CN206580174U - Soil transporter for pile foundation construction - Google Patents

Soil transporter for pile foundation construction Download PDF

Info

Publication number
CN206580174U
CN206580174U CN201720199735.0U CN201720199735U CN206580174U CN 206580174 U CN206580174 U CN 206580174U CN 201720199735 U CN201720199735 U CN 201720199735U CN 206580174 U CN206580174 U CN 206580174U
Authority
CN
China
Prior art keywords
support
pile foundation
chain
driving
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720199735.0U
Other languages
Chinese (zh)
Inventor
张红卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720199735.0U priority Critical patent/CN206580174U/en
Application granted granted Critical
Publication of CN206580174U publication Critical patent/CN206580174U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to a kind of soil transporter for pile foundation construction, belong to piling Technology field, end, which is placed, in pile foundation hole both sides and soil is provided with slide rail, sliding block is installed in slide rail, support I is set respectively on sliding block, support II and support III, set between support I and support II and crossbeam is installed, install and power transmission shaft I is set on crossbeam, power transmission shaft I connects driving motor I by driving-chain I, mounting bracket is set on support III, power transmission shaft II is set in mounting bracket, power transmission shaft I and power transmission shaft II are connected by driving-chain II, mounting blocks are set on driving-chain II, hook is set on mounting blocks, the bottom of support II sets mounting bracket, driving motor II is set on mounting bracket, driving motor II connects transfer roller, buckle steel wire rope is set on transfer roller.The utility model is simple in construction, reasonable in design, easy to install, is not only able to substantially reduce the workload of staff, additionally it is possible to improve the transport efficacy of soil, it is ensured that construction speed, reduces cost of labor.

Description

Soil transporter for pile foundation construction
Technical field
The utility model is related to a kind of soil transporter for pile foundation construction, belongs to piling Technology field.
Background technology
Pile foundation construction mainly has pore-forming and pile two parts, in pore forming process, can dig out soil from pile foundation, soil The side of pile foundation hole can be stacked on when being dug out and, appointed place is manually finally being transported to by dolly, the transhipment side Formula wastes time and energy, and not only the workload of staff is larger, and soil transport process is relatively slow, and transport efficacy is very low, and One people can not individually complete, it is necessary to many people complete in turn, adds somewhat to cost of labor, once he encounters bad weather, Can also due to dolly cannot be introduced into and so that construction speed can not ensure.
Utility model content
According to deficiency of the prior art above, problem to be solved in the utility model is:There is provided a kind of simple in construction, if Meter is reasonable, can substantially reduce the workload of staff, improves the transport efficacy of soil, it is ensured that construction speed, and reduction is artificial The soil transporter for pile foundation construction of cost.
The utility model solves the technical scheme that its technical problem used:
The described soil transporter for pile foundation construction, including the pile foundation hole set on ground, pile foundation hole both sides with And soil placement end is provided with slide rail, slide rail and is respectively mounted sliding block, sets support I, support II and support on sliding block respectively III, support I, support II and support III are connected as one by connecting rod, are set between support I and support II and are installed crossbeam, installed Power transmission shaft I is set on crossbeam, and power transmission shaft I is connected by driving-chain I and mounting bracket is set on driving motor I, support III, installs branch Set on frame on power transmission shaft II, power transmission shaft I and power transmission shaft II and drive sprocket I and drive sprocket II, the He of drive sprocket I are set respectively Drive sprocket II is connected by driving-chain II, is set on driving-chain II and hook is set on mounting blocks, mounting blocks, the bottom of support II is set Put and buckle steel wire rope, buckle are set on setting driving motor II on mounting bracket, mounting bracket, the connection transfer roller of driving motor II, transfer roller Steel wire rope is corresponding with pile foundation hole.
Soil transporter for pile foundation construction, can be by pile foundation hole by the cooperation of driving motor I and driving-chain II The soil at place is conveniently transported to soil lay down location, and whole process, which only needs to 1-2 people, to be completed, and staff need not walk up and down It is dynamic, cost of labor is not only reduced, the workload of staff is reduced, also improves operating efficiency, due to support I, support II and support III connected as one by connecting rod, and the sliding block and slide rail being engaged are provided with bottom and ground, therefore be not required to To be installed for each pile foundation hole, once installation, then be all suitable for for the pile foundation hole of a row or a line, and in support I, branch Frame II and the top of support III set waterproof cloth, additionally it is possible to be prevented effectively from the influence that bad weather is brought to construction speed.
Further preferably driving-chain II uses chain structure, and mounting blocks are welded on driving-chain II.Ensure that transmission is steady It is qualitative.
The described fixing device used cooperatively with the soil transporter for pile foundation construction, including block, block top Portion sets baffle plate, and baffle plate both sides set set foundation bolt on transverse slat, transverse slat respectively.Effectively transporter can be consolidated It is fixed, it is ensured that equipment reliability of operation.
Further preferred, foundation bolt is respectively provided with 2-4 on every side transverse slat.Improve stability.
The utility model is had an advantageous effect in that:
Soil transporter described in the utility model for pile foundation construction is simple in construction, reasonable in design, installs and uses It is convenient, it is not only able to substantially reduce the workload of staff, additionally it is possible to improve the transport efficacy of soil, it is ensured that construction speed, Cost of labor is reduced, with stronger practicality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the structural representation of the utility model fixing device;
Wherein, 1, ground;2nd, link up with;3rd, mounting bracket;4th, driving motor II;5th, pile foundation hole;6th, buckle steel wire rope;7th, it is sliding Rail;8th, sliding block;9th, support I;10th, transfer roller;The 11st, crossbeam is installed;12nd, power transmission shaft I;13rd, driving-chain I;14th, driving motor I;15、 Support II;16th, mounting blocks;17th, driving-chain II;18th, support III;19th, power transmission shaft II;20th, mounting bracket;21st, drive sprocket I; 22nd, drive sprocket II;23rd, baffle plate;24th, transverse slat;25th, foundation bolt;26th, block.
Embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings:
As shown in Figure 1-2, the soil transporter described in the utility model for pile foundation construction, including set on ground 1 The pile foundation hole 5 put, the both sides of pile foundation hole 5 and soil placement end are provided with slide rail 7, slide rail 7 and are respectively mounted sliding block 8, sliding block 8 Upper to set support I 9, support II 15 and support III 18 respectively, support I 9, support II 15 and support III 18 are connected as one by connecting rod Body, sets between support I 9 and support II 15 and installs crossbeam 11, install and power transmission shaft I 12, the two of power transmission shaft I 12 are set on crossbeam 11 End is fixed on installation crossbeam 11 by bearing block and bearing, and power transmission shaft I 12 is driven by travelling gear and the connection of driving-chain I 13 Set on the rotary shaft of motor I 14, support III 18 and power transmission shaft II 19, power transmission shaft II are set in mounting bracket 20, mounting bracket 20 19 two ends are fixed in mounting bracket 20 by bearing block and bearing, are set and are passed respectively on power transmission shaft I 12 and power transmission shaft II 19 Movable sprocket I 21 and drive sprocket II 22, drive sprocket I 21 and drive sprocket II 22 are connected by the driving-chain II 17 of chain structure Connect, set on driving-chain II 17 and hook 2 is set on mounting blocks 16, mounting blocks 16, the bottom of support II 15 sets mounting bracket 3, installs Set on frame 3 and buckle steel wire rope 6, buckle steel wire rope are set on driving motor II 4, the connection transfer roller 10 of driving motor II 4, transfer roller 10 6 is corresponding with pile foundation hole 5.
As shown in figure 3, the fixing device used cooperatively with the soil transporter for pile foundation construction, including gear Block 26, the top of block 26 sets baffle plate 23, and the both sides of baffle plate 23 set 2-4 foundation bolt of setting on transverse slat 24, transverse slat 24 respectively 25。
Operation principle of the present utility model and use process:
The described soil transporter for pile foundation construction when in use, by support I 9, support II 15 and support III 18 Moved integrally under the mating reaction of slide rail 7 and sliding block 8 to the top of pile foundation hole 5, then in support I 9, support II 15 and support III Placing fixer is distinguished in 18 both sides, and the block 26 of fixing device is fixed in slide rail 7, and baffle plate 23 is fixed on support I 9, branch Frame II 15 and the both sides of the bottom of support III 18, are fastened by the foundation bolt 25 on transverse slat 24.After the completion of fixation, pass through peace Shelving the driving motor II 4 on 3 drives transfer roller 10 to rotate, and the soil lifting in pile foundation hole 5 is arrived into ground by buckle steel wire rope 6 On, then the container for holding soil is hung to the hook 2 of the lower section of driving-chain II 17, driving motor I 14, driving motor I is opened 14 drive power transmission shaft I 12 to rotate by driving-chain I 13 and travelling gear, so by the drive sprocket I 21 on power transmission shaft I 12, Driving-chain II 17 and drive sprocket II 22 drive power transmission shaft II 19 to rotate, in transmission process, and driving-chain II 17 can be in transmission The rotating effect of motor I 14 is lower movable, drives the container on hook 2 to place end movement to soil, completes soil transhipment. After the completion of pile foundation hole 5, fixing device is removed, by support I 9, support II 15 and support III 18 matching somebody with somebody in slide rail 7 and sliding block 8 Cooperation is moved integrally under to the next top of pile foundation hole 5, and this process is repeated after being fixed.
The utility model is simple in construction, reasonable in design, and the transhipment of soil can be completed easily and fast, work is greatly reduced Make the workload of personnel, improve operating efficiency, and the transshipment acitivity can be applied to the mining process of whole pile foundation hole, install It is easy to use, with stronger practicality.
The utility model is not limited in above-mentioned embodiment, and those of ordinary skill in the art are of the present utility model The variations, modifications, additions or substitutions made in essential scope, should also belong to protection domain of the present utility model.

Claims (4)

1. the pile foundation hole (5) set on a kind of soil transporter for pile foundation construction, including ground (1), it is characterised in that: Pile foundation hole (5) both sides and soil place end and are provided with slide rail (7), and slide rail (7) is interior to be respectively mounted on sliding block (8), sliding block (8) Support I (9), support II (15) and support III (18) are set respectively, and support I (9), support II (15) and support III (18) pass through even Bar is connected as one, and is set between support I (9) and support II (15) and is installed crossbeam (11), installed and transmission is set on crossbeam (11) Axle I (12), power transmission shaft I (12) is connected by driving-chain I (13) and sets mounting bracket on driving motor I (14), support III (18) (20), set in mounting bracket (20) on power transmission shaft II (19), power transmission shaft I (12) and power transmission shaft II (19) and driving-chain is set respectively I (21) and drive sprocket II (22) are taken turns, drive sprocket I (21) and drive sprocket II (22) are connected by driving-chain II (17), passed Set on dynamic chain II (17) and hook (2) is set on mounting blocks (16), mounting blocks (16), support II (15) bottom sets mounting bracket (3) driving motor II (4), is set on mounting bracket (3), and driving motor II (4) connection transfer roller (10), transfer roller sets buckle on (10) Steel wire rope (6), buckle steel wire rope (6) is corresponding with pile foundation hole (5).
2. the soil transporter according to claim 1 for pile foundation construction, it is characterised in that:Described driving-chain II (17) chain structure is used, mounting blocks (16) are welded on driving-chain II (17).
3. a kind of fixing device used cooperatively for the soil transporter of pile foundation construction with described in claim 1 or 2, its It is characterised by:Including block (26), baffle plate (23) is set at the top of block (26), baffle plate (23) both sides set transverse slat (24) respectively, Foundation bolt (25) is set on transverse slat (24).
4. the fixing device that the soil transporter according to claim 3 for pile foundation construction is used cooperatively, its feature It is:Described foundation bolt (25) is respectively provided with 2-4 on every side transverse slat (24).
CN201720199735.0U 2017-03-02 2017-03-02 Soil transporter for pile foundation construction Expired - Fee Related CN206580174U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720199735.0U CN206580174U (en) 2017-03-02 2017-03-02 Soil transporter for pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720199735.0U CN206580174U (en) 2017-03-02 2017-03-02 Soil transporter for pile foundation construction

Publications (1)

Publication Number Publication Date
CN206580174U true CN206580174U (en) 2017-10-24

Family

ID=60112937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720199735.0U Expired - Fee Related CN206580174U (en) 2017-03-02 2017-03-02 Soil transporter for pile foundation construction

Country Status (1)

Country Link
CN (1) CN206580174U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108423368A (en) * 2018-03-01 2018-08-21 芜湖市海联机械设备有限公司 A kind of high temperature resistant overhead chain conveyer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108423368A (en) * 2018-03-01 2018-08-21 芜湖市海联机械设备有限公司 A kind of high temperature resistant overhead chain conveyer

Similar Documents

Publication Publication Date Title
CN105401582B (en) Suspension type excavation device and construction method for bi-directional synchronization adverse construction method
CN100564791C (en) The drilling machine shaft frame two-layer platform mechanical arm grasping drill pipe device
CN206580174U (en) Soil transporter for pile foundation construction
CN102518396A (en) Automatic drilling machine
CN102162333A (en) Fully-electric crawler suspension remote control pile driver
CN206244334U (en) Beam of a loom lifts car
CN109457560B (en) Rail carrying device for shield tunnel construction
CN204057795U (en) Electronic down-hole lifting means
CN103121626B (en) Mining power-driven monorail crane
CN212449286U (en) Decorate material hoisting device for engineering
CN206955487U (en) It is exclusively used in lifting steel pipes and the crane device of welding
CN202937278U (en) Rapid duct piece back conveying mechanism for subway shield tunnel construction
CN205661838U (en) A transportation frame for construction steel bar
CN209890099U (en) Portable pneumatic pulley device
CN207844686U (en) A kind of pay off rack that railroad track uses
CN203246798U (en) Transport device in gallery
CN204417004U (en) A kind of concrete wire pole lifting transport trolley
CN205100984U (en) Waste material handling device of marble underground mining
CN217498418U (en) A positioner for slip casting pipe buries and puts
CN113954722B (en) Transfer device for electric power pole tower frame
CN217515172U (en) Novel pipeline transportation device
CN110407092B (en) Automatic air pipe coiling device of pneumatic monorail crane
CN204934217U (en) The quick transporting device of a kind of pickling lines kink slewing rollers
CN216007854U (en) Curtain wall construction device
CN209468082U (en) A kind of hoisting platform of Underground Subway Station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

CF01 Termination of patent right due to non-payment of annual fee