CN211314098U - Be used for construction to use pile device - Google Patents

Be used for construction to use pile device Download PDF

Info

Publication number
CN211314098U
CN211314098U CN201922036290.6U CN201922036290U CN211314098U CN 211314098 U CN211314098 U CN 211314098U CN 201922036290 U CN201922036290 U CN 201922036290U CN 211314098 U CN211314098 U CN 211314098U
Authority
CN
China
Prior art keywords
fixed mounting
rod
dwang
pile
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922036290.6U
Other languages
Chinese (zh)
Inventor
蒋玉林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhengping Construction Investment Group Co ltd
Original Assignee
Beijing Zhengping Construction Investment Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhengping Construction Investment Group Co ltd filed Critical Beijing Zhengping Construction Investment Group Co ltd
Priority to CN201922036290.6U priority Critical patent/CN211314098U/en
Application granted granted Critical
Publication of CN211314098U publication Critical patent/CN211314098U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model belongs to the technical field of the construction, especially, be a be used for construction to use pile device, the mode that adopts the hammering to current pile equipment more strikes, needs to guarantee that the tup has sufficient stroke to obtain great impulse, consequently, the unsuitable problem of being under construction in constrictive environment of this kind of equipment, the scheme is put forward now to it, it is including pushing away the case, the top side fixed mounting who pushes away the case has the fixed plate, has the motor through bolt fixed mounting on the fixed plate, and fixed mounting has the one end of first rotation pole on the output shaft of motor, and the other end fixed mounting of first rotation pole has first bevel gear, and slidable mounting has first slide bar in the first rotation pole, and the bottom fixed mounting of first slide bar has the pile body. The utility model discloses a pile body punches to ground, labour saving and time saving, easy operation improves pile efficiency.

Description

Be used for construction to use pile device
Technical Field
The utility model relates to a construction technical field especially relates to a be used for construction to use pile device.
Background
The pile driver consists of a pile hammer, a pile frame, accessory equipment and the like. The pile hammer is attached between two parallel vertical guide rods at the front part of the pile frame and is hoisted by a hoisting hook. The pile frame is a steel structure tower frame, and a winch is arranged at the rear part of the pile frame and used for hoisting the pile and the pile hammer. The front of the pile frame is provided with a guide frame consisting of two guide rods for controlling the piling direction so that the pile can accurately penetrate into the stratum according to the designed direction.
The existing piling equipment mostly adopts a hammering mode to strike, and the hammer head needs to be ensured to have enough stroke to obtain larger impulse, so the equipment is not suitable for construction in a narrow environment, and a piling device for building construction is provided to solve the problems.
Disclosure of Invention
The utility model aims at solving the mode that present pile driving equipment adopted the hammering more and strike, need guarantee that the tup has sufficient stroke and obtains great momentum, consequently, this kind of equipment is unsuitable in the shortcoming of being under construction in constrictive environment, and the pile driving device for construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pile device for construction, including pushing away the case, the top side fixed mounting who pushes away the case has the fixed plate, there is the motor through bolt fixed mounting on the fixed plate, fixed mounting has the one end of first dwang on the output shaft of motor, the other end fixed mounting of first dwang has first bevel gear, slidable mounting has first slide bar in the first dwang, the bottom fixed mounting of first slide bar has the pile body, first bevel gear both sides all mesh there is second bevel gear, the equal fixed mounting in one side that two second bevel gears kept away from each other has the one end of second dwang, fixed mounting has two dead levers on the inner wall of pushing away the case, the other end of second dwang rotates respectively and installs on the dead lever that corresponds, fixed mounting has the gear on the second dwang, the meshing has the rack on the gear, the bottom fixed mounting of two racks has same carriage release lever, the.
Preferably, a plurality of bases are fixedly mounted at the bottom side of the push box, and rollers are rotatably mounted at the bottom ends of the bases, so that the push box is convenient to move.
Preferably, slidable mounting has the second slide bar in the dead lever, and the bottom fixed mounting of two second slide bars is on same carriage release lever, and fixed mounting has the one end of spring on the inner wall of dead lever, and the other end fixed mounting of spring prevents carriage release lever offset on the second slide bar, is pulled out the back at the second slide bar, by the elasticity of spring, can pull back the second slide bar.
Preferably, the one end of gag lever post is all fixed mounting in the one side that two dead levers are close to each other, and the other end slidable mounting of gag lever post prevents rack offset on the rack.
Preferably, be equipped with the helicitic texture on the pile body, the bottom of pile body extends to the outside of pushing away the case, realizes piling ground.
Preferably, one side that two dead levers are close to each other all fixed mounting have the one end of locating lever, and the other end of locating lever rotates and installs on the second dwang.
In the utility model, a be used for building construction to use pile device, at first, will push away the case and pass through the gyro wheel and move to the place that needs the pile, lock the gyro wheel, open the motor, the motor drives first dwang and rotates, first slide bar rotates in step, with the pile body rotation of first slide bar meshing, first bevel gear on the first dwang rotates in step, drive two second bevel gear rotations, make the second dwang fixed on second bevel gear rotate in step, two gear rotation directions with second dwang fixed connection are opposite, move downwards with the rack of gear engagement, when realizing that the pile body rotates, can move downwards, pile ground;
the utility model discloses a pile body punches to ground, labour saving and time saving, easy operation improves pile efficiency.
Drawings
Fig. 1 is a schematic structural diagram of a piling device for building construction according to the present invention;
fig. 2 is a schematic structural diagram of a part a of the piling device for building construction according to the present invention.
In the figure: 1. pushing the box; 2. a base; 3. a roller; 4. a travel bar; 5. a pile body; 6. a fixing plate; 7. a motor; 8. a first rotating lever; 9. a first slide bar; 10. a first bevel gear; 11. a second bevel gear; 12. a second rotating lever; 13. a gear; 14. a rack; 15. a limiting rod; 16. fixing the rod; 17. a second slide bar; 18. a spring; 19. and (5) positioning the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a piling device for building construction includes a push box 1, a fixed plate 6 is fixedly installed on the top side of the push box 1, a motor 7 is fixedly installed on the fixed plate 6 through bolts, one end of a first rotating rod 8 is fixedly installed on an output shaft of the motor 7, a first bevel gear 10 is fixedly installed on the other end of the first rotating rod 8, a first sliding rod 9 is slidably installed in the first rotating rod 8, a pile body 5 is fixedly installed on the bottom end of the first sliding rod 9, two second bevel gears 11 are respectively engaged on two sides of the first bevel gear 10, one end of a second rotating rod 12 is fixedly installed on one side of the two second bevel gears 11 away from each other, two fixed rods 16 are fixedly installed on the inner wall of the push box 1, the other end of the second rotating rod 12 is respectively rotatably installed on the corresponding fixed rods 16, a gear 13 is fixedly installed on the second rotating rod 12, and a, the bottom ends of the two racks 14 are fixedly provided with the same movable rod 4, and the pile body 5 is rotatably arranged in the movable rod 4.
In this embodiment, push away the bottom side fixed mounting of case 1 and have a plurality of bases 2, and the bottom of a plurality of bases 2 is all rotated and is installed gyro wheel 3, conveniently removes and pushes away case 1.
In this embodiment, the second sliding rod 17 is slidably mounted in the fixing rod 16, the bottom ends of the two second sliding rods 17 are fixedly mounted on the same moving rod 4, one end of the spring 18 is fixedly mounted on the inner wall of the fixing rod 16, and the other end of the spring 18 is fixedly mounted on the second sliding rod 17, so as to prevent the moving rod 4 from shifting, and after the second sliding rod 17 is pulled out, the second sliding rod 17 can be pulled back by the elasticity of the spring 18.
In this embodiment, one side of each of the two fixing rods 16 close to each other is fixedly provided with one end of a limiting rod 15, and the other end of the limiting rod 15 is slidably mounted on the rack 14 to prevent the rack 14 from deviating.
In this embodiment, the pile body 5 is provided with a thread structure, and the bottom end of the pile body 5 extends to the outer side of the push box 1, so as to realize piling on the ground.
In this embodiment, one end of the positioning rod 19 is fixedly mounted on one side of each of the two fixing rods 16, which is close to each other, and the other end of the positioning rod 19 is rotatably mounted on the second rotating rod 12.
The utility model discloses in, at first, will push away case 1 and remove the place that needs the pile through gyro wheel 3, pin gyro wheel 3, open motor 7, motor 7 drives first dwang 8 and rotates, first slide bar 9 rotates in step, 5 rotations with the pile body of first slide bar 9 meshing, first bevel gear 10 on the first dwang 8 rotates in step, drive two second bevel gear 11 and rotate, make the second dwang 12 of fixing on second dwang 11 rotate in step, rotate opposite direction with two gears 13 of 12 fixed connection of second dwang, 14 downshifts with gear 13 meshed rack, when realizing pile body 5 pivoted, can the downshifting, pile ground.

Claims (6)

1. The utility model provides a pile driving device for construction, including pushing away case (1), a serial communication port, the top side fixed mounting who pushes away case (1) has fixed plate (6), there is motor (7) through bolt fixed mounting on fixed plate (6), the one end of fixed mounting first dwang (8) on the output shaft of motor (7), the other end fixed mounting of first dwang (8) has first bevel gear (10), slidable mounting has first slide bar (9) in first dwang (8), the bottom fixed mounting of first slide bar (9) has pile body (5), first bevel gear (10) both sides all mesh there are second dwang (11), the one end of second dwang (12) is all fixed mounting in the one side that two second dwang (11) kept away from each other, fixed mounting has two dead lever (16) on the inner wall of pushing away case (1), the other end of second dwang (12) rotates respectively and installs on corresponding dead lever (16), a gear (13) is fixedly mounted on the second rotating rod (12), racks (14) are meshed on the gear (13), the bottom ends of the two racks (14) are fixedly mounted with the same moving rod (4), and the pile body (5) is rotatably mounted in the moving rod (4).
2. Piling device for building construction according to claim 1, characterized in that the bottom side of the push box (1) is fixedly mounted with a plurality of pedestals (2), and the bottom ends of the pedestals (2) are rotatably mounted with rollers (3).
3. A piling device for building construction as recited in claim 1, wherein the fixed rod (16) is slidably installed with the second sliding rod (17), the bottom ends of the two second sliding rods (17) are fixedly installed on the same movable rod (4), one end of the spring (18) is fixedly installed on the inner wall of the fixed rod (16), and the other end of the spring (18) is fixedly installed on the second sliding rod (17).
4. Piling device for building construction according to claim 1, characterized in that one end of the stop rod (15) is fixedly mounted on one side of the two fixed rods (16) close to each other, and the other end of the stop rod (15) is slidably mounted on the rack (14).
5. Piling device for building construction according to claim 1, characterized in that said pile body (5) is provided with a screw structure, the bottom end of the pile body (5) extending to the outside of the push box (1).
6. A piling device for building construction as recited in claim 1, wherein one end of the positioning rod (19) is fixedly installed on one side of the two fixing rods (16) adjacent to each other, and the other end of the positioning rod (19) is rotatably installed on the second rotating rod (12).
CN201922036290.6U 2019-11-22 2019-11-22 Be used for construction to use pile device Expired - Fee Related CN211314098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922036290.6U CN211314098U (en) 2019-11-22 2019-11-22 Be used for construction to use pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922036290.6U CN211314098U (en) 2019-11-22 2019-11-22 Be used for construction to use pile device

Publications (1)

Publication Number Publication Date
CN211314098U true CN211314098U (en) 2020-08-21

Family

ID=72058202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922036290.6U Expired - Fee Related CN211314098U (en) 2019-11-22 2019-11-22 Be used for construction to use pile device

Country Status (1)

Country Link
CN (1) CN211314098U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112675951A (en) * 2020-12-02 2021-04-20 王亚亭 Fixed hydraulic crusher with higher striking efficiency

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112675951A (en) * 2020-12-02 2021-04-20 王亚亭 Fixed hydraulic crusher with higher striking efficiency
CN112675951B (en) * 2020-12-02 2022-08-12 魁伯恩重工(兰陵)有限公司 Strike fixed hydraulic breaker that efficiency is higher

Similar Documents

Publication Publication Date Title
CN211314098U (en) Be used for construction to use pile device
CN201835767U (en) Tunnel drilling machine gear rack multiplication feeding mechanism
CN201391229Y (en) Wheel-type ditcher
CN219511852U (en) Rock and soil sampler capable of taking out sample rapidly
CN211646386U (en) Constructional engineering pile device
CN212612425U (en) Super large diameter pile foundation steel reinforcement cage erection equipment
CN215977263U (en) Pile driver for water conservancy construction
CN109339537B (en) Lifting type three-dimensional intelligent parking mechanical equipment
CN214169062U (en) Municipal works are with pile device
CN212299953U (en) Bidirectional pushing head of return tractor
CN201292675Y (en) Ribbon board installation apparatus
CN210617951U (en) Wear-resistant material frame of block forming machine
CN212656222U (en) Pile driver for civil engineering
CN108222819B (en) High-efficient pile driver
CN202440778U (en) Motor sweeper side brush lifting mechanism
CN206580174U (en) Soil transporter for pile foundation construction
CN204837184U (en) Domestic fungus fungus stick oxygenates machine
CN108755684A (en) The pile pulling system of piling machine
CN216041154U (en) Easily-transported modularized detachable pile driver
CN214942140U (en) Bearing stores pylon for civil engineering
CN220813833U (en) Pile driving device for road and bridge construction
CN217651781U (en) Piling device for building construction
CN218991495U (en) Four-pan pile machine
CN108716365A (en) The support device of piling machine
CN217708671U (en) Electric hanging cloth roll system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200821

Termination date: 20201122

CF01 Termination of patent right due to non-payment of annual fee