CN214658965U - Roof sleeve pipe construction positioner - Google Patents

Roof sleeve pipe construction positioner Download PDF

Info

Publication number
CN214658965U
CN214658965U CN202023115157.9U CN202023115157U CN214658965U CN 214658965 U CN214658965 U CN 214658965U CN 202023115157 U CN202023115157 U CN 202023115157U CN 214658965 U CN214658965 U CN 214658965U
Authority
CN
China
Prior art keywords
rod
positioning
sliding
adjusting
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023115157.9U
Other languages
Chinese (zh)
Inventor
温宇亮
武延合
陈洪伟
闻宝金
张云良
路玉金
邵娜
李睿哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202023115157.9U priority Critical patent/CN214658965U/en
Application granted granted Critical
Publication of CN214658965U publication Critical patent/CN214658965U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a roof sleeve construction positioning device, which relates to the field of building construction auxiliary equipment, and adopts the technical scheme that the roof sleeve construction positioning device comprises a clamping mechanism and two groups of positioning mechanisms which are connected to the clamping mechanism in a sliding way, wherein the clamping mechanism comprises two semi-circular arc-shaped clamping plates which are oppositely arranged, two T-shaped sliding rails are arranged on the outer wall of each clamping plate in parallel, each sliding rail is respectively connected with one positioning mechanism in a sliding way, two threaded holes are arranged on the plate body of each clamping plate, and each threaded hole is internally and respectively connected with an adjusting rod in a threaded way; each group of positioning mechanisms comprises a fixed rod which is connected with the slide rail in a sliding way, an extension rod is connected in the fixed rod in a sliding way, and an adjusting rod is rotatably arranged at one end, far away from the locking bolt, of the extension rod; the device also comprises a plurality of positioning units which are movably connected with the positioning mechanism. The utility model has the advantages that: the positioning steps are simplified, the positioning efficiency is improved, the positioning error is small, the labor intensity of workers is reduced, the labor is saved, and the construction efficiency is improved.

Description

Roof sleeve pipe construction positioner
Technical Field
The utility model relates to a construction auxiliary assembly field, in particular to roof sleeve pipe construction positioner.
Background
In modern residential construction, the number of floors is higher and higher, and the building construction difficulty is also higher and higher, especially in the bathroom construction of floor, because the unique service property of bathroom, need set up a plurality of wash ports and assemble the drain pipe on the ground of bathroom, because reasons such as bathroom overall arrangement lead to the position distribution of a plurality of wash ports comparatively dispersed.
The utility model discloses a wash port of bathroom is constructed the location and is adopted artifical measurement basically at present stage, through adopting instruments such as rulers to measure and the wall between the distance to confirm each drain pipe trompil position, because the floor number of piles is more, the positioning work is great, the location is comparatively wasted time and energy, can have certain error moreover, leads to later stage pipeline construction comparatively troublesome.
SUMMERY OF THE UTILITY MODEL
To the technical problem, the utility model provides a roof sleeve pipe construction positioner.
The technical scheme includes that the clamping device comprises a clamping mechanism and two groups of positioning mechanisms which are connected to the clamping mechanism in a sliding mode, the clamping mechanism comprises two semicircular arc-shaped clamping plates which are arranged in an opposite mode, two T-shaped sliding rails are arranged on the outer wall of each clamping plate in parallel, each sliding rail is connected with one positioning mechanism in a sliding mode, two threaded holes are formed in a plate body of each clamping plate and located in the middle of the two sliding rails, and each threaded hole is internally and respectively connected with an adjusting rod in a threaded mode;
each group of positioning mechanisms comprises a fixed rod which is connected with the slide rail in a sliding manner, one end of the fixed rod is provided with a sliding groove, the sliding groove corresponds to the slide rail, the fixed rod is connected with the slide rail in a sliding manner through the sliding groove, a through groove which penetrates through the fixed rod is arranged on a rod body of the fixed rod, an extension rod is connected with the fixed rod in a sliding manner, one end of the extension rod is fixedly provided with a locking bolt, the locking bolt slides in the through groove, two sides of the locking bolt extend to the outer side of the fixed rod, one end of the extension rod, which is far away from the locking bolt, is rotatably provided with an adjusting rod, and a fastening bolt is arranged at the joint of the adjusting rod and the extension rod;
the positioning mechanism is movably connected with the positioning units.
Preferably, a plurality of adjusting holes are respectively arranged on the rod bodies of the fixing rod, the extension rod and the adjusting rod in an array mode.
Preferably, the positioning unit comprises an adjusting column inserted into the adjusting hole, one end of the adjusting column is provided with a rectangular convex block, the middle part of the convex block is provided with a through hole, and the through hole is connected with the positioning rod in a sliding manner.
Preferably, the adjusting rod comprises a screw rod in threaded connection with the threaded hole, one end of the screw rod extends to the outer side of the clamping plate, and the other end of the screw rod is rotatably connected with the arc-shaped clamping plate.
Preferably, the upper end face and the lower end face of each clamping plate are respectively provided with a mounting block, a mounting hole is formed in the middle of each mounting block, and the two clamping plates are fixed through bolts penetrating through the mounting holes.
The embodiment of the utility model provides a beneficial effect that technical scheme brought is: the positioning steps are simplified, the positioning efficiency is improved, the drain pipe of the whole building can be positioned only by manually adjusting once, the positioning error is small, the labor intensity of workers is reduced, the labor is saved, and the construction efficiency is improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the embodiment of the present invention.
Fig. 2 is an exploded view of a clamping mechanism according to an embodiment of the present invention.
Fig. 3 is a first usage state diagram of the positioning mechanism according to the embodiment of the present invention.
Fig. 4 is a second usage state diagram of the positioning mechanism according to the embodiment of the present invention.
Fig. 5 is a schematic structural diagram of a positioning unit according to an embodiment of the present invention.
Wherein the reference numerals are: 1. a clamping structure; 2. a positioning mechanism; 3. a clamping plate; 4. a slide rail; 5. a threaded hole; 6. adjusting a rod; 7. fixing the rod; 8. a through groove; 9. an extension pole; 10. locking the bolt; 11. an adjusting lever; 12. fastening a bolt; 13. an adjustment hole; 14. a positioning unit; 15. an adjustment column; 16. a bump; 17. a through hole; 18. positioning a rod; 19. a screw; 20. a splint; 21. mounting blocks; 22. mounting holes; 23. a chute.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. Of course, the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
It should be noted that the embodiments and features of the embodiments of the present invention can be combined with each other without conflict.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the invention, unless otherwise specified, "a plurality" means two or more.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the creation of the present invention can be understood by those of ordinary skill in the art through specific situations.
Example 1
Referring to fig. 1 to 5, the utility model provides a roof sleeve construction positioning device, including fixture 1 and two sets of positioning mechanism 2 of sliding connection on fixture 1, fixture 1 includes two semicircular arc grip blocks 3 that opposite direction set up, parallel arrangement has two "T" shape slide rails 4 on the outer wall of each grip block 3, two grip blocks 3 make up and form an annular centre gripping cover, slide rail 4 also forms annular track, it slides on fixture 1 to be convenient for the positioning mechanism, each slide rail 4 is respectively with a positioning mechanism 2 sliding connection, set up two screw holes 5 on the plate body of grip block 3, screw hole 5 is located two slide rail 4 middles, the axis of two screw holes 5 is 90 degrees in the projection contained angle of horizontal direction, threaded connection adjusts pole 6 respectively in each screw hole 5;
each group of positioning mechanisms 2 comprises a fixed rod 7 connected with a sliding rail 4 in a sliding manner, one end of the fixed rod 7 is provided with a sliding groove 23, the sliding groove 23 corresponds to the sliding rail 4, the fixed rod 7 is connected with the sliding rail 4 in a sliding manner through the sliding groove 23, a through groove 8 penetrating through the rod body of the fixed rod 7 is formed in the rod body of the fixed rod 7, an extension rod 9 is connected with the fixed rod 7 in the sliding manner, one end of the extension rod 9 is fixedly provided with a locking bolt 10, the locking bolt 10 slides in the through groove 8, two sides of the locking bolt 10 extend to the outer side of the fixed rod 7, one end, far away from the locking bolt 10, of the extension rod 9 is rotatably provided with an adjusting rod 11, and a fastening bolt 12 is arranged at the joint of the adjusting rod 11 and the extension rod 9;
and a plurality of positioning units 14 movably connected on the positioning mechanism 2.
A plurality of adjusting holes 13 are respectively arranged on the rod bodies of the fixed rod 7, the extension rod 9 and the adjusting rod 11 in an array manner.
The positioning unit 14 comprises an adjusting column 15 inserted into the adjusting hole 13, one end of the adjusting column 15 is provided with a rectangular projection 16, the middle of the projection 16 is provided with a through hole 17, and the through hole 17 is connected with a positioning rod 18 in a sliding manner.
The adjusting rod 6 comprises a screw rod 19 in threaded connection with the threaded hole 5, one end of the screw rod 19 extends to the outer side of the clamping plate 3, and the other end of the screw rod 19 is rotatably connected with an arc-shaped clamping plate 20.
The upper end face and the lower end face of each clamping plate 3 are respectively provided with a mounting block 21, the middle of each mounting block 21 is provided with a mounting hole 22, and the two clamping plates 3 are fixed through bolts penetrating through the mounting holes 22.
The utility model discloses during the use, be connected two positioning mechanism 2 with one of them grip block 3 respectively, place two grip block 3 in the outside of drainage trunk line, bolt through running through mounting hole 22 makes up two grip block 3, through adjusting the position of pole 6, make every splint of adjusting pole 6 hug closely the trunk line, avoid taking place the skew in positioning process grip block's position, lead to producing positioning error, can also adapt to the trunk line of different diameters, the range of application is wide, when fixing a position next floor simultaneously, only need establish the outside at the trunk line with 3 covers of grip block, need not adjust regulation pole 6, construction steps have been saved, and the efficiency of construction is improved.
The positions of the two positioning mechanisms 2 on the clamping mechanism 1 are adjusted, so that the two positioning mechanisms 2 can cover the position of a drain pipe in a toilet, the positioning mechanisms are fastened on the clamping mechanism 1 through bolts, and the positions of the positioning mechanisms 2 do not need to be adjusted when multilayer positioning is carried out; the position of the extension rod 9 is adjusted, the extension rod 9 and the fixing rod 7 are locked by the locking bolt 10, the extension rod 9 can increase the application range of the fixing rod 7, then the position of the adjusting rod 11 is adjusted as required, the adjusting rod 11 is suitable for the condition that the tail end of the drain hole and the fixing rod 7 are not on the same straight line, and the application range of the positioning mechanism 2 is improved.
The positioning unit 14 is spliced with the adjusting hole in a proper position according to the position of the positioning point, the adjusting column 15 is inserted into the adjusting hole, the positioning rod 18 naturally droops according to gravity, the lower end central point of the positioning rod 18 is the central point of the drainage hole to be formed, the position is marked by a constructor, and the drainage hole is formed in the later period conveniently.
Example 2
On embodiment 1's basis, locating lever 18 includes the outer tube with through-hole 17 sliding connection, and the lower extreme of outer tube sets up the opening, still include with outer tube inner wall sliding connection's interior post, and the outer tube intussuseption is filled with paint, through the extrusion interior post, makes the interior paint of outer tube drip subaerial, forms the mark subaerial, makes things convenient for later stage constructor to carry out the trompil according to the mark to ground.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (5)

