CN211340775U - Hollow pile for civil construction - Google Patents

Hollow pile for civil construction Download PDF

Info

Publication number
CN211340775U
CN211340775U CN201922242476.7U CN201922242476U CN211340775U CN 211340775 U CN211340775 U CN 211340775U CN 201922242476 U CN201922242476 U CN 201922242476U CN 211340775 U CN211340775 U CN 211340775U
Authority
CN
China
Prior art keywords
fixedly connected
hollow pile
outer barrel
barrel
inner chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922242476.7U
Other languages
Chinese (zh)
Inventor
刘雅琦
唐晓春
王淑娟
敬耀辉
赵传华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin University of Architecture and Technology
Original Assignee
Jilin University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin University of Architecture and Technology filed Critical Jilin University of Architecture and Technology
Priority to CN201922242476.7U priority Critical patent/CN211340775U/en
Application granted granted Critical
Publication of CN211340775U publication Critical patent/CN211340775U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a hollow pile for civil construction, including outer barrel and interior barrel, be provided with the reinforcing bar between outer barrel and the interior barrel, backup pad on the top fixedly connected with of inner barrel inner chamber, the bottom fixedly connected with bottom suspension fagging of inner barrel inner chamber, go up the fixedly connected with support column between backup pad and the bottom suspension fagging, the top fixedly connected with impact plate of outer barrel, the top of impact plate is provided with strikes the cover, the equal threaded connection in inner chamber that strikes cover both sides has the bolt. The utility model discloses an outer barrel, interior barrel, reinforcing bar, go up backup pad, bottom suspension fagging, support column, impingement plate, impact the cooperation of cover and bolt and use, possess the advantage that intensity is high, solved current hollow pile intensity difference for the civil construction, can not support great weight, when hollow pile squeezes into the ground in addition, the afterbody of hollow pile is beaten the power and is great, causes the broken problem of afterbody easily.

Description

Hollow pile for civil construction
Technical Field
The utility model relates to a civil construction technical field specifically is a hollow pile for civil construction.
Background
In the building construction process, hollow pile is a common building foundation building material, and hollow pile is firstly weight reduction, and secondly hollow pile arch force each other is than solid big, and the usage is extensive in the building, and current hollow pile for civil construction intensity is poor, can not support great weight, and when hollow pile squeezed into the ground in addition, the afterbody of hollow pile was hit the power greatly, caused the afterbody broken easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hollow pile for civil construction possesses the advantage that intensity is high, has solved current hollow pile for civil construction intensity poor, can not support great weight, and when hollow pile squeezed into the ground in addition, the afterbody of hollow pile was hit the power of beating great, caused the broken problem of afterbody easily.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hollow pile for civil construction, includes outer barrel and interior barrel, be provided with the reinforcing bar between outer barrel and the interior barrel, the backup pad is gone up to inner barrel inner chamber's top fixedly connected with, inner barrel inner chamber's bottom fixedly connected with bottom suspension fagging, go up the fixedly connected with support column between backup pad and the bottom suspension fagging.
Preferably, the top fixedly connected with of outer barrel strikes the board, the top of striking the board is provided with strikes the cover, the equal threaded connection of inner chamber that strikes the cover both sides has the bolt, the bolt runs through and strikes the cover and extend to the inner chamber of outer barrel.
Preferably, the top of the two sides of the inner cavity of the outer cylinder body is fixedly connected with a first fixing seat, and a hoisting hook is arranged on the surface of the first fixing seat.
Preferably, the two sides of the inner cavity of the outer barrel are fixedly connected with four anti-collision strips.
Preferably, the bottom of outer barrel is fixedly connected with plug, the shape of plug is the toper, the equal fixedly connected with horizontal pole in both sides of support column, the bottom fixedly connected with second fixing base on outer barrel surface, threaded hole has been seted up on the surface of second fixing base.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses an outer barrel, interior barrel, reinforcing bar, go up backup pad, bottom suspension fagging, support column, impingement plate, impact the cooperation of cover and bolt and use, possess the advantage that intensity is high, solved current hollow pile intensity difference for the civil construction, can not support great weight, when hollow pile squeezes into the ground in addition, the afterbody of hollow pile is beaten the power and is great, causes the broken problem of afterbody easily.
2. The utility model discloses a set up the bolt, can be convenient for fixed impact cover, avoid it to appear insecure condition, through setting up fixing base and jack-up couple, can be convenient for carry out the centre gripping to external barrel, through setting up the anticollision strip, can provide the protection for hollow pile, avoid it to appear damaging easily on the way in the transportation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the structure of the present invention;
fig. 3 is an enlarged view of a in fig. 1 according to the present invention.
In the figure: 1. an outer cylinder; 2. an inner cylinder; 3. reinforcing steel bars; 4. an upper support plate; 5. a lower support plate; 6. a support pillar; 7. an impact plate; 8. an impact sleeve; 9. a bolt; 10. a first fixed seat; 11. a lifting hook; 12. an anti-collision strip; 13. a plug; 14. a cross bar; 15. a second fixed seat; 16. a threaded bore.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a hollow pile for civil construction comprises an outer cylinder 1 and an inner cylinder 2, a reinforcing steel bar 3 is arranged between the outer cylinder 1 and the inner cylinder 2, an upper support plate 4 is fixedly connected to the top of the inner cavity of the inner cylinder 2, a lower support plate 5 is fixedly connected to the bottom of the inner cavity of the inner cylinder 2, a support column 6 is fixedly connected between the upper support plate 4 and the lower support plate 5, an impact plate 7 is fixedly connected to the top of the outer cylinder 1, an impact sleeve 8 is arranged on the top of the impact plate 7, bolts 9 are screwed into the inner cavities on both sides of the impact sleeve 8, the impact sleeve 8 can be conveniently fixed by arranging the bolts 9, so as to avoid infirm situation, the bolts 9 penetrate through the impact sleeve 8 and extend into the inner cavity of the outer cylinder 1, first fixing seats 10 are fixedly connected to the tops on both sides of the inner cavity of the outer cylinder 1, and, through arranging the first fixing seat 10 and the lifting hook 11, the outer barrel 1 can be conveniently clamped, the two sides of the inner cavity of the outer barrel 1 are fixedly connected with the anti-collision strips 12, through arranging the anti-collision strips 12, the hollow pile can be protected, the hollow pile is prevented from being easily damaged in the transportation process, the number of the anti-collision strips 12 is four, the bottom of the outer barrel 1 is fixedly connected with the plug 13, the plug 13 is conical, the two sides of the supporting column 6 are fixedly connected with the cross rod 14, the bottom of the surface of the outer barrel 1 is fixedly connected with the second fixing seat 15, the surface of the second fixing seat 15 is provided with the threaded hole 16, through the outer barrel 1, the inner barrel 2, the reinforcing steel bar 3, the upper supporting plate 4, the lower supporting plate 5, the supporting column 6, the impact plate 7, the impact sleeve 8 and the bolt 9, the hollow pile has the advantage of high strength, the, the tail part of the hollow pile is large in striking force when the hollow pile is driven into the foundation, and the tail part is easy to break.
During the use, through reinforcing bar 3, can improve the intensity of hollow pile, through last backup pad 4, bottom suspension fagging 5 and support column 6, can improve the intensity of hollow pile, through strikeing board 7 and impact cover 8, the afterbody that can avoid hollow pile is hit the power of hitting greatly, causes the broken condition of afterbody easily, through first fixing base 10 and jack-up couple 11, can be convenient for when installing hollow pile, has certain impetus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a hollow pile for civil construction, includes outer barrel (1) and interior barrel (2), its characterized in that: be provided with between outer barrel (1) and interior barrel (2) reinforcing bar (3), backup pad (4) are gone up to the top fixedly connected with of interior barrel (2) inner chamber, the bottom fixedly connected with bottom suspension fagging (5) of interior barrel (2) inner chamber, go up fixedly connected with support column (6) between backup pad (4) and bottom suspension fagging (5).
2. The hollow pile for civil construction according to claim 1, characterized in that: the top fixedly connected with of outer barrel (1) strikes board (7), the top of striking board (7) is provided with strikes cover (8), the equal threaded connection in inner chamber that strikes cover (8) both sides has bolt (9), bolt (9) run through and strike cover (8) and extend to the inner chamber of outer barrel (1).
3. The hollow pile for civil construction according to claim 1, characterized in that: the top of outer barrel (1) inner chamber both sides all fixedly connected with first fixing base (10), the surface of first fixing base (10) is provided with jack-up couple (11).
4. The hollow pile for civil construction according to claim 1, characterized in that: the equal fixedly connected with anticollision strip (12) in both sides of outer barrel (1) inner chamber, the quantity of anticollision strip (12) is four.
5. The hollow pile for civil construction according to claim 1, characterized in that: the bottom fixedly connected with plug (13) of outer barrel (1), the shape of plug (13) is the toper, the equal fixedly connected with horizontal pole (14) in both sides of support column (6), the bottom fixedly connected with second fixing base (15) on outer barrel (1) surface, threaded hole (16) are seted up on the surface of second fixing base (15).
CN201922242476.7U 2019-12-13 2019-12-13 Hollow pile for civil construction Expired - Fee Related CN211340775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922242476.7U CN211340775U (en) 2019-12-13 2019-12-13 Hollow pile for civil construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922242476.7U CN211340775U (en) 2019-12-13 2019-12-13 Hollow pile for civil construction

Publications (1)

Publication Number Publication Date
CN211340775U true CN211340775U (en) 2020-08-25

Family

ID=72129056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922242476.7U Expired - Fee Related CN211340775U (en) 2019-12-13 2019-12-13 Hollow pile for civil construction

Country Status (1)

Country Link
CN (1) CN211340775U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202127A (en) * 2021-03-15 2021-08-03 上海宝冶集团有限公司 Civil engineering foundation pile structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202127A (en) * 2021-03-15 2021-08-03 上海宝冶集团有限公司 Civil engineering foundation pile structure and construction method thereof
CN113202127B (en) * 2021-03-15 2022-12-13 上海宝冶集团有限公司 Civil engineering foundation pile structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN211340775U (en) Hollow pile for civil construction
CN207498959U (en) Double pile-anchor system
CN218595955U (en) Cab for bridge-gate crane
CN201520971U (en) Foundation pile
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN211922633U (en) Geotechnical engineering's adjustable foundation ditch consolidates rectangle supporting device
CN212773710U (en) Communication power pole
CN214883800U (en) Long service life's pile foundation structure for building engineering
CN215406032U (en) Hollow pile for civil construction
CN207646735U (en) A kind of piling machine support leg bracing means
CN202544875U (en) Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
CN103388474B (en) The system of attack of a kind of efficiently not material folding impact blanking and efficient not material folding impact blanking digger
CN209082545U (en) Distribution steel pipe pole basis and distribution steel pipe pole
CN105804055A (en) Piling-facilitating sheet pile shaped like Chinese character 'ji'
CN206015677U (en) A kind of anchor pole is to medium-height trestle
CN216238503U (en) Wear-resisting square pile based on centrifugal molding
CN214614038U (en) Square pile end plate blank
CN215562662U (en) Deep foundation pit support structure in bridge construction
CN207159992U (en) One kind building stake
CN216615837U (en) Wear-resisting plate of hydraulic vibration hammer
CN213391258U (en) Hanging basket
CN212104095U (en) Civil engineering pile driver
CN109231004A (en) The big section Steel Column lifting of general-purpose type hooks up bumper and absorbing shock bracket and its application method
CN214832144U (en) Height limiting early warning device for road and bridge traffic
CN204608774U (en) A kind of PHC pile tube pile top

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

Termination date: 20211213

CF01 Termination of patent right due to non-payment of annual fee