CN211502062U - Pre-buried formula fixing device - Google Patents
Pre-buried formula fixing device Download PDFInfo
- Publication number
- CN211502062U CN211502062U CN202020110153.2U CN202020110153U CN211502062U CN 211502062 U CN211502062 U CN 211502062U CN 202020110153 U CN202020110153 U CN 202020110153U CN 211502062 U CN211502062 U CN 211502062U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- ground
- hollow steel
- fixing device
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to the field of installation technique, specifically disclose a pre-buried formula fixing device, including the cavity steel pipe, the inside internal thread that is provided with of cavity steel pipe, with the screw rod one end that the internal thread matches with cavity steel pipe threaded connection, the other end is connected with the fastener, the cavity steel pipe buries ground and pours fixedly around with ground, the fastener compresses tightly equipment with the ground cooperation. Utilize the cavity sleeve pipe to strengthen the atress with ground, the rigidity intensity requirement on ground is low, realizes conveniently fixing, dismantlement through movable screw rod, and can provide different atress.
Description
Technical Field
The utility model relates to an equipment fixing technical field, concretely relates to pre-buried formula fixing device.
Background
The foundation bolt and the expansion screw are important fixing modes for equipment installation, and the fixing modes are that after the ground is drilled, the foundation bolt or the expansion screw is driven into a fixing hole in the ground; or the screw rod and the concrete foundation are poured into an integral structure.
To the mode that makes rag bolt or inflation screw squeeze into the fixed orifices in ground punching, the rigidity intensity requirement on ground is high, and rag bolt and inflation screw atress itself are not big enough, and the size is fixed can not change according to special demands. For the mode of pouring the screw and the concrete foundation into a whole, if the screw of the foundation bolt is broken, equipment needs to be stopped to replace the screw for maintenance, when the equipment is replaced, firstly, the whole equipment needs to be hoisted, then, the equipment can be replaced after the concrete foundation is dismantled, and finally, the concrete foundation is manufactured again; the whole replacement process is complicated, replacement needs to be completed by means of other equipment, time and labor are consumed, efficiency is low, a concrete foundation needs to be manufactured again, labor intensity of workers is high, and maintenance cost is high.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a require lowly to ground rigidity intensity, the atress is big and can satisfy the pre-buried formula fixing device of different fixed dynamics requirements.
In order to solve the technical problem, the utility model provides a pre-buried formula fixing device, including the cavity steel pipe, the inside internal thread that is provided with of cavity steel pipe, with screw rod one end that the internal thread matches with cavity steel pipe threaded connection, the other end are connected with the fastener, the cavity steel pipe buries ground and pours fixedly with ground on every side, the fastener compresses tightly equipment with the ground cooperation. Utilize the cavity sleeve pipe to strengthen the atress with ground, the rigidity intensity requirement on ground is low, realizes conveniently fixing, dismantlement through movable screw rod, and can provide different atress.
Furthermore, a nut is connected to the inner portion of the upper end of the hollow steel pipe, the internal thread is a thread of the nut, and the height of the upper edge of the nut is not higher than that of the upper edge of the hollow steel pipe. The screws with different sizes can be conveniently replaced, and the cost is saved.
Further, the bottom end of the hollow steel pipe is connected with a bottom plate, and the size of the bottom plate is larger than the cross sectional area of the hollow steel pipe. The fixation between the hollow steel pipe and the ground is strengthened, and the stress strength of the hollow steel pipe is increased.
Further, cavity steel pipe circumference is provided with a plurality of barbs, the barb along with the tie point of cavity steel pipe sets up to its top slope. The stress between the hollow steel pipe and the ground is increased.
Further, the angle between the barbs and the axial direction of the hollow steel pipe is 10-80 degrees.
Further, the fastener is a compression plate.
Further, the fastener is a pipe. I.e. the device can be fixed as well as the cable.
Furthermore, the upper edge of the hollow steel pipe is flush with the ground.
The utility model discloses a pre-buried formula fixing device compares with prior art's beneficial effect is, it is big still to guarantee the atress under the low condition of ground rigidity, is convenient for change different model sizes, satisfies various fixed requirements.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a second embodiment of the present invention;
FIG. 3 is a perspective view of the third embodiment of the present invention;
fig. 4 is a schematic view of the operation of the fixing device of the present invention.
The reference numbers in the figures illustrate: 1. hollow steel pipe, 2, screw rod, 3, fastener, 3a, pressure strip, 3b, tubular product, 4, nut, 5, bottom plate, 6, barb, 7, ground, 8, equipment, 9, equipment foot.
Detailed Description
The present invention is further described with reference to the following drawings and specific embodiments so that those skilled in the art can better understand the present invention and can implement the present invention, but the embodiments are not to be construed as limiting the present invention.
Referring to fig. 1, for the utility model discloses a pre-buried formula fixing device's an embodiment schematic diagram, fixing device in this embodiment includes cavity steel pipe 1, 1 inside internal threads that are provided with of cavity steel pipe, with 2 one end of screw rod that the internal thread matches with 1 threaded connection of cavity steel pipe, the other end is connected with fastener 3, cavity steel pipe 1 buries ground and pours fixedly with ground on every side, fastener 3 compresses tightly equipment with the ground cooperation.
Because cavity steel pipe 1 buries ground and pours fixedly with ground on every side, consequently, the rigidity intensity requirement to former ground is low, still can guarantee the stable position of cavity steel pipe 1 in the ground, can not take place to rock, can also guarantee 2 backs in the screw in cavity steel pipe 1, the stability of 2 positions of screw, because screw 2 and 1 threaded connection of cavity steel pipe, consequently 2 atress of screw are big, it can compress tightly equipment with the ground cooperation to ensure the fastener 3 of 2 tip of screw, prevent that equipment from producing to rock and cause the damage to equipment in the course of the work. In order to ensure the stability of the connection between the screw rod 2 and the fastener 3, the screw rod 2 and the fastener 3 are connected by welding. Further, in order to guarantee that the distance between the fastening piece 3 and the ground is enough to clamp the equipment with any thickness, the upper edge of the hollow steel pipe 1 is flush with the ground, and at the moment, even if a fixing device is not used, the fixing device does not protrude out of the ground, so that the attractiveness of the ground cannot be influenced, the ground cannot be obstructed in use, and the foot cannot be stumbled. The adoption is at 2 one end connection fastener 3's of screw rod mode fixed equipment, on the one hand because the equipment foot is last not necessarily offered threaded hole, compresses tightly equipment through 3 cooperations of fastener and can be applicable to various different equipment, and on the other hand, the equipment product that fastener 3 can be fixed as required is changed to satisfy different demands. In this embodiment, the fastener 3 is the pressure strip 3a, and the pressure strip 3a can be various shapes, adopts circularly in this embodiment, adopts panel can guarantee that the contact surface with equipment is big, compresses tightly more stably to equipment. The stress of the fixing device can be changed by changing the size of the hollow steel pipe 1, the depth of the hollow steel pipe embedded into the ground, the size of the compression plate 3a and the size of the screw rod 2, so that the stress requirements of different devices can be met. In order to further ensure the fixation of the equipment, after the pressing plate 3a presses the equipment, holes can be punched on the pressing plate, and the pressing plate 3a and the equipment feet are locked through fastening bolts.
Refer to fig. 2, do the utility model discloses a two structure schematics of embodiment, in this embodiment, for convenient change screw rod 2 size and save the cost simultaneously rather than complex internal thread size, cavity steel pipe 1 upper end internal connection has nut 4, the internal thread is the screw thread of nut 4, nut 4 top edge height is not higher than cavity steel pipe 1 top edge height. When the size of the screw rod 2 is changed, the screw rod 2 can be matched with the hollow steel pipe 1 by replacing the nut 4 corresponding to the screw rod. In addition, when the screw thread of the nut is damaged due to long-time use or frequent disassembly and assembly, the screw thread can be conveniently replaced, the maintenance period is short, and the cost is low. In this embodiment, the nut 4 is welded inside the upper end of the hollow steel pipe 1, and the nut 4 is completely located inside the hollow steel pipe 1, so that on one hand, the stability of the connection between the nut 4 and the hollow steel pipe 1 is ensured, and on the other hand, the appearance of the hollow steel pipe is prevented from being affected by the protrusion of the nut 4. In this embodiment, the fastener 3 is a tube 3 b. On the one hand, tubular product 3b can with ground cooperation clamping device, on the other hand, the equipment cable can pass tubular product 3b, tubular product 3b can also play the fixed cable's of cover bunch effect.
Referring to fig. 3, for the third structural schematic diagram of the embodiment of the present invention, in this embodiment, in order to prevent the surface of the hollow steel pipe 1 from being smooth, the hollow steel pipe 1 is separated from the surrounding concrete after being used for a long time, and cannot play a role of fixing equipment, the bottom end of the hollow steel pipe 1 is connected with a bottom plate 5, and the size of the bottom plate 5 is greater than the cross-sectional area of the hollow steel pipe 1. When the periphery of the hollow steel pipe 1 is poured and fixed, the bottom plate 5 is embedded into concrete, so that the connection between the hollow steel pipe 1 and the bottom plate 5 is more stable, the hollow steel pipe 1 is prevented from being separated from a concrete pouring part, and the stress of the fixing device is increased. Furthermore, for further increasing fixing device's atress, cavity steel pipe 1 circumference is provided with a plurality of barbs 6, barb 6 along with cavity steel pipe 1's tie point sets up to its top slope. After fixing device fixed equipment, because rocking of equipment, fixing device receives ascending pulling power and the power of shaking about and, through setting up barb 6, increases the resistance that hollow steel pipe 1 removed, further increases fixing device's atress. In this embodiment, the angle between the barb 6 and the axial direction of the hollow steel pipe 1 is 10-80 °.
Fig. 4 is the utility model discloses a fixing device working schematic diagram, cavity steel pipe 1 is pour as an organic wholely by concrete and ground 7 on every side, equipment 8 is placed in 7 scope tops on the ground that fixing device encloses, be connected with fastener 3's screw rod screw in cavity steel pipe 1 in, make fastener 3 push down equipment foot 9, fastener 3 presss from both sides equipment 8 with the cooperation of ground 7 tightly, for further guaranteeing equipment 8's stability, can also set up the fixed orifices on fastener 3 after fastener 3 compresses tightly equipment 8, fastening bolt passes fixed orifices and equipment foot 9, lock equipment foot 9 and fastener 3. The utility model discloses a fixing device and application method can overcome and have had fixing device to require highly to the ground rigidity, and the atress is less, and the model size is fixed, can not change the scheduling problem according to the in-service use requirement, simple structure, convenient to use, and the commonality is strong simultaneously, is applicable to the equipment of different shape size designs.
The above-mentioned embodiments are merely preferred embodiments for fully illustrating the present invention, and the scope of the present invention is not limited thereto. Equivalent substitutes or changes made by the technical personnel in the technical field on the basis of the utility model are all within the protection scope of the utility model. The protection scope of the present invention is subject to the claims.
Claims (8)
1. The utility model provides a pre-buried formula fixing device which characterized in that, includes the cavity steel pipe, cavity steel pipe inside is provided with the internal thread, with screw rod one end that the internal thread matches with cavity steel pipe threaded connection, the other end is connected with the fastener, cavity steel pipe buries ground and pours fixedly around with ground, fastener and ground cooperation compress tightly equipment.
2. The pre-buried fixing device of claim 1, wherein a nut is connected to the inside of the upper end of the hollow steel tube, the internal thread is a thread of the nut, and the height of the upper edge of the nut is not higher than that of the upper edge of the hollow steel tube.
3. The pre-buried fixing device of claim 1, wherein a bottom plate is connected to the bottom end of the hollow steel pipe, and the size of the bottom plate is larger than the cross-sectional area of the hollow steel pipe.
4. The pre-buried fixing device of claim 1, wherein the hollow steel pipe is circumferentially provided with a plurality of barbs, and the barbs are inclined towards the top of the hollow steel pipe along the connection point with the hollow steel pipe.
5. The pre-embedded fixing device of claim 4, wherein the angle between the barbs and the axial direction of the hollow steel tube is 10-80 °.
6. The embedment fixture of claim 1, wherein the fastener is a hold-down plate.
7. The embedment fixture of claim 1, wherein the fastener is a tubular.
8. The embedment fixture of claim 1, wherein an upper edge of the hollow steel pipe is flush with the ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020110153.2U CN211502062U (en) | 2020-01-18 | 2020-01-18 | Pre-buried formula fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020110153.2U CN211502062U (en) | 2020-01-18 | 2020-01-18 | Pre-buried formula fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211502062U true CN211502062U (en) | 2020-09-15 |
Family
ID=72400854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020110153.2U Active CN211502062U (en) | 2020-01-18 | 2020-01-18 | Pre-buried formula fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211502062U (en) |
-
2020
- 2020-01-18 CN CN202020110153.2U patent/CN211502062U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201326524Y (en) | Composite tower cylinder of wind turbine | |
CN204491608U (en) | Building pile foundation pile crown concrete rapid cleaning device | |
KR100992736B1 (en) | Section steel-pile pulling machine | |
CN211502062U (en) | Pre-buried formula fixing device | |
CN204852619U (en) | Can have enough to meet need pump line fixing device of use | |
CN211340764U (en) | Mechanical connection precast pile | |
CN111188969A (en) | Pre-embedded fixing device and using method | |
CN216840656U (en) | Telescopic separator for beam column node concrete pouring | |
CN210827850U (en) | Quick detachable temporary building fixed knot constructs | |
CN210080680U (en) | Crystallizer positioning and pressing device | |
CN204282394U (en) | A kind of blower foundation and the prestressing force assembly for blower foundation | |
CN104532871A (en) | Fan foundation and pre-stress component for same | |
CN210001480U (en) | Tower section replacement device and tower crane comprising same | |
CN201250516Y (en) | Single-side wall mould holder strengthening device | |
CN203905527U (en) | Reinforcing device for weak transmission tower | |
CN203096731U (en) | Pre-stressed hollow square pile assembly without end plate at one end | |
CN211773577U (en) | Pile head structure of prefabricated tubular pile | |
CN203755798U (en) | Grid fence | |
CN203452440U (en) | Pre-stress concrete rod section with two ends connected by inner flanges | |
CN218541543U (en) | Concrete wall pouring template fixing water-stop screw structure | |
CN201501034U (en) | Fixed structure of embedded screw cap on concrete segment mould | |
CN202753279U (en) | Novel tension board assembly | |
CN216544885U (en) | High-reliability hydraulic cylinder piston thread anti-loosening device | |
CN220166948U (en) | A turn over top structure that is used for enclosure steel to support to tear open and prop | |
CN211687966U (en) | Clamping plate type fixing structure of gantry crane guide rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |