CN211341709U - Fixing device of hanging flower basket support - Google Patents

Fixing device of hanging flower basket support Download PDF

Info

Publication number
CN211341709U
CN211341709U CN201921944301.4U CN201921944301U CN211341709U CN 211341709 U CN211341709 U CN 211341709U CN 201921944301 U CN201921944301 U CN 201921944301U CN 211341709 U CN211341709 U CN 211341709U
Authority
CN
China
Prior art keywords
fixing device
basket support
hoop
support
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921944301.4U
Other languages
Chinese (zh)
Inventor
李志强
廖万林
祝东明
张海仙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201921944301.4U priority Critical patent/CN211341709U/en
Application granted granted Critical
Publication of CN211341709U publication Critical patent/CN211341709U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The application discloses a fixing device for a hanging basket support, which comprises a support and a hoop part, wherein the support is provided with a supporting bottom plate, a connecting column and a U-shaped clamping groove, the clamping groove is positioned above the supporting bottom plate and is fixedly connected with the supporting bottom plate through the connecting column, and the clamping groove is used for limiting and mounting the hanging basket support; the top of embracing the hoop piece is open structure, and the hoop piece is used for hooping the steel construction roof beam above the rail, and the connection can be dismantled on supporting baseplate in the top of embracing the hoop piece, and supporting baseplate is used for hugging closely the top of steel construction roof beam. This application hanging flower basket support's fixing device can avoid railway rails construction and station room curtain construction conflict, and the efficiency of construction is high, is showing and has accelerated the engineering progress.

Description

Fixing device of hanging flower basket support
Technical Field
The application relates to the technical field of engineering construction, especially, relate to a fixing device of hanging flower basket support.
Background
In engineering construction, intercity railways mostly adopt a 'station and bridge integrated' station house design form, namely, a station house is designed below a railway track and is used for passengers to purchase tickets, enter stations, wait for vehicles and the like; the railway track is designed as a platform beside the railway track, and the platform is used for passengers to wait and get on the train; the steel structure canopy is designed above the railway track, and the steel structure canopy is used for shielding wind and rain for the station rooms and the stations.
In the design form of the 'station and bridge integrated' structure, during engineering construction, the positions (namely the station platform surface) where the hanging basket supports can be installed are often occupied by materials such as steel rails of railway tracks, the hanging basket supports can be fixedly installed after the steel rails which wait for occupying the station platform surface are consumed, and then hanging basket curtain wall construction and installation operation is carried out. The construction mode greatly influences the construction period of the curtain wall of the station house, delays the construction progress and has low construction efficiency.
Disclosure of Invention
The application provides a fixing device of hanging flower basket support can solve present railway rails construction and the conflict of station room curtain construction, problem that the efficiency of construction is low.
In order to achieve the purpose, the following technical scheme is adopted in the application:
a fixing device for a hanging basket support comprises a support and a hoop member, wherein the support is provided with a supporting bottom plate, a connecting column and a U-shaped clamping groove, the clamping groove is positioned above the supporting bottom plate and is fixedly connected with the supporting bottom plate through the connecting column, and the clamping groove is used for limiting and mounting the hanging basket support; the top of embracing the hoop piece is open structure, and the hoop piece is used for hooping the steel construction roof beam above the rail, and the connection can be dismantled on supporting baseplate in the top of embracing the hoop piece, and supporting baseplate is used for hugging closely the top of steel construction roof beam.
Further, the hoop member is a hoop screw.
Furthermore, the hooping piece is of a U-shaped structure.
Furthermore, fixing device still includes two screw caps, is equipped with the through-hole on the supporting baseplate, and the top of staple bolt screw rod has the external screw thread, and the top of staple bolt screw rod passes behind the through-hole of supporting baseplate and with two screw cap threaded connection.
Further, the lateral wall of draw-in groove is equipped with a plurality of installation through-holes.
Further, at least 2 hooping members are detachably connected with the supporting bottom plate.
The beneficial effect of this application is:
this application hanging flower basket support's fixing device, can be with hanging flower basket support fixed mounting on the steel construction roof beam of railway rails top, the hanging flower basket support extends the back outward to the station room, the rope is climbed to the rethread, devices such as major-minor wire rope hoist the hanging flower basket, constructor can stand and carry out the curtain construction in the hanging flower basket, other constructors can lay or move railway rails's rail simultaneously, railway rails construction and station room curtain construction conflict has been avoided, high construction efficiency, the engineering progress has been obviously accelerated.
Drawings
FIG. 1 is a perspective view of a support;
FIG. 2 is a schematic structural view of the hoop member;
FIG. 3 is a front view of a basket support fixture;
FIG. 4 is a side view of a basket support fixture;
figure 5 is a schematic view of the mounting of the suspension mechanism of the gondola.
Detailed Description
The present application will be described in further detail below with reference to the accompanying drawings by way of specific embodiments.
In the design form of station bridge unification, railway rails's rail is laid and is constructed with the curtain of station room unable parallelly, need wait for the rail to lay and accomplish the back, carries out the installation of hanging flower basket support again, and the hanging flower basket support goes up and down to the hanging flower basket, and constructor could stand and construct the curtain of station room on the hanging flower basket. The construction mode is slow in progress and low in construction efficiency. This application is through fixing the hanging flower basket support on the steel construction roof beam of railway rails top, and the hanging flower basket is hoisted after the hanging flower basket support extends to the station room is outer, need not wait for the rail and lays the completion, just can solve the problem that the construction project conflict leads to the efficiency of construction low in this condition.
As shown in fig. 1 to 5, a basket support fixing device includes a support 1 and a hoop member 2. As shown in fig. 1, the support 1 has a supporting bottom plate 11, a connecting column 12 and a clamping groove 13 of a U-shaped structure, the clamping groove 13 is located above the supporting bottom plate 11, the clamping groove 13 is fixedly connected with the supporting bottom plate 11 through the connecting column 12, and the clamping groove 13 is used for limiting and installing the basket support 3. As shown in fig. 2, the top of the hoop member 2 is an open structure, the hoop member 2 is used for hooping the steel structural beam above the rail, the bottom end of the supporting base plate 11 is tightly attached to the top end of the steel structural beam, and the top of the hoop member 2 is detachably connected to the supporting base plate 11. From this through steel construction roof beam, staple bolt spare 2 and supporting baseplate 11, whole support 1 has been installed on the steel construction roof beam, and hanging flower basket support 3 has been spacing again in the draw-in groove 13 at support top, consequently by fixed hanging flower basket support 3 can extend to standing the room outward, and then through rope lift hanging flower basket.
In the embodiment, the clamping groove is made of a steel plate, and has a length of 300mm, a groove width of 82mm and a groove depth of 80 mm. The spliced pole is made by square pipe, and length and width are 80mm, and the height of spliced pole is customized according to the high condition of steel structure roof beam. The supporting base is an iron plate, the length of the supporting base is 300mm, the width of the supporting base is 200mm, and the thickness of the supporting base is 10 mm. The clamping grooves 13, the connecting columns 12 and the supporting bottom plate 11 are all connected through welding, wherein stiffening plates are required to be welded at the connecting positions between the supporting bottom plate 11 and the connecting columns 12 and at the connecting positions between the connecting columns 12 and the clamping grooves 13.
As shown in fig. 2-5, the hoop member 2 is a hoop screw, and the hoop screw is U-shaped. The fixing device of the hanging basket support further comprises a double-nut 4, a through hole 111 is formed in the supporting base plate 11 of the support 1, an external thread is arranged at the top of the hoop screw, and the top of the hoop screw penetrates through the through hole 111 of the supporting base plate 11 and then is in threaded connection with the double-nut 4.
As shown in fig. 1, a plurality of mounting holes 131 are formed in the side wall of the slot 13, and after the basket support 3 is clamped into the slot 13, the basket support 3 is fixedly mounted in the slot 13 by passing through the mounting holes 131 of the slot 13 and the through hole of the basket support 3 through connectors such as bolts and screws.
In order to enable the support base 1 to be connected to the steel structural beam more firmly, at least two hoop members 2 can be detachably connected with the supporting bottom plate 11. As shown in fig. 4, in the present embodiment, 2 hoop screws are connected to the supporting base plate 11, and each hoop screw has a diameter of 20 mm.
A hanging structure installation step of the hanging basket:
1. preparation before installation:
cleaning the working surface, erecting a climbing platform, and climbing to the climbing platform for operation by constructors.
2. Positioning the installation position:
according to the length of the hanging basket support 3, two fixing devices, namely a first fixing device A and a second fixing device B are arranged in the embodiment, the first fixing device A is installed on the steel structure main beam 51 and fixes the rear end of the hanging basket support 3; the second fixing device B is arranged on the steel structure secondary beam 52 and is responsible for fixing the middle part of the hanging basket support 3 and is close to the front end, and the front end of the hanging basket support 3 extends outwards from the standing room. The steel structure main beam 51 and the steel structure secondary beam 52 are both i-beams in the present embodiment.
And positioning and paying off are carried out according to the mounting position of the hanging basket, and the specific mounting positions of the first fixing device A and the second fixing device B on the steel structure main beam 51 and the steel structure secondary beam 52 are determined.
3. Connecting the support and the hoop:
the anchor ear screw of the first fixing device A is used for installing the support 1 of the first fixing device on the steel structure main beam 51, and the anchor ear screw of the second fixing device B is used for installing the support 1 of the second fixing device on the steel structure secondary beam 52.
During the installation, support 1 and staple bolt screw rod are connected and are adopted two nuts 4, should screw up between two nuts, eliminate intermediate space (locking measure), and the head of staple bolt screw rod should expose 2 ~ 3 pitches of the terminal surface of nut to reserve sufficient distance. The back surfaces of the screw cap and the washer face the connected body, and the screw cap and the washer are coated with antirust paint.
5. Installing a hanging basket support:
the basket support 3 is fixed in the clamping grooves 13 of the 2 fixing devices by using M14 bolts. Due to the different heights of the steel structure main beams 51 and the steel structure secondary beams 52, the heights of the connecting columns of the two fixing devices are different in order to keep the basket supports 3 horizontally fixed. In this embodiment, the higher 50mm of steel construction secondary beam 52 is compared in the off-ground position of steel construction girder 51, consequently sets up the high spliced pole 12 of first fixing device A to 400mm, and the spliced pole 12 of second fixing device B highly sets up to 450mm, just so can make the draw-in groove 13 of 2 supports 1 all be the parallel and level for ground, so make hanging flower basket support 3 keep the level.
Wherein the portion between the first fixing means a and the second fixing means B is defined as a rear arm 31 and the portion between the second fixing means B and the front end of the basket support 3 is defined as a front arm 32. Adjusting the distance between the front arm and the rear arm to set as follows: the front arm 31 is 1.4m long and the rear arm 32 is 2.0m long.
The hanging basket support 3 is a standard support fitting and is formed by splicing a large square tube with the specification of 80 x 4mm and a small square tube with the specification of 70 x 4 mm.
5. Installing a flagpole, a climbing rope and a hanging weight:
in the embodiment, the flag pole 6 is arranged above the second fixing device B, the flag pole 6 is vertically connected with the basket support 3, one end of the climbing rope 7 is connected with the rear end part of the basket support 3 through the hanging bracket 8, then the climbing rope 7 sequentially passes through the top of the flag pole 6 and the front end of the basket support 3, and finally the two ends of a basket (not shown in the figure) are connected through the main steel wire rope 9 and the auxiliary steel wire rope 9.
It should be noted that: the climbing rope 7 is pre-tightened when being installed, so that the front end of the front arm 32 slightly tilts upwards, and then the climbing rope is connected with the main steel wire rope 9 and the auxiliary steel wire rope 9, and a limit stop is installed.
6. And (4) qualified inspection:
and checking whether each connecting bolt is screwed down or not and whether the size of the support arm meets the requirement or not.
After the suspension mechanism is installed and checked to be qualified, a constructor can stand on the hanging basket to carry out curtain wall construction of the standing room, and meanwhile, steel rail laying projects of railway tracks below the steel structure beams are not influenced.
The foregoing is a more detailed description of the present application in connection with specific embodiments thereof, and it is not intended that the present application be limited to the specific embodiments thereof. It will be apparent to those skilled in the art from this disclosure that many more simple derivations or substitutions can be made without departing from the inventive concepts herein.

Claims (6)

1. The utility model provides a fixing device of hanging flower basket support which characterized in that: the hanging basket support comprises a support and a hoop part, wherein the support is provided with a supporting bottom plate, a connecting column and a U-shaped clamping groove, the clamping groove is positioned above the supporting bottom plate and is fixedly connected with the supporting bottom plate through the connecting column, and the clamping groove is used for limiting and mounting a hanging basket support;
the top of embracing the hoop member is open structure, the hoop member is used for hooping the steel structure roof beam above the rail, the top of embracing the hoop member can be dismantled the connection and be in on the supporting baseplate, the supporting baseplate is used for hugging closely the top of steel structure roof beam.
2. A basket support fixing device as claimed in claim 1, wherein: the hoop member is a hoop screw rod.
3. A basket support fixing device according to claim 2, wherein: the hoop is of a U-shaped structure.
4. A basket support fixing device according to claim 2, wherein: the fixing device further comprises a double nut, a through hole is formed in the supporting base plate, an external thread is arranged at the top of the hoop screw rod, and the top of the hoop screw rod penetrates through the through hole of the supporting base plate and then is in threaded connection with the double nut.
5. A basket support fixing device as claimed in claim 1, wherein: the lateral wall of draw-in groove is equipped with a plurality of installation through-holes.
6. A basket support fixing device according to any one of claims 1 to 5, wherein: at least 2 the hooping piece is detachably connected with the supporting bottom plate.
CN201921944301.4U 2019-11-12 2019-11-12 Fixing device of hanging flower basket support Expired - Fee Related CN211341709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921944301.4U CN211341709U (en) 2019-11-12 2019-11-12 Fixing device of hanging flower basket support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921944301.4U CN211341709U (en) 2019-11-12 2019-11-12 Fixing device of hanging flower basket support

Publications (1)

Publication Number Publication Date
CN211341709U true CN211341709U (en) 2020-08-25

Family

ID=72134551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921944301.4U Expired - Fee Related CN211341709U (en) 2019-11-12 2019-11-12 Fixing device of hanging flower basket support

Country Status (1)

Country Link
CN (1) CN211341709U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854817A (en) * 2021-01-07 2021-05-28 中国建筑第八工程局有限公司 Connecting structure for structural beam and support frame and method thereof
CN113775166A (en) * 2021-10-22 2021-12-10 上海同济建设有限公司 Hanging basket suspension mechanism fixing device and hanging basket suspension system
CN114033185A (en) * 2021-11-12 2022-02-11 中建八局第二建设有限公司 Integral accumulated sliding construction method for steel structure and auxiliary pipeline applied to roof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854817A (en) * 2021-01-07 2021-05-28 中国建筑第八工程局有限公司 Connecting structure for structural beam and support frame and method thereof
CN113775166A (en) * 2021-10-22 2021-12-10 上海同济建设有限公司 Hanging basket suspension mechanism fixing device and hanging basket suspension system
CN114033185A (en) * 2021-11-12 2022-02-11 中建八局第二建设有限公司 Integral accumulated sliding construction method for steel structure and auxiliary pipeline applied to roof

Similar Documents

Publication Publication Date Title
CN211341709U (en) Fixing device of hanging flower basket support
CN212478241U (en) Novel steel structure spherical net rack ceiling conversion layer connecting structure
CN112681714A (en) Construction method of steel wire rope lengthened rear support type hanging basket
CN110318344B (en) Novel steel box girder No. 0 block support and No. 0 block erection construction method
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN212271570U (en) Elevator shaft adhesion lifting protection platform
CN117005664A (en) Electric translation type hanging basket
CN205743048U (en) Correction positioner installed by a kind of curtain wall large-size column
CN110952786A (en) Truss structure and installation method thereof
CN107740585B (en) Hanging installation method for ultra-long inclined steel structure circular pipe
CN115478480A (en) Installation and construction method for preventing beam falling of prestressed stay cable of high-pier simply-supported beam bridge
CN211971544U (en) Tower crane cable fixing device
CN205329549U (en) Corbel frame device is deposited to steel case roof beam temporarily
CN219513748U (en) Unilateral long arm cable platform
CN109458303B (en) Tower and wind generating set
CN110790113A (en) Construction method suitable for mounting wall-attached frame of ultra-long-distance construction elevator
CN111851980A (en) Elevator shaft attached lifting protection platform and application method thereof
CN220365282U (en) Electric translation type hanging basket
CN220621124U (en) Unit curtain wall hoisting and hanging basket installing guide rail system
CN218161571U (en) Stand fixed knot constructs for tunnel cable installing support
CN214993151U (en) Accurate quick positioner of short tower cable-stay bridge branch silk pipe cable saddle
CN216305332U (en) Guide rail upright post for building construction
CN215897209U (en) Bridge device and photovoltaic power station
CN218721590U (en) Convenient boiler room chimney mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

CF01 Termination of patent right due to non-payment of annual fee