CN211446447U - Urban hardened road is with preventing blockking up hydrophobic means - Google Patents
Urban hardened road is with preventing blockking up hydrophobic means Download PDFInfo
- Publication number
- CN211446447U CN211446447U CN201921597212.7U CN201921597212U CN211446447U CN 211446447 U CN211446447 U CN 211446447U CN 201921597212 U CN201921597212 U CN 201921597212U CN 211446447 U CN211446447 U CN 211446447U
- Authority
- CN
- China
- Prior art keywords
- baffle
- water supply
- passageway
- supply pipe
- road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to a road traffic auxiliary assembly technical field especially relates to city sclerosis road is with preventing blockking up hydrophobic means, and current sclerosis road is hydrophobic to be blockked by the greenbelt, and the drainage difficulty just causes the water waste, and city sclerosis road is with preventing blockking up hydrophobic means, including the passageway body, the one end that the passageway body is close to the road is provided with the filter plate, passageway body lower part is provided with album silt layer, the filter plate includes the filter screen that the surface set up and has the first baffle that filters the passageway, each it is the arch bridge form by the one end that is close to the filter screen to the inside extension that is of passageway body to filter the passageway body, the one end that the filter plate was kept away from to the passageway body is provided with the drain pipe, drainage water storage, and afforestation city.
Description
Technical Field
The utility model relates to a road traffic auxiliary assembly technical field especially relates to urban hardened road is with preventing blockking up hydrophobic means.
Background
Urban hardened road ubiquitous hydrophobic performance is poor, the problem of drainage in time, for normal traffic brings inconvenience, air pollution that industrial production leads to in addition, the road both sides set up the greenbelt, are used for air purification on the one hand, are used for standardizing the vehicle on the one hand and go, when setting up the greenbelt, also brought new problem for hardened road drainage, ordinary greenbelt directly influences the discharge of rivers in the middle of the road both sides, can not effectively make hydrophobic work.
Set up on the greenbelt and be used for the hydrophobic device of drainage can effectively solve sclerosis road water delivery problem, now disclose an urban hardening road is with preventing blockking up hydrophobic means, the device can set up between current greenbelt, breaks holistic greenbelt that can not supply rivers to pass through for the drainage, also can directly make up the device, replaces the greenbelt, is used for hydrophobic.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned condition, for overcoming prior art's defect, the utility model provides a city sclerosis road is with preventing blockking up hydrophobic means, solves the hydrophobic problem that is blockked by the greenbelt of sclerosis road, water waste.
The technical scheme is that the anti-blocking drainage device for the urban hardened road comprises a channel body, wherein a transverse through groove with the width consistent with that of the channel body is formed between green belts, the channel body is positioned in the through groove between the green belts, two side faces of the channel body are tightly attached to the inner wall of the through groove between the green belts, a filter plate is arranged at one end, close to the road, of the channel body, the filter plate is movably connected with the channel body in a buckling mode, water in the middle of the road flows into the channel body from one end provided with the filter plate, large impurities are left outside the filter plate after being filtered by the filter plate, a silt collecting layer is arranged at the lower part of the channel body and is movably connected with the channel body, the filter plate is opened, the silt collecting layer placed at the bottom of the channel body can be taken out from the channel body and cleaned, and unsmooth drainage caused by internal blockage of the, the filter plate includes the filter screen that the surface set up and the first baffle that has a plurality of filtration passageways, the filter screen is the arcwall face and outwards extrudees, each the filtration passageway is by the one end that is close to the filter screen to the inside arch bridge form that is of passageway body extends, and single filtration passageway is close to the one end port height that the filter screen was kept away from to the one end port height that is close to the filter screen, and one low one is high sets up and intercepts rubble impurity etc. outside the filtration passageway more easily, the one end that the filter plate was kept away from to the passageway body is provided with the drain pipe, the water inlet of drain pipe and this body coupling of passageway is located between the bottom surface under collection silt layer bottom surface and the passageway body, and the filterable water stream of layer through collection is outwards discharged through the drain pipe, the drain pipe passes.
Still further, it is the arc of undercut to collect the silt layer, it includes the gravel layer that the upper strata was laid and the grit layer of lower floor to collect the silt layer, the stereoplasm arc platelike structure of fixed shape is pressed into with the integrative of grit layer, passageway body bottom is provided with a plurality ofly to curved collection silt layer plays supporting role's support column, each the support column is located collection silt layer edge and welds with passageway body lower fixed surface, each the distance between collection silt layer bottom and the passageway body of support column height and position keeps unanimous, the water inlet that the drain pipe is close to the passageway body is located collection silt layer below.
Still further, the passageway body includes breed groove and drainage cavity, breed the groove and be located drainage cavity top and have the opening that is used for planting green planting, breed the groove and separate through the second baffle with drainage cavity, breed the groove and include a plurality of breed units, each breed the unit for lay the cylindric tubular structure in breeding the groove to be the matrix arrangement in breeding the groove, be provided with the delivery pipe in each breed unit, each delivery pipe passes second baffle intercommunication and breeds unit and drainage cavity, be provided with sealed the pad between delivery pipe and the second baffle.
Furthermore, the end part of the water supply pipe, which is positioned in the drainage cavity, is provided with an anti-reflux device, the anti-reflux device comprises a baffle plate and a baffle plate, the edge of the baffle plate is provided with a through hole, the center of the baffle plate is provided with a cross cut, the baffle plate is tightly attached to the baffle plate, the baffle plate is made of hard plastics, the baffle plate is made of soft rubber, the edge of the baffle plate is fixedly connected with the port of the water supply pipe in an adhesive manner, the baffle plate is positioned in the water supply pipe, the edge of the baffle plate is fixedly connected with the water supply pipe in an adhesive manner, when the water level in the drainage cavity reaches the height of the bottom of the water supply pipe, the baffle plate spreads upwards from the lower part of the water supply pipe and flows into the culture unit through the water supply pipe, the culture unit is prevented, simultaneously to the cross incision on the inside jack-up separation blade, if liquid flows downwards under the effect of gravity, then the separation blade pressurized hugs closely in the baffle, and the cross incision can't be opened to avoid the backward flow, prevent that the device against the current can be used to the delivery pipe on the one hand and deposit water, be used for green planting to grow, the water that enters into in the delivery pipe can not follow the delivery pipe lower extreme and flow, avoids breeding the interior nutrient composition of unit and runs off simultaneously.
Furthermore, each water supply pipe comprises a spiral pipe positioned in the culture unit and a straight pipe positioned between the culture unit and the drainage cavity, the water supply pipes are integrally manufactured, water supply holes are formed in the surface of the spiral pipe, and the upward spiral structure is favorable for uniform distribution of water and is convenient for plant absorption.
Furthermore, a valve for controlling the opening or closing of the drain pipe is arranged on the drain pipe, and the opening and closing of the drain pipe are controlled through the valve.
The utility model has the technical effects that the drainage device can be placed on the basis of the prior green belt by digging a channel in the middle of the green belt, the facilities of the prior green belt are not influenced, the resources are saved, the engineering quantity is small, and the road traffic is not influenced; also can form new both can play the afforestation city through combining a plurality of hydrophobic means each other, with the facility that can in time drain, accessible cement is fixed between the single passageway body, the independent shaping of passageway body has avoided long-time construction in road both sides to influence the traffic, the passageway body is difficult for blockking up, and with clean, and can effectively utilize the water resource, water the plant, close the valve, this internal drainage cavity of passageway can regard as the water storage chamber to use, the function is comprehensive, energy-concerving and environment-protective.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is the utility model discloses collection silt layer structure sketch map.
Fig. 3 is a schematic diagram of the structure of the filtering channel of the present invention.
Fig. 4 is a schematic structural view of the anti-reflux device of the present invention.
Detailed Description
The following detailed description is made with reference to the accompanying drawings.
The first embodiment is as follows: as shown in figures 1 to 4, the anti-blocking drainage device for the urban hardened road comprises a channel body 1, wherein a transverse through groove with the width consistent with that of the channel body 1 is arranged between green belts, the channel body 1 is positioned in the through groove between the green belts, two side surfaces of the channel body 1 are tightly attached to the inner wall of the through groove between the green belts, one end of the channel body 1 close to the road is provided with a filter plate 2, the filter plate 2 is movably connected with the channel body 1 in a buckling mode, water in the middle of the road flows into the channel body 1 from one end provided with the filter plate 2, large impurities are left outside the filter plate 2 after being filtered by the filter plate, a silt collecting layer 3 is arranged at the lower part of the channel body 1, the silt collecting layer 3 is arranged in the channel body 1 and is movably connected with the channel body 1, the filter plate 2 is opened, the silt collecting layer 3 arranged at the bottom of the channel body 1 can be, avoid long-time use 1 inside jam of passageway body to lead to the drainage not smooth, filter plate 2 is including the filter screen 4 that the surface set up and the first baffle 71 that has a plurality of filtration passageways 5, filter screen 4 is the arcwall face outwards protruding, each filtration passageway 5 is by the one end that is close to filter screen 4 to the inside arch bridge form that is of passageway body and extends, and single filtration passageway 5 is close to the one end port height of keeping away from the filter screen of filter screen 4, and one low one high setting is held back rubble impurity etc. more easily outside filtration passageway, the one end that filter plate 2 was kept away from to passageway body 1 is provided with drain pipe 6, drain pipe 6 passes through bolt and nut fixed connection with passageway body 1, it is waterproof to set up sealed the pad between drain pipe 6 and the passageway body 1.
In an embodiment, collection silt layer 3 is the arc of undercut, collection silt layer 3 includes the gravel layer 9 that the upper strata was laid and the gravel layer 10 of lower floor, the stereoplasm arc platelike structure of fixed shape is suppressed to gravel layer 9 and gravel layer 10 an organic whole, passageway body 1 bottom is provided with a plurality of support columns 14, each support column 14 is located collection silt layer 3 edge and with the inside fixed surface welding of lower surface of passageway body, plays supporting role to curved collection silt layer 3, drain pipe 6 is located collection silt layer 3 below near the water inlet of passageway body 1.
In an embodiment, the channel body 1 includes a cultivation groove 102 and a drainage cavity 101, the cultivation groove 102 is located above the drainage cavity 101 and has an opening for planting green plants, the cultivation groove 102 is separated from the drainage cavity 101 by a second partition plate 72, the cultivation groove 102 includes a plurality of cultivation units 8, each cultivation unit 8 is cylindrical and arranged in a matrix in the cultivation groove 102, a water supply pipe 11 is disposed in each cultivation unit 8, each water supply pipe 11 passes through the second partition plate 72 to communicate the cultivation unit 8 with the drainage cavity 101, and a sealing gasket is disposed between the water supply pipe 11 and the second partition plate 72.
In the above embodiment, the end of the water supply pipe 11 located in the drainage cavity 101 is provided with the backflow prevention device 18, the backflow prevention device 18 includes the baffle 12 and the baffle 13, the edge of the baffle 12 is provided with a through hole, the center of the baffle 13 is provided with a cross-shaped notch, the baffle 13 is tightly attached to the baffle 12, the baffle 12 is made of hard plastic, the baffle 13 is made of soft rubber, the edge of the baffle 12 is fixedly connected to the port of the water supply pipe 11 by gluing, the baffle 13 is located in the water supply pipe 11 and is fixedly connected to the water supply pipe 11 by gluing, when the water level in the drainage cavity reaches the height of the bottom of the water supply pipe 11, the baffle spreads upward from the lower part of the water supply pipe and flows into the culture unit through the water supply pipe 11, the culture unit is prevented from directly contacting with the drainage cavity to prevent waterlogging caused by excessive water, and when, at first through-hole passes through on the baffle, simultaneously to the cross incision on the jack-up separation blade, if liquid flows downwards under the effect of gravity, then the separation blade pressurized hugs closely in the baffle, and the cross incision can't be opened to avoid the backward flow, prevent that the device against the current can be used to delivery pipe 11 on the one hand and deposit water, be used for green planting to grow, the water that enters into in the delivery pipe can not follow the outflow of delivery pipe 11 lower extreme, avoids breeding the interior nutrient composition of unit and runs off simultaneously.
In one embodiment, each water supply pipe 11 comprises a spiral pipe 17 positioned in the culture unit 8 and a straight pipe 16 positioned between the culture unit and the drainage cavity, the water supply pipe 11 is integrally made, the surface of the spiral pipe 17 is provided with water supply holes, and the spiral upward structure is favorable for uniform distribution of water and absorption of plants.
In an embodiment, a valve 15 for controlling opening and closing is arranged on the water discharge pipe 6, and the opening and closing of the water discharge pipe 6 are controlled through the valve 15.
The utility model has the technical effects that the drainage device can be placed on the basis of the prior green belt by digging a channel in the middle of the green belt, the facilities of the prior green belt are not influenced, the resources are saved, the engineering quantity is small, and the road traffic is not influenced; also can form new both can play the afforestation city through combining a plurality of hydrophobic means each other, with the facility that can in time drain, accessible cement is fixed between the single passageway body, the independent shaping of passageway body has avoided long-time construction in road both sides to influence the traffic, the passageway body is difficult for blockking up, and with clean, and can effectively utilize the water resource, water the plant, close the valve, this internal drainage cavity of passageway can regard as the water storage chamber to use, the function is comprehensive, energy-concerving and environment-protective.
The present invention has been described in detail with reference to the specific embodiments and examples, but these should not be construed as limitations of the present invention. Numerous variations and modifications can be made by those skilled in the art without departing from the principles of the invention, which should also be considered as within the scope of the invention.
Claims (6)
1. Urban hardening road is with preventing blockking up hydrophobic means, including passageway body (1), its characterized in that, the one end that passageway body (1) is close to the road is provided with filter plate (2), passageway body (1) lower part is provided with and is used for drainage and with accumulational collection silt layer (3) of silt, filter plate (2) are including filter screen (4) that the surface set up and first baffle (71) that have filtration passageway (5), each filtration passageway (5) are by the one end that is close to filter screen (4) to passageway body (1) inside be arch bridge form and extend, the one end that filter plate (2) were kept away from in passageway body (1) is provided with drain pipe (6).
2. The anti-blocking hydrophobic device for the urban hardened road according to claim 1, wherein the silt collecting layer (3) is of a downwardly concave arc structure, the silt collecting layer (3) comprises an upper gravel layer (9) and a lower gravel layer (10), a plurality of supporting columns (14) are arranged at the bottom of the channel body (1), and each supporting column (14) is located at the edge of the silt collecting layer (3) and is fixedly connected with the bottom surface of the channel body (1).
3. The anti-clogging water drainage device for the urban hardened road according to claim 1, characterized in that the channel body (1) comprises a culture tank (102) and a drainage cavity (101), the culture tank (102) and the drainage cavity (101) are separated by a second partition plate (72), the culture tank (102) comprises a plurality of culture units (8), a water supply pipe (11) is arranged in each culture unit (8), and each water supply pipe (11) is communicated with the culture unit (8) and the drainage cavity (101).
4. The anti-blocking drainage device for the urban hardened road according to claim 3, wherein an anti-backflow device (18) is arranged at one end of the water supply pipe (11) located in the drainage cavity (101), the anti-backflow device comprises a baffle (12) and a baffle (13), a through hole is formed in the edge of the baffle (12), a cross-shaped notch is formed in the center of the baffle (13), the baffle (13) is tightly attached to the baffle (12), the baffle (12) is made of hard plastics, the baffle (13) is made of soft rubber, the edge of the baffle (12) is fixedly connected with the port of the water supply pipe (11), and the baffle (13) is located in the water supply pipe (11) and is fixedly connected with the water supply pipe (11).
5. The anti-clogging water trap for urban hardened roads according to claim 3, characterized in that each water supply pipe (11) comprises a spiral pipe (17) located inside the culture unit (8) and a straight pipe (16) located between the culture unit and the drainage cavity, said water supply pipe (11) being made in one piece, the surface of said spiral pipe (17) being provided with water supply holes.
6. Anti-clogging hydrophobic device for urban hardened roads according to claim 1, characterized in that said drain pipe (6) is provided with a valve (15) to control the opening or closing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921597212.7U CN211446447U (en) | 2019-09-24 | 2019-09-24 | Urban hardened road is with preventing blockking up hydrophobic means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921597212.7U CN211446447U (en) | 2019-09-24 | 2019-09-24 | Urban hardened road is with preventing blockking up hydrophobic means |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211446447U true CN211446447U (en) | 2020-09-08 |
Family
ID=72313675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921597212.7U Active CN211446447U (en) | 2019-09-24 | 2019-09-24 | Urban hardened road is with preventing blockking up hydrophobic means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211446447U (en) |
-
2019
- 2019-09-24 CN CN201921597212.7U patent/CN211446447U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108104247B (en) | Mixed flow non-concave biological detention pool with initial rainwater discarding function | |
CN205636879U (en) | System's device is collected, is purified and utilize to overpass rainwater | |
CN109024146B (en) | Highway side slope drainage structure | |
CN215454456U (en) | Greening irrigation system based on municipal road green belt rainwater cyclic utilization | |
CN203079741U (en) | Sewage biochemical treatment integrated device and sewage biochemical treatment integrated system | |
CN203708954U (en) | Novel rainwater irrigation device | |
CN209234526U (en) | A kind of rainwater-collecting irrigation of garden landscape recirculated water | |
CN205662974U (en) | Environmental rainwater branch matter collection in hillock district holds system | |
CN109734254A (en) | A kind of small rural Domestic sewage collecting, processing, reusing integral system | |
CN211897679U (en) | Novel sponge urban road system | |
CN110629631A (en) | Urban hardened road is with preventing blockking up hydrophobic means | |
CN211446447U (en) | Urban hardened road is with preventing blockking up hydrophobic means | |
CN210620554U (en) | Rainwater collecting and processing system suitable for landscape greenhouse and indoor greening water source | |
CN210559937U (en) | Ecological rainwater drainage device | |
CN207469409U (en) | A kind of catch-basin biological filter system | |
CN106396324A (en) | Septic tank with water drain filtering device | |
CN207775977U (en) | Novel garden landscape rain collector and water recycling system | |
CN105804201B (en) | A kind of novel intelligent grid storm water man- agement system | |
CN207512045U (en) | A kind of rural scattered domestic sewage processing system | |
CN111364571B (en) | Sponge urban rainwater collection and purification system | |
CN210684370U (en) | Biological purification detention band structure for sponge city municipal road | |
CN210263232U (en) | A intelligent rain collector for gardens water conservation | |
CN209226688U (en) | Underflow wet land sewage purification device | |
CN209082658U (en) | A kind of town road drainage system | |
CN107879559B (en) | Low-maintenance durable landscape waterscape and rainwater self-purification system under viaduct |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210510 Address after: 242000 Xuangang Road, Huangdu Township, Xuanzhou District, Xuancheng City, Anhui Province Patentee after: Anhui Xingyu Construction Engineering Co.,Ltd. Address before: No.94 hanghai Middle Road, Erqi District, Zhengzhou City, Henan Province Patentee before: Si Xiaoping |