CN206580174U - Soil transporter for pile foundation construction - Google Patents
Soil transporter for pile foundation construction Download PDFInfo
- Publication number
- CN206580174U CN206580174U CN201720199735.0U CN201720199735U CN206580174U CN 206580174 U CN206580174 U CN 206580174U CN 201720199735 U CN201720199735 U CN 201720199735U CN 206580174 U CN206580174 U CN 206580174U
- Authority
- CN
- China
- Prior art keywords
- support
- pile foundation
- chain
- driving
- power transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model is related to a kind of soil transporter for pile foundation construction, belong to piling Technology field, end, which is placed, in pile foundation hole both sides and soil is provided with slide rail, sliding block is installed in slide rail, support I is set respectively on sliding block, support II and support III, set between support I and support II and crossbeam is installed, install and power transmission shaft I is set on crossbeam, power transmission shaft I connects driving motor I by driving-chain I, mounting bracket is set on support III, power transmission shaft II is set in mounting bracket, power transmission shaft I and power transmission shaft II are connected by driving-chain II, mounting blocks are set on driving-chain II, hook is set on mounting blocks, the bottom of support II sets mounting bracket, driving motor II is set on mounting bracket, driving motor II connects transfer roller, buckle steel wire rope is set on transfer roller.The utility model is simple in construction, reasonable in design, easy to install, is not only able to substantially reduce the workload of staff, additionally it is possible to improve the transport efficacy of soil, it is ensured that construction speed, reduces cost of labor.
Description
Technical field
The utility model is related to a kind of soil transporter for pile foundation construction, belongs to piling Technology field.
Background technology
Pile foundation construction mainly has pore-forming and pile two parts, in pore forming process, can dig out soil from pile foundation, soil
The side of pile foundation hole can be stacked on when being dug out and, appointed place is manually finally being transported to by dolly, the transhipment side
Formula wastes time and energy, and not only the workload of staff is larger, and soil transport process is relatively slow, and transport efficacy is very low, and
One people can not individually complete, it is necessary to many people complete in turn, adds somewhat to cost of labor, once he encounters bad weather,
Can also due to dolly cannot be introduced into and so that construction speed can not ensure.
Utility model content
According to deficiency of the prior art above, problem to be solved in the utility model is:There is provided a kind of simple in construction, if
Meter is reasonable, can substantially reduce the workload of staff, improves the transport efficacy of soil, it is ensured that construction speed, and reduction is artificial
The soil transporter for pile foundation construction of cost.
The utility model solves the technical scheme that its technical problem used:
The described soil transporter for pile foundation construction, including the pile foundation hole set on ground, pile foundation hole both sides with
And soil placement end is provided with slide rail, slide rail and is respectively mounted sliding block, sets support I, support II and support on sliding block respectively
III, support I, support II and support III are connected as one by connecting rod, are set between support I and support II and are installed crossbeam, installed
Power transmission shaft I is set on crossbeam, and power transmission shaft I is connected by driving-chain I and mounting bracket is set on driving motor I, support III, installs branch
Set on frame on power transmission shaft II, power transmission shaft I and power transmission shaft II and drive sprocket I and drive sprocket II, the He of drive sprocket I are set respectively
Drive sprocket II is connected by driving-chain II, is set on driving-chain II and hook is set on mounting blocks, mounting blocks, the bottom of support II is set
Put and buckle steel wire rope, buckle are set on setting driving motor II on mounting bracket, mounting bracket, the connection transfer roller of driving motor II, transfer roller
Steel wire rope is corresponding with pile foundation hole.
Soil transporter for pile foundation construction, can be by pile foundation hole by the cooperation of driving motor I and driving-chain II
The soil at place is conveniently transported to soil lay down location, and whole process, which only needs to 1-2 people, to be completed, and staff need not walk up and down
It is dynamic, cost of labor is not only reduced, the workload of staff is reduced, also improves operating efficiency, due to support I, support
II and support III connected as one by connecting rod, and the sliding block and slide rail being engaged are provided with bottom and ground, therefore be not required to
To be installed for each pile foundation hole, once installation, then be all suitable for for the pile foundation hole of a row or a line, and in support I, branch
Frame II and the top of support III set waterproof cloth, additionally it is possible to be prevented effectively from the influence that bad weather is brought to construction speed.
Further preferably driving-chain II uses chain structure, and mounting blocks are welded on driving-chain II.Ensure that transmission is steady
It is qualitative.
The described fixing device used cooperatively with the soil transporter for pile foundation construction, including block, block top
Portion sets baffle plate, and baffle plate both sides set set foundation bolt on transverse slat, transverse slat respectively.Effectively transporter can be consolidated
It is fixed, it is ensured that equipment reliability of operation.
Further preferred, foundation bolt is respectively provided with 2-4 on every side transverse slat.Improve stability.
The utility model is had an advantageous effect in that:
Soil transporter described in the utility model for pile foundation construction is simple in construction, reasonable in design, installs and uses
It is convenient, it is not only able to substantially reduce the workload of staff, additionally it is possible to improve the transport efficacy of soil, it is ensured that construction speed,
Cost of labor is reduced, with stronger practicality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the structural representation of the utility model fixing device;
Wherein, 1, ground;2nd, link up with;3rd, mounting bracket;4th, driving motor II;5th, pile foundation hole;6th, buckle steel wire rope;7th, it is sliding
Rail;8th, sliding block;9th, support I;10th, transfer roller;The 11st, crossbeam is installed;12nd, power transmission shaft I;13rd, driving-chain I;14th, driving motor I;15、
Support II;16th, mounting blocks;17th, driving-chain II;18th, support III;19th, power transmission shaft II;20th, mounting bracket;21st, drive sprocket I;
22nd, drive sprocket II;23rd, baffle plate;24th, transverse slat;25th, foundation bolt;26th, block.
Embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings:
As shown in Figure 1-2, the soil transporter described in the utility model for pile foundation construction, including set on ground 1
The pile foundation hole 5 put, the both sides of pile foundation hole 5 and soil placement end are provided with slide rail 7, slide rail 7 and are respectively mounted sliding block 8, sliding block 8
Upper to set support I 9, support II 15 and support III 18 respectively, support I 9, support II 15 and support III 18 are connected as one by connecting rod
Body, sets between support I 9 and support II 15 and installs crossbeam 11, install and power transmission shaft I 12, the two of power transmission shaft I 12 are set on crossbeam 11
End is fixed on installation crossbeam 11 by bearing block and bearing, and power transmission shaft I 12 is driven by travelling gear and the connection of driving-chain I 13
Set on the rotary shaft of motor I 14, support III 18 and power transmission shaft II 19, power transmission shaft II are set in mounting bracket 20, mounting bracket 20
19 two ends are fixed in mounting bracket 20 by bearing block and bearing, are set and are passed respectively on power transmission shaft I 12 and power transmission shaft II 19
Movable sprocket I 21 and drive sprocket II 22, drive sprocket I 21 and drive sprocket II 22 are connected by the driving-chain II 17 of chain structure
Connect, set on driving-chain II 17 and hook 2 is set on mounting blocks 16, mounting blocks 16, the bottom of support II 15 sets mounting bracket 3, installs
Set on frame 3 and buckle steel wire rope 6, buckle steel wire rope are set on driving motor II 4, the connection transfer roller 10 of driving motor II 4, transfer roller 10
6 is corresponding with pile foundation hole 5.
As shown in figure 3, the fixing device used cooperatively with the soil transporter for pile foundation construction, including gear
Block 26, the top of block 26 sets baffle plate 23, and the both sides of baffle plate 23 set 2-4 foundation bolt of setting on transverse slat 24, transverse slat 24 respectively
25。
Operation principle of the present utility model and use process:
The described soil transporter for pile foundation construction when in use, by support I 9, support II 15 and support III 18
Moved integrally under the mating reaction of slide rail 7 and sliding block 8 to the top of pile foundation hole 5, then in support I 9, support II 15 and support III
Placing fixer is distinguished in 18 both sides, and the block 26 of fixing device is fixed in slide rail 7, and baffle plate 23 is fixed on support I 9, branch
Frame II 15 and the both sides of the bottom of support III 18, are fastened by the foundation bolt 25 on transverse slat 24.After the completion of fixation, pass through peace
Shelving the driving motor II 4 on 3 drives transfer roller 10 to rotate, and the soil lifting in pile foundation hole 5 is arrived into ground by buckle steel wire rope 6
On, then the container for holding soil is hung to the hook 2 of the lower section of driving-chain II 17, driving motor I 14, driving motor I is opened
14 drive power transmission shaft I 12 to rotate by driving-chain I 13 and travelling gear, so by the drive sprocket I 21 on power transmission shaft I 12,
Driving-chain II 17 and drive sprocket II 22 drive power transmission shaft II 19 to rotate, in transmission process, and driving-chain II 17 can be in transmission
The rotating effect of motor I 14 is lower movable, drives the container on hook 2 to place end movement to soil, completes soil transhipment.
After the completion of pile foundation hole 5, fixing device is removed, by support I 9, support II 15 and support III 18 matching somebody with somebody in slide rail 7 and sliding block 8
Cooperation is moved integrally under to the next top of pile foundation hole 5, and this process is repeated after being fixed.
The utility model is simple in construction, reasonable in design, and the transhipment of soil can be completed easily and fast, work is greatly reduced
Make the workload of personnel, improve operating efficiency, and the transshipment acitivity can be applied to the mining process of whole pile foundation hole, install
It is easy to use, with stronger practicality.
The utility model is not limited in above-mentioned embodiment, and those of ordinary skill in the art are of the present utility model
The variations, modifications, additions or substitutions made in essential scope, should also belong to protection domain of the present utility model.
Claims (4)
1. the pile foundation hole (5) set on a kind of soil transporter for pile foundation construction, including ground (1), it is characterised in that:
Pile foundation hole (5) both sides and soil place end and are provided with slide rail (7), and slide rail (7) is interior to be respectively mounted on sliding block (8), sliding block (8)
Support I (9), support II (15) and support III (18) are set respectively, and support I (9), support II (15) and support III (18) pass through even
Bar is connected as one, and is set between support I (9) and support II (15) and is installed crossbeam (11), installed and transmission is set on crossbeam (11)
Axle I (12), power transmission shaft I (12) is connected by driving-chain I (13) and sets mounting bracket on driving motor I (14), support III (18)
(20), set in mounting bracket (20) on power transmission shaft II (19), power transmission shaft I (12) and power transmission shaft II (19) and driving-chain is set respectively
I (21) and drive sprocket II (22) are taken turns, drive sprocket I (21) and drive sprocket II (22) are connected by driving-chain II (17), passed
Set on dynamic chain II (17) and hook (2) is set on mounting blocks (16), mounting blocks (16), support II (15) bottom sets mounting bracket
(3) driving motor II (4), is set on mounting bracket (3), and driving motor II (4) connection transfer roller (10), transfer roller sets buckle on (10)
Steel wire rope (6), buckle steel wire rope (6) is corresponding with pile foundation hole (5).
2. the soil transporter according to claim 1 for pile foundation construction, it is characterised in that:Described driving-chain II
(17) chain structure is used, mounting blocks (16) are welded on driving-chain II (17).
3. a kind of fixing device used cooperatively for the soil transporter of pile foundation construction with described in claim 1 or 2, its
It is characterised by:Including block (26), baffle plate (23) is set at the top of block (26), baffle plate (23) both sides set transverse slat (24) respectively,
Foundation bolt (25) is set on transverse slat (24).
4. the fixing device that the soil transporter according to claim 3 for pile foundation construction is used cooperatively, its feature
It is:Described foundation bolt (25) is respectively provided with 2-4 on every side transverse slat (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720199735.0U CN206580174U (en) | 2017-03-02 | 2017-03-02 | Soil transporter for pile foundation construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720199735.0U CN206580174U (en) | 2017-03-02 | 2017-03-02 | Soil transporter for pile foundation construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206580174U true CN206580174U (en) | 2017-10-24 |
Family
ID=60112937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720199735.0U Expired - Fee Related CN206580174U (en) | 2017-03-02 | 2017-03-02 | Soil transporter for pile foundation construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206580174U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108423368A (en) * | 2018-03-01 | 2018-08-21 | 芜湖市海联机械设备有限公司 | A kind of high temperature resistant overhead chain conveyer |
-
2017
- 2017-03-02 CN CN201720199735.0U patent/CN206580174U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108423368A (en) * | 2018-03-01 | 2018-08-21 | 芜湖市海联机械设备有限公司 | A kind of high temperature resistant overhead chain conveyer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105401582B (en) | Suspension type excavation device and construction method for bi-directional synchronization adverse construction method | |
CN100564791C (en) | The drilling machine shaft frame two-layer platform mechanical arm grasping drill pipe device | |
CN206580174U (en) | Soil transporter for pile foundation construction | |
CN102518396A (en) | Automatic drilling machine | |
CN102162333A (en) | Fully-electric crawler suspension remote control pile driver | |
CN206244334U (en) | Beam of a loom lifts car | |
CN109457560B (en) | Rail carrying device for shield tunnel construction | |
CN204057795U (en) | Electronic down-hole lifting means | |
CN103121626B (en) | Mining power-driven monorail crane | |
CN212449286U (en) | Decorate material hoisting device for engineering | |
CN206955487U (en) | It is exclusively used in lifting steel pipes and the crane device of welding | |
CN202937278U (en) | Rapid duct piece back conveying mechanism for subway shield tunnel construction | |
CN205661838U (en) | A transportation frame for construction steel bar | |
CN209890099U (en) | Portable pneumatic pulley device | |
CN207844686U (en) | A kind of pay off rack that railroad track uses | |
CN203246798U (en) | Transport device in gallery | |
CN204417004U (en) | A kind of concrete wire pole lifting transport trolley | |
CN205100984U (en) | Waste material handling device of marble underground mining | |
CN217498418U (en) | A positioner for slip casting pipe buries and puts | |
CN113954722B (en) | Transfer device for electric power pole tower frame | |
CN217515172U (en) | Novel pipeline transportation device | |
CN110407092B (en) | Automatic air pipe coiling device of pneumatic monorail crane | |
CN204934217U (en) | The quick transporting device of a kind of pickling lines kink slewing rollers | |
CN216007854U (en) | Curtain wall construction device | |
CN209468082U (en) | A kind of hoisting platform of Underground Subway Station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171024 |
|
CF01 | Termination of patent right due to non-payment of annual fee |