CN211523513U - 一种更有效的减小竖向位移的张弦管桁架结构 - Google Patents
一种更有效的减小竖向位移的张弦管桁架结构 Download PDFInfo
- Publication number
- CN211523513U CN211523513U CN201921326113.5U CN201921326113U CN211523513U CN 211523513 U CN211523513 U CN 211523513U CN 201921326113 U CN201921326113 U CN 201921326113U CN 211523513 U CN211523513 U CN 211523513U
- Authority
- CN
- China
- Prior art keywords
- main
- cable
- truss
- pipe truss
- string pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921326113.5U CN211523513U (zh) | 2019-08-15 | 2019-08-15 | 一种更有效的减小竖向位移的张弦管桁架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921326113.5U CN211523513U (zh) | 2019-08-15 | 2019-08-15 | 一种更有效的减小竖向位移的张弦管桁架结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211523513U true CN211523513U (zh) | 2020-09-18 |
Family
ID=72439531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921326113.5U Active CN211523513U (zh) | 2019-08-15 | 2019-08-15 | 一种更有效的减小竖向位移的张弦管桁架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211523513U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411758A (zh) * | 2020-10-28 | 2021-02-26 | 上海宝冶工程技术有限公司 | 一种大跨度管桁架张弦结构三段一线快速安装方法 |
-
2019
- 2019-08-15 CN CN201921326113.5U patent/CN211523513U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411758A (zh) * | 2020-10-28 | 2021-02-26 | 上海宝冶工程技术有限公司 | 一种大跨度管桁架张弦结构三段一线快速安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235650B (zh) | 大跨度刚性山墙空间网格-三段组合索拱桁架-膜结构体系 | |
CN208534492U (zh) | 用于盾构重叠隧道的穿行支撑台车 | |
CN109235651B (zh) | 大跨度刚性山墙空间网格-索膜结构体系 | |
CN103774543B (zh) | 一种上承式索拱组合结构桥 | |
CN211523513U (zh) | 一种更有效的减小竖向位移的张弦管桁架结构 | |
CN110984385A (zh) | 一种新型的桩拱转换结构 | |
CN202578055U (zh) | 一种高、宽可调的焦炉筑炉施工用大棚 | |
CN104060759B (zh) | 一种内置斜牵索的张弦桁架 | |
CN212104539U (zh) | 一种新型的桩拱转换结构 | |
CN203716044U (zh) | 一种下承或中承式索拱组合结构桥 | |
CN2923870Y (zh) | 大跨度大柱距拟肋型楼盖式预应力钢网格屋盖 | |
CN209339019U (zh) | 一种钢混结构的防风雪廊棚 | |
CN203924483U (zh) | 一种内置斜牵索的张弦桁架 | |
CN216892442U (zh) | 一种多重下弦式大跨度张弦梁结构 | |
CN212672593U (zh) | 一种屋面管道抗风装置 | |
CN207794690U (zh) | 可周转的装配式钢筋加工棚 | |
CN205663282U (zh) | 一种大容量轻型格构式钢柱 | |
CN205712075U (zh) | 一种低耗材地下连续墙 | |
CN213268362U (zh) | 室内工厂化预制梁片装置 | |
CN207484299U (zh) | 一种立交桥梁钢结构防护棚 | |
CN203160565U (zh) | 一种钢结构建筑彩钢板水沟 | |
CN208844443U (zh) | 一种基于拱的箱型梁加固结构 | |
CN106869390A (zh) | 一种张弦式的双曲拱形屋面板梁结构 | |
CN210420839U (zh) | 一种匝道桥钢筋结构 | |
CN217949072U (zh) | 一种用于基坑围护墙与腰梁连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A more effective truss string structure for reducing vertical displacement Effective date of registration: 20210220 Granted publication date: 20200918 Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd. Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd. Registration number: Y2021230000002 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220224 Granted publication date: 20200918 Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd. Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd. Registration number: Y2021230000002 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A more effective truss string structure for reducing vertical displacement Effective date of registration: 20220324 Granted publication date: 20200918 Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd. Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd. Registration number: Y2022230000009 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230403 Granted publication date: 20200918 Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd. Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd. Registration number: Y2022230000009 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A more effective method for reducing vertical displacement of truss string structure Effective date of registration: 20230530 Granted publication date: 20200918 Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd. Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd. Registration number: Y2023230000045 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |