CN211341096U - Hydraulic engineering floats quick flood discharge sewer well lid subassembly of formula - Google Patents
Hydraulic engineering floats quick flood discharge sewer well lid subassembly of formula Download PDFInfo
- Publication number
- CN211341096U CN211341096U CN201921560140.9U CN201921560140U CN211341096U CN 211341096 U CN211341096 U CN 211341096U CN 201921560140 U CN201921560140 U CN 201921560140U CN 211341096 U CN211341096 U CN 211341096U
- Authority
- CN
- China
- Prior art keywords
- well lid
- well
- lid frame
- hydraulic engineering
- flood discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a hydraulic engineering floats quick flood discharge sewer well lid subassembly of formula, including prefabricated well and sealed bearing, the constant head tank has been seted up in the exit of prefabricated well, and the top of prefabricated well installs the well lid frame, the middle part of well lid frame and inoxidizing coating all is provided with the mesh of intaking, and the inside of well lid frame is fixed with mounting and support, the outside edge and the inside of well lid frame bottom are provided with standing groove and locating rack respectively, and the bearing installs the bull stick between standing groove and the locating rack, be connected with the one end of bracing piece on the outer wall of bull stick, and the other end of bracing piece is provided with the removal wheel, be fixed with the holding ring on the inner wall of prefabricated well, and be provided with on the holding ring and prevent weighing down the net. This quick flood discharge sewer well lid subassembly of hydraulic engineering formula of floating when road ponding is serious, can accelerate the discharge rate of ponding, reduce the emergence of waterlogging condition to reduce the potential safety hazard when well lid drainage was used.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a quick flood discharge sewer well lid subassembly of hydraulic engineering formula of floating.
Background
In the hydraulic engineering construction of urban street, accomplish the emission of urban surface ponding through the use of sewer, avoid the emergence of urban surface ponding problem to influence normal road traffic transportation, cause the waterlogging in city, influence resident daily work and life in the city.
However, the existing water conservancy project water course well cover has the following problems when in use:
run into large-scale rainfall weather, the use of sewer well lid can influence the quick discharge of surface gathered water, reduces the discharge velocity of ponding, causes the ponding waterlogging problem on urban road surface to take place, and sewer well lid is too much and when shifting out the drainage at surface gathered water simultaneously, has the potential safety hazard of using, is unfavorable for urban road surface's safe driving.
Aiming at the problems, innovative design is urgently needed on the basis of the original water conservancy project water channel well cover.
Disclosure of Invention
An object of the utility model is to provide a quick flood discharge sewer well lid subassembly of hydraulic engineering formula of floating to solve above-mentioned background and put forward current hydraulic engineering water course well lid and meet large-scale rainfall weather, the use of sewer well lid can influence the quick discharge of surface ponding, reduce the discharge rate of ponding, cause the ponding waterlogging problem on urban road surface to take place, sewer well lid is too much and when shifting out the drainage in surface ponding simultaneously, there is the potential safety hazard of using, be unfavorable for the problem of the safe traffic on urban road surface.
In order to achieve the above object, the utility model provides a following technical scheme: a water conservancy project floating type rapid flood discharge sewer well cover assembly comprises a prefabricated well and a sealing bearing, wherein a positioning groove is formed in an outlet of the prefabricated well, a well cover frame is installed at the top of the prefabricated well, a protective layer is laid on the upper end face of the well cover frame, water inlet meshes are respectively arranged in the middle of the well cover frame and the protective layer, a fixing piece and a support are fixed inside the well cover frame, a turbine is installed on the inner wall of the fixing piece through the sealing bearing, a conical tooth ring is fixedly installed on the outer wall of the turbine, a placing groove and a positioning frame are respectively arranged at the outer side edge and inside of the bottom of the well cover frame, a rotating rod is installed between the placing groove and the positioning frame through a bearing, the rotating rod is mutually connected with the conical tooth ring through a conical gear, one end of a supporting rod is connected onto the outer wall of the rotating, be fixed with the holding ring on the inner wall of prefabricated well, and be provided with on the holding ring and prevent weighing down the net to prevent weighing down and be connected with telescopic link and elastic component between the top of net and the top of well lid frame.
Preferably, the support is triangle-shaped structural distribution in the inside of well lid frame, and well lid frame and inoxidizing coating integral structure set up to block each other between the top of well lid frame and prefabricated well.
Preferably, the turbine and the water inlet mesh and the well lid frame are vertically and coaxially arranged, a sealed relative rotation structure is arranged between the turbine and the fixing piece, and the side section of the fixing piece is L-shaped.
Preferably, the standing groove is evenly arranged at equal angles at the bottom of the well lid frame, the standing groove and the supporting rod and the positioning groove are arranged in a one-to-one correspondence mode, and the supporting rod and the well lid frame form a relative rotation structure.
Preferably, the edge of the anti-falling net is arranged to be of an L-shaped structure, the anti-falling net and the positioning ring are clamped with each other, and the positioning ring and the anti-falling net form a dismounting and mounting structure connected through bolts.
Preferably, telescopic link and elastic component set up about the vertical center axis symmetry of well lid frame, and the elastic component is located the outside of telescopic link to leave the clearance between the two.
Compared with the prior art, the beneficial effects of the utility model are that: the water conservancy project floating type rapid flood discharge sewer well cover assembly can accelerate the discharge rate of accumulated water, reduce the occurrence of waterlogging and reduce the potential safety hazard when the well cover is used for drainage when the accumulated water on a road is serious;
1. the use quality of the well lid body is reduced only through a well lid structure consisting of the well lid frame and the protective layer, meanwhile, when the accumulated water is excessive, the accumulated water quickly rushes to the turbine to rotate, the turbine is installed and used to enable the bevel gear ring and the gear shaft to be meshed with each other, the storage state of the supporting rod is changed, the well lid is jacked up under the action of the supporting rod, and the accumulated water discharge efficiency is improved;
2. the well lid is by jack-up back, when ponding undersize or receive the vehicle extrusion of traveling, can make the well lid accurate decline under the effect of telescopic link and elastic component, carries out the motion that resets, avoids the well lid to cause the use potential safety hazard that exposes the existence of well.
Drawings
Fig. 1 is a schematic top view of the present invention;
fig. 2 is a schematic view of the overhead structure of the well lid frame of the present invention;
FIG. 3 is a schematic side sectional view of the manhole cover frame of the present invention;
fig. 4 is the utility model discloses well lid frame mounting structure schematic diagram.
In the figure: 1. prefabricating a well; 2. positioning a groove; 3. a well lid frame; 4. a protective layer; 5. water inlet mesh holes; 6. a fixing member; 7. a support; 8. sealing the bearing; 9. a turbine; 10. a conical gear ring; 11. a placement groove; 12. a positioning frame; 13. a rotating rod; 14. a bevel gear; 15. a support bar; 16. a moving wheel; 17. a positioning ring; 18. the anti-falling net; 19. a telescopic rod; 20. an elastic member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a water conservancy project floating type rapid flood discharge sewer well cover assembly comprises a prefabricated well 1, positioning grooves 2, a well cover frame 3, a protective layer 4, water inlet mesh holes 5, fixing pieces 6, a support 7, a sealing bearing 8, a turbine 9, a bevel gear ring 10, a placing groove 11, a positioning frame 12, a rotating rod 13, a bevel gear 14, a supporting rod 15, a moving wheel 16, a positioning ring 17, an anti-falling net 18, a telescopic rod 19 and an elastic piece 20, wherein the positioning grooves 2 are formed in an outlet of the prefabricated well 1, the well cover frame 3 is installed at the top of the prefabricated well 1, the protective layer 4 is laid on the upper end face of the well cover frame 3, the water inlet mesh holes 5 are formed in the middle parts of the well cover frame 3 and the protective layer 4, the fixing pieces 6 and the support 7 are fixed inside the well cover frame 3, the turbine 9 is installed on the inner wall of the fixing pieces 6 through the sealing bearing 8, outside edge and the inside of 3 bottoms of well lid frames are provided with standing groove 11 and locating rack 12 respectively, and bearing installation has bull stick 13 between standing groove 11 and the locating rack 12, and bull stick 13 passes through bevel gear 14 and awl tooth ring 10 interconnect, be connected with the one end of bracing piece 15 on the outer wall of bull stick 13, and the other end of bracing piece 15 is provided with removes wheel 16, be fixed with holding ring 17 on prefabricated well 1's the inner wall, and be provided with on the holding ring 17 and prevent weighing down net 18, and prevent weighing down and be connected with telescopic link 19 and elastic component 20 between the top of net 18 and the top of well lid frames 3.
The turbine 9 sets up with the vertical coaxial of mesh 5 and well lid frame 3 of intaking, and sets up to sealed relative revolution mechanic between turbine 9 and the mounting 6 to the side cross-section of mounting 6 sets up to "L" style of calligraphy, makes things convenient for the installation of turbine 9, and when rivers were too big, makes turbine 9 rotatory, changes the motion state of turbine 9.
Standing groove 11 evenly sets up in the bottom of well lid frame 3 equiangularly, and the one-to-one setting between standing groove 11 and bracing piece 15 and the constant head tank 2 to bracing piece 15 constitutes relative revolution mechanic with well lid frame 3, conveniently moves through the position that lasts promotion control bracing piece 15 of rivers, thereby changes well lid frame 3's installation position height, improves the drainage efficiency of well lid.
Prevent weighing down the edge of net 18 and set up to "L" style of calligraphy structure, and prevent weighing down mutual block between net 18 and the holding ring 17, and holding ring 17 with prevent weighing down the dismantlement mounting structure that net 18 constitutes bolted connection, telescopic link 19 and elastic component 20 set up about the vertical center axis symmetry of well lid frame 3, and elastic component 20 is located telescopic link 19's the outside, and leave the clearance between the two, make the well lid have good effect of preventing weighing down when using, it is convenient to make well lid frame 3 reset motion after the position height changes simultaneously.
The working principle is as follows: when the water conservancy project floating type rapid flood discharge sewer well cover assembly is used, firstly, according to the figures 1-3, under the mutual clamping action of a well cover frame 3 and a prefabricated well 1, the use, installation and positioning of a well cover are carried out, a complete well cover structure is formed by the well cover frame 3 and a protective layer 4, compared with the existing well cover, the whole weight of the well cover is reduced, as shown in the figure 3, the installation stability of the well cover frame 3 in the use process is improved through the arrangement of the brackets 7 which are distributed in a triangular shape, under the condition of road ponding, rainwater is rapidly discharged through the action of the water inlet mesh 5, when the rainwater passes through the turbine 9, the turbine 9 and the fixing piece 6 do relative rotary motion under the action of the sealing bearing 8 due to the impact of water flow, the rotary motion of the turbine 9 drives the conical tooth ring 10 to be meshed with the bevel gear 14 to rotate, so that the rotating rod 13 rotates between the placing, the setting state of the supporting rod 15 is changed through the rotation of the rotating rod 13, as shown in fig. 1-2, the supporting rod 15 drives the moving wheel 16 at the end part to slide in the positioning groove 2, so that the angle between the supporting rod 15 and the well lid frame 3 is expanded, the well lid frame 3 is jacked up by the action of the supporting rod 15 and the moving wheel 16, and rainwater can be quickly discharged through the expansion gap between the well lid frame 3 and the prefabricated well 1;
according to fig. 4, when the well lid frame 3 is jacked up, the telescopic rod 19 stretches and retracts, the elastic piece 20 deforms, the flowing water flow in the turbine 9 is too small, when the well lid frame 3 is pushed down by a running vehicle, the resetting movement of the well lid frame 3 is more accurate, position shifting deviation cannot occur, the potential safety hazard caused by moving away the well lid when road accumulated water is discharged is reduced, meanwhile, the positioning ring 17 and the installation arrangement between the anti-falling nets 18 are arranged, the replacement of the anti-falling nets 18 is facilitated, dirt cleaning on the anti-falling nets 18 is facilitated, and falling protection is performed by the anti-falling nets 18.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (6)
1. The utility model provides a quick flood discharge sewer well lid subassembly of hydraulic engineering formula of floating, includes prefabricated well (1) and sealed bearing (8), its characterized in that: the well lid is characterized in that a positioning groove (2) is formed in an outlet of the prefabricated well (1), a well lid frame (3) is installed at the top of the prefabricated well (1), a protective layer (4) is laid on the upper end face of the well lid frame (3), water inlet mesh holes (5) are formed in the middles of the well lid frame (3) and the protective layer (4), a fixing piece (6) and a support (7) are fixed inside the well lid frame (3), a turbine (9) is installed on the inner wall of the fixing piece (6) through a sealing bearing (8), a conical tooth ring (10) is fixedly installed on the outer wall of the turbine (9), a placing groove (11) and a positioning frame (12) are respectively arranged at the edge and inside of the outer side of the bottom of the well lid frame (3), a rotating rod (13) is installed between the placing groove (11) and the positioning frame (12) through a bearing, and the rotating rod (13) is connected with, be connected with the one end of bracing piece (15) on the outer wall of bull stick (13), and the other end of bracing piece (15) is provided with removes wheel (16), be fixed with holding ring (17) on the inner wall of prefabricated well (1), and be provided with on holding ring (17) and prevent weighing down net (18) to be connected with telescopic link (19) and elastic component (20) between the top of preventing weighing down net (18) and the top of well lid frame (3).
2. The hydraulic engineering floating type rapid flood discharge sewer well cover assembly according to claim 1, is characterized in that: support (7) are the triangle-shaped structural distribution in the inside of well lid frame (3), and well lid frame (3) and inoxidizing coating (4) integral structure set up to block each other between the top of well lid frame (3) and prefabricated well (1).
3. The hydraulic engineering floating type rapid flood discharge sewer well cover assembly according to claim 1, is characterized in that: turbine (9) and the vertical coaxial setting of mesh (5) and well lid frame (3) of intaking, and set up to sealed relative revolution mechanic between turbine (9) and mounting (6) to the side cross-section of mounting (6) sets up to "L" style of calligraphy.
4. The hydraulic engineering floating type rapid flood discharge sewer well cover assembly according to claim 1, is characterized in that: standing groove (11) are evenly set up in the bottom of well lid frame (3) equal angle, and the one-to-one setting between standing groove (11) and bracing piece (15) and constant head tank (2) to bracing piece (15) and well lid frame (3) constitute relative revolution mechanic.
5. The hydraulic engineering floating type rapid flood discharge sewer well cover assembly according to claim 1, is characterized in that: the edge of the anti-falling net (18) is arranged to be of an L-shaped structure, the anti-falling net (18) and the positioning ring (17) are clamped with each other, and the positioning ring (17) and the anti-falling net (18) form a dismounting and mounting structure connected through bolts.
6. The hydraulic engineering floating type rapid flood discharge sewer well cover assembly according to claim 1, is characterized in that: the telescopic rod (19) and the elastic piece (20) are symmetrically arranged about a vertical central axis of the well lid frame (3), the elastic piece (20) is located on the outer side of the telescopic rod (19), and a gap is reserved between the telescopic rod and the elastic piece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921560140.9U CN211341096U (en) | 2019-09-19 | 2019-09-19 | Hydraulic engineering floats quick flood discharge sewer well lid subassembly of formula |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921560140.9U CN211341096U (en) | 2019-09-19 | 2019-09-19 | Hydraulic engineering floats quick flood discharge sewer well lid subassembly of formula |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211341096U true CN211341096U (en) | 2020-08-25 |
Family
ID=72135968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921560140.9U Expired - Fee Related CN211341096U (en) | 2019-09-19 | 2019-09-19 | Hydraulic engineering floats quick flood discharge sewer well lid subassembly of formula |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211341096U (en) |
-
2019
- 2019-09-19 CN CN201921560140.9U patent/CN211341096U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207419254U (en) | A kind of bridge drainage structure | |
CN114508165B (en) | Municipal rainwater collection system | |
CN211312078U (en) | Drainage device for building engineering | |
CN210562532U (en) | Sewage well for municipal engineering road | |
CN211341096U (en) | Hydraulic engineering floats quick flood discharge sewer well lid subassembly of formula | |
CN212383385U (en) | Building site dust device for environmental protection | |
CN209254372U (en) | A kind of architectural engineering dust-extraction unit of environmental protection | |
CN206302901U (en) | A kind of horticultural water-saving micro-watering apparatus | |
CN216640480U (en) | Water diversion device for hydraulic engineering | |
CN215211406U (en) | Rainwater water conservancy diversion project organization is used in sponge city | |
CN214695286U (en) | Safety warning sign is used in civil engineering | |
CN112431280B (en) | Plant water collecting equipment for urban planning and using method thereof by utilizing rainwater gravity for pollution discharge | |
CN210122739U (en) | Rainwater is retrieved and is sprayed dust fall system for green construction | |
CN213328722U (en) | Air guide device for rapidly cleaning accumulated sand on road surface of desert highway | |
CN210013272U (en) | Low influence development device that rainwater was collected and is utilized | |
CN209817034U (en) | Water circulation structure of sponge city seepage and drainage system | |
CN209011283U (en) | A kind of sponge novel urban rainwater separate system | |
CN214809439U (en) | Watering device for dust fall of highway construction outlet | |
CN112982631A (en) | Novel big or small rainwater reposition of redundant personnel well in sponge city | |
CN111495007A (en) | Sewage treatment removes different anti-return water conservancy diversion discharge mechanism | |
CN210507694U (en) | Urban road drainage pipeline | |
CN218843297U (en) | Water supply and drainage structure with anti-blocking function | |
CN215446252U (en) | Landscape lamp for municipal works | |
CN214302093U (en) | Highway drainage anti-blocking device | |
CN214040815U (en) | Automatic surface runoff sampler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210510 Address after: Room 601, building a, area 9, Chengzhou Industrial Zone, Quanzhou construction service Industrial Park, Tongji Road, Fengze District, Quanzhou City, Fujian Province, 362200 Patentee after: Fujian Jiayi Construction Engineering Co.,Ltd. Address before: 241100 No.39, beixie natural village, zhougao administrative village, LIULANG Town, Wuhu County, Wuhu City, Anhui Province Patentee before: Xie Taoming |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200825 |
|
CF01 | Termination of patent right due to non-payment of annual fee |