CN211499732U - Super-long cantilever fixing device for attached lifting scaffold - Google Patents

Super-long cantilever fixing device for attached lifting scaffold Download PDF

Info

Publication number
CN211499732U
CN211499732U CN201921868061.4U CN201921868061U CN211499732U CN 211499732 U CN211499732 U CN 211499732U CN 201921868061 U CN201921868061 U CN 201921868061U CN 211499732 U CN211499732 U CN 211499732U
Authority
CN
China
Prior art keywords
pull rod
scaffold
stud
inserted lift
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921868061.4U
Other languages
Chinese (zh)
Inventor
周靖康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201921868061.4U priority Critical patent/CN211499732U/en
Application granted granted Critical
Publication of CN211499732U publication Critical patent/CN211499732U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses an inserted lift scaffold overlength cantilever fixing device, including inserted lift scaffold and pre-buried built-in fitting on the floor, be fixed with the base on the built-in fitting, there is the lower link through bolt hinged joint on the base, has the upper link through bolt hinged joint on inserted lift scaffold, lower link and upper link between connect through stud, and stud's one end and lower link pass through left-handed threaded connection, stud's the other end and upper link pass through right-handed threaded connection. The utility model discloses an adjustable draw bar device carries out the rigidity drawknot to the cantilever of inserted lift scaffold, reduces inserted lift scaffold cantilever length, has guaranteed the support body and has climbed the safety problem in the use. And the adjustable pull rod device can be detached to be used in a turnover way after being used, so that the construction cost is saved.

Description

Super-long cantilever fixing device for attached lifting scaffold
Technical Field
The utility model relates to an attached lifting scaffold overlength cantilever fixing device belongs to construction technical field.
Background
With the rapid development of economic level in recent years in China, more and more high-grade five-star hotels are in China, and corresponding business units and construction units increasingly pay more attention to the comfort of the use function of hotel buildings, so that a large number of high-grade hotels with the height of 4.5m and above appear. The cantilever of the attached lifting scaffold is too long due to the ultrahigh story height, potential safety hazards exist, and the attached lifting scaffold is required not to exceed the limit value of 6m in the building construction specification. Therefore, how to solve the problem of overlong cantilever of the attached lifting scaffold has become an urgent technical problem to be solved in super high-rise building construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure, safe and reliable, can have enough to meet the need the inserted lift scaffold overlength cantilever fixing device who uses to overcome not enough among the prior art.
The technical scheme of the utility model: the utility model provides an inserted lift scaffold overlength cantilever fixing device, includes inserted lift scaffold and pre-buried built-in fitting on the floor, is fixed with the base on the built-in fitting, has a lower pull rod through bolt hinged joint on the base, has an upper pull rod through bolt hinged joint on inserted lift scaffold, lower pull rod and upper pull rod between connect through stud, and stud's one end and lower pull rod pass through left-handed threaded connection, stud's the other end and upper pull rod pass through right-handed threaded connection.
Furthermore, the embedded part is composed of a bottom plate and a stud welded on the bottom plate, a through hole is formed in the base, and the stud penetrates through the through hole and then is fixed through double nuts.
Furthermore, the middle part of the double-end screw is provided with a hexagonal wrenching part.
Since the technical scheme is used, the utility model has the advantages of: the utility model discloses an adjustable draw bar device carries out the rigidity drawknot to the cantilever of inserted lift scaffold, reduces inserted lift scaffold cantilever length, has guaranteed the support body and has climbed the safety problem in the use. And the adjustable pull rod device can be detached to be used in a turnover way after being used, so that the construction cost is saved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Description of reference numerals: the scaffold comprises a base plate 1, a stud 2, a double nut 3, a bolt 4, a base 5, a lower pull rod 6, a hexagonal wrenching part 7, a double-headed screw 8, an upper pull rod 9 and an attached lifting scaffold 10.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention is further described in detail with reference to the accompanying drawings and examples.
The embodiment of the utility model provides a: the structural schematic diagram of the ultra-long cantilever fixing device for the attached lifting scaffold is shown in fig. 1, and comprises an attached lifting scaffold 10 and an embedded part embedded on a floor slab, wherein a base 5 is fixed on the embedded part, a lower pull rod 6 is connected to the base 5 through a bolt 4 hinge, an upper pull rod 9 is connected to the attached lifting scaffold 10 through a bolt 4 hinge, the lower pull rod 6 and the upper pull rod 9 are connected through a double-headed screw 8, one end of the double-headed screw 8 is connected with the lower pull rod 6 through left-handed threads, and the other end of the double-headed screw 8 is connected with the upper pull rod 9 through right-handed threads. The embedded part is composed of a bottom plate 1 and a stud 2 welded on the bottom plate 1, a through hole is formed in a base 5, and the stud 2 penetrates through the through hole and then is fixed through a double nut 3. The hexagonal screwing part 7 is arranged in the middle of the double-threaded screw 8, so that the hexagonal screwing part 7 can be screwed through a wrench to rotate the double-threaded screw 8, and the force for tensioning the attached lifting scaffold 10 is adjusted.
During construction, an embedded part is embedded in a floor slab, a base 5 is fixed on the floor slab through the embedded part, a lower pull rod 6 is connected to the base 5 through a bolt 4 hinge, an upper pull rod 9 is connected to an attached lifting scaffold 10 through the bolt 4 hinge, the lower pull rod 6 and the upper pull rod 9 are connected together through a double-headed screw 8, at the moment, the double-headed screw 8 is rotated, the force for tensioning the attached lifting scaffold 10 is adjusted, the whole adjustable pull rod device is stressed, and the attached lifting scaffold 10 is guaranteed not to be pulled and deformed in the fastening process. Therefore, the utility model discloses an adjustable draw bar device carries out the rigidity drawknot to the cantilever of inserted lift scaffold, reduces inserted lift scaffold cantilever length, has guaranteed the support body and has climbed the safety problem in the use. And the adjustable pull rod device can be detached to be used in a turnover way after being used, so that the construction cost is saved.

Claims (3)

1. The utility model provides an inserted lift scaffold overlength cantilever fixing device, includes inserted lift scaffold (10) and pre-buried built-in fitting on the floor, its characterized in that: the embedded part is fixedly provided with a base (5), the base (5) is hinged with a lower pull rod (6) through a bolt (4), the attached lifting scaffold (10) is hinged with an upper pull rod (9) through a bolt (4), the lower pull rod (6) and the upper pull rod (9) are connected through a double-headed screw (8), one end of the double-headed screw (8) is connected with the lower pull rod (6) through left-handed threads, and the other end of the double-headed screw (8) is connected with the upper pull rod (9) through right-handed threads.
2. The attached lifting scaffold overlength cantilever fixing device of claim 1, wherein: the embedded part is composed of a bottom plate (1) and a stud (2) welded on the bottom plate (1), a through hole is formed in the base (5), and the stud (2) penetrates through the through hole and then is fixed through the double nuts (3).
3. The attached lifting scaffold overlength cantilever fixing device of claim 1, wherein: the middle part of the double-end screw (8) is provided with a hexagonal wrenching part (7).
CN201921868061.4U 2019-11-01 2019-11-01 Super-long cantilever fixing device for attached lifting scaffold Expired - Fee Related CN211499732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921868061.4U CN211499732U (en) 2019-11-01 2019-11-01 Super-long cantilever fixing device for attached lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921868061.4U CN211499732U (en) 2019-11-01 2019-11-01 Super-long cantilever fixing device for attached lifting scaffold

Publications (1)

Publication Number Publication Date
CN211499732U true CN211499732U (en) 2020-09-15

Family

ID=72408193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921868061.4U Expired - Fee Related CN211499732U (en) 2019-11-01 2019-11-01 Super-long cantilever fixing device for attached lifting scaffold

Country Status (1)

Country Link
CN (1) CN211499732U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982236A (en) * 2021-11-05 2022-01-28 浙吉建筑新材料科技(苏州)有限公司 External hanging type operation frame system with novel structure for building
CN115142663A (en) * 2022-06-16 2022-10-04 中交一公局集团有限公司 Construction elevator attachment device and method for super-large space

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982236A (en) * 2021-11-05 2022-01-28 浙吉建筑新材料科技(苏州)有限公司 External hanging type operation frame system with novel structure for building
CN115142663A (en) * 2022-06-16 2022-10-04 中交一公局集团有限公司 Construction elevator attachment device and method for super-large space

Similar Documents

Publication Publication Date Title
CN211499732U (en) Super-long cantilever fixing device for attached lifting scaffold
CN202577934U (en) Screw thread wall-connection member of scaffold and building
CN213710299U (en) Modular two-layer elevartor shaft integral lifting bracing operation platform
CN210289148U (en) Be used for building aluminium template bracing piece iron pipe
CN107338965A (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN201574592U (en) Safety net fastener
CN202324585U (en) Connecting tube of holistic inserted lift scaffold with steel frame structure for high-rise buildings
CN206815795U (en) A kind of new builder's jack component
CN206987424U (en) A kind of supporting construction and the overlapping harden structure based on the supporting construction
CN214399423U (en) Adjustable wall-attached support
CN203475809U (en) Scaffold supporting structure convenient to mount and dismount
CN211647208U (en) Assembled building outer wall construction platform
CN213774429U (en) Building engineering external scaffolding is wall spare even
CN203499235U (en) Structure for locating scaffold
CN220889421U (en) Anti-tilting drawknot device for adjustable attached scaffold
CN217759634U (en) Roofing superelevation parapet pours template structure
CN218597745U (en) Accurate fixing device of wall post template
CN205577396U (en) Machinery screw rod steel strutting arrangement with adjustable
CN217871482U (en) Glass fiber reinforced plastic railing with telescopic structure
CN203626215U (en) Floor-type scaffold
CN215717265U (en) Supporting rod capable of being balanced
CN203795827U (en) Scaffold supporting device
CN216865947U (en) Triangular diagonal bracing structure of overhanging scaffold convenient for hooking protective net for high-rise residential project
CN204098029U (en) Prestressed concrete is sheet pile linkage for no reason
CN213418562U (en) Square column reinforcement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200915

Termination date: 20211101