CN211523261U - Prevent tower crane basis of ponding - Google Patents
Prevent tower crane basis of ponding Download PDFInfo
- Publication number
- CN211523261U CN211523261U CN201921940846.8U CN201921940846U CN211523261U CN 211523261 U CN211523261 U CN 211523261U CN 201921940846 U CN201921940846 U CN 201921940846U CN 211523261 U CN211523261 U CN 211523261U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- crane foundation
- well
- waterproof
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model belongs to the technical field of the tower crane construction, especially, relate to a prevent tower crane basis of ponding. The lower end of the tower crane foundation is provided with expanding step anchors which are reduced layer by layer, an embedded connecting bolt penetrates through the interior of the tower crane foundation, and the upper end of the embedded connecting bolt is connected with a tower body support through a bolt and an inclined support piece; a circle of waterproof well is arranged on the outer side of the tower crane foundation, a rubber waterproof pad is fixed at the upper port of the waterproof well in a sealing manner and is arranged between the first layer and the second layer of the tower body support; the middle lower end of the rubber waterproof pad is provided with a water accumulation port, the water accumulation port is connected with a water pump on the side wall of the waterproof well, and the lower end of the water pump is connected with a municipal drainage pipeline or a river through a drainage pipeline. The airtight protection well is added in the outside of its tower crane foundation, cooperates ponding initiative collecting plate and the drain pump at top, the contact of great reduction tower crane foundation and ponding.
Description
Technical Field
The utility model belongs to the technical field of the tower crane construction, especially, relate to a prevent tower crane basis of ponding.
Background
The tower crane is the most common hoisting equipment used in building construction, and is used for hoisting construction raw materials such as templates, reinforcing steel bars, wood, concrete, steel pipes and the like for construction. The tower crane foundation is an important facility for ensuring the safe work of the tower crane, and because the tower crane foundation is formed by deep digging and pouring, the general terrain is lower, the construction water and the rainwater on the construction site are easily gathered around the tower crane foundation to cause serious accumulated water, so that the foundation is sunk and the bolts are corroded, the tower crane is inclined or even collapsed, and safety accidents occur. But the traditional mode is to discharge the ponding that has formed in time, but the infiltration that ponding has formed has certain influence to the tower crane foundation.
SUMMERY OF THE UTILITY MODEL
Aiming at solving the problems of the defects and the shortcomings of the prior art; an object of the utility model is to provide a simple structure, reasonable in design, convenient to use's tower crane basis of preventing ponding, it increases inclosed protection well in the outside on tower crane basis, and ponding initiative collecting plate and the drain pump at cooperation top avoid ponding to form, the contact of great reduction tower crane basis and ponding.
In order to achieve the above object, the utility model adopts the following technical scheme: the tower crane comprises a tower crane foundation, an expanding step anchor, an embedded connecting bolt, a tower body support, a waterproof well, a rubber waterproof pad, a water accumulation port, a water pump and a drainage pipeline; the lower end of the tower crane foundation is provided with expanding step anchors which are reduced layer by layer, an embedded connecting bolt penetrates through the interior of the tower crane foundation, and the upper end of the embedded connecting bolt is connected with a tower body support through a bolt and an inclined support piece; a circle of waterproof well is arranged on the outer side of the tower crane foundation, a rubber waterproof pad is fixed at the upper port of the waterproof well in a sealing manner and is arranged between the first layer and the second layer of the tower body support; the middle lower end of the rubber waterproof pad is provided with a water accumulation port, the water accumulation port is connected with a water pump on the side wall of the waterproof well, and the lower end of the water pump is connected with a municipal drainage pipeline or a river through a drainage pipeline.
Preferably, the upper port of the waterproof well is of an inclined slope structure.
Preferably, four groups of tower body connecting through holes are arranged on the outer side of the water accumulation port in the middle of the rubber waterproof pad.
Preferably, the outer side edge of the rubber waterproof pad is fixed on the inner wall of the waterproof well port through a bolt.
Preferably, the depth of the waterproof well is consistent with the height of the tower body support.
After the structure is adopted, the utility model discloses beneficial effect does: it increases inclosed guard well in the outside on tower crane basis, and the ponding initiative collecting plate and the drain pump at cooperation top avoid ponding to form, the contact of great reduction tower crane basis and ponding.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the present invention is described in detail by the following specific embodiments and the accompanying drawings.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention.
Description of reference numerals: the water-proof tower comprises a hanging foundation 1, an expanding step anchor 2, an embedded connecting bolt 3, a tower body support 4, a water-proof well 5, a rubber water-proof pad 6, a water accumulation port 7, a water pump 8, a drainage pipeline 9 and a tower body connecting through hole 10.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described below with reference to specific embodiments shown in the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
It should also be noted that, in order to avoid obscuring the invention with unnecessary details, only the structures and/or process steps that are closely related to the solution according to the invention are shown in the drawings, while other details that are not relevant to the invention are omitted.
Referring to fig. 1-2, the following technical solutions are adopted in the present embodiment: the tower crane comprises a tower crane foundation 1, an expanding step anchor 2, an embedded connecting bolt 3, a tower body support 4, a waterproof well 5, a rubber waterproof pad 6, a water accumulation port 7, a water pump 8 and a drainage pipeline 9; the lower end of the tower crane foundation 1 is provided with expanding ladder anchors 2 which are reduced layer by layer, embedded connecting bolts 3 penetrate through the interior of the tower crane foundation 1, and the upper ends of the embedded connecting bolts 3 are connected with a tower body support 4 through bolts and inclined support pieces; a circle of waterproof well 5 is arranged on the outer side of the tower crane foundation 1, a rubber waterproof pad 6 is fixed at the upper port of the waterproof well 5 in a sealing manner, and the rubber waterproof pad 6 is arranged between the first layer and the second layer of the tower body support 4; the middle lower end of the rubber waterproof pad 6 is provided with a water accumulation port 7, the water accumulation port 7 is connected with a water pump 8 on the side wall of the waterproof well 5, and the lower end of the water pump 8 is connected with a municipal drainage pipeline or a river through a drainage pipeline 9.
Wherein, the upper port of the waterproof well 5 is an inclined slope structure; four groups of tower body connecting through holes 10 are arranged on the outer side of the water accumulation port 7 in the middle of the rubber waterproof pad 6; the outer side edge of the rubber waterproof pad 6 is fixed on the inner wall of the port of the waterproof well 5 through a bolt; the depth of the waterproof well 5 is consistent with the height of the tower body bracket 4.
The working principle of the specific embodiment is as follows: firstly, fixing a tower body support 4 at the bottommost layer at the upper end of a tower crane foundation 1, and maintaining and reinforcing by matching with an inclined support piece; then, paving the rubber waterproof pad 6 on the upper end of the tower body support 4 at the bottommost layer, and installing the tower body support 4 at the upper layer, so that the rubber waterproof pad 6 is arranged between the tower body supports 4 at the first layer and the second layer; after a water accumulation port 7 in the middle of the rubber waterproof pad 6 is connected with a water pump 8, the rubber waterproof pad 6 is connected with the side wall of the waterproof well 5 through a bolt; rainwater slides down to the rubber waterproof pad 6 along the inclined plane of the waterproof well 5 in rainy days, and then accumulated water is quickly pumped away under the matching of the water accumulation port 7 and the water pump 8, so that the probability that the accumulated water downwards permeates into the tower crane foundation 1 is reduced.
