and placing concrete prefabricated parts, which comprises a box body and a plurality of placing frames arranged in the box body, wherein one side of the box body is hinged with a box door; mounting plates parallel to the bottom surface of the box body are respectively arranged on the inner wall of the box body and positioned on two sides of the placing frame, an upper track plate and a lower track plate which are parallel up and down are arranged on the mounting plates along the length direction of the mounting plates, a first roller wheel is rotatably arranged at one end, close to the box door, of the mounting plates, and the first roller wheel is positioned above the lower track plate; the two side faces of the placing frame are provided with supporting plates parallel to the lower track plate, one side, away from the box door, of each supporting plate is provided with a second roller, the second rollers are rotatably connected to the placing frame, the second rollers are arranged between the upper track plate and the lower track plate in a rolling mode, and the lower surfaces of the supporting plates are attached to the wheel faces of the first rollers.
The above prior art solutions have the following drawbacks: when carrying out the maintenance of concrete test block, need the staff to place the concrete test block in proper order on every rack, then the maintenance of beginning the concrete test block again, but owing to the highly higher of the rack that is located the top, and the concrete test block has certain weight, staff's intensity of labour is very big when placing the concrete test block, and is comparatively troublesome.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a concrete curing room convenient to place the concrete test block and reduced staff intensity of labour.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a concrete curing room, is including setting up the multiunit mounting on the curing room inner wall, the mounting is including the first board of placing, the board is placed to the second and the board is placed to the third that are parallel to each other, the first board of placing, the second is placed the board and the third is placed the board and is set up along vertical direction interval, the first board of placing highly being higher than the second and place the board and the third is placed the board, the first board of placing, the second is placed board and third and is placed board sliding connection on the inner wall of curing room body, the first board of placing and the second is placed board, the second is placed and all is provided with the connection rope between the board with the third, the both ends of connecting rope respectively with the first board of placing, the second is placed board and the third is placed board fixed connection, this internal drive arrangement that is used for driving the first board of placing along vertical direction removal that is provided with of curing room.
By adopting the technical scheme, when the concrete test block is maintained, the driving device is started firstly to enable the first placing plate to move downwards along the vertical direction, at the moment, the connecting ropes among the first placing plate, the second placing plate and the third placing plate are loosened, finally, the first placing plate, the second placing plate and the third placing plate are stacked together, at the moment, a worker can place the concrete test block on the first placing plate, then the first placing plate is enabled to move upwards by the driving device, so that the first placing plate and the second placing plate are separated, the worker places the concrete test block on the second placing plate, then the first placing plate is driven to move, the first placing plate drives the second placing plate to move, the second placing plate and the third placing plate are separated, the worker places the concrete test block on the third placing plate, and continues to move the first placing plate, until connecting the whole tensioning of rope, alright afterwards with place the board and the board removal is placed to the third in order to concrete test block, through the first board of placing of drive, second, make first board, the second of placing place the board and the third place the high change of board for the staff can place the concrete test block more conveniently, and the staff's intensity of labour that has significantly reduced.
The present invention may be further configured in a preferred embodiment as: drive arrangement is including setting up the motor on the maintenance room inner wall, the motor is provided with two and is located the both sides of mounting respectively, two the rotation opposite direction of motor, two the motor all is located the first board top of placing, be provided with the pulley on the output shaft of motor, the winding is equipped with the driving rope on the pulley, the one end that the pulley was kept away from to the driving rope is with first board fixed connection of placing.
Through adopting above-mentioned technical scheme, start two motors simultaneously, two motors can drive the pulley rotation rather than linking to each other, and the pulley can drive the driving rope and remove, and because the rotation opposite direction of two motors, consequently the rotation opposite direction of pulley for the moving direction of driving rope is the same all the time, and then makes the driving rope can drive first place the board and remove along vertical direction, and can bear the gravity that comes from the concrete test block better through the driving rope.
The present invention may be further configured in a preferred embodiment as: the position that lies in the motor on the maintenance room inner wall is provided with the fixed plate, the motor is located the fixed plate, be provided with the protection casing on the fixed plate, the motor is located the protection casing, the output shaft of motor runs through the protection casing setting.
Through adopting above-mentioned technical scheme, the setting of protection casing can prevent that the water in the maintenance room from getting into the motor, causes the motor to damage to the life of motor has been increased.
The present invention may be further configured in a preferred embodiment as: the position that is located every group mounting on the inner wall of curing room all is provided with the slide rail, first board, the second of placing is placed the board and the third is placed and all is provided with the sliding block on the board, set up on the sliding block with slide rail complex spout.
Through adopting above-mentioned technical scheme, when first board, the second of placing was placed the board and the third was placed the board and is removed, first board, the second of placing was placed board and the third and can be driven the sliding block and pass through the spout and remove on the board, the setting up of slide rail can be to first board, the second of placing and the third of placing the removal of board and play the guide effect, makes first board, the second of placing place the board and the third place the board and can slide on the inner wall of curing room better.
The present invention may be further configured in a preferred embodiment as: the connecting rope is a steel chain.
By adopting the technical scheme, the steel chain has high strength and can better bear the weight of the concrete test block.
The present invention may be further configured in a preferred embodiment as: the steel chain overcoat is equipped with waterproof sleeve pipe, the steel chain is located waterproof sleeve pipe.
By adopting the technical scheme, the waterproof sleeve can prevent the steel chain from being rusted in a long-term humid environment, and the service life of the steel chain is prolonged.
The present invention may be further configured in a preferred embodiment as: the first placing plate, the second placing plate and the third placing plate are all provided with placing grooves.
By adopting the technical scheme, when the concrete test block is placed, the concrete block is placed in the placing grooves of the first placing plate, the second placing plate and the third placing plate, so that the concrete test block can be prevented from falling off from the first placing plate, the second placing plate and the third placing plate.
The present invention may be further configured in a preferred embodiment as: the first board, the second of placing is placed and all is offered the hole of permeating water on the board is placed to the third, the hole evenly distributed of permeating water is in the standing groove.
Through adopting above-mentioned technical scheme, the setting in the hole of permeating water can avoid moisture to pile up in the standing groove to prevent that the maintenance of concrete test block from receiving the influence.
To sum up, the utility model discloses a following at least one useful technological effect:
through set up the first board of placing of slidable on the maintenance room inner wall, the board is placed to the second and the board is placed to the third to place the board through connecting the rope with first board, the second is placed the board and the third is placed the board and is connected, recycle drive arrangement and drive first board of placing and remove along vertical direction, make first board, the second of placing place the board and the third place the height that the board can change, thereby make the staff can place the concrete test block more conveniently, and reduced staff's intensity of labour.
Drawings
Fig. 1 is a schematic view of the overall structure of the embodiment of the present invention.
Fig. 2 is a partially enlarged schematic view of a portion a in fig. 1.
Fig. 3 is a schematic partial structural view after the waterproof casing and the protective cover are partially hidden according to the embodiment of the present invention.
In the figure, 1, a fixing piece; 11. a first placing plate; 12. a second placing plate; 13. a third placing plate; 14. connecting ropes; 141. a waterproof sleeve; 15. a slider; 151. a chute; 16. a placement groove; 17. water permeable holes; 2. a motor; 21. a pulley; 211. a drive rope; 22. a fixing plate; 23. a protective cover; 3. a slide rail.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 3, for the concrete curing room disclosed by the present invention, comprising a plurality of sets of fixing members 1 disposed on the inner wall of the curing room, the fixing members 1 comprise a first placing plate 11, a second placing plate 12 and a third placing plate 13, the first placing plate 11, the second placing plate 12 and the third placing plate 13 are disposed at intervals along the vertical direction and are parallel to each other, the first placing plate 11 is higher than the second placing plate 12 and the third placing plate 13, the first placing plate 11, the second placing plate 12 and the third placing plate 13 are slidably connected to the inner wall of the curing room body, meanwhile, a connecting rope 14 is disposed between the first placing plate 11, the second placing plate 12 and the third placing plate 13, the connecting rope 14 is provided with two, two ends of the connecting rope 14 are fixedly connected to the first placing plate 11, the second placing plate 12 and the third placing plate 13 respectively, a driving device is disposed on the inner wall of the curing room, the driving means can drive the first resting plate 11 to move in the vertical direction.
Referring to fig. 1 and 3, drive arrangement includes two motors 2 that set up on the curing chamber inner wall, two motors 2 are located the both sides of mounting 1 respectively, two motors 2's rotation opposite direction, two motors 2 all are located the first board 11 top of placing, coaxial coupling has pulley 21 on motor 2's the output shaft, the winding is equipped with driving rope 211 on the pulley 21, the one end that pulley 21 was kept away from to driving rope 211 is with the first board 11 fixed connection of placing, still rotate on the inner wall of curing chamber and be connected with spacing round, driving rope 211 butt is on spacing round.
The starting motor 2 drives the pulley 21 to rotate, the driving rope 211 is wound out of the pulley 21, the first placing plate 11 moves downwards along the vertical direction due to the fact that gravity is far away, and finally the first placing plate 11, the second placing plate 12 and the third placing plate 13 move to the lowest positions, at the moment, a worker can place the concrete test block on the first placing plate 11, the second placing plate 12 and the third placing plate 13 in sequence, and finally the driving rope 211 is arranged on the pulley 21 in a winding mode through the starting motor 2, the driving rope 211 drives the first placing plate 11, the second placing plate 12 and the third placing plate 13 to return to the initial height, and the worker can place the concrete test block more conveniently through the height change of the first placing plate 11, the second placing plate 12 and the third placing plate 13.
Referring to fig. 3, in order to increase the service life of the motor 2 and prevent water used for maintenance from entering the motor 2 to damage the motor 2, a fixing plate 22 is arranged on the inner wall of the maintenance room at the position of the motor 2, the motor 2 is arranged on the fixing plate 22, a protective cover 23 is arranged on the fixing plate 22, the motor 2 is arranged in the protective cover 23, and the output shaft of the motor 2 penetrates through the protective cover 23 and is connected with the pulley 21.
Referring to fig. 1 and 2, the inner wall of the curing room is fixedly connected with two slide rails 3 at the position of each set of fixing parts 1, the two slide rails 3 are arranged, the first placing plate 11, the second placing plate 12 and the third placing plate 13 are respectively provided with two slide blocks 15, the two slide blocks 15 are respectively arranged on the two slide rails 3, and the slide blocks 15 are provided with sliding grooves 151 matched with the slide rails 3; when the first placing plate 11, the second placing plate 12 and the third placing plate 13 move, the sliding block 15 is driven to move on the sliding rail 3, and the sliding rail 3 can guide the first placing plate 11, the second placing plate 12 and the third placing plate 13.
Referring to fig. 3, in order to make the connection rope 14 better bear the gravity of the concrete test block, the connection rope 14 is provided as a steel chain, and a waterproof sleeve 141 is sleeved outside the steel chain, and the waterproof sleeve 141 can prevent the steel chain from being rusted, thereby increasing the service life of the connection rope 14.
Referring to fig. 1 and 3, in order to prevent the concrete test block from falling off the first placing plate 11, the second placing plate 12 and the third placing plate 13, placing grooves 16 are respectively formed on the first placing plate 11, the second placing plate 12 and the third placing plate 13, water permeable holes 17 are uniformly formed in the placing grooves 16, and the water permeable holes 17 are arranged to penetrate through the first placing plate 11, the second placing plate 12 and the third placing plate 13; the water permeable holes 17 can prevent moisture from accumulating in the placing groove 16, resulting in the maintenance of the concrete test block being affected.
The implementation principle of the embodiment is as follows: when the concrete test block needs to be maintained, the concrete is placed on the first placing plate 11, the second placing plate 12 and the third placing plate 13, the worker firstly starts the two motors 2 at the same time to wind the driving rope 211 out of the pulley 21, so that the first placing plate 11, the second placing plate 12 and the third placing plate 13 move downwards, finally the first placing plate 11, the second placing plate 12 and the third placing plate 13 are stacked together, at the moment, the worker places the concrete test block on the first placing plate 11, then starts the motors 2 to move the first placing plate 11 upwards, and sequentially places the concrete test block on the second placing plate 12 and the third placing plate 13, after the first placing plate 11, the second placing plate 12 and the third placing plate 13 return to the initial positions, the concrete test block can be maintained, and the height of the first placing plate 11, the second placing plate 12 and the third placing plate 13 is changed, the convenience of placing the concrete test block by the worker is improved, and the labor intensity of the worker is reduced.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. A concrete curing room is characterized in that: the maintenance room comprises a plurality of groups of fixing pieces (1) arranged on the inner wall of the maintenance room, wherein each fixing piece (1) comprises a first placing plate (11), a second placing plate (12) and a third placing plate (13) which are parallel to each other, the first placing plate (11), the second placing plate (12) and the third placing plate (13) are arranged at intervals along the vertical direction, the first placing plate (11) is higher than the second placing plate (12) and the third placing plate (13), the first placing plate (11), the second placing plate (12) and the third placing plate (13) are connected to the inner wall of the maintenance room body in a sliding mode, connecting ropes (14) are arranged between the first placing plate (11) and the second placing plate (12) and between the second placing plate (12) and the third placing plate (13), and two ends of each connecting rope (14) are fixedly connected with the first placing plate (11), the second placing plate (12) and the third placing plate (13) respectively, the curing room is internally provided with a driving device for driving the first placing plate (11) to move along the vertical direction.
2. A concrete curing room as defined in claim 1, wherein: drive arrangement is including setting up motor (2) on the maintenance room inner wall, motor (2) are provided with two and are located the both sides of mounting (1) respectively, two the rotation direction of motor (2) is opposite, two motor (2) all are located the first board (11) top of placing, be provided with pulley (21) on the output shaft of motor (2), around being equipped with driving rope (211) on pulley (21), the one end and the first board (11) fixed connection of placing of pulley (21) are kept away from in driving rope (211).
3. A concrete curing room as defined in claim 1, wherein: the position that lies in motor (2) on the maintenance room inner wall is provided with fixed plate (22), motor (2) are located fixed plate (22), be provided with protection casing (23) on fixed plate (22), motor (2) are located protection casing (23), the output shaft of motor (2) runs through protection casing (23) and sets up.
4. A concrete curing room as defined in claim 1, wherein: slide rails (3) are arranged at the positions, located on each group of fixing pieces (1), on the inner wall of the curing room, sliding blocks (15) are arranged on the first placing plate (11), the second placing plate (12) and the third placing plate (13), and sliding grooves (151) matched with the slide rails (3) are formed in the sliding blocks (15).
5. A concrete curing room as defined in claim 1, wherein: the connecting rope (14) is a steel chain.
6. A concrete curing room as defined in claim 5, wherein: waterproof sleeves (141) are sleeved outside the steel chains, and the steel chains are located in the waterproof sleeves (141).
7. A concrete curing room as defined in claim 1, wherein: the first placing plate (11), the second placing plate (12) and the third placing plate (13) are all provided with placing grooves (16).
8. A concrete curing room as defined in claim 7, wherein: the first placing plate (11), the second placing plate (12) and the third placing plate (13) are all provided with water permeable holes (17), and the water permeable holes (17) are uniformly distributed in the placing grooves (16).
CN201922248939.0U 2019-12-14 2019-12-14 Concrete curing room Active CN211541706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922248939.0U CN211541706U (en) 2019-12-14 2019-12-14 Concrete curing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922248939.0U CN211541706U (en) 2019-12-14 2019-12-14 Concrete curing room

