CN211527538U - Bank island type water gauge - Google Patents

Bank island type water gauge Download PDF

Info

Publication number
CN211527538U
CN211527538U CN202020666671.2U CN202020666671U CN211527538U CN 211527538 U CN211527538 U CN 211527538U CN 202020666671 U CN202020666671 U CN 202020666671U CN 211527538 U CN211527538 U CN 211527538U
Authority
CN
China
Prior art keywords
water gauge
truss
water
buried
gauge steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020666671.2U
Other languages
Chinese (zh)
Inventor
刘谦
赵艳军
刘凯
张冬
李国良
高坚
�田�浩
吕宏
庞雪
孙婕
张伟昊
张建民
毕栋
黄德方
李蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020666671.2U priority Critical patent/CN211527538U/en
Application granted granted Critical
Publication of CN211527538U publication Critical patent/CN211527538U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a bank island type water gauge, which comprises a pre-buried structural member, a reinforcing rib and a truss, wherein the truss comprises a first water gauge steel structure truss and a second water gauge steel structure truss, the pre-buried structural member is pre-buried and arranged in a fixed base, the reinforcing rib is paved in the base, and the first water gauge steel structure truss and the second water gauge steel structure truss are spirally arranged on the pre-buried structural member through bolts; this water gauge is when the installation, be convenient for install, look for a firm position on the bank edge, excavate the basis, pre-buried support bolt can, the water gauge adopts the steel pipe as the chi body, the water gauge board adopts stainless steel water gauge board to have certain corrosion resistance, hardness is higher relatively, non-deformable, the used steel of water gauge all is through overheated galvanizing treatment, adopt stainless steel, the later maintenance is exempted from, whole water gauge truss is formed by the bolt combination, can dismantle in advance in big water phase, avoid rivers to strike and hang the grass, the basis is firm, the water gauge chi body is unsettled in the aquatic, can avoid rivers to elutriate the brush to the chi body lower part.

Description

Bank island type water gauge
Technical Field
The utility model belongs to the technical field of the water gauge, concretely relates to bank island formula water gauge.
Background
The water gauge is widely applied to soft soil foundation treatment, projects such as ports and wharfs and the like, is used for observing the change of underground water level and ocean tide level, has the characteristics of stable reading, interference resistance, long service life and the like, is adopted by various major projects at home and abroad, and is a gauge for directly observing and reading the water level of rivers, lakes, reservoirs and irrigation canals. The water gauge has a long history and is still widely used until now. The scale device is used for measuring the water level of water bodies such as rivers, lakes, reservoirs, irrigation canals and the like, the ancient Chinese is called as the water rule, the mark pile is called in the Ming and Qing seasons, the water rule is called in the beginning of the 20 th century, and the water rule is still widely used up to now.
The river bottom elevation gradually decreases during the observation of the existing river bed, and the vertical water gauge dehydration condition easily occurs during the low water period. As the riverbed descends and scours, a steep terrain is formed on the bank side, if a permanent water gauge is built, underwater construction is involved, the construction difficulty is very large, and the water level can only be read by adopting a temporary water gauge. The temporary water gauge is embedded, the working environment is severe, observers need to take severe summer and cold operation, and the potential safety hazard is great because the steep water depth change of the bank side wall is difficult to predict; the problem that the water gauge plate is scratched and falls off is solved, and therefore the island type water gauge is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bank island formula water gauge to the river bed elevation descends gradually when surveing of the current riverbed who proposes in solving above-mentioned background art, vertical type water gauge dehydration condition appears easily during low water. As the riverbed descends and scours, a steep terrain is formed on the bank side, if a permanent water gauge is built, underwater construction is involved, the construction difficulty is very large, and the water level can only be read by adopting a temporary water gauge. The temporary water gauge is embedded, the working environment is severe, observers need to take severe summer and cold operation, and the potential safety hazard is great because the steep water depth change of the bank side wall is difficult to predict; the water gauge plate can be scratched and fall off simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme: bank island formula water gauge, including embedded structure, strengthening rib and truss, the truss includes first water gauge steel construction truss and second water gauge steel construction truss, embedded structure is pre-buried installs in fixed baseplate, and the base middle berth is equipped with the strengthening rib, first water gauge steel construction truss and second water gauge steel construction truss establish soon on pre-buried embedded structure through the bolt, the fixed water gauge sighting rod that has installed of one end of first water gauge steel construction truss, the one end of first water gauge steel construction truss is connected and is installed and hold the piece tightly.
Preferably, it is equipped with the bolt to hold the piece top spin tightly, hold the piece and establish the one end of fixing at first water gauge steel structure truss through the bolt soon tightly, just the water gauge sighting rod holds the adjacent water end of fixing on first water gauge steel structure truss through holding the piece tightly with the bolt.
Preferably, the first water gauge steel structure truss and the second water gauge steel structure truss are provided with the holding pieces.
Preferably, the longitudinal section of the first water gauge steel structure truss is a triangular support structure.
Preferably, the water gauge mark post is marked with scale marks.
Preferably, the reinforcing rib arrays are arranged in the mounting base in a crossed manner.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the water gauge adopts a steel pipe as a gauge body, and a stainless steel water gauge plate is adopted as a water gauge plate, so that the water gauge has certain corrosion resistance, relatively high hardness and difficult deformation;
(2) the water gauge is convenient to install when being installed, a firm position is found on the bank, a foundation is excavated, and a support bolt is pre-buried;
(3) steel used by the water gauge is subjected to overheating galvanizing treatment, and is made of stainless steel, so that later maintenance is avoided;
(4) the whole water gauge truss is formed by combining bolts, and can be disassembled in advance in a heavy water period, so that water flow impact and grass hanging are avoided;
(5) the foundation is arranged at a firmer bank riprap or a permanent dam head, and the foundation is firm. The water gauge body is suspended in water, so that the lower part of the water gauge body can be prevented from being washed by water flow.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a left side view structure diagram of the present invention;
fig. 3 is a schematic view of the basic overhead structure of the water gauge truss of the present invention;
fig. 4 is a schematic structural view of the end of the water gauge marking rod on the water gauge truss of the present invention;
in the figure: 1. pre-burying a structural part; 2. a first water gauge steel structure truss; 3. a second water gauge steel structure truss; 4. a holding sheet; 5. a water gauge marking pole; 6. and (5) reinforcing ribs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, the present invention provides a technical solution: shore island formula water gauge, including embedded structure 1, strengthening rib 6 and truss, the truss includes first water gauge steel construction truss 2 and second water gauge steel construction truss 3, embedded structure 1 is pre-buried installs in fixed baseplate, and the base middle berth is equipped with strengthening rib 6, first water gauge steel construction truss 2 and second water gauge steel construction truss 3 establish on pre-buried embedded structure 1 through the bolt soon, water gauge marker post 5 has been installed to the one end of first water gauge steel construction truss 2 is fixed, the one end of first water gauge steel construction truss 2 is connected and has been installed and hold tight piece 4, whole water gauge truss is formed by the bolt combination, can dismantle in advance in big water phase, avoid water impact and hang the grass, the device's stability has been improved simultaneously.
For better installing the water gauge mark post 5, in this embodiment, preferably, the tightening piece 4 is screwed with a bolt and fixed at one end of the first water gauge steel structure truss 2, and the water gauge mark post 5 is tightly fixed at the adjacent water end of the first water gauge steel structure truss 2 through the tightening piece 4 and the bolt, so as to prevent the water gauge mark post 5 from being unstable, in order to improve the stability of the water gauge mark post 5, in this embodiment, preferably, the tightening pieces 4 are installed on the first water gauge steel structure truss 2 and the second water gauge steel structure truss 3, so as to prevent the water gauge mark post 5 from shaking after being fixed, in order to better erect, in this embodiment, preferably, the longitudinal section of the first water gauge steel structure truss 2 is a triangular support structure, so as to improve the basic structure strength of the truss, in this embodiment, preferably, the water gauge mark on the water gauge mark post 5 is provided with scale marks, in order to improve the stability of the base, in the present embodiment, it is preferable that the reinforcing ribs 6 are arranged in the mounting base in a crossing manner to prevent the base from falling down and collapsing.
The utility model discloses a theory of operation and use flow: because the water depth of section department of basic water gauge is great, the first water gauge steel structure truss 2 of special installing support has been designed during the water gauge installation, first water gauge steel structure truss 2 adopts I-steel and angle steel to form through screwed connection, the main material on the first water gauge steel structure truss 2 adopts 14# I-steel, connect the crossbeam and adopt 100 angle steel to become the cross connection, the front end design water gauge is connected and is held tight piece 4, hold through the bolt when the water gauge is installed and hold tight piece 4 tightly establish soon can, easy to assemble water gauge sighting rod 5, the device overall structure intensity is big, the impact resistance is big, the stability and the practicality of the device have been improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Bank island formula water gauge, including pre-buried structure (1), strengthening rib (6) and truss, its characterized in that: the truss includes first water gauge steel construction truss (2) and second water gauge steel construction truss (3), pre-buried structure (1) is pre-buried installs in fixed baseplate, and the base middle berth is equipped with strengthening rib (6), first water gauge steel construction truss (2) and second water gauge steel construction truss (3) are established soon on pre-buried structure (1) through the bolt, water gauge marker post (5) have been installed to the one end of first water gauge steel construction truss (2) is fixed, the one end of first water gauge steel construction truss (2) is connected and has been installed and is held tightly piece (4).
2. The land island water gauge of claim 1, wherein: it is equipped with the bolt to hold on piece (4) top spin, hold on piece (4) and establish the one end of fixing in first water gauge steel construction truss (2) through the bolt soon, just water gauge sighting rod (5) hold on the adjacent water end of fixing on first water gauge steel construction truss (2) through holding on piece (4) and bolt tightly.
3. The land island water gauge of claim 1, wherein: and the first water gauge steel structure truss (2) and the second water gauge steel structure truss (3) are provided with the holding pieces (4).
4. The land island water gauge of claim 1, wherein: the longitudinal section of the first water gauge steel structure truss (2) is a triangular supporting structure.
5. The land island water gauge of claim 1, wherein: the scale mark on the water gauge rod (5) is provided with scale marks.
6. The land island water gauge of claim 1, wherein: the reinforcing ribs (6) are arrayed and crossly arranged in the mounting base.
CN202020666671.2U 2020-04-27 2020-04-27 Bank island type water gauge Expired - Fee Related CN211527538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020666671.2U CN211527538U (en) 2020-04-27 2020-04-27 Bank island type water gauge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020666671.2U CN211527538U (en) 2020-04-27 2020-04-27 Bank island type water gauge

Publications (1)

Publication Number Publication Date
CN211527538U true CN211527538U (en) 2020-09-18

Family

ID=72441649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020666671.2U Expired - Fee Related CN211527538U (en) 2020-04-27 2020-04-27 Bank island type water gauge

Country Status (1)

Country Link
CN (1) CN211527538U (en)

Similar Documents

Publication Publication Date Title
CN110616726B (en) Water retaining cofferdam structure and construction process thereof
CN108193642B (en) Revetment reinforcing facility and construction method thereof
CN210857112U (en) Hidden water conservancy slope protection structure
CN210658383U (en) Silt deep water big rivers foundation ditch combination is strutted
CN211527538U (en) Bank island type water gauge
CN112095543B (en) Edge bank wave retaining structure and construction method thereof
CN206220172U (en) Tubular type diversion pumping plant
CN201738286U (en) Tetrapod pier type structure
CN106677121B (en) Protect the movable permeable spur structure and construction method of Coastal erosion
CN213204179U (en) Foundation pit peripheral water level stabilizing device utilizing high gravity recharge
CN214194751U (en) Intercepting drain structure suitable for steep rock slope
CN212026103U (en) Pile group sloping plate diversion dam suitable for desert river
CN203795437U (en) Reinforced steel plate pile foundation pit
CN113756257A (en) Soil and water conservation bank protection structure
CN211257001U (en) Hydraulic structure foundation pit supporting precipitation device
CN210216374U (en) Novel subside board and bury fixedly underground device
CN210658322U (en) Ecological pile and integrated retaining wall formed by same
CN212533952U (en) Terrace type water conservancy slope protection ecological dike
CN211922676U (en) Damp water prevention facility for foundation pit civil engineering
CN206768738U (en) A kind of suspension type anti-scour wall protective slope structure
CN205242503U (en) Water intake device under complex geological environment
CN216007007U (en) Detachable water conservancy construction cofferdam
CN217203839U (en) Concrete buried pile structure for flood prevention revetment
CN211523083U (en) Soil and water conservation net that hydraulic engineering used
CN213836668U (en) Foundation pit supporting device convenient to quick assembly disassembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200918

Termination date: 20210427