CN211340263U - Water permeable ground - Google Patents

Water permeable ground Download PDF

Info

Publication number
CN211340263U
CN211340263U CN201921532413.9U CN201921532413U CN211340263U CN 211340263 U CN211340263 U CN 211340263U CN 201921532413 U CN201921532413 U CN 201921532413U CN 211340263 U CN211340263 U CN 211340263U
Authority
CN
China
Prior art keywords
prefabricated frame
layer
water
brick layer
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921532413.9U
Other languages
Chinese (zh)
Inventor
蔡明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Mingzhi New Material Technology Co ltd
Original Assignee
Ningbo Mingzhi New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Mingzhi New Material Technology Co ltd filed Critical Ningbo Mingzhi New Material Technology Co ltd
Priority to CN201921532413.9U priority Critical patent/CN211340263U/en
Application granted granted Critical
Publication of CN211340263U publication Critical patent/CN211340263U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a ground permeates water, including prefabricated frame, the top of prefabricated frame is provided with the brick layer, the wash port has been seted up at the top on brick layer, the inside of prefabricated frame is provided with the metalling, the mortar tie coat has been laid at the top of metalling, the brick layer passes through the top fixed connection of mortar tie coat and prefabricated frame, the bottom fixedly connected with reinforcing bar net of prefabricated frame. The utility model discloses a setting of prefabricated frame, brick layer, wash port, metalling, mortar tie coat and reinforcing bar net has solved the brick that has permeated water and has mostly utilized and mix earth clearance and pore and seep water, and its retaining effect is poor, and is slower during the infiltration simultaneously, and the problem of the structure after the retaining is easily collapsible simultaneously should permeate water ground, possesses the advantage that retaining effect is good and the retaining structure is difficult for collapsibility, has improved retaining effect.

Description

Water permeable ground
Technical Field
The utility model relates to a building technical field specifically is permeable to water ground.
Background
At present, along with the popularization of sponge city theory, the control of rainwater receives people more and more to attach importance to, and the rewet of rainwater is important in the middle of the sponge city engineering, if the rainwater can not permeate on the spot, must form the rainwater and assemble, increases the burden of municipal rainwater pipe network, arouses the urban waterlogging easily. Even if the river can be discharged through the municipal rainwater pipe network, flood disasters in downstream areas are also easily caused. When the rainy season passes, the river water resource is reduced and the drought is easy to occur due to the fact that underground water cannot be fully conserved. At present, the way of urban rainwater infiltration to the underground is mostly realized through the permeable ground that the brick laid that permeates water.
But the brick that permeates water that has now utilizes muddy earth clearance and pore to ooze greatly, and its retaining effect is poor, and is slower during the infiltration simultaneously, and the structure after the retaining is easy to be collapsible simultaneously, lacks spacing structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a ground permeates water, possesses the advantage that retaining is effectual and the retaining structure is difficult for collapsing, has solved the brick that has permeated water now and has utilized to mix earth clearance and pore greatly and carry out the infiltration, and its retaining effect is poor, and is slower when permeating water simultaneously, the easy problem of collapsing of structure after the retaining simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme: the permeable ground comprises a prefabricated frame, wherein a brick layer is arranged on the top of the prefabricated frame, a drain hole is formed in the top of the brick layer, a gravel layer is arranged inside the prefabricated frame, a mortar bonding layer is laid on the top of the gravel layer, the brick layer is fixedly connected with the top of the prefabricated frame through the mortar bonding layer, and a reinforcing mesh is fixedly connected to the bottom of the prefabricated frame.
Preferably, the prefabricated frame is internally inlaid with anti-deformation reinforcing steel bars, and an anti-corrosion layer is coated on the surfaces of the anti-deformation reinforcing steel bars.
Preferably, the inside fixedly connected with baffle of prefabricated frame, the baffle is for mixing earth and making, baffle and prefabricated frame make as an organic whole.
Preferably, a quartz sand layer is mixed on the top of the crushed stone layer, and a drainage plate is arranged at the bottom of the reinforcing mesh.
Preferably, the clamping grooves are formed in the front side and the rear side of the right side of the prefabricated frame, and the clamping blocks in clearance fit with the clamping grooves are fixedly connected to the front side and the rear side of the left side of the prefabricated frame.
Preferably, the top of the brick layer is provided with a water chute, the water chute is arranged in a cross shape, the number of the drain holes is four, and the four drain holes are located on the outer side of the water chute.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a setting of prefabricated frame, brick layer, wash port, metalling, mortar tie coat and reinforcing bar net has solved the brick that has permeated water and has mostly utilized and mix earth clearance and pore and seep water, and its retaining effect is poor, and is slower during the infiltration simultaneously, and the problem of the structure after the retaining is easily collapsible simultaneously should permeate water ground, possesses the advantage that retaining effect is good and the retaining structure is difficult for collapsibility, has improved retaining effect.
2. The utility model discloses inlay because of the inside of prefabricated frame has anti-deformation reinforcing bar, the anticorrosive coating has been smeared on the surface of anti-deformation reinforcing bar, and this design is through the setting of anti-deformation reinforcing bar and anticorrosive coating, and convenient to use person improves the intensity of prefabricated frame through anti-deformation reinforcing bar, prevents that prefabricated frame is out of shape, and the anticorrosive coating can improve the anticorrosive effect of anti-deformation reinforcing bar simultaneously, improves the life of anti-deformation reinforcing bar.
3. The utility model discloses because of the inside fixedly connected with baffle of prefabricated frame, the baffle is made for mixing earth, and baffle and prefabricated frame are as an organic whole made, and this design passes through the setting of baffle, and convenient to use person improves the internal strength of prefabricated frame through the baffle, prevents that the inside metalling of prefabricated frame from scattering and warping.
4. The utility model discloses because of the top on metalling mixes there is quartz sand layer, and the bottom of reinforcing bar net is provided with the drain bar, and quartz sand layer and drain bar's setting has been used in this design, and convenient to use person adsorbs filtering impurity to the water that the infiltration got into the water storage layer through quartz sand layer, avoids the water polluted environment on infiltration ground to the water yield of seepage can be controlled to the drain bar, prevents that the earth's surface is too moist.
5. The utility model discloses because of the draw-in groove has all been seted up to front side and the rear side on prefabricated frame right side, the equal fixedly connected with in left front side of prefabricated frame and the equal fixedly connected with in rear side and draw-in groove clearance fit's fixture block, this design passes through the setting of draw-in groove and fixture block, and the person of facilitating the use passes through the clearance fit of draw-in groove and fixture block, dislocation around can not making after the prefabricated frame installation.
6. The utility model discloses because of the guiding gutter has been seted up at the top on brick layer, the guiding gutter is the cross setting, and the wash port is provided with four, and four wash ports all are located the outside of guiding gutter, and this design passes through the setting of guiding gutter, and convenient to use person passes through the scope that the guiding gutter increased the infiltration, and the rainwater of being convenient for flows in drainage hole department fast and impounds.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the top-view cross-sectional structure of the prefabricated frame of the present invention;
FIG. 3 is a schematic perspective view of the prefabricated frame of the present invention;
fig. 4 is a schematic top view of the brick layer according to the present invention.
In the figure: 1 prefabricated frame, 2 brick layers, 3 drain holes, 4 rubble layers, 5 mortar bonding layers, 6 reinforcing mesh, 7 anti-deformation reinforcing steel bars, 8 anticorrosive layers, 9 partition plates, 10 quartz sand layers, 11 drainage plates, 12 clamping grooves, 13 clamping blocks and 14 water guide grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the permeable ground comprises a prefabricated frame 1, wherein anti-deformation reinforcing bars 7 are embedded in the prefabricated frame 1, and anti-corrosion layers 8 are coated on the surfaces of the anti-deformation reinforcing bars 7, the anti-deformation reinforcing bars 7 and the anti-corrosion layers 8 are arranged, so that a user can improve the strength of the prefabricated frame 1 through the anti-deformation reinforcing bars 7 and prevent the prefabricated frame 1 from deforming, meanwhile, the anti-corrosion layers 8 can improve the anti-corrosion effect of the anti-deformation reinforcing bars 7 and prolong the service life of the anti-deformation reinforcing bars 7, the prefabricated frame 1 is fixedly connected with a partition plate 9 inside, the partition plate 9 is made of concrete, the partition plate 9 and the prefabricated frame 1 are integrally manufactured, the design is convenient for the user to improve the internal strength of the prefabricated frame 1 through the partition plate 9 and prevent a crushed stone layer 4 in the prefabricated frame 1 from being scattered and deformed, and clamping grooves 12 are formed in the front side and the rear side of the, the front side and the rear side of the left side of the prefabricated frame 1 are fixedly connected with clamping blocks 13 in clearance fit with the clamping grooves 12, the design is convenient for a user to avoid front and rear dislocation of the prefabricated frame 1 after installation by the clearance fit of the clamping grooves 12 and the clamping blocks 13, the top of the prefabricated frame 1 is provided with a brick layer 2, the top of the brick layer 2 is provided with a water guide groove 14, the water guide groove 14 is in a cross arrangement, four drain holes 3 are arranged, the four drain holes 3 are all positioned on the outer side of the water guide groove 14, the design is convenient for the user to increase the water seepage range through the water guide groove 14 by the arrangement of the water guide groove 14, rainwater can conveniently and rapidly flow into the drain holes 3 for water storage, the top of the brick layer 2 is provided with the drain holes 3, the prefabricated frame 1 is internally provided with the crushed stone layer 4, the top of the crushed stone layer 4 is paved with bonding layer mortar 5, and the brick layer 2, prefabricated frame 1's bottom fixedly connected with reinforcing bar net 6, the top because of metalling 4 mixes has quartz sand layer 10, reinforcing bar net 6's bottom is provided with drain bar 11, this design has used quartz sand layer 10 and drain bar 11's setting, and convenient to use person passes through quartz sand layer 10 and filters impurity to the water absorption that the infiltration got into the water storage layer, avoids the water polluted environment on infiltration ground to the water yield of seepage can be controlled to drain bar 11, prevents that the earth's surface is too moist.
During the use, the user lays drainage plate 11 at the bottom, lay reinforcing bar net 6 again, hoist prefabricated frame 1 again and place the installation, pile rubble layer 4 with the inside of prefabricated frame 1 again, pile quartz sand layer 10 again, lay mortar tie coat 5 fixed brick layer 2 at last, prevent through reinforcing bar net 6 that rubble layer 4 from collapsing to the bottom, rethread prefabricated frame 1 improves the intensity of the structure of permeating water, prevent simultaneously that rubble layer 4 from collapsing to sliding all around, the rainwater passes through 3 infiltration entering rubble layer 4 of wash port and carries out the retaining and collect simultaneously, quartz sand layer 10 adsorbs the separation with the pollution impurity of rainwater simultaneously.
In summary, the following steps: this ground permeates water, through the setting of prefabricated frame 1, fragment layer 2, wash port 3, metalling 4, mortar tie coat 5 and reinforcing bar net 6, has solved current brick that permeates water and has utilized muddy earth clearance and pore to seep water greatly, and its retaining effect is poor, and is slower when seeping water simultaneously, the problem that the structure after the retaining is easily ulcerated simultaneously.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The ground of permeating water, including prefabricated frame (1), its characterized in that: the top of prefabricated frame (1) is provided with brick layer (2), wash port (3) have been seted up at the top of brick layer (2), the inside of prefabricated frame (1) is provided with rubble layer (4), mortar tie coat (5) have been laid at the top of rubble layer (4), brick layer (2) are through the top fixed connection of mortar tie coat (5) and prefabricated frame (1), the bottom fixedly connected with reinforcing bar net (6) of prefabricated frame (1).
2. The water permeable floor of claim 1, wherein: the prefabricated frame is characterized in that anti-deformation reinforcing steel bars (7) are embedded in the prefabricated frame (1), and an anticorrosive layer (8) is coated on the surfaces of the anti-deformation reinforcing steel bars (7).
3. The water permeable floor of claim 1, wherein: the inside fixedly connected with baffle (9) of prefabricated frame (1), baffle (9) are made for muddy earth, baffle (9) and prefabricated frame (1) are manufacturing as an organic whole.
4. The water permeable floor of claim 1, wherein: the top of the gravel layer (4) is mixed with a quartz sand layer (10), and the bottom of the reinforcing mesh (6) is provided with a drainage plate (11).
5. The water permeable floor of claim 1, wherein: draw-in groove (12) have all been seted up to the front side and the rear side on prefabricated frame (1) right side, the equal fixedly connected with of left front side of prefabricated frame (1) and rear side and draw-in groove (12) clearance fit's fixture block (13).
6. The water permeable floor of claim 1, wherein: the water guide grooves (14) are formed in the top of the brick layer (2), the water guide grooves (14) are arranged in a cross mode, four drain holes (3) are formed, and the four drain holes (3) are located on the outer side of the water guide grooves (14).
CN201921532413.9U 2019-09-16 2019-09-16 Water permeable ground Expired - Fee Related CN211340263U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921532413.9U CN211340263U (en) 2019-09-16 2019-09-16 Water permeable ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921532413.9U CN211340263U (en) 2019-09-16 2019-09-16 Water permeable ground

Publications (1)

Publication Number Publication Date
CN211340263U true CN211340263U (en) 2020-08-25

Family

ID=72134047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921532413.9U Expired - Fee Related CN211340263U (en) 2019-09-16 2019-09-16 Water permeable ground

Country Status (1)

Country Link
CN (1) CN211340263U (en)

Similar Documents

Publication Publication Date Title
CN106638918B (en) Construction method of sponge urban rainwater collection system
CN105297872A (en) LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining
CN205347914U (en) Interlocking formula ecology concrete road surface brick that permeates water with water conservancy diversion hole
CN206189231U (en) Gardens permeable pavement structure
CN204753291U (en) Be fit for at rainwater that laid on waterproof ground water storage device that permeates water
CN214033246U (en) A road seepage prevention structure for sponge city design
CN213173176U (en) Municipal works road pavement structure
CN212223500U (en) Sponge city town road
CN205223783U (en) But hole regenerative permeable ground surface structure
CN209482092U (en) Suitable for the sponge city system of biological stranded belt is arranged outside town road red line
CN105421647B (en) A kind of step building block of Collection utilization rainwater
CN211340263U (en) Water permeable ground
CN216474335U (en) A foundation structure for installing night light ceramic tile that permeates water
CN216193763U (en) Sponge road with rainwater infiltration function
CN211815262U (en) Brick permeates water convenient to drainage
CN211848696U (en) Type bituminous paving structure permeates water
CN212153012U (en) Sponge city pavement that permeates water
CN212223483U (en) Permeable pavement structure applied to sponge city
CN202989722U (en) Permeable road kerb
CN207469030U (en) A kind of urban road filtration, purification and collection drainage systems
CN217711049U (en) Prefabricated infiltration ditch that permeates water suitable for sponge city pavement
CN215518229U (en) Sponge urban landscape sidewalk structure
CN215290505U (en) Prefabricated drainage ditch component with improved permeation function
CN212670179U (en) Concrete that permeates water fast flat curbstone
CN213925715U (en) Novel permeable pavement