Publications (1)

Publication Number Publication Date
CN211541706U true CN211541706U (en) 2020-09-22

Family

ID=72506743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922248939.0U Active CN211541706U (en) 2019-12-14 2019-12-14 Concrete curing room

Country Status (1)

Country Link
CN (1) CN211541706U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112497462A (en) * 2020-12-01 2021-03-16 深圳市汇基砼混凝土有限公司 Curing room of recycled concrete test block

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112497462A (en) * 2020-12-01 2021-03-16 深圳市汇基砼混凝土有限公司 Curing room of recycled concrete test block
CN112497462B (en) * 2020-12-01 2022-03-15 深圳市汇基砼混凝土有限公司 Curing room of recycled concrete test block

Similar Documents

Publication Publication Date Title
CN211541706U (en) Concrete curing room
CN204847532U (en) Tape unit is received to permanent tension
CN108952244B (en) Automatic parking and picking garage based on shared bicycle management system
CN105519456B (en) A kind of automatic shifting spleen honeycomb
CN214500772U (en) Inspection robot for electric power tunnel
CN105152097B (en) Stopping sliding door installs lowering or hoisting gear
CN107444232B (en) Automatic lifting device for carriage rear door
CN113089894B (en) Method for mounting prefabricated wall panel of prefabricated building
CN211815624U (en) Hanging basket for bridge construction
CN115724355A (en) Hoisting equipment in tower section of thick bamboo
CN110759293A (en) Vertical component transportation platform of assembly type structure
CN110319996A (en) Novel free fall pilot system
CN207194566U (en) A kind of car multi-storied garage car handling device
CN110091581B (en) Automatic bag removing equipment
CN108872785B (en) Portable high tension cable test platform
CN215359027U (en) Concrete curing room
CN209774899U (en) Drilling equipment is used in wooden furniture production
CN112811346A (en) Totally closed installation device for sound barrier
CN206327962U (en) Conveyer belt rolls up intracardiac square steel and takes out frame
CN218579525U (en) Lifting ladder stand for building construction safety
CN213571997U (en) Water conservancy cofferdam construction equipment
CN220473191U (en) Finished product concrete sleeper detection device
CN210802994U (en) Fresh water quality detection sampling device
CN117703078B (en) Special installation device of cast in situ concrete form removal-free composite insulation system
CN220394670U (en) Foundation depth detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant