CN211411445U - A earthwork dust device for building construction site - Google Patents
A earthwork dust device for building construction site Download PDFInfo
- Publication number
- CN211411445U CN211411445U CN201922196541.7U CN201922196541U CN211411445U CN 211411445 U CN211411445 U CN 211411445U CN 201922196541 U CN201922196541 U CN 201922196541U CN 211411445 U CN211411445 U CN 211411445U
- Authority
- CN
- China
- Prior art keywords
- plate
- construction site
- building construction
- hole
- earthwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides an earthwork dust device for building construction site. The earthwork dust falling device for the building construction site comprises an installation plate; the fixing plate is fixedly arranged on the top of the mounting plate; the upper plate is fixedly arranged at the top of the fixing plate; the threaded rod is rotatably arranged on the fixing plate and the upper plate; the sliding block is installed on the threaded rod in a threaded mode; the vertical plate is fixedly arranged at the bottom of the sliding block; the transverse plate is fixedly arranged at the bottom of the vertical plate; the spraying mechanism is arranged on the transverse plate; a first elbow disposed on the spray mechanism. The utility model provides an earthwork dust device for building construction site has the position that can carry out position control according to the earthwork, sprays effectually, sprays evenly, advantage that can effective dust fall.
Description
Technical Field
The utility model relates to a building technical field especially relates to an earthwork dust device for building construction site.
Background
Earthwork engineering is one of the main engineering in construction engineering, and includes the steps of cutting earth (stone) side, digging, filling, transportation, drainage, precipitation and the like. In civil engineering, the earthwork is as follows: the method comprises the steps of field leveling, roadbed excavation, civil air defense engineering excavation, terrace filling, roadbed filling and foundation pit backfilling. The reasonable deployment scheme of the earthwork is needed to be made and the arrangement is planned in a comprehensive way in order to reasonably arrange a construction plan and avoid arranging the earthwork in rainy season as much as possible and simultaneously implement the principles of not occupying or occupying less farmland and being beneficial to land improvement and field building in order to reduce the construction cost of the earthwork and stone engineering.
However, when excavating the ground, generally can dig out more soil and pile and put, arrange the vehicle in unison again and transport, the soil pile of piling produces the dust easily, drifts about in the building site, is inhaled internally by people, damages healthy easily, and the tradition adopts artifical regular water spray, or installs the shower nozzle on the wall, and is comparatively hard and time consuming like this, and sprays apart from limited effect general.
Therefore, it is necessary to provide a new earthwork dust falling device for a construction site to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a can carry out position control according to the position of earthwork, spray effectually, spray evenly, can be effectively the earthwork dust device that is used for building construction site of dust fall.
In order to solve the technical problem, the utility model provides an earthwork dust device for building construction site includes: mounting a plate; the fixing plate is fixedly arranged on the top of the mounting plate; the upper plate is fixedly arranged at the top of the fixing plate; the threaded rod is rotatably arranged on the fixing plate and the upper plate; the sliding block is installed on the threaded rod in a threaded mode; the vertical plate is fixedly arranged at the bottom of the sliding block; the transverse plate is fixedly arranged at the bottom of the vertical plate; the spraying mechanism is arranged on the transverse plate; a first elbow disposed on the spray mechanism; the water pump is fixedly arranged at the top of the mounting plate; the second elbow pipe is arranged on one side of the water pump; a bellows disposed between the first bend and the second bend.
Preferably, the spraying mechanism includes motor, first helical gear, pipe, second helical gear, flow distribution box and a plurality of atomizer, motor fixed mounting be in the top of diaphragm, first helical gear fixed sleeve is established on the output shaft of motor, the pipe rotates to be installed on the diaphragm, second helical gear fixed sleeve is established on the pipe, flow distribution box fixed mounting be in on the pipe, it is a plurality of the equal fixed mounting of atomizer is in on the flow distribution box.
Preferably, a first through hole is formed in the top of the transverse plate, a first bearing is arranged inside the first through hole, the outer ring of the first bearing is fixedly connected with the inner wall of the first through hole, and the inner ring of the first bearing is fixedly sleeved on the circular tube.
Preferably, the top fixed mounting of diaphragm has the dead lever, the top fixed mounting of dead lever has the bracing piece, the second through-hole has been seted up at the top of bracing piece, first return bend runs through the second through-hole.
Preferably, the bottom of upper portion board fixed mounting has the installation piece, the installation piece with all seted up the third through-hole on the fixed plate, two the inside of third through-hole all is equipped with the second bearing, two the outer lane of second bearing respectively with two the inner wall fixed connection of third through-hole, two the inner circle of second bearing is all fixed the cover and is established on the threaded rod.
Preferably, a fourth through hole has been seted up on the sliding block, be equipped with the internal thread on the inner wall of fourth through hole, be equipped with the external screw thread on the threaded rod, just the external screw thread of threaded rod with the internal thread of fourth through hole closes each other soon, the spout has been seted up to the bottom of upper portion board, the top fixed mounting of sliding block has the slide bar, the slide bar with sliding connection between the spout.
Preferably, one end of the threaded rod is fixedly provided with a crank.
Preferably, a sealing ring is fixedly mounted on the inner wall of the circular tube, and the inner ring of the sealing ring is rotatably sleeved on the first bent tube in a sealing manner.
Compared with the prior art, the utility model provides an earthwork dust device for building construction site has following beneficial effect:
the utility model provides an earthwork dust device for building construction site rotates the crank, drives the motion of spraying mechanism, until moving suitable position, then starts the water pump, sprays even effect in order to increase, and starter motor, flow distribution box drive atomizer and take place to rotate, and the atomizing nozzle drives even spraying of water and comes out, has further improved the effect of spraying.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of an earthwork dust-settling device for a building construction site according to the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is an enlarged schematic view of part B shown in fig. 1.
Reference numbers in the figures: 1. mounting panel, 2, fixed plate, 3, upper portion board, 4, threaded rod, 5, sliding block, 6, riser, 7, diaphragm, 8, motor, 9, first helical gear, 10, pipe, 11, second helical gear, 12, reposition of redundant personnel box, 13, atomizer, 14, first return bend, 15, bellows, 16, water pump, 17, second return bend.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural diagram of a preferred embodiment of an earth dust settling device for a building construction site according to the present invention; FIG. 2 is an enlarged view of portion A of FIG. 1; fig. 3 is an enlarged schematic view of part B shown in fig. 1. An earthwork dust falling device for a construction site includes: a mounting plate 1; the fixing plate 2 is fixedly arranged on the top of the mounting plate 1; the upper plate 3 is fixedly arranged on the top of the fixed plate 2; the threaded rod 4 is rotatably arranged on the fixed plate 2 and the upper plate 3; the sliding block 5 is installed on the threaded rod 4 in a threaded mode; the vertical plate 6 is fixedly arranged at the bottom of the sliding block 5; the transverse plate 7 is fixedly arranged at the bottom of the vertical plate 6; the spraying mechanism is arranged on the transverse plate 7; a first elbow 14, said first elbow 14 disposed on said spray mechanism; the water pump 16 is fixedly arranged on the top of the mounting plate 1; a second elbow 17, the second elbow 17 being provided at one side of the water pump 16; a bellows 15, said bellows 15 being arranged between said first bend 14 and said second bend 17.
Spraying mechanism includes motor 8, first helical gear 9, pipe 10, second helical gear 11, flow distribution box 12 and a plurality of atomizer 13, motor 8 fixed mounting be in the top of diaphragm 7, first helical gear 9 fixed sleeve is established on the output shaft of motor 8, pipe 10 rotates and installs on diaphragm 7, second helical gear 11 fixed sleeve is established on pipe 10, flow distribution box 12 fixed mounting be in on pipe 10, it is a plurality of the equal fixed mounting of atomizer 13 is in on flow distribution box 12.
Preferably, a first through hole is formed in the top of the transverse plate 7, a first bearing is arranged inside the first through hole, an outer ring of the first bearing is fixedly connected with the inner wall of the first through hole, and an inner ring of the first bearing is fixedly sleeved on the circular tube 10.
The top fixed mounting of diaphragm 7 has the dead lever, the top fixed mounting of dead lever has the bracing piece, the second through-hole has been seted up at the top of bracing piece, first return bend 14 runs through the second through-hole.
The bottom fixed mounting of upper portion board 3 has the installation piece, the installation piece with all seted up the third through-hole on the fixed plate 2, two the inside of third through-hole all is equipped with the second bearing, two the outer lane of second bearing respectively with two the inner wall fixed connection of third through-hole, two the inner circle of second bearing is all fixed the cover and is established on the threaded rod 4.
The fourth through-hole has been seted up on sliding block 5, be equipped with the internal thread on the inner wall of fourth through-hole, be equipped with the external screw thread on the threaded rod 4, just the external screw thread of threaded rod 4 with the internal thread of fourth through-hole closes soon each other, the spout has been seted up to the bottom of upper portion board 3, sliding block 5's top fixed mounting has the slide bar, the slide bar with sliding connection between the spout.
And a crank is fixedly arranged at one end of the threaded rod 4.
A sealing ring is fixedly mounted on the inner wall of the circular tube 10, and an inner ring of the sealing ring is arranged on the first bent tube 14 in a rotating sealing manner.
The utility model provides an earthwork dust device for building construction site's theory of operation as follows:
the mounting plate 1 can be mounted on a wall or a support near a soil pile, firstly, the position of a spraying mechanism is adjusted according to the position of the soil pile, a crank is rotated to drive a threaded rod 4 to move, the threaded rod 4 drives a sliding block 5 to move, the sliding block 5 drives a vertical plate 6 to move, the vertical plate 6 drives a transverse plate 7 to move, the transverse plate 7 drives the spraying mechanism to move until the spraying mechanism moves to a proper position, then a water pump 16 is started, the water pump 16 is pumped away from underground water and sequentially passes through a second bent pipe 17, a corrugated pipe 15, a first bent pipe 14 and a circular pipe 10, and finally enters the interior of a flow distribution box 12, in order to increase the uniform spraying effect, the motor 8 is started, the motor 8 drives a first helical gear 9 to move, the first helical gear 9 drives a second helical gear 11 to move, the second helical gear 11 drives the circular pipe 10 to move, the circular, the atomizer 13 drives water to be uniformly sprayed out, and the spraying effect is further improved.
Compared with the prior art, the utility model provides an earthwork dust device for building construction site has following beneficial effect:
the utility model provides an earthwork dust device for building construction site rotates the crank, drives the motion of sprinkler mechanism, until moving suitable position, then starts water pump 16, sprays even effect in order to increase, and starter motor 8, flow distribution box 12 drive atomizer 13 and take place to rotate, and atomizer 13 drives that water is even to spray out, has further improved the effect of spraying.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.
Claims (8)
1. The utility model provides an earthwork dust device for building construction site which characterized in that includes:
mounting a plate;
the fixing plate is fixedly arranged on the top of the mounting plate;
the upper plate is fixedly arranged at the top of the fixing plate;
the threaded rod is rotatably arranged on the fixing plate and the upper plate;
the sliding block is installed on the threaded rod in a threaded mode;
the vertical plate is fixedly arranged at the bottom of the sliding block;
the transverse plate is fixedly arranged at the bottom of the vertical plate;
the spraying mechanism is arranged on the transverse plate;
a first elbow disposed on the spray mechanism;
the water pump is fixedly arranged at the top of the mounting plate;
the second elbow pipe is arranged on one side of the water pump;
a bellows disposed between the first bend and the second bend.
2. The earthwork dust falling device for the building construction site according to claim 1, wherein the spraying mechanism comprises a motor, a first bevel gear, a circular tube, a second bevel gear, a flow distribution box and a plurality of atomizing nozzles, the motor is fixedly installed at the top of the transverse plate, the first bevel gear is fixedly sleeved on an output shaft of the motor, the circular tube is rotatably installed on the transverse plate, the second bevel gear is fixedly sleeved on the circular tube, the flow distribution box is fixedly installed on the circular tube, and the plurality of atomizing nozzles are all fixedly installed on the flow distribution box.
3. The earthwork dust falling device for the building construction site according to claim 2, wherein a first through hole is opened at the top of the transverse plate, a first bearing is arranged inside the first through hole, an outer ring of the first bearing is fixedly connected with an inner wall of the first through hole, and an inner ring of the first bearing is fixedly sleeved on the circular tube.
4. The earthwork dust falling device for the building construction site according to claim 1, wherein a fixing rod is fixedly installed at the top of the cross plate, a supporting rod is fixedly installed at the top end of the fixing rod, a second through hole is opened at the top of the supporting rod, and the first bent pipe penetrates through the second through hole.
5. The earthwork dust falling device for the building construction site according to claim 1, wherein a mounting block is fixedly mounted at the bottom of the upper plate, third through holes are formed in the mounting block and the fixing plate, second bearings are arranged inside the two third through holes, outer rings of the two second bearings are fixedly connected with inner walls of the two third through holes respectively, and inner rings of the two second bearings are fixedly sleeved on the threaded rod.
6. The earthwork dust falling device for the building construction site according to claim 1, wherein a fourth through hole is opened on the sliding block, an internal thread is provided on an inner wall of the fourth through hole, an external thread is provided on the threaded rod, the external thread of the threaded rod and the internal thread of the fourth through hole are screwed with each other, a sliding groove is opened at the bottom of the upper plate, a sliding rod is fixedly installed at the top of the sliding block, and the sliding rod is slidably connected with the sliding groove.
7. The earthwork dust falling device for the construction site according to claim 1, wherein a crank is fixedly installed at one end of the threaded rod.
8. The earthwork dust falling device for the building construction site according to claim 2, wherein a sealing ring is fixedly installed on the inner wall of the circular tube, and an inner ring of the sealing ring is rotatably sleeved on the first bent tube in a sealing manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922196541.7U CN211411445U (en) | 2019-12-08 | 2019-12-08 | A earthwork dust device for building construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922196541.7U CN211411445U (en) | 2019-12-08 | 2019-12-08 | A earthwork dust device for building construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211411445U true CN211411445U (en) | 2020-09-04 |
Family
ID=72285858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922196541.7U Expired - Fee Related CN211411445U (en) | 2019-12-08 | 2019-12-08 | A earthwork dust device for building construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211411445U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112320636A (en) * | 2020-09-29 | 2021-02-05 | 安塔(福建)机械设备实业有限公司 | Watering dust device of building site tower crane |
CN112844678A (en) * | 2020-12-18 | 2021-05-28 | 常德市两栖建筑工程有限公司 | Quick cleaning device of slabstone for shield machine |
-
2019
- 2019-12-08 CN CN201922196541.7U patent/CN211411445U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112320636A (en) * | 2020-09-29 | 2021-02-05 | 安塔(福建)机械设备实业有限公司 | Watering dust device of building site tower crane |
CN112320636B (en) * | 2020-09-29 | 2023-01-10 | 安塔(福建)机械设备实业有限公司 | Watering dust device of building site tower crane |
CN112844678A (en) * | 2020-12-18 | 2021-05-28 | 常德市两栖建筑工程有限公司 | Quick cleaning device of slabstone for shield machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211411445U (en) | A earthwork dust device for building construction site | |
CN101603309B (en) | Occlusive pile of long spiral stirring water-stop curtain and construction process thereof | |
CN104533449B (en) | A kind of tunnel excavation stand and apply the adit construction method of this stand | |
CN103114577B (en) | Rotary excavating hole-forming construction method for building pile foundation | |
CN106836438A (en) | Step for municipal Storm Sewer Network blocks water with water system of regulating and storing | |
CN108080409A (en) | A kind of triple churning device and method thereof of soil remediation | |
CN106013171A (en) | Semi-rigid and semi-flexible support structure and method for deep foundation pit side wall | |
CN105239577A (en) | Method for carrying out settlement of underground wall structure by means of high-pressure water guns | |
CN212065191U (en) | Green sprinkling irrigation equipment of planting of high steep slope geology | |
CN205954638U (en) | Half semi -rigid flexible supporting construction of deep basal pit lateral wall | |
CN107313469A (en) | Especially big & deep basement anti-floating pressure relief water collects the method prevented and treated for airborne dust | |
CN101158162A (en) | Unmanned pneumatic caisson construction process | |
CN206873478U (en) | A kind of underground shaft robot | |
CN214883350U (en) | Civil engineering is with on-spot dust collector | |
CN207904909U (en) | A kind of note sand device | |
CN213790631U (en) | Civil engineering is with on-spot dust collector | |
CN108437178A (en) | A kind of adjustable type watering device for constructing tunnel lining concrete | |
CN204982946U (en) | Prevent native sediment device that drops | |
CN108396728A (en) | Constructing device and construction method for the multi-functional pile pile that the islands Tian Haizhu can drain | |
CN220589396U (en) | On-site dust settling device for civil engineering | |
CN209958294U (en) | Water conservancy project ditch water and soil erosion prevention side slope | |
CN210288445U (en) | Rotary spraying drill bit of ultrathin ribbed waterproof curtain | |
CN113216235A (en) | Construction method for large open caisson water storage settlement | |
CN212670596U (en) | Earth backfill tamping device | |
CN214460348U (en) | Powder spraying pile machine with portable dust suppression system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200904 Termination date: 20211208 |