CN211473276U - Stair mortar finish coat construction tool - Google Patents

Stair mortar finish coat construction tool Download PDF

Info

Publication number
CN211473276U
CN211473276U CN201922174774.7U CN201922174774U CN211473276U CN 211473276 U CN211473276 U CN 211473276U CN 201922174774 U CN201922174774 U CN 201922174774U CN 211473276 U CN211473276 U CN 211473276U
Authority
CN
China
Prior art keywords
frame
tread
tool
cloth
stair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922174774.7U
Other languages
Chinese (zh)
Inventor
卞青峰
王磊
李乐昌
卢新鹏
张继永
董焕然
马新平
屈军霞
林德会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yijian Group Co Ltd
Original Assignee
Zhengzhou Yijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yijian Group Co Ltd filed Critical Zhengzhou Yijian Group Co Ltd
Priority to CN201922174774.7U priority Critical patent/CN211473276U/en
Application granted granted Critical
Publication of CN211473276U publication Critical patent/CN211473276U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a stair mortar finish coat construction tool, which comprises a cloth tool and a surface collecting tool, wherein the cloth tool and the surface collecting tool are arranged on a stair base body, the cloth tool is used as a filling frame of mortar, and the mortar is leveled by the surface collecting tool; the method is characterized in that: the cloth tool comprises a tread frame and a kicking frame, the tread frame and the kicking frame are alternately fixed together to form a stair-shaped cloth frame, and the bottom of the cloth frame is provided with adjusting support legs for adjusting the level; the cloth frame is located on the stair base body, and the inside of the tread frame and the inside of the kick frame are square filling areas; receive a face instrument and wipe the board including the tread of vertical fixation together and wipe the board with the kicking, the front side that the board was wiped to the tread is provided with convex sand grip downwards, and is provided with the handle in the outside that the board was wiped to the tread and the kicking, and horizontal tread, vertical kicking and the antiskid groove on the tread can be accomplished to one operation, and convenient to use has improved the efficiency of construction.

Description

Stair mortar finish coat construction tool
The technical field is as follows:
the utility model belongs to the technical field of the architectural decoration fitment, concretely relates to stair mortar finish coat construction tool.
Background art:
present building interior decoration finishing work stair cement mortar finish coat of marking time is comparatively common, and it carries out the finish coat construction of stair marking time with cement mortar cooperation cement thick liquids to set up the angle bead reinforcing bar in the external corner department of marking time and be used for protection and device stair marking time finish coat, keep a construction process in anti-skidding groove in the front side of tread, its wholeness is good, with low costs, still the anti-skidding groove still has anti-skidding function simultaneously.
Present cement mortar stair finish coat construction, because current instrument simple structure, the function singleness, it is troublesome to use, the condition of the tread is out of level and the tread out of plumb appears easily, tread and tread size difference can appear simultaneously, neglect high and neglected low scheduling problem, the efficiency of construction is low, the effect is poor, and in case take place above-mentioned problem, the maintenance degree of difficulty is great, rework not only causes the waste of manpower and material resources, the back is reworked to the stair finish simultaneously, need just can allow personnel to get into after the certain time, it can not normally go on to be other work, great delay the whole progress of engineering, it is troublesome to have brought for construction personnel.
The invention content is as follows:
defect and problem to existing equipment existence, the utility model provides a stair mortar finish coat construction tool, the effectual tread and the playing surface construction effect who exists among the existing equipment of having solved are poor, inefficiency, cause the tread not horizontal, the playing surface is not vertical, tread and playing surface size not of uniform size, neglect the problem of high neglecting the low.
The utility model provides a scheme that its technical problem adopted is: a stair mortar finish coat construction tool comprises a cloth tool and a surface collecting tool, wherein the cloth tool and the surface collecting tool are placed on a stair base body, the cloth tool is used as a filling frame of mortar, and the mortar is leveled through the surface collecting tool; the method is characterized in that: the cloth tool comprises a tread frame and a kicking frame, the tread frame and the kicking frame are alternately fixed together to form a stair-shaped cloth frame, and the bottom of the cloth frame is provided with adjusting support legs for adjusting the level; the cloth frame is located on the stair base body, and the inside of the tread frame and the inside of the kick frame are square filling areas; receive a instrument and wipe the board including the tread of vertical fixation together and wipe the board with the skirt, the front side that the board was wiped to the tread is provided with convex sand grip downwards, and the board is wiped to the tread and the adaptation of the board is wiped to the skirt with the tread, and will the filling area covers, and is provided with the handle in the outside that the board was wiped to the tread and the skirt was wiped the board.
Furthermore, the cross section of each convex strip is arc-shaped, and two convex strips are arranged at intervals.
Furthermore, the junction of the inner side of the tread frame and the lower side of the kicking face frame is a boundary plate, the boundary plate is in a right-angle isosceles triangle shape, the bottom surface of the boundary plate faces outwards, and the vertex angle of the boundary plate faces inwards.
Furthermore, a level gauge is arranged on the side edge of the tread frame.
The utility model has the advantages that: the utility model discloses set up the cloth frame in the top of original stair base member as the mould that holds and fix a position cement mortar, cloth frame self has violently flat vertical characteristics to set up height-adjustable's regulation landing leg in its bottom, judge its levelness through the spirit level of its side, and then arranged horizontally in the top of stair base member and stepped on a frame and vertical face frame of playing, pack cement mortar in the cloth frame, and trowel cement mortar along stepping on a frame and playing the frame through receiving the instrument.
Simultaneously the bottom at the floating plate of tread has set up the sand grip, can mark out the antiskid groove on the tread at the in-process of floating, horizontally tread, antiskid groove one shot forming on vertical tread and the tread, high durability and convenient use, moreover, the operation is simple, the high construction efficiency is realized, and can used repeatedly, the construction effect is good, the effectual tread and the tread construction effect of having solved existence among the existing equipment are poor, the inefficiency, cause the tread to be not level, the tread is not vertical, tread and tread size are not of uniform size, the problem of neglecting the height.
Description of the drawings:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of fig. 1.
Fig. 3 is a front view of fig. 1.
Fig. 4 is a schematic structural view of the cloth frame.
Fig. 5 is a schematic view of the structure of the level.
Fig. 6 is a schematic perspective view of the noodle folding tool.
Fig. 7 is a front view of fig. 6.
Fig. 8 is a side view of fig. 6.
FIG. 9 is a schematic structural diagram of a boundary plate.
Fig. 10 is a schematic view of an embodiment of the present invention.
The reference numbers in the figures are: 1 is the tread frame, 2 is the face frame of playing, 3 is for adjusting the landing leg, 4 is the spirit level, 5 is the filling area, 6 is the handle, 7 is the sand grip, 8 is anti-skidding groove, 9 is the boundary plate, 10 is the tread and smears the board, 11 is the face and smears the board, 12 is the instrument of drawing a face, 13 is cement mortar.
The specific implementation mode is as follows:
the present invention will be further explained with reference to the drawings and examples.
Example 1: the embodiment aims to provide a stair mortar facing layer construction tool, mainly solves the problems of stair tread levelness, riser perpendicularity, tread and riser size control, improves the stair mortar facing layer construction efficiency, and accordingly promotes the development of stair mortar facing layer quality standardized construction; as shown in fig. 1, the device comprises a cloth tool and a face-closing tool 12 which are arranged on the base body of the stair, as shown in fig. 4, the cloth tool is used as a filling frame of mortar, and the mortar is leveled through the face-closing tool 12; the cloth tool comprises a tread frame 1 and a kick frame 2, wherein the tread frame 1 and the kick frame 2 are alternately fixed together to form a stair-shaped cloth frame, adjusting support legs 3 for adjusting the level are arranged at the bottom of the cloth frame, the adjusting support legs 3 are screw rods connected to the bottom of the cloth frame in a threaded mode, the cloth frame is located on a stair base body, the tread frame 1 is parallel to a tread of the stair base body, the kick frame 2 is parallel to a kick of the stair base body, the tread frame 1 and the kick frame 2 are in a vertical state, and since the tread frame 1 and the kick frame 2 are in a vertical state, the surface of the stair base body is possibly uneven, the cloth frame is required to be kept horizontal by the adjusting support legs 3, so that the cloth frame is in a state meeting the standard requirements, the defects of the stair base body are further overcome, and a horizontal and vertical stair facing is manufactured on the outer.
The interior of the tread frame 1 and the kick frame 2 is a square filling area 5, cement mortar is added into the filling area 5, and the cement mortar is leveled by a surface collecting tool 12; receive a instrument 12 including the floating board 10 of tread and the floating board 11 of playing of vertical fixation together, the floating board 10 of tread and the floating board 11 of playing correspond the facing frame 1 and the playing frame 2 of cloth frame respectively, receive a instrument 12 and be L shape, be provided with the strengthening rib in its inside, can regard as handle 6 through the strengthening rib, the floating board of tread and the floating board of playing and the looks adaptation of facing frame and playing frame, and will the filling area covers, handheld handle along cloth frame left and right sides translation can to cement mortar 13 in the filling area 5 is floating.
Simultaneously the front side of the floating plate of the tread is provided with convex sand grip 7 downwards, boss 7 sets up along the horizontal direction, and the cross-section of sand grip 7 is circular-arc, and the interval is provided with two, the existence that has the sand grip at the in-process of floating cement mortar can form twice parallel and horizontally antiskid groove 8 in the front side of tread, antiskid groove 8 sets up twice, first front edge 30mm of marking time apart from, the second is said and is set up antiskid groove indwelling equipment in receipts face instrument bottom according to antiskid groove 8 position and be sand grip 7, at the tread, the antiskid groove direct forming of face receipts face in-process is rolled up to the tread, the tread.
Therefore, the construction of the tread, the kicking surface and the tread anti-skid groove is completed by the surface folding tool 12 in one step, after 2 stepping surfaces are completed, the tool is taken out, the gap of the position of the square pipe is filled with mortar, and the construction of the mortar finish coat of the stair is performed by the same method.
The utility model discloses a standard component, need confirm platform finish coat elevation in advance before the construction, accomplish platform finish coat, finish coat top-down of marking time is under construction in proper order, and per two sections step forms with the preparation of same cloth frame, the size is unified, the step of producing is unanimous, effective control stair finish coat quality, guarantee to mark time finish coat size even unanimous, the corner out-of-plumb is avoided appearing, and easy operation, and cloth frame and receipts face instrument all are circulated use, high-usage, low cost, the efficiency of construction of stair veneer is greatly improved, whole construction progress has been accelerated.
Example 2: in this embodiment, the cloth frame is further defined on the basis of embodiment 1.
The side of cloth frame embedded be provided with spirit level 4, spirit level 4 can be as the basis of judging whether step on face frame 1 and be in the horizontality, through the height position of adjusting 3 adjustment cloth frames of landing leg, when spirit level 4 is in the horizontality, this cloth frame is in the standard position, and the tread frame is in the horizontality promptly, the kicking face frame is in vertical state.
When the stair tread structure is used, firstly, a cloth frame is placed on a stair base body, the adjusting supporting legs are located on the tread, the height of the adjusting supporting legs 3 is adjusted, the cloth frame is ensured to be in a standard position by observing a level gauge 4 on the side face, cement mortar 13 is arranged in a horizontal and vertical filling area of the cloth frame, a tread trowelling plate 10 abuts against the tread frame 1 when a face collecting tool 12 is used, a tread trowelling plate 11 abuts against the tread frame 2, the raised strips 7 can be embedded into the surface of the cement mortar 13 at the moment, the cement mortar 13 is trowelled by moving from left to right, construction of the anti-skidding grooves 8 is completed simultaneously, after the cement mortar 13 is molded, the cloth frame is taken out, construction of 2 tread finish layers is completed, and after the cloth frame is taken out, the gaps at the positions of the square pipes of the cloth frame are trowelled by the cement mortar.
Example 3: this embodiment aims to reduce the size of the vacancy described in embodiment 2 and reduce the amount of post-repair work.
The lower side handing-over department of 1 inboard and the kicking surface frame 2 of step on be boundary plate 9, boundary plate 9 is right angle isosceles triangle shape, and its bottom surface outwards, the apex angle is inside, admittedly take out the cloth frame and make, the most advanced of boundary plate 9 is inside, the wide end of bottom surface is outwards, when taking out the cloth frame, can not destroy fashioned cement mortar, reduces the size of repairing the vacancy.

Claims (4)

1. A stair mortar finish coat construction tool comprises a cloth tool and a surface collecting tool, wherein the cloth tool and the surface collecting tool are placed on a stair base body, the cloth tool is used as a filling frame of mortar, and the mortar is leveled through the surface collecting tool; the method is characterized in that: the cloth tool comprises a tread frame and a kicking frame, the tread frame and the kicking frame are alternately fixed together to form a stair-shaped cloth frame, and the bottom of the cloth frame is provided with adjusting support legs for adjusting the level; the cloth frame is located on the stair base body, and the inside of the tread frame and the inside of the kick frame are square filling areas; receive a instrument and wipe the board including the tread of vertical fixation together and wipe the board with the skirt, the front side that the board was wiped to the tread is provided with convex sand grip downwards, and the board is wiped to the tread and the adaptation of the board is wiped to the skirt with the tread, and will the filling area covers, and is provided with the handle in the outside that the board was wiped to the tread and the skirt was wiped the board.
2. The stair mortar finish coat construction tool of claim 1, wherein: the cross section of the convex strip is arc-shaped, and two convex strips are arranged at intervals.
3. The stair mortar finish coat construction tool of claim 1, wherein: the lower side junction of the inner side of the tread frame and the lower side of the tread frame is a boundary plate, the boundary plate is in a right-angle isosceles triangle shape, the bottom surface of the boundary plate faces outwards, and the vertex angle of the boundary plate faces inwards.
4. The stair mortar finish coat construction tool of claim 1, wherein: the side of the tread frame is provided with a level gauge.
CN201922174774.7U 2019-12-07 2019-12-07 Stair mortar finish coat construction tool Expired - Fee Related CN211473276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922174774.7U CN211473276U (en) 2019-12-07 2019-12-07 Stair mortar finish coat construction tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922174774.7U CN211473276U (en) 2019-12-07 2019-12-07 Stair mortar finish coat construction tool

Publications (1)

Publication Number Publication Date
CN211473276U true CN211473276U (en) 2020-09-11

Family

ID=72361396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922174774.7U Expired - Fee Related CN211473276U (en) 2019-12-07 2019-12-07 Stair mortar finish coat construction tool

Country Status (1)

Country Link
CN (1) CN211473276U (en)

Similar Documents

Publication Publication Date Title
CA2771894C (en) Concrete sideform system
CN204057828U (en) Curb machinery hoist tool
CN205531247U (en) Tile work device
CN113323134A (en) One-time pouring construction method for waterproof reversed ridge and main building of toilet
CN105569238A (en) Construction method for infusion of AB glue and resin glue for curtain wall stone dry-hanging process
CN211473276U (en) Stair mortar finish coat construction tool
CN105178547A (en) Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof
ITVI20110083A1 (en) GRINDING MACHINE FOR THE CONSTRUCTION OF FLOOR SUBSTRATES
CN104313984A (en) Kerbstone mechanical-hoisting and seam-spacing method-based construction method, hoisting tool and seam-spacing tool
CN103225394B (en) Big wood template construction method of indoor constructional engineering shear wall
CN211201040U (en) Epoxy grindstone terrace application structure
CN101798873B (en) Cast-in-place floorslab concrete pouring one-step forming device and construction method
CN205025042U (en) Big unit pottery sheet metal back of body kiss -coating bonds and constructs
CN210342560U (en) Dry-type worker method aerial decoration subassembly
CN111962808B (en) Large-size ceramic thin plate ground paved based on light steel keel screeds and construction process thereof
CN211850840U (en) Concrete stair template
CN210032685U (en) Construction thickness adjusting device of regularization screeding
CN210152297U (en) Engineering construction plastering mortar cake pasting tool
CN205822733U (en) A kind of wall-surface screeding robot
CN110965774A (en) Concrete stair formwork and erecting method thereof
CN204059162U (en) Road kerb card tailor tool
CN214062376U (en) Structure is adjusted in built on stilts basic unit installation of stair
CN209855153U (en) Ground ash laying tool
CN204081104U (en) A kind of heat-insulation system
CN216641461U (en) Floor concrete leveling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200911

CF01 Termination of patent right due to non-payment of annual fee