1. The top plate sleeve construction positioning device is characterized by comprising a clamping mechanism (1) and two groups of positioning mechanisms (2) which are connected to the clamping mechanism (1) in a sliding manner, wherein the clamping mechanism (1) comprises two semi-circular arc-shaped clamping plates (3) which are arranged oppositely, two T-shaped sliding rails (4) are arranged on the outer wall of each clamping plate (3) in parallel, each sliding rail (4) is connected with one positioning mechanism (2) in a sliding manner, two threaded holes (5) are formed in the plate body of each clamping plate (3), each threaded hole (5) is located in the middle of each sliding rail (4), and an adjusting rod (6) is connected to each threaded hole (5) in a threaded manner;
each group of positioning mechanisms (2) comprises a fixed rod (7) which is connected with the slide rail (4) in a sliding way, one end of the fixed rod (7) is provided with a sliding chute (23), the sliding chute (23) corresponds to the sliding rail (4), the fixed rod (7) is connected with the slide rail (4) in a sliding way through the chute (23), a through groove (8) is arranged on the rod body of the fixed rod (7), an extension rod (9) is connected in the fixed rod (7) in a sliding way, one end of the extension rod (9) is fixedly provided with a locking bolt (10), the locking bolt (10) slides in the through groove (8), both sides of the locking bolt (10) extend to the outer side of the fixing rod (7), an adjusting rod (11) is rotatably arranged at one end of the extension rod (9) far away from the locking bolt (10), a fastening bolt (12) is arranged at the joint of the adjusting rod (11) and the extension rod (9);
the device also comprises a plurality of positioning units (14) movably connected with the positioning mechanism (2).
2. The roof plate casing construction positioning device as claimed in claim 1, wherein a plurality of adjusting holes (13) are respectively arranged on the rod bodies of the fixing rod (7), the extension rod (9) and the adjusting rod (11) in an array manner.
3. The roof slab casing construction positioning device as claimed in claim 2, characterized in that the positioning unit (14) comprises an adjusting column (15) inserted into the adjusting hole (13), one end of the adjusting column (15) is provided with a rectangular projection (16), the middle of the projection (16) is provided with a through hole (17), and the through hole (17) is connected with a positioning rod (18) in a sliding manner.
4. The roof lining construction positioning device according to claim 1, characterized in that the adjusting rod (6) comprises a screw rod (19) in threaded connection with the threaded hole (5), one end of the screw rod (19) extends to the outer side of the clamping plate (3), and the other end of the screw rod (19) is rotatably connected with an arc-shaped clamping plate (20).
5. The roof plate sleeve construction positioning device as claimed in claim 1, wherein mounting blocks (21) are respectively arranged on the upper end surface and the lower end surface of the clamping plate (3), a mounting hole (22) is formed in the middle of each mounting block (21), and the two clamping plates (3) are fixed through bolts penetrating through the mounting holes (22).
CN202023115157.9U 2020-12-22 2020-12-22 Roof sleeve pipe construction positioner Active CN214658965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023115157.9U CN214658965U (en) 2020-12-22 2020-12-22 Roof sleeve pipe construction positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023115157.9U CN214658965U (en) 2020-12-22 2020-12-22 Roof sleeve pipe construction positioner

Publications (1)

Publication Number Publication Date
CN214658965U true CN214658965U (en) 2021-11-09

Family

ID=78500929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023115157.9U Active CN214658965U (en) 2020-12-22 2020-12-22 Roof sleeve pipe construction positioner

Country Status (1)

Country Link
CN (1) CN214658965U (en)

Similar Documents

Publication Publication Date Title
US8826555B2 (en) Self-supporting story pole
CN202595979U (en) Connecting structure for upright post and building main body
CN214658965U (en) Roof sleeve pipe construction positioner
CN113089827B (en) Node structure of shaped steel concrete column and reinforced concrete beam
CN206053057U (en) A kind of buried cell curtain wall adapting system in the adjustable side of three-dimensional
CN213952247U (en) Supporting device for improving stability of foundation pit
RU203085U1 (en) CONDUCTOR FOR MOUNTING WATER INLETS
CN211522684U (en) Positioning device and ditch forming assembly
CN212175511U (en) Road and bridge construction equipment
CN102644328A (en) Connection structure between stand column and building main body
CN211341607U (en) Building engineering mounting structure
CN211421549U (en) Suspended ceiling stone connecting piece for curtain wall
CN210886897U (en) Plank road suitable for massif
CN111663646A (en) Crossbeam and stand connecting device for assembly type structure
CN220909247U (en) Supporting equipment for construction
CN215172803U (en) PE pipe convenient to installation auxiliary
CN214274894U (en) Be applied to municipal administration drainage sewage pipes's underslung
CN216688848U (en) Operation track of tunnel inspection robot
CN217398338U (en) Sliding rail system for offshore platform well workover
CN112605948B (en) Efficient top plate positioning and punching construction method
CN219389278U (en) Correctable laser mapping device based on engineering mapping
CN218081350U (en) Socket joint dish screw hole position correcting unit
CN214091063U (en) Roof suit that punches
CN219551614U (en) Installation auxiliary structure of balance test flowmeter
CN212836796U (en) Vertical pipe positioning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant