CN211500723U - Settlement observation device for tunnel construction period - Google Patents

Settlement observation device for tunnel construction period Download PDF

Info

Publication number
CN211500723U
CN211500723U CN201921669855.8U CN201921669855U CN211500723U CN 211500723 U CN211500723 U CN 211500723U CN 201921669855 U CN201921669855 U CN 201921669855U CN 211500723 U CN211500723 U CN 211500723U
Authority
CN
China
Prior art keywords
laser range
tunnel
range finder
observation device
central control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921669855.8U
Other languages
Chinese (zh)
Inventor
罗燕平
李坤
文展
马印怀
侯玲超
安凤华
徐双利
刘树中
喻文映
冯国春
谭军
曾斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Road and Bridge Group Co Ltd
Original Assignee
Sichuan Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Road and Bridge Group Co Ltd filed Critical Sichuan Road and Bridge Group Co Ltd
Priority to CN201921669855.8U priority Critical patent/CN211500723U/en
Application granted granted Critical
Publication of CN211500723U publication Critical patent/CN211500723U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an observation device is subsided to tunnel construction phase, include: set up at least one laser range finder, at least one inclinometer, central control module in the tunnel to and set up respectively in the 4G route conversion module and the command portion router of tunnel entrance to a cave, laser range finder and inclinometer are connected with central control module respectively, and central control module gathers laser range finder and inclinometer's parameter information in real time, and transmits for 4G route conversion module and command portion router through optic fibre. The utility model discloses can conveniently in time accurately monitor the change in tunnel, reach the effect that dynamic observation tunnel construction period subsided.

Description

Settlement observation device for tunnel construction period
Technical Field
The utility model relates to a tunnel field especially relates to an observation device is subsided to tunnel construction phase.
Background
With the continuous development of socioeconomic of China, the strength of infrastructure construction of China is continuously enhanced, and the tunnel construction method becomes the country with the largest quantity and the fastest growth of tunnel engineering in the world. Investigation and research find that tunnel diseases in highway engineering generally exist in life, driving safety in tunnels and personal safety of passengers are seriously threatened, and meanwhile, the operation benefit of highways is directly influenced. In recent years, with the increase of the number of highway bridges and tunnels in China, more and more quality problems begin to emerge, and the quality of engineering is widely concerned by people, so that the control strength of tunnel quality needs to be enhanced, and detection is an effective means for tunnel quality control. The traditional tunnel quality detection method mainly adopts manual inspection, the result depends on the level of detection personnel, the number of monitoring points is small, the automation degree is low, the monitoring period can not meet the requirements, and the field requirements can not be met.
SUMMERY OF THE UTILITY MODEL
Utility model's an aim at to above-mentioned problem, provides a tunnel construction period settlement observation device, and this utility model in time accurately monitors the change in tunnel, reaches the effect that dynamic observation tunnel construction period subsides.
A settlement observation device in a tunnel construction period comprises: set up at least one laser range finder, at least one inclinometer, central control module in the tunnel to and set up respectively in the 4G route conversion module and the command portion router of tunnel entrance to a cave, laser range finder and inclinometer are connected with central control module respectively, and central control module gathers laser range finder and inclinometer's parameter information in real time, and transmits for 4G route conversion module and command portion router through optic fibre.
Furthermore, the number of the laser range finders is two, and the two laser range finders comprise phase difference detectors and are used for calculating the distance between the laser range finders and a measured object.
Furthermore, the quantity of the inclinometers is four, and the inclinometers are arranged on the wall body in the tunnel and used for testing the change of the horizontal angle.
The 4G routing conversion module is connected with the cloud server and used for uploading parameter information in real time.
Furthermore, the intelligent terminal monitoring system further comprises a plurality of intelligent terminals, the command department router is connected with the intelligent terminals, and the intelligent terminals check monitoring data in real time.
Further, the headquarters router is connected with the central control module through a 500 meter optical fiber.
Furthermore, the intelligent terminal comprises a display module and an early warning module, which are respectively used for displaying parameter information in real time and carrying out real-time early warning according to the parameter information.
Has the advantages that: the utility model discloses can in time accurately monitor the change in tunnel through intelligent terminal, reach the effect that dynamic observation tunnel construction period subsided.
Drawings
FIG. 1 is a system diagram of a settlement observation device during tunnel construction;
fig. 2 is an APP page schematic diagram of the intelligent terminal.
Detailed Description
In order to clearly understand the technical features, objects, and effects of the present invention, embodiments of the present invention will be described with reference to the accompanying drawings.
Fig. 1 shows a specific embodiment, and fig. 2 shows a settlement observation device for tunnel construction period, including: set up at least one laser range finder, at least one inclinometer, central control module in the tunnel to and set up respectively in the 4G route conversion module and the command portion router of tunnel entrance to a cave, laser range finder and inclinometer are connected with central control module respectively, and central control module gathers laser range finder and inclinometer's parameter information in real time, and transmits for 4G route conversion module and command portion router through optic fibre.
The laser emitted by a laser emitter in the laser range finder is divided into two parts: one part of the phase difference signals passes through the distance L and is reflected back by the measured object to enter the phase difference detector; the other part goes directly to the phase difference detector. The phase difference detector measures the phase difference of the two parts of laser, the distance L between the laser transmitter and the measured object is calculated according to the phase difference value, and the laser range finder is directly fixed in the tunnel by using expansion screws.
The inclinometer is used for measuring the horizontal angle change of the system, and the inclination angle sensor integrates the MCU, the MEMS accelerometer, the analog-to-digital conversion circuit and the communication unit on a very small circuit board and directly outputs inclination data such as angles. The theoretical basis is newton's second law: according to basic physical principles, inside a system, velocity is not measurable, but acceleration is measurable. If the initial velocity is known, the linear velocity can be calculated through integration, and then the linear displacement can be calculated, so that the acceleration sensor is actually an acceleration sensor applying the inertia principle. When the tilt sensor is at rest, i.e. no acceleration is acting in the lateral and vertical directions, then only the gravitational acceleration acts on it. The included angle between the gravity vertical axis and the sensitive axis of the acceleration sensor is the inclined angle. The inclinometer is directly fixed on a wall body in the tunnel.
The 4G route conversion module is connected with the central control module through 500 m optical fibers.
The basic principles and main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and what is described in the specification are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and these changes and modifications fall within the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a settlement observation device during tunnel construction period which characterized in that includes: set up at least one laser range finder, at least one inclinometer, central control module in the tunnel to and set up respectively in the 4G route conversion module and the command portion router of tunnel entrance to a cave, laser range finder and inclinometer are connected with central control module respectively, and central control module gathers laser range finder and inclinometer's parameter information in real time, and transmits for 4G route conversion module and command portion router through optic fibre.
2. The settlement observation device during tunnel construction according to claim 1, wherein the number of the laser range finders is two, and each laser range finder comprises a phase difference detector for calculating the distance between the laser range finder and a measured object.
3. The settlement observation device of claim 1, wherein the number of the inclinometers is four, and the inclinometers are arranged on the wall body in the tunnel and used for testing the change of the horizontal angle.
4. The device of claim 1, further comprising a cloud server, wherein the 4G routing conversion module is connected to the cloud server and is configured to upload parameter information in real time.
5. The settlement observation device of claim 1, further comprising a plurality of intelligent terminals, wherein the router of the command department is connected with the intelligent terminals, and the intelligent terminals view the monitoring data in real time.
6. The settlement observation device during tunnel construction according to claim 1, wherein the headquarters router is connected to the central control module through an optical fiber of 500 meters.
7. The device for observing sedimentation during tunnel construction according to claim 5, wherein the intelligent terminal comprises a display module and an early warning module, which are respectively used for displaying parameter information in real time and giving an early warning in real time according to the parameter information.
CN201921669855.8U 2019-10-08 2019-10-08 Settlement observation device for tunnel construction period Active CN211500723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921669855.8U CN211500723U (en) 2019-10-08 2019-10-08 Settlement observation device for tunnel construction period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921669855.8U CN211500723U (en) 2019-10-08 2019-10-08 Settlement observation device for tunnel construction period

Publications (1)

Publication Number Publication Date
CN211500723U true CN211500723U (en) 2020-09-15

Family

ID=72406162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921669855.8U Active CN211500723U (en) 2019-10-08 2019-10-08 Settlement observation device for tunnel construction period

Country Status (1)

Country Link
CN (1) CN211500723U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513150A (en) * 2019-10-08 2019-11-29 四川公路桥梁建设集团有限公司 A kind of constructing tunnel phase settlement observer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513150A (en) * 2019-10-08 2019-11-29 四川公路桥梁建设集团有限公司 A kind of constructing tunnel phase settlement observer

Similar Documents

Publication Publication Date Title
CN207123616U (en) A kind of deflection of bridge span real-time monitoring device based on laser ranging technique
CN106197288B (en) Self-calibration measuring device and method for large structure vertical displacement or deformation
CN105136115B (en) A kind of method and apparatus of automatic measurement tunnel cross-section deformation
CN106225682B (en) Measuring device and method for the vertical displacement of large structure ontology and ground settlement
CN106224007A (en) Safety for tunnel engineering monitoring and warning management system
CN208254531U (en) A kind of building safety monitoring and acquisition system based on Internet of Things big data
CN109373980B (en) Monitoring method and system based on video monitoring measuring instrument and inclinometry terminal
CN209446243U (en) A kind of middle-small span beam deflection real-time online high frequency monitoring device
CN106197287B (en) Self-calibration measuring device and method for large scale structure composition deformation or displacement parameter
CN206223097U (en) For the vertical displacement of large structure body and the measurement apparatus of ground settlement
CN106840092B (en) Using the method for laser range finder monitoring high-supported formwork
CN204165548U (en) A kind of tunnel sedimentation monitoring system of improvement
CN108917718A (en) A kind of wireless tilt and displacement monitoring device, system and method
CN110987057A (en) Hydraulic pressure is automatic monitoring system in high in clouds for creeping formwork
CN104330037B (en) Displacement monitoring device and method for laser projection type anchorage structure
CN109405747A (en) Landslide surface displacement monitoring method and device based on plate
CN211500723U (en) Settlement observation device for tunnel construction period
CN106338272A (en) Testing device and testing method for measuring inclination angle of component
KR102365368B1 (en) System for monitoring displacement of slope
CN209840973U (en) Device for monitoring micro displacement of structure
CN207816204U (en) A kind of optical sensing bridge monitoring system
CN109000601A (en) A kind of pylon offset dynamic observation system
CN109741575A (en) A kind of large size caving of dangerous rock real-time system for monitoring and pre-warning
CN210513017U (en) High formwork upright rod displacement real-time monitoring system based on CCD sensor
CN206095356U (en) Differential pressure water level measuring apparatu

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant