CN211389546U - Drilling equipment on roof in building - Google Patents

Drilling equipment on roof in building Download PDF

Info

Publication number
CN211389546U
CN211389546U CN201921188898.4U CN201921188898U CN211389546U CN 211389546 U CN211389546 U CN 211389546U CN 201921188898 U CN201921188898 U CN 201921188898U CN 211389546 U CN211389546 U CN 211389546U
Authority
CN
China
Prior art keywords
electric drill
pole
dead lever
pole setting
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921188898.4U
Other languages
Chinese (zh)
Inventor
刘志山
张鹏飞
魏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201921188898.4U priority Critical patent/CN211389546U/en
Application granted granted Critical
Publication of CN211389546U publication Critical patent/CN211389546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a drilling equipment on roof in building, pole setting including perpendicular to ground, a cross swing joint manual operation pole in the pole setting, in an electric drill dead lever is connected perpendicularly to manual operation pole end, the pole setting top with the electric drill dead lever passes through a connecting rod and connects, the pole setting manual operation pole and the electric drill dead lever with the connecting rod encloses into a rectangle enclosure space, and each member junction all sets up the through-hole, and the through-hole is by bolted connection, nut and each have the certain distance between the member, realizes the rotation of each member, in connect one on the manual operation pole and pull the weight, the pole setting bottom sets up the slipmat. The utility model provides high efficiency of construction, reduction construction cost guarantee construction safety, device easy operation in addition, convenient for material collection.

Description

Drilling equipment on roof in building
Technical Field
The utility model belongs to the housing construction field especially relates to a roof drilling among indoor electrical equipment, comprehensive pipeline installation engineering and interior decoration and finishing engineering.
Background
In the construction stage of decoration, electromechanical equipment and comprehensive pipeline installation, the construction of electromechanical equipment, comprehensive pipeline and suspended ceiling is usually carried out by using a suspender, so that the engineering quantity is relatively large. Along with the diversified development of building service function, the equipment and the comprehensive pipeline that need install on the indoor roof of building are more and more, and the furred ceiling construction is also more and more common. Adopt the mode installation of traditional drilling, its shortcoming is when constructor installation quantity is more jib, utilizes the ladder or sets up movable scaffold frame, and it is inconvenient, remove inconvenient to take the material, and work efficiency is low, causes construction cost to increase. In addition, when the layer height is higher, constructors climb to the high position for operation, and a higher danger coefficient exists; if under the prerequisite of guaranteeing safety, need increase construction operation personnel and operate jointly, construction cost will increase equally.
Disclosure of Invention
The to-be-solved problem of the utility model is to provide a drilling equipment especially is fit for the construction of erection equipment and furred ceiling on the indoor roof.
In order to solve the technical problem, the utility model discloses a technical scheme is:
the utility model provides a drilling equipment on roof in building, includes the pole setting on perpendicular to ground, a cross swing joint manually operation pole in the pole setting, in an electric drill dead lever is connected perpendicularly to the end of manually operation pole, the pole setting top with the electric drill dead lever is connected through a connecting rod, the pole setting manually operation pole and the electric drill dead lever with the connecting rod encloses into a rectangle enclosure space, in connect one on the manually operation pole and pull the weight, the pole setting bottom sets up the slipmat.
Further, the electric drill dead lever with the connecting rod the junction of manual operation pole, and the pole setting with the connecting rod the junction of manual operation pole all sets up the through-hole, the through-hole is by bolted connection, set up two nuts that can move in opposite directions and realize locking on the screw rod of bolt, set up between nut and the nut and supply each member free rotation's distance.
Furthermore, the size of the through hole is larger than the diameter of the screw on the bolt, so that the rotation of each rod piece is realized.
Further, the electric drill fixing point is arranged at the top end of the electric drill fixing rod, a power line and a control switch of the electric drill droop to the end portion of the manual operation rod, and therefore the construction personnel can control the electric drill.
Furthermore, an iron wire is arranged at the fixed point of the electric drill, so that the electric drill is fixed.
The utility model has the advantages and positive effects that:
the invention can improve the construction efficiency, reduce the construction cost and ensure the construction safety. Simple operation and convenient material taking.
Drawings
FIG. 1 is a schematic front view of an embodiment of the present invention
FIG. 2 is a schematic side view of an embodiment of the present invention
In the figure:
1. electric drill fixing rod 2, upright rod 3 and manual operating rod
4. Connecting rod 5, through hole 6 and rectangular closed space
7. Traction weight 8, power line 9 and control switch
10. Non-slip mat 11, electric drill fixing hole 12 and electric drill
13. Nut 14, nut 15, bolt
Detailed Description
The embodiments of the present invention will be described with reference to the accompanying drawings.
In describing embodiments of the present invention, the perspective of figure one will be defined as the front view of the roof drilling apparatus. In the description of the embodiments of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "vertical", "perpendicular", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Referring to fig. 1, the drilling device for the inner roof of the building comprises a vertical rod 2 perpendicular to the ground, a manual operating rod 3 is fixed on the upper half portion of the vertical rod 2 in a crossed mode, an electric drill fixing rod 1 is perpendicularly connected to the left end of the manual operating rod 3, an electric drill 12 used for drilling is fixedly connected to the top of the electric drill fixing rod 1, a connecting rod 4 is fixedly connected to the top end of the vertical rod 2, the vertical rod 2 and the electric drill fixing rod 1 are connected together, and therefore the vertical rod 2, the electric drill fixing rod 1, the connecting rod 4 and the manual operating rod 3 enclose a rectangular closed space 6. Through holes 5 are formed in four top points of the rectangular closed space 6, and the through holes 5 are connected through bolts 15 to realize rotation of each rod piece; the bottom of the upright stanchion 2 is provided with an antiskid pad 10, so that the upright stanchion 2 is prevented from slipping when the device is used; a traction weight 7 is clamped on the right side of the manual operating rod 3 in a buckling mode, so that the problem that a worker on a construction site is inconvenient to operate the drilling device due to the height is avoided; 1 top of electric drill dead lever sets up electric drill fixed orifices 11, and the top is drilled two, utilizes the fenestrate mode of iron wire to be fixed in electric drill 12 on 1 top of electric drill dead lever, and power cord 8 and the control switch 9 of electric drill 12 hang down extremely under the manual operation pole 3 tip, it is right to realize the constructor the on-off control of electric drill 12.
Referring to the enlarged side view of the connection points of the upright rod 2, the electric drill fixing rod 1, the connecting rod 4 and the manual operating rod 3 shown in the figure II, the four preferred rods of the device are made of battens and installed, so that the device is light in use, good in insulation performance and high in safety factor. All set up through-hole 5 in four junctions department, through-hole 5 is connected by bolt 15, as shown in the figure set up two can move in opposite directions and realize the dead nut 14 of lock on the screw rod rear end on bolt 15, avoid each member activity in-process to drop from bolt 15, set up the distance that can supply four member free rotation between nut 14 and the nut 13, the 5 trompil sizes of through-hole in preferred junctions department are greater than the screw rod diameter of bolt 15 by one, make the device rotate light convenient.
The working process of the example is as follows:
the actual height of a room in a building at a construction site is measured, the height of the device in the figure 1 is determined, the electric drill fixing rod 1, the total length of two horizontal rod piece manual operation rods 3 and connecting rods 4 at an upright rod 2 and a through hole 5 meets the use requirement of all places, an electric drill power line 8 and a switch 9 are properly adjusted, the switch power line can be lengthened according to the specific construction site conditions, the electric drill fixing rod meets the use requirement, the upright rod 2 is arranged on the ground of a drilling top plate part, the electric drill 12 is aligned to a point position needing drilling, the power is switched on, the electric drill fixing rod 1 is lifted by pressing down the manual operation rods 3, a rectangular closed space 6 forms a parallelogram, the electric drill 12 is pushed to drill, and the top.
The embodiments of the present invention have been described in detail, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (5)

1. The utility model provides a drilling equipment on roof in building which characterized in that: including the pole setting on perpendicular to ground, a cross swing joint manually operated pole in the pole setting, in an electric drill dead lever is connected perpendicularly to the manually operated pole end, the pole setting top with the electric drill dead lever is connected through a connecting rod, the pole setting manually operated pole and the electric drill dead lever with the connecting rod encloses into a rectangle enclosure space, in connect one on the manually operated pole and pull the weight, the pole setting bottom sets up the slipmat.
2. The drilling device for the roof inner panel of the building as claimed in claim 1, wherein: the electric drill dead lever with the connecting rod the junction of manual operation pole, and the pole setting with the connecting rod the junction of manual operation pole all sets up the through-hole, the through-hole is by bolted connection, set up two nuts that can move in opposite directions and realize locking on the screw rod of bolt, set up between nut and the nut and supply each member free rotation's distance.
3. The drilling device for the roof inner panel of the building as claimed in claim 2, wherein: the size of the through hole is larger than the diameter of the screw on the bolt, so that the rotation of each rod piece is realized.
4. The drilling device for the roof inner panel of the building as claimed in claim 2, wherein: still include the electric drill, electric drill dead lever top sets up the electric drill fixed orifices, the power cord of electric drill and control switch hang down extremely manual operation pole tip realizes that constructor is right the control of electric drill.
5. The drilling device for the roof inner panel of the building as claimed in claim 4, wherein: and an iron wire is arranged at the position of the electric drill fixing hole, so that the electric drill is fixed.
CN201921188898.4U 2019-07-26 2019-07-26 Drilling equipment on roof in building Active CN211389546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921188898.4U CN211389546U (en) 2019-07-26 2019-07-26 Drilling equipment on roof in building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921188898.4U CN211389546U (en) 2019-07-26 2019-07-26 Drilling equipment on roof in building

Publications (1)

Publication Number Publication Date
CN211389546U true CN211389546U (en) 2020-09-01

Family

ID=72225869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921188898.4U Active CN211389546U (en) 2019-07-26 2019-07-26 Drilling equipment on roof in building

Country Status (1)

Country Link
CN (1) CN211389546U (en)

Similar Documents

Publication Publication Date Title
JP3141450U (en) Solar cell module mounting structure
CN210032533U (en) Construction equipment scaffold
CN109264601B (en) Air conditioner outdoor unit installation device and method
CN211389546U (en) Drilling equipment on roof in building
CN210451082U (en) Hanging rod installation device in building
CN207686261U (en) A kind of adjustable attached lifting scaffold
CN206677242U (en) A kind of boring device of top plate
CN110405252A (en) Hanger rod mounting device and method in a kind of building
CN215364583U (en) Intelligent hoisting device for assembly type structure with diversified regulation
CN213923842U (en) Wallboard lifting device in assembled
CN212642168U (en) Handling frame suitable for ALC slat outer wall installation
CN205419576U (en) Novel hoist and mount device
CN212518185U (en) Erection supporting device for electromechanical installation
CN204135402U (en) Ceiling drilling device
CN220162361U (en) Assembled jib mounting tool
CN211229642U (en) Narrow place room construction arrangement structure
CN220351513U (en) Hoisting device for high-rise distribution room equipment
CN219587282U (en) Support frame for supporting ceiling
CN215434402U (en) Drilling device
CN212056559U (en) Remote monitoring device based on house building engineering supervision
CN211791755U (en) Monitoring device for housing construction engineering
CN210550743U (en) Mounting tool of jib
CN214531986U (en) Vertical lifting device for high-altitude installation of partition board in narrow space
CN213890693U (en) Height-adjustable auxiliary drilling support
CN204711271U (en) A kind of portable high-rise working crosshead

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant