CN211341607U - Building engineering mounting structure - Google Patents

Building engineering mounting structure Download PDF

Info

Publication number
CN211341607U
CN211341607U CN201921688652.3U CN201921688652U CN211341607U CN 211341607 U CN211341607 U CN 211341607U CN 201921688652 U CN201921688652 U CN 201921688652U CN 211341607 U CN211341607 U CN 211341607U
Authority
CN
China
Prior art keywords
air conditioner
ventilation air
plate
fixedly connected
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921688652.3U
Other languages
Chinese (zh)
Inventor
曾智福
关小冰
梅啟华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Xingqi Power Engineering Co ltd
Original Assignee
Foshan Xingqi Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Xingqi Power Engineering Co ltd filed Critical Foshan Xingqi Power Engineering Co ltd
Priority to CN201921688652.3U priority Critical patent/CN211341607U/en
Application granted granted Critical
Publication of CN211341607U publication Critical patent/CN211341607U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air-Flow Control Members (AREA)

Abstract

The utility model relates to a building engineering technical field, and a building engineering mounting structure is disclosed, riser including two symmetric distributions, the fixed plate of two symmetric distributions of the equal fixedly connected with in the left and right sides of two risers, the mounting hole has been seted up on the surface of fixed plate, the common sliding connection in surface of two risers has the diaphragm, the first movable plate of two symmetric distributions of lateral wall fixedly connected with of diaphragm, the first shifting chute corresponding with first movable plate is all seted up on the surface of two risers, corresponding first screw hole has all been seted up on the surface of first movable plate and first shifting chute, and first screw hole female connection has first bolt. The utility model discloses can conveniently be corresponding with ventilation air conditioner and air pipe, the supplementary ventilation air conditioner of being convenient for is installed, can conveniently carry out the dismouting to ventilation air conditioner simultaneously, is convenient for maintain ventilation air conditioner.

Description

Building engineering mounting structure
Technical Field
The utility model relates to a building engineering technical field especially relates to a building engineering mounting structure.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities.
When installing, the existing building ventilation air conditioner is installed in a matching way with a ventilation pipeline as required, so that certain deviation can be caused during installation, the existing building ventilation air conditioner is required to be accurately measured in advance, and the existing building ventilation air conditioner is too cumbersome and inconvenient and has high installation difficulty.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art building ventilation air conditioner when installing, match the installation because of needs and air pipe, can cause certain deviation when the installation, still need carry out accurate measurement to it in advance, too loaded down with trivial details inconvenience, and the great problem of the installation degree of difficulty, and the building engineering mounting structure who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building engineering installation structure comprises two symmetrically distributed vertical plates, wherein the left side and the right side of the two vertical plates are fixedly connected with two symmetrically distributed fixed plates, the surfaces of the fixed plates are provided with installation holes, the surfaces of the two vertical plates are jointly and slidably connected with a transverse plate, the side wall of the transverse plate is fixedly connected with two symmetrically distributed first movable plates, the surfaces of the two vertical plates are respectively provided with a first movable groove corresponding to the first movable plate, the surfaces of the first movable plates and the first movable grooves are respectively provided with a corresponding first threaded hole, the first threaded holes are internally threaded with a first bolt, the side wall of the transverse plate is slidably connected with an installation block, the left side and the right side of the installation block are respectively and fixedly connected with a second movable plate, the surface of the transverse plate is provided with a second movable groove corresponding to the second movable plate, and the surfaces of the second movable plates and the second movable grooves are respectively provided with a second, and a second bolt is connected with the second threaded hole in a threaded manner, the side wall of the mounting block is movably connected with a ventilation air conditioner, and the side wall of the ventilation air conditioner is fixedly connected with a mounting mechanism corresponding to the mounting block.
Preferably, two equal sliding connection in the relative one side in riser bottom has the backup pad corresponding with ventilation air conditioner, the bracing piece that the bottom fixedly connected with slope of backup pad set up, the bar opening corresponding with bracing piece and backup pad is seted up to the lateral wall of riser, the lateral wall of backup pad and bracing piece all is equipped with the fourth screw hole corresponding with the bar opening, and fourth screw hole female connection has the fourth bolt.
Preferably, the bottom of the ventilation air conditioner is fixedly connected with a limiting slide block, and the upper surface of the supporting plate is provided with a limiting slide groove in matched connection with the limiting slide block.
Preferably, the side wall of the ventilation air conditioner is fixedly connected with two symmetrically distributed limiting clamping blocks, and the surface of the second moving plate is provided with limiting clamping grooves corresponding to the limiting clamping blocks.
Preferably, installation mechanism includes the chucking piece with ventilation air conditioner lateral wall fixed connection, the first recess corresponding with the chucking piece is seted up to the lateral wall of installation piece, the equal fixedly connected with gag lever post in the left and right sides of chucking piece, the spacing groove corresponding with the gag lever post is all seted up to the left and right sides of first recess, corresponding third screw hole has all been seted up on the surface of gag lever post and spacing groove, and third screw hole female connection has the third bolt.
Compared with the prior art, the utility model provides a building engineering mounting structure possesses following beneficial effect:
1. this building engineering mounting structure through being provided with riser, diaphragm, first movable plate, second movable plate and ventilation air conditioner, can conveniently correspond ventilation air conditioner and air pipe, and the supplementary ventilation air conditioner of being convenient for is installed.
2. This building engineering mounting structure through being provided with installation mechanism, can conveniently carry out the dismouting to ventilation air conditioner, is convenient for maintain ventilation air conditioner.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses can conveniently be corresponding ventilation air conditioner and air pipe, the supplementary ventilation air conditioner of being convenient for is installed, can conveniently carry out the dismouting to ventilation air conditioner simultaneously, is convenient for maintain ventilation air conditioner.
Drawings
Fig. 1 is a schematic structural view of a construction engineering installation structure provided by the present invention;
fig. 2 is a schematic structural diagram of a part a of the installation structure of the construction engineering provided by the present invention.
In the figure: the device comprises a vertical plate 1, a fixed plate 2, a transverse plate 3, a first moving plate 4, a first bolt 5, an installation block 6, a second moving plate 7, a second bolt 8, a ventilation air conditioner 9, an installation mechanism 10, a clamping block 101, a limiting rod 102, a third bolt 103, a support plate 11, a support rod 12, a limiting clamping block 13 and a fourth bolt 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, a construction engineering installation structure comprises two symmetrically distributed vertical plates 1, two symmetrically distributed fixed plates 2 are fixedly connected to the left and right sides of the two vertical plates 1, installation holes are formed in the surfaces of the fixed plates 2, transverse plates 3 are jointly and slidably connected to the surfaces of the two vertical plates 1, two symmetrically distributed first moving plates 4 are fixedly connected to the side walls of the transverse plates 3, first moving grooves corresponding to the first moving plates 4 are formed in the surfaces of the two vertical plates 1, corresponding first threaded holes are formed in the surfaces of the first moving plates 4 and the first moving grooves, first bolts 5 are connected in threaded connection with the first threaded holes, installation blocks 6 are slidably connected to the side walls of the transverse plates 3, second moving plates 7 are fixedly connected to the left and right sides of the installation blocks 6, second moving grooves corresponding to the second moving plates 7 are formed in the surfaces of the transverse plates 3, second threaded holes are formed in the surfaces of the second moving plate 7 and the second moving groove, a second bolt 8 is connected to the second threaded holes in an internal thread mode, a ventilation air conditioner 9 is movably connected to the side wall of the mounting block 6, and a mounting mechanism 10 corresponding to the mounting block 6 is fixedly connected to the side wall of the ventilation air conditioner 9.
Equal sliding connection in two riser 1 bottom relative one sides has backup pad 11 corresponding with ventilation air conditioner 9, the bracing piece 12 that the bottom fixedly connected with slope of backup pad 11 set up, the bar opening corresponding with bracing piece 12 and backup pad 11 is seted up to riser 1's lateral wall, backup pad 11 and bracing piece 12's lateral wall all is equipped with the fourth screw hole corresponding with the bar opening, and fourth screw hole female connection has fourth bolt 14, can conveniently increase ventilation air conditioner 9's stability.
The bottom fixedly connected with limit slide block of ventilation air conditioner 9, the upper surface of backup pad 11 is seted up with limit slide block accordant connection's spacing spout, can conveniently carry out spacing slip to ventilation air conditioner 9.
The side wall of the ventilation air conditioner 9 is fixedly connected with two symmetrically distributed limiting clamping blocks 13, and the surface of the second moving plate 7 is provided with limiting clamping grooves corresponding to the limiting clamping blocks 13, so that the ventilation air conditioner 9 can be conveniently limited and fixed.
Installation mechanism 10 includes the chucking piece 101 with ventilation air conditioner 9 lateral wall fixed connection, the first recess corresponding with chucking piece 101 is seted up to the lateral wall of installation piece 6, the equal fixedly connected with gag lever post 102 in the left and right sides of chucking piece 101, the spacing groove corresponding with gag lever post 102 is all seted up to the left and right sides of first recess, corresponding third screw hole has all been seted up on the surface of gag lever post 102 and spacing groove, and third screw hole female connection has third bolt 103, can conveniently carry out the dismouting to ventilation air conditioner 9, be convenient for maintain ventilation air conditioner 9.
In the utility model, when the ventilation air conditioner 9 is needed to be installed, the two first moving plates 4 on the transverse plate 3 are respectively clamped into the first moving grooves on the two vertical plates 1, the fixed plates 2 on the vertical plates 1 are fixed with the wall surface by using screws, the second moving plate 7 on the installation block 6 is clamped into the second moving groove on the transverse plate 3, the clamping block 101 on the ventilation air conditioner 9 is corresponding to the first groove on the installation block 6, the clamping block 101 is clamped into the first groove on the installation block 6, the clamping block 101 pulls the limiting rod 102, the limiting rod 102 extends into the limiting groove on the installation block 6, the limiting rod 102 is fixed by using the third bolt 103, the fourth bolt 14 is loosened by rotating the fourth bolt 14, the support plate 11 is abutted against the bottom of the ventilation air conditioner 9 to support the ventilation air conditioner 9, otherwise, the ventilation air conditioner 9 can be mechanically disassembled, the ventilation air conditioner 9 can be conveniently disassembled and assembled, the ventilation air conditioner 9 can be conveniently maintained, when the auxiliary ventilation air conditioner 9 is required to correspond to the ventilation pipeline, the ventilation air conditioner 9 is horizontally pulled, the ventilation air conditioner 9 pulls the clamping block 101, the clamping block 101 pulls the mounting block 6, the mounting block 6 pulls the second moving plate 7, so that the second moving plate 7 horizontally moves in the second moving groove on the transverse plate 3 and is locked by using the second bolt 8, adjusting the horizontal position of the ventilation air conditioner 9, vertically pulling the ventilation air conditioner 9, pulling the transverse plate 3 by the ventilation air conditioner 9, pulling the first moving plate 4 by the transverse plate 3, sliding the first moving plate 4 in the first moving groove on the vertical plate 1, locking by using the first bolt 5, the vertical position of the ventilation air conditioner 9 is adjusted, so that the ventilation air conditioner 9 can be conveniently corresponding to a ventilation pipeline, and the auxiliary ventilation air conditioner 9 is convenient to install.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A building engineering installation structure comprises two symmetrically distributed vertical plates (1), and is characterized in that the left side and the right side of the two vertical plates (1) are fixedly connected with two symmetrically distributed fixed plates (2), the surface of each fixed plate (2) is provided with an installation hole, the surfaces of the two vertical plates (1) are jointly and slidably connected with a transverse plate (3), the side wall of the transverse plate (3) is fixedly connected with two symmetrically distributed first movable plates (4), the surfaces of the two vertical plates (1) are respectively provided with a first movable groove corresponding to the first movable plate (4), the surfaces of the first movable plates (4) and the first movable grooves are respectively provided with corresponding first threaded holes, the first threaded holes are internally threaded with first bolts (5), the side wall of the transverse plate (3) is slidably connected with an installation block (6), the left side and the right side of the installation block (6) are respectively and fixedly connected with a second movable plate (7), the surface of diaphragm (3) is seted up with the corresponding second shifting chute of second movable plate (7), the second screw hole has all been seted up on the surface of second movable plate (7) and second shifting chute, and second screw hole female connection has second bolt (8), the lateral wall swing joint of installation piece (6) has ventilation air conditioner (9), the lateral wall fixedly connected with of ventilation air conditioner (9) and installation mechanism (10) corresponding with installation piece (6).
2. The constructional engineering mounting structure of claim 1, wherein the two opposite sides of the bottom of the vertical plate (1) are respectively and slidably connected with a supporting plate (11) corresponding to the ventilation air conditioner (9), the bottom of the supporting plate (11) is fixedly connected with a supporting rod (12) which is obliquely arranged, the side wall of the vertical plate (1) is provided with a strip-shaped opening corresponding to the supporting rod (12) and the supporting plate (11), the side walls of the supporting plate (11) and the supporting rod (12) are respectively provided with a fourth threaded hole corresponding to the strip-shaped opening, and the fourth threaded hole is internally threaded with a fourth bolt (14).
3. The constructional engineering mounting structure of claim 2, wherein the bottom of the ventilation air conditioner (9) is fixedly connected with a limiting sliding block, and the upper surface of the support plate (11) is provided with a limiting sliding groove in matched connection with the limiting sliding block.
4. The constructional engineering mounting structure of claim 1, wherein the side wall of the ventilation air conditioner (9) is fixedly connected with two symmetrically distributed limiting clamping blocks (13), and the surface of the second moving plate (7) is provided with limiting clamping grooves corresponding to the limiting clamping blocks (13).
5. The constructional engineering mounting structure as claimed in claim 1, wherein the mounting mechanism (10) comprises a clamping block (101) fixedly connected with the side wall of the ventilation air conditioner (9), the side wall of the mounting block (6) is provided with a first groove corresponding to the clamping block (101), the left and right sides of the clamping block (101) are both fixedly connected with a limiting rod (102), the left and right sides of the first groove are both provided with a limiting groove corresponding to the limiting rod (102), the surfaces of the limiting rod (102) and the limiting groove are both provided with corresponding third threaded holes, and the third threaded holes are internally threaded with third bolts (103).
CN201921688652.3U 2019-10-10 2019-10-10 Building engineering mounting structure Expired - Fee Related CN211341607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921688652.3U CN211341607U (en) 2019-10-10 2019-10-10 Building engineering mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921688652.3U CN211341607U (en) 2019-10-10 2019-10-10 Building engineering mounting structure

Publications (1)

Publication Number Publication Date
CN211341607U true CN211341607U (en) 2020-08-25

Family

ID=72131914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921688652.3U Expired - Fee Related CN211341607U (en) 2019-10-10 2019-10-10 Building engineering mounting structure

Country Status (1)

Country Link
CN (1) CN211341607U (en)

Similar Documents

Publication Publication Date Title
CN108978966B (en) Non-welding environment-friendly energy-saving slotted back bolt stone curtain wall system
CN106401029A (en) Wallboard connection piece, wallboard structure and construction method
CN115370048B (en) Adjustable accurate positioning device for curved curtain wall
CN111364505A (en) Aluminum template supporting system for comprehensive pipe gallery
CN214833830U (en) Aluminum unit curtain wall switching adjusting device
CN110273433A (en) A kind of piping lane
CN211341607U (en) Building engineering mounting structure
CN219527977U (en) Pre-buried structure of construction
CN211898545U (en) Aluminum template supporting system for comprehensive pipe gallery
CN206815864U (en) A kind of construction mould efficiently docked
CN203701355U (en) Open curtain wall joint device with full-size inter-grasping structure
CN102230331B (en) Three-dimension adjustable transition device for curtain wall vertical post
CN203846655U (en) Short-cantilever dry-hanging device of stone curtain wall
CN113309271A (en) Aluminum unit curtain wall switching adjusting device
CN208964955U (en) A kind of assembled operating platform
CN216641529U (en) Supporting structure for building
CN216893523U (en) Strutting arrangement for building engineering
CN219483935U (en) Novel aluminum die K plate reinforcing straightener
CN219992823U (en) Curtain wall construction with adjustable
CN218643952U (en) Building engineering reinforced structure for city planning
CN221095801U (en) Flower basket type cantilever Liang Shuanger pull ring
CN214658965U (en) Roof sleeve pipe construction positioner
CN112681718B (en) A novel pre-buried expansion bolts even wall spare for fixing overhanging type scaffold
CN219327299U (en) H-shaped steel member
CN210396459U (en) Plug-in type shower room track connection structure of easy dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825