CN203452440U - Pre-stress concrete rod section with two ends connected by inner flanges - Google Patents

Pre-stress concrete rod section with two ends connected by inner flanges Download PDF

Info

Publication number
CN203452440U
CN203452440U CN201320561950.2U CN201320561950U CN203452440U CN 203452440 U CN203452440 U CN 203452440U CN 201320561950 U CN201320561950 U CN 201320561950U CN 203452440 U CN203452440 U CN 203452440U
Authority
CN
China
Prior art keywords
guard ring
rod
prestressed concrete
concrete rod
concrete body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320561950.2U
Other languages
Chinese (zh)
Inventor
祁锦明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320561950.2U priority Critical patent/CN203452440U/en
Application granted granted Critical
Publication of CN203452440U publication Critical patent/CN203452440U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a pre-stress concrete rod section with two ends connected by inner flanges. The pre-stress concrete rod section comprises a pre-stress concrete rod body and connection flanges arranged on two end parts of the pre-stress concrete rod body. The pre-stress concrete rod section is characterized in that the connection flanges on the two end parts of the pre-stress concrete rod body are steel-made inner flanges respectively provided with an inner protective ring and an outer protective ring; each steel-made inner flange with the inner protective ring and the outer protective ring is uniformly provided with connecting bolt holes and stepped holes in the peripheral direction; the inner protective rings and the outer protective rings are connected by rib plates or steel bars and are pre-embedded at the two ends of the pre-stress concrete rod body; the outer protective rings are level with the outer surface of the pre-stress concrete rod body; two ends of a pre-stress main bar are directly anchored in the stepped holes of the inner flanges. The pre-stress concrete rod section with the two ends connected by the inner flanges has the advantages that the appearance of the rod body connected by the steel-made inner flanges is smooth and beautiful and the rod body is not easy to collide; the inner protective rings and the outer protective rings are arranged so that the inner flanges and the pre-stress concrete rod body can be connected firmly.

Description

Two ends are the prestressed concrete bar section that inner flange connects
Technical field
The utility model belongs to a kind of prestressed concrete bar member, and relating in particular to a kind of two ends is the prestressed concrete bar section that inner flange connects.
Background technology
The prestressed concrete bodies of rod that adopt such as the conical electric pole that conventional major diameter multistage connects, communication rod, wind-power tower more, and each section of prestressed concrete body of rod both ends adopt adpting flange to connect, what the adpting flange at its both ends was used is all outward flange, the prestressed concrete body of rod is directly pressed on flange inner face, because the modulus of elasticity of Steel concrete is different, at its contact surface, easily cause fatigue failure or stress to concentrate and destroy, reliability is not high; Simultaneously due to multistage connect after tie point evagination, not only affect attractive in appearancely, and in transportation, due to flange evagination, easily bump to other members, cause damage.
Summary of the invention
It is attractive in appearance that the purpose of this utility model is to provide a kind of smooth in appearance, is also difficult for colliding with during shipment, make the concrete body of rod and flange to be connected two ends more be reliably the prestressed concrete bar section that inner flange connects.
The purpose of this utility model is to realize like this.
According to two ends of the present utility model, it is the prestressed concrete bar section that inner flange connects, comprise the prestressed concrete body of rod and the adpting flange that is located at prestressed concrete body of rod both ends, it is characterized in that the described adpting flange that is located at prestressed concrete body of rod both ends is respectively the steel inner flange with interior guard ring and outer guard ring, circumferencial direction at the described steel inner flange with interior guard ring and outer guard ring is evenly provided with connecting bolt hole and shoulder hole, interior guard ring adopts the gusset or the reinforcing bar that are uniformly distributed along the circumference to be connected with outer guard ring, and be embedded in the two ends of the concrete body of rod, the concordant setting of appearance of described outer guard ring and the described concrete body of rod, prestressed main muscle two ends is directly anchored in the shoulder hole of inner flange.
Described interior guard ring be arranged in parallel at little head end and the outer guard ring of the prestressed concrete body of rod, and at stub end and 5 ° of-30 ° of angles of outer guard ring formation of the prestressed concrete body of rod, and interior guard ring is longer than outer guard ring.
The utility model has the advantages that:
Because the adpting flange at the prestressed concrete body of rod of the present utility model both ends has adopted respectively two steel inner flanges, the smooth in appearance of the body of rod after this inner flange connected mode makes to connect is attractive in appearance, is also difficult for colliding with during shipment; In addition owing to being provided with inside and outside two guard rings on the inner face of inner flange, the main muscle of prestressing force of the body of rod is directly anchored on flange simultaneously, the pressure of main muscle pulling force and the body of rod is all directly passed to inner flange, make the concrete body of rod more reliable with being connected of inner flange, the contact surface that its inside and outside two guard rings have been eliminated concrete and flange effectively produces fatigue failure and the concentrated possibility of destroying of stress.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1 of the present utility model.
Fig. 3 is the structural representation of another embodiment of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further illustrated.
As Fig. 1, shown in Fig. 2, two ends of the present utility model are the prestressed concrete bar section that inner flange connects, comprise the prestressed concrete body of rod 1 and the adpting flange that is located at the prestressed concrete body of rod 1 both ends, it is characterized in that the described adpting flange that is located at the prestressed concrete body of rod 1 both ends is respectively the steel inner flange 5 with interior guard ring 3 and outer guard ring 4, circumferencial direction at the described steel inner flange 5 with interior guard ring 3 and outer guard ring 4 is evenly provided with connecting bolt hole 6 and shoulder hole 7, interior guard ring 3 adopts gusset or reinforcing bar 8 to be connected with outer guard ring 4, and be embedded in the two ends of the prestressed concrete body of rod 1, the concordant setting of appearance of described outer guard ring 4 and the described prestressed concrete body of rod 1, after steel inner flange 5 with interior guard ring 3 and outer guard ring 4 is connected with the prestressed concrete body of rod 1, smooth in appearance is attractive in appearance, during shipment, be also difficult for colliding with, prestressed main muscle 2 two ends are directly anchored in the shoulder hole 7 of inner flange, this anchor structure not only makes to be firmly connected with the prestressed concrete body of rod 1 with the steel inner flange 5 of interior guard ring 3 and outer guard ring 4, and the pulling force of the main muscle 2 of prestressing force and the pressure of the prestressed concrete body of rod 1 is all directly passed to steel inner flange 5, make the prestressed concrete body of rod 1 more reliable with being connected of steel inner flange 5.
As shown in Figure 3, interior guard ring 3 described in the utility model be arranged in parallel at little head end and the outer guard ring 4 of the prestressed concrete body of rod 1, and at stub end and 5 ° of-30 ° of angles of outer guard ring 4 formation of the prestressed concrete body of rod 1, and interior guard ring 3 is longer than outer guard ring 4.Make interior guard ring 3 form an intilted structure, because the prestressed concrete body of rod 1 top is stressed little, bottom is stressed large, therefore it is more reasonable that the wall thickness of the prestressed concrete body of rod 1 bottom is greater than the wall ratio on top conventionally, and the utility model is because the concrete between inside and outside guard ring is owing to there being guard ring constraint, while adopting the utility model to make the prestressed concrete body of rod 1, only need to increase the concrete thickness of the above part of guard ring, and need not increase guard ring position concrete thickness, under the prerequisite that does not change inner flange size, also can increase the supporting capacity of the body of rod.
Between the inside and outside guard ring of the utility model, adopt the gusset or the reinforcing bar 8 that are uniformly distributed along the circumference to connect, guard ring has been eliminated the contact surface of concrete and flange and is produced fatigue failure and the concentrated possibility of destroying of stress.Be positioned at the connecting bolt hole 6 of the circumferencial direction of steel inner flange 5, for the connection of 1 section, upper and lower prestressed concrete bar.

Claims (2)

1. two ends are the prestressed concrete bar section that inner flange connects, comprise the prestressed concrete body of rod and the adpting flange that is located at prestressed concrete body of rod both ends, it is characterized in that the described adpting flange that is located at prestressed concrete body of rod both ends is respectively the steel inner flange with interior guard ring and outer guard ring, circumferencial direction at the described steel inner flange with interior guard ring and outer guard ring is evenly provided with connecting bolt hole and shoulder hole, interior guard ring adopts gusset or reinforcing bar to be connected with outer guard ring, and be embedded in the two ends of the concrete body of rod, the concordant setting of appearance of described outer guard ring and the described concrete body of rod, prestressed main muscle two ends is directly anchored in the shoulder hole of inner flange.
2. two ends according to claim 1 are the prestressed concrete bar section that inner flange connects, it is characterized in that described interior guard ring be arranged in parallel at little head end and the outer guard ring of the prestressed concrete body of rod, stub end and outer guard ring at the prestressed concrete body of rod form 5 ° of-30 ° of angles, and interior guard ring is longer than outer guard ring.
CN201320561950.2U 2013-09-11 2013-09-11 Pre-stress concrete rod section with two ends connected by inner flanges Expired - Fee Related CN203452440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320561950.2U CN203452440U (en) 2013-09-11 2013-09-11 Pre-stress concrete rod section with two ends connected by inner flanges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320561950.2U CN203452440U (en) 2013-09-11 2013-09-11 Pre-stress concrete rod section with two ends connected by inner flanges

Publications (1)

Publication Number Publication Date
CN203452440U true CN203452440U (en) 2014-02-26

Family

ID=50132327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320561950.2U Expired - Fee Related CN203452440U (en) 2013-09-11 2013-09-11 Pre-stress concrete rod section with two ends connected by inner flanges

Country Status (1)

Country Link
CN (1) CN203452440U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422702A (en) * 2013-09-11 2013-12-04 祁锦明 Prestressed concrete rod section with two ends in inner flange connection
EP3502378A1 (en) * 2017-11-29 2019-06-26 Senvion GmbH Tower segment for a wind turbine and method for producing a tower segment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422702A (en) * 2013-09-11 2013-12-04 祁锦明 Prestressed concrete rod section with two ends in inner flange connection
EP3502378A1 (en) * 2017-11-29 2019-06-26 Senvion GmbH Tower segment for a wind turbine and method for producing a tower segment

Similar Documents

Publication Publication Date Title
KR101803358B1 (en) Concrete pile connection apparatus and method
CN203296450U (en) Concrete pole with cross arm connecting points
CN102002944A (en) Mechanical connecting structure of anti-floating pile heads and connecting method thereof
CN103422702A (en) Prestressed concrete rod section with two ends in inner flange connection
CN203510449U (en) Novel tension device for pipe pile production
CN203452440U (en) Pre-stress concrete rod section with two ends connected by inner flanges
CN104500866B (en) The concrete hollow slender member of built-in helical spring
CN204753616U (en) Stock and stock basis
CN202090336U (en) Spirally-proceeding type steel tube concrete pile
CN201635080U (en) Anchor bolt
CN203613533U (en) Reinforced prestressed pipe pile
CN201531143U (en) Anchoring ring of partial prestress electric rod connecting flange and connecting structure of electric rod and flange
CN201817811U (en) Mechanical connecting structure of heads of anti-floating piles
CN103407904A (en) Hoop type wall-attached connection piece for tower crane and construction method thereof
CN202596242U (en) Concrete tower
CN204300534U (en) Built-in helical spring concrete hollow slender member
CN104405734B (en) The buckle-type flange connection of windmill tower frame and pedestal and method of attachment
CN207194167U (en) Prefabricated member
CN201730108U (en) Tensioning and stressing reinforcement stress structure
CN202031370U (en) Concrete-steel structure composite wind power tower
CN204282394U (en) A kind of blower foundation and the prestressing force assembly for blower foundation
CN203006796U (en) Embrace hoop type wall-attached connecting piece used for tower crane
CN203639900U (en) Hollow pile
CN203393904U (en) Reinforcement fabric hoop
CN207004140U (en) A kind of anchor ear pole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140226

Termination date: 20150911

EXPY Termination of patent right or utility model