CN211524235U - Building pipe gallery structure - Google Patents

Building pipe gallery structure Download PDF

Info

Publication number
CN211524235U
CN211524235U CN201921528592.9U CN201921528592U CN211524235U CN 211524235 U CN211524235 U CN 211524235U CN 201921528592 U CN201921528592 U CN 201921528592U CN 211524235 U CN211524235 U CN 211524235U
Authority
CN
China
Prior art keywords
pipe gallery
gallery structure
building
roof
structure according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921528592.9U
Other languages
Chinese (zh)
Inventor
王伟成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Longxin Architectural Design Technology Group Co.,Ltd.
Original Assignee
Shanghai Longxin Building Technology Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Longxin Building Technology Office filed Critical Shanghai Longxin Building Technology Office
Application granted granted Critical
Publication of CN211524235U publication Critical patent/CN211524235U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/42Devices or arrangements peculiar to garages, not covered elsewhere, e.g. securing devices, safety devices, monitoring and operating schemes; centering devices
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/22Installations of cables or lines through walls, floors or ceilings, e.g. into buildings
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • H02G3/34Installations of cables or lines on walls, floors or ceilings using separate protective tubing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a building piping lane structure belongs to the building field. Building piping lane structure comprises mainly electromechanical pipeline, piping lane structure roof, curb girder, haunching, close rib roof, structure post or wall, bottom plate etc. the installation of piping lane structure roof bottom surface is pressed close to mainly electromechanical pipeline, and it arranges for optimizing the back. The beneficial effects of the utility model are that can reduce the floor height under the condition that does not influence garage service function and guarantee structure safety.

Description

Building pipe gallery structure
Technical Field
The utility model relates to a building technical field particularly, relates to a building piping lane structure.
Background
At present, most building structures have large span and large load, electromechanical pipelines, structural height and floor height of buildings with net height are considered to be generally large, and the floor height causes construction difficulty and construction period increase, engineering construction cost increase, resource waste, energy source and environment damage, and does not meet the overall targets of energy conservation and emission reduction and conservation society construction advocated by the state, so that the reduction of the floor height becomes one of key factors for realizing energy conservation and consumption reduction of the buildings. The utility model aims to overcome the not enough of prior art, provide a building piping lane structure, can effectively reduce the building floor height.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building piping lane structure possesses the advantage that can effectively reduce the building story height. In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building pipe gallery structure, by main electromechanical pipeline, pipe gallery structure roof, haunch, curb girder, structure post or wall, close rib roof beam and bottom plate constitute, the pipe gallery structure roof does not have the structure crossbeam of hanging down or adopts highly less close rib roof beam, so main electromechanical pipeline can press close to pipe gallery structure roof bottom surface installation and do not occupy the floor height.
Preferably, the building is a single-layer or multi-layer cast-in-place concrete structure and mainly adopts a beam slab structure system.
Preferably, the pipe gallery structure roof does not have the structural beam of hanging down, and the installation of pipe gallery structure roof bottom surface can be pressed close to main electromechanical pipeline.
Preferably, the roof both sides of pipe gallery structure adopt the haunch to improve structural strength and guarantee safety.
Preferably, the main electromechanical pipeline can be installed by being close to the bottom surface of the top plate of the pipe gallery structure, the main electromechanical pipeline is arranged after optimization, and other non-main electromechanical pipelines are arranged by penetrating beams or being close to the beam bottoms.
Preferably, the main electromechanical pipeline refers to an air pipe, but is not limited to an air pipe, a spray, a strong current, a weak current and the like.
Preferably, the pipe gallery structure can adopt flat beams or upturned beams at corners without influencing the arrangement of main electromechanical pipelines.
Preferably, the pipe gallery structure top plate at the position with the smaller height of the air pipe can adopt the multi-ribbed beam to improve the structural strength.
The haunched beam, the flat beam or the upturned beam and the multi-ribbed beam in the technical scheme are widely applied in the technical field and belong to the common general knowledge in the field.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses with building electromechanical device system through optimizing the back, the installation of pipe gallery structure roof bottom surface or close rib roof beam bottom surface is pressed close to main electromechanical pipeline and does not occupy the floor height, adopts behind the optimization arrangement of other non-main electromechanical device pipelines to wear the roof beam or press close to the beam bottom and arrange to effectively reduce the floor height of building.
Drawings
Fig. 1 is a plane layout diagram of the building roof structure of the utility model. Figure 2 is the utility model discloses a pipe gallery structure A-A section view. Figure 3 is the utility model discloses a pipe gallery structure B-B section view.
In the figure: the structure comprises a main electromechanical pipeline 1, a pipe gallery structure top plate 2, an haunching 3, a side beam 4, a structure column or wall 5, a bottom plate 6, a flat beam or an upturned beam 7, a ribbed beam 8, a basement floor height H, a pipe gallery width L, an haunching height a, an haunching length b and a top plate thickness h.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, in a single-layer cast-in-place concrete building, the top plate is integrally of a beam-slab structure, and the main electromechanical pipelines are optimized and then the utility model discloses building pipe gallery structure. The pipe gallery structure comprises main electromechanical pipelines (1), a pipe gallery structure top plate (2), haunches (3), side beams (4), structural columns or walls (5), a bottom plate (6), flat beams or upturned beams (7) and multi-ribbed beams (8). At the position with larger height of the air pipe, as the pipe gallery structure top plate (2) is not provided with a downward hanging structural beam, the main electromechanical pipeline (1) can be arranged close to the bottom surface of the pipe gallery structure top plate (2) without occupying the floor height; the pipe gallery structure top plate at the position with the smaller height of the air pipe adopts the multi-ribbed beam (8), and the main electromechanical pipeline (1) can be installed close to the bottom surface of the multi-ribbed beam (8) and does not occupy the floor height due to the fact that the multi-ribbed beam is smaller in height. Pipe gallery width L is confirmed according to engineering actual conditions, and pipe gallery roof thickness h can be according to the load size 1/15 ~ 1/50 of span L, and it is a than to add armpit height and width: b may be 1: 1-1: 8, the height of the multi-ribbed beam can be 1/20-1/10 of the span L.
For example, after the pipe gallery structure shown in fig. 1 is adopted in a building on a certain underground floor, the height of a beam is 1.0 meter, the thickness of the plate is 0.25 meter, the height of a pipe gallery top plate at the position of 0.5 meter of the height of main electromechanical pipelines is two-side armpits, as shown in fig. 2, the total height H of a garage is =2.2 (net height requirement) +1.0 (beam height) =3.2 meters (the main electromechanical pipelines are arranged in the pipe gallery structure and do not occupy the height of the layer); a dense rib beam is adopted on a top plate at the position of 0.32 m of the height of the main electromechanical pipeline, as shown in fig. 3, the height of the dense rib beam is 0.6 m, the total layer height H =2.2 (net height requirement) +1.0 (beam height) =3.2 m (the main electromechanical pipeline is arranged in the pipe gallery structure and does not occupy the layer height); the required layer height H =2.2 (net height requirement) +1.0 (beam height) +0.5 (pipeline height) =3.7 m over other structural systems.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The utility model provides a building pipe gallery structure, by main electromechanical pipeline (1), pipe gallery structure roof (2), haunch (3), curb girder (4), structure post or wall (5), bottom plate (6), flat roof beam or turn over roof beam (7), close rib roof beam (8) and constitute its characterized in that: the pipe gallery structure roof (2) does not have a structural beam hung down, and the main electromechanical pipeline (1) is installed close to the bottom surface of the pipe gallery structure roof (2) or the dense rib beam (8).
2. A building pipe gallery structure according to claim 1, wherein: the structural strength is improved by adopting the haunches (3) on two sides of the pipe gallery structure top plate (2).
3. A building pipe gallery structure according to claim 1, wherein: the main electromechanical pipeline (1) is arranged close to the bottom surface of the top plate (2) of the pipe gallery structure and is optimized; while other non-primary electromechanical lines are deployed through or proximate to the beam bottom.
4. A building pipe gallery structure according to claim 1, wherein: the main electromechanical pipeline (1) is an air pipe.
5. A building pipe gallery structure according to claim 1, wherein: the building is a single-layer or multi-layer cast-in-place concrete structure.
6. A building pipe gallery structure according to claim 1, wherein: the roof mainly adopts beam slab structure system except that the piping lane structure of building.
7. A building pipe gallery structure according to claim 1, wherein: the pipe gallery structure top plate at the position with smaller height of the air pipe can adopt the multi-ribbed beam (8) to improve the structural strength.
8. A building pipe gallery structure according to claim 2, wherein: the pipe gallery structure top plate (2) can be free of two-side haunches (3) under the condition that the structural strength is met.
9. A building pipe gallery structure according to claim 2, wherein: pipe gallery structure roof (2) can set up flat roof beam or upturning roof beam (7) in pipe gallery corner and do not influence main electromechanical pipeline and arrange.
CN201921528592.9U 2018-09-23 2019-09-16 Building pipe gallery structure Active CN211524235U (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201821553666 2018-09-23
CN201811111334 2018-09-23
CN2018111113340 2018-09-23
CN201821553666X 2018-09-23

Publications (1)

Publication Number Publication Date
CN211524235U true CN211524235U (en) 2020-09-18

Family

ID=71158007

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201921528592.9U Active CN211524235U (en) 2018-09-23 2019-09-16 Building pipe gallery structure
CN201910869029.6A Pending CN111305615A (en) 2018-09-23 2019-09-16 Building pipe gallery structure

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201910869029.6A Pending CN111305615A (en) 2018-09-23 2019-09-16 Building pipe gallery structure

Country Status (1)

Country Link
CN (2) CN211524235U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305615A (en) * 2018-09-23 2020-06-19 上海珑信建筑科技事务所 Building pipe gallery structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031023A (en) * 2020-08-31 2020-12-04 王隆权 Ground warehouse and design method and construction method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2365031B (en) * 2000-07-13 2002-10-09 Lg Mouchel & Partners Ltd Flooring system
CN101100881B (en) * 2007-07-30 2010-09-08 广东省建筑设计研究院 Local type steel concrete multi-ribbed flat beam building cover
CN202672811U (en) * 2012-07-09 2013-01-16 王生刚 Beamless multi-storied garage
CN105625621B (en) * 2015-12-30 2018-04-10 中国一冶集团有限公司 Waffle beam formwork is fixed and electromechanical pipeline fixes Versatile apparatus and method
CN106930460A (en) * 2015-12-30 2017-07-07 龚展宇 A kind of twin beams-thick reinforced concrete floor device
CN108729712A (en) * 2018-07-20 2018-11-02 王伟成 A kind of economizing type underground garage technical system
CN211524235U (en) * 2018-09-23 2020-09-18 上海珑信建筑科技事务所 Building pipe gallery structure
CN109469200B (en) * 2018-12-18 2024-06-21 上海珑信建筑设计科技集团股份有限公司 Building structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305615A (en) * 2018-09-23 2020-06-19 上海珑信建筑科技事务所 Building pipe gallery structure

Also Published As

Publication number Publication date
CN111305615A (en) 2020-06-19

Similar Documents

Publication Publication Date Title
CN204386002U (en) A kind of precast assemble floor system
CN205637106U (en) Building structure system of completely assembling formula steel construction
CN109372187B (en) Frame system containing assembled concrete-filled steel tube combined special-shaped column and energy-dissipating steel plate wall
CN211524235U (en) Building pipe gallery structure
CN103993679B (en) Low layer assembling combined wall house bolt connection node structure
CN102162278A (en) Light steel structure building system
WO2017028576A1 (en) Roofing system for aluminium alloy house
CN203347077U (en) Steel and concrete flitch beam
CN109610311A (en) Prefabrication and assembly construction L-type floorings seam construction and implementation method
CN103452219A (en) Honeycomb steel hidden beam composite floor system
CN211396202U (en) Prefabricated floor of assembled
CN205259361U (en) Connected node of reinforced concrete column and light -duty girder steel
CN201771070U (en) Externally hung wallboard connection part
CN101949185A (en) Outer hanging-wall plate connecting piece
CN206396794U (en) A kind of assembled piping lane
CN108729712A (en) A kind of economizing type underground garage technical system
CN203347076U (en) Steel and concrete flitch beam
CN212835499U (en) Assembled utility tunnel convenient to cast-in-place
CN214144105U (en) Structure for reducing floor height of underground chamber by adopting wide flat beam arrangement
CN210459525U (en) High-performance movable board house
CN210684774U (en) Assembled concrete utility tunnel is connected to slot type
CN210767303U (en) External thermal insulation structure of prefabricated wallboard
CN203440968U (en) Solid-web steel hidden-beam composite floor system
CN113293857A (en) Basement for reducing floor height by laying channels through overall pipelines
CN113062642A (en) Intensive underground garage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220218

Address after: 200435 room 126, 4th floor, building 1, No. 5199, Gonghexin Road, Baoshan District, Shanghai

Patentee after: Shanghai Longxin Architectural Design Technology Group Co.,Ltd.

Address before: 202150 room 35325, building 3, No. 1800, Panyuan Road, Changxing Town, Chongming District, Shanghai (Shanghai Taihe Economic Development Zone)

Patentee before: SHANGHAI LONGXIN BUILDING TECHNOLOGY OFFICE

TR01 Transfer of patent right