After adopting above-mentioned structure, this embodiment beneficial effect does: it increases inclosed guard well in the outside on tower crane basis, and the ponding initiative collecting plate and the drain pump at cooperation top avoid ponding to form, the contact of great reduction tower crane basis and ponding.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (5)
1. The utility model provides a prevent tower crane basis of ponding which characterized in that: the tower crane comprises a tower crane foundation (1), an expanding step anchor (2), an embedded connecting bolt (3), a tower body support (4), a waterproof well (5), a rubber waterproof pad (6), a water accumulation opening (7), a water pump (8) and a drainage pipeline (9); the lower end of the tower crane foundation (1) is provided with expanding step anchor pieces (2) which are reduced layer by layer, an embedded connecting bolt (3) penetrates through the interior of the tower crane foundation (1), and the upper end of the embedded connecting bolt (3) is connected with a tower body support (4) through a bolt and an inclined support piece; a circle of waterproof well (5) is arranged on the outer side of the tower crane foundation (1), a rubber waterproof pad (6) is fixed at the upper port of the waterproof well (5) in a sealing manner, and the rubber waterproof pad (6) is arranged between the first layer and the second layer of the tower body support (4); the middle lower end of the rubber waterproof pad (6) is provided with a water accumulation opening (7), the water accumulation opening (7) is connected with a water pump (8) fixed on the side wall of the waterproof well (5), and the lower end of the water pump (8) is connected with a municipal drainage pipeline or a river through a drainage pipeline (9).
2. The water accumulation preventing tower crane foundation according to claim 1, wherein: the upper port of the waterproof well (5) is of an inclined slope structure.
3. The water accumulation preventing tower crane foundation according to claim 1, wherein: four groups of tower body connecting through holes (10) are arranged on the outer side of the water collecting port (7) in the middle of the rubber waterproof pad (6).
4. The water accumulation preventing tower crane foundation according to claim 1, wherein: the outer side edge of the rubber waterproof pad (6) is fixed on the inner wall of the port of the waterproof well (5) through a bolt.
5. The water accumulation preventing tower crane foundation according to claim 1, wherein: the depth of the waterproof well (5) is consistent with the height of the tower body support (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921940846.8U CN211523261U (en) | 2019-11-12 | 2019-11-12 | Prevent tower crane basis of ponding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921940846.8U CN211523261U (en) | 2019-11-12 | 2019-11-12 | Prevent tower crane basis of ponding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211523261U true CN211523261U (en) | 2020-09-18 |
Family
ID=72443324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921940846.8U Active CN211523261U (en) | 2019-11-12 | 2019-11-12 | Prevent tower crane basis of ponding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211523261U (en) |
-
2019
- 2019-11-12 CN CN201921940846.8U patent/CN211523261U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202689031U (en) | Deep foundation pit retaining and protecting retaining wall | |
CN101446088A (en) | Construction method for pole and tower foundation in Gobi Desert gravelly soil area | |
CN206768861U (en) | A kind of reinforcement ring retaining wall | |
CN205857173U (en) | A kind of Novel steel casing sheath applying bored concrete pile on the water | |
CN211523261U (en) | Prevent tower crane basis of ponding | |
CN205501983U (en) | Decompression drainage tubular pile | |
CN201679008U (en) | Rigid water drainage device for foundation pit | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN201581408U (en) | Open caisson with sump | |
CN205000350U (en) | Closed automatic precipitation device | |
CN204825955U (en) | After drive piles construction equipment on marine fan basis | |
CN204418194U (en) | For high water-permeability layer of sand foundation pit dewatering device | |
CN103031851A (en) | Caisson device and construction method for caisson device applied to water foundation ditch | |
CN216075134U (en) | Rich water district faces lake sandy soil deep basal pit hillside top construction road structure | |
CN203320576U (en) | Waterproof and drainage system for basement external wall of super high-rise buildings | |
CN212688978U (en) | But recovery type core steel-pipe pile struts system | |
CN211873283U (en) | Steel shell type reinforced concrete water collecting well structure of soft soil foundation pump station | |
CN204510291U (en) | Reduce pressure under a kind of ultra-deep underground space structure base plate drainage system | |
CN204898696U (en) | Telescopic steel cofferdam | |
CN204780894U (en) | Can dismantle steel protects wound packages and puts | |
CN209702332U (en) | A kind of buried under earth type sewage treatment equipment | |
CN208778855U (en) | A kind of aerial jet chimney stake formula bracket | |
CN203034470U (en) | Caisson device applied to water foundation pit | |
CN202610819U (en) | Foundation pit drainage system | |
CN209144964U (en) | A kind of efficient rainwater isolation collection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |