CN211312985U - Ceramic brick curtain wall with built-in aluminum alloy keels - Google Patents

Ceramic brick curtain wall with built-in aluminum alloy keels Download PDF

Info

Publication number
CN211312985U
CN211312985U CN201921903481.1U CN201921903481U CN211312985U CN 211312985 U CN211312985 U CN 211312985U CN 201921903481 U CN201921903481 U CN 201921903481U CN 211312985 U CN211312985 U CN 211312985U
Authority
CN
China
Prior art keywords
aluminum alloy
ceramic brick
ceramic
brick
keel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921903481.1U
Other languages
Chinese (zh)
Inventor
耿龙春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin Huade Curtain Wall Co ltd
Original Assignee
Jiangyin Huade Curtain Wall Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin Huade Curtain Wall Co ltd filed Critical Jiangyin Huade Curtain Wall Co ltd
Priority to CN201921903481.1U priority Critical patent/CN211312985U/en
Application granted granted Critical
Publication of CN211312985U publication Critical patent/CN211312985U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a ceramic brick curtain wall with a built-in aluminum alloy keel, wherein an aluminum alloy beam hanging plate is fixedly arranged on a stand column of the aluminum alloy keel, an aluminum alloy hanging part is clamped on a hook of the aluminum alloy beam hanging plate, a ceramic brick is clamped on the front surface of the aluminum alloy hanging part, a vertical positioning part is fixedly assembled on the aluminum alloy hanging part, the vertical positioning part is inserted between gaps of adjacent ceramic bricks, a transverse limiting rod penetrates through the ceramic brick, the vertical positioning part comprises a first limiting block and a second limiting block, a V-shaped gap is reserved between the first limiting block and the second limiting block, the upper surface of the second limiting block is in a zigzag shape, the ceramic brick and the aluminum alloy beam hanging plate are respectively fixed by a T-shaped structure body and a U-shaped hook body of the aluminum alloy hanging part, so that the ceramic brick is arranged on the aluminum alloy beam hanging plate, the installation stability of the ceramic brick, the ceramic tile fixing device is used for limiting the installation position of ceramic tiles and ensuring the uniformity of the installation distance of the ceramic tiles.

Description

Ceramic brick curtain wall with built-in aluminum alloy keels
Technical Field
The utility model relates to a ceramic brick curtain technical field specifically is a ceramic brick curtain of built-in aluminum alloy fossil fragments.
Background
The ceramic brick is a novel green building material, and can effectively reduce the building cost by using the ceramic brick as a building curtain wall outer vertical surface material. In the prior art, ceramic bricks are installed on a keel through a connecting piece in a dry method, and ceramic bricks with different sizes are usually included on a curtain wall for pursuing beauty, so that gaps between adjacent ceramic bricks are not easy to control, and the stability of ceramic brick installation cannot be guaranteed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a ceramic brick curtain of built-in aluminum alloy fossil fragments to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a ceramic brick curtain wall with an aluminum alloy keel inside comprises the aluminum alloy section keel, wherein a stand column of the aluminum alloy section keel is fixedly installed on a building concrete structure through steel angle connectors and screws, an aluminum alloy beam hanging plate is fixedly installed on the stand column of the aluminum alloy section keel through stainless steel bolts, an aluminum alloy hanging piece is clamped on a hook of the aluminum alloy beam hanging plate, ceramic bricks are clamped on the front surface of the aluminum alloy hanging piece, vertical positioning pieces are fixedly assembled on the aluminum alloy hanging piece and are inserted between gaps of adjacent ceramic bricks, and a transverse limiting rod penetrates through the ceramic bricks in the same line;
the vertical positioning piece comprises a first limiting block and a second limiting block which are sequentially and fixedly assembled on the front surface of the aluminum alloy pendant from bottom to top, a V-shaped gap is reserved between the first limiting block and the second limiting block, and the upper surface of the second limiting block is in a sawtooth shape.
Preferably, the aluminum alloy pendant includes the U-shaped coupler body of joint on the couple of aluminum alloy crossbeam link plate, surface welding has the T shape structure body before the U-shaped coupler body, the right flank fixed mounting of T shape structure body has the montant, and the front fixed surface of montant is equipped with vertical setting element, fixed surface is equipped with the stainless steel spring plate with the ceramic brick laminating before the U-shaped coupler body.
Preferably, the ceramic brick includes the brick body, the T shape hole has been seted up to the trailing flank of the brick body, and both ends run through the brick body about the T shape hole, it has T shape structure body to peg graft in the T shape hole, both ends all run through the through-hole about the left surface of the brick body, it has horizontal gag lever post to run through in the through-hole.
Preferably, a back lining aluminum veneer is fixedly installed between adjacent columns of the aluminum alloy section keel.
Preferably, the rubber strip is adhered to the contact position of the aluminum alloy beam hanging plate and the aluminum alloy hanging piece.
Compared with the prior art, the beneficial effects of the utility model are that: this scheme has designed a ceramic brick curtain of built-in aluminum alloy fossil fragments, and pottery brick and aluminum alloy crossbeam link plate are fixed respectively to T shape structure body and the U-shaped coupler body that this device passes through the aluminum alloy pendant for the pottery brick is installed on aluminum alloy crossbeam link plate, and the stability of reinforcing pottery brick installation utilizes the cooperation of vertical setting element and horizontal gag lever post simultaneously, is used for injecing the mounted position of pottery brick, ensures that the pottery brick erection space is unified.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention;
FIG. 3 is a schematic sectional view of the longitudinal section structure of the present invention;
fig. 4 is an enlarged schematic view of a in fig. 3 according to the present invention;
fig. 5 is the structural schematic diagram of the aluminum alloy hanging piece and the ceramic brick of the utility model.
In the figure: the aluminum alloy profile keel and aluminum alloy brick comprises an aluminum alloy profile keel 1, an aluminum alloy beam hanging plate 2, a backing aluminum veneer 3, an aluminum alloy hanging part 4, a U-shaped hook body 41, a T-shaped hook body 42, a vertical plate 43, a stainless steel spring piece 44, a ceramic brick 5, a brick body 51, a T-shaped hole 52, a through hole 53, a transverse limiting rod 6, a vertical positioning piece 7, a first limiting block 71, a second limiting block 72, a sawtooth shape 73 and a rubber strip 8.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5, the present invention provides a technical solution: the utility model provides a ceramic brick curtain wall of built-in aluminum alloy fossil fragments, including aluminum alloy ex-trusions fossil fragments 1, and aluminum alloy ex-trusions fossil fragments 1's stand passes through steel angle sign indicating number cooperation screw fixed mounting on building concrete structure, there is aluminum alloy crossbeam link plate 2 through stainless steel bolt fixed mounting on aluminum alloy ex-trusions fossil fragments 1's the stand, the joint has aluminum alloy hanger 4 on aluminum alloy crossbeam link plate 2's the couple, aluminum alloy hanger 4's front surface card is equipped with ceramic brick 5, fixed being equipped with vertical setting element 7 on the aluminum alloy hanger 4, and vertical setting element 7 pegs graft between adjacent ceramic brick 5's gap, it has horizontal gag lever post 6 to run through in the ceramic brick 5.
As shown in fig. 1, in this embodiment, the ceramic bricks 5 are assembled in two sizes, the size of the ceramic brick 5 in one size is 256 × 55 × 45mm, the size of the ceramic brick 5 in another size is 123 × 55 × 30mm, the ceramic brick 5 is fixed on the aluminum alloy beam hanging plate 2 through the aluminum alloy hanging piece 4, the curtain wall is made of a new mold, wherein the aluminum alloy section keel 1, the aluminum alloy hanging piece 4 and the aluminum alloy beam hanging plate 2 are aluminum material factory open molds and extrude aluminum wire materials, the ceramic brick 5 is formed by firing the ceramic brick factory 2 open bricks, and the rubber strip 8, the transverse limiting rod 6 and the vertical positioning piece 7 are processed by opening the molds of a rubber factory.
This device passes through T shape structure 42 and the U-shaped hook 41 of aluminum alloy pendant 4 and fixes ceramic brick 5 and aluminum alloy crossbeam link plate 2 respectively for ceramic brick 5 installs on aluminum alloy crossbeam link plate 2, strengthens the stability of ceramic brick 5 installation, utilizes the cooperation of vertical setting element 7 and horizontal gag lever post 6 simultaneously for inject ceramic brick 5's mounted position, ensure that ceramic brick 5 erection space is unified
The vertical positioning member 7 comprises a first limiting block 71 and a second limiting block 72 which are sequentially and fixedly assembled on the front surface of the aluminum alloy hanging member 4 from bottom to top, a V-shaped gap is reserved between the first limiting block 71 and the second limiting block 72, and the upper surface of the second limiting block 72 is in a sawtooth shape 73.
Two stoppers are pegged graft between two adjacent ceramic brick 5 gaps after the installation, guarantee that two ceramic bricks 5 laminate with first stopper 71 and second stopper 72 respectively to this unifies 5 erection space of ceramic brick, and the frictional force between zigzag 73's design increase stopper and the ceramic brick 5 improves ceramic brick 5 installation stability.
The aluminum alloy pendant 4 includes the U-shaped coupler body 41 of joint on the couple of aluminum alloy crossbeam link plate 2, and the front surface welding has T shape structure 42 before the U-shaped coupler body 41, and the right flank fixed mounting of T shape structure 42 has montant 43, and the fixed surface of the front side of montant 43 is equipped with vertical positioning element 7, and the fixed surface is equipped with the stainless steel spring piece 44 with the laminating of ceramic brick 5 before the U-shaped coupler body 41.
Through two coupler bodies, install convenient stable the installing between aluminum alloy crossbeam link plate 2 and ceramic brick 5 of aluminum alloy pendant 4, make it play the connection effect, stainless steel spring plate 4 makes special aluminum alloy pendant 4 and ceramic brick 5 have an elasticity to connect certainly, avoids direct collision between the two, and noise abatement produces.
Ceramic brick 5 includes the brick body 51, and T-shaped hole 52 has been seted up to the trailing flank of the brick body 51, and both ends run through the brick body 51 about T-shaped hole 52, and it has T-shaped structure 42 to peg graft in the T-shaped hole 52, and both ends all run through there is the through-hole 53 about the left surface of the brick body 51, and run through in the through-hole 53 has horizontal gag lever post 6.
The brick bodies 51 are provided with drying holes, the through holes 53 on all the brick bodies 51 in the same row are mutually communicated, and the inside of the brick bodies passes through the same transverse limiting rod 6, so as to limit the position of the brick bodies 51,
fixed mounting has back lining aluminium veneer 3 between aluminium alloy ex-trusions fossil fragments 1's the adjacent stand, aluminium alloy crossbeam link plate 2 pastes with aluminium alloy pendant 4 contact department has rubber strip 8, the thickness of back lining aluminium veneer 3 is 2mm for strengthen water-proof effects, make the rainwater can not get into the wall body inside, rubber strip 8 is for setting up between aluminium alloy pendant 4 and aluminium alloy crossbeam link plate 2, make aluminium alloy pendant 4 be difficult for deviating from, reduce the noise that aluminium alloy pendant 4 produced when being extruded simultaneously.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a ceramic brick curtain wall of built-in aluminum alloy fossil fragments which characterized in that: the aluminum alloy concrete building block comprises an aluminum alloy section keel (1), wherein a stand column of the aluminum alloy section keel (1) is fixedly installed on a building concrete structure through steel angle code matching screws, an aluminum alloy beam hanging plate (2) is fixedly installed on the stand column of the aluminum alloy section keel (1) through stainless steel bolts, an aluminum alloy hanging piece (4) is clamped on a hook of the aluminum alloy beam hanging plate (2), a ceramic brick (5) is clamped on the front surface of the aluminum alloy hanging piece (4), a vertical positioning piece (7) is fixedly installed on the aluminum alloy hanging piece (4), the vertical positioning piece (7) is inserted between gaps of adjacent ceramic bricks (5), and a transverse limiting rod (6) penetrates through the ceramic brick (5) in the same way;
vertical positioning piece (7) include from lower supreme fixed assembly in proper order in first stopper (71) and second stopper (72) of aluminum alloy pendant (4) front surface, and first stopper (71) and second stopper (72) leave the V-arrangement gap, the upper surface of second stopper (72) is zigzag (73).
2. The ceramic brick curtain wall with the built-in aluminum alloy keel as recited in claim 1, is characterized in that: aluminum alloy pendant (4) are including the U-shaped coupler body (41) of joint on the couple of aluminum alloy crossbeam link plate (2), surface welding has T shape structure (42) before U-shaped coupler body (41), the right flank fixed mounting of T shape structure (42) has montant (43), and the front fixed surface of montant (43) is equipped with vertical setting element (7), fixed surface is equipped with stainless steel spring leaf (44) with ceramic brick (5) laminating before U-shaped coupler body (41).
3. The ceramic brick curtain wall with the built-in aluminum alloy keel as recited in claim 1, is characterized in that: ceramic brick (5) are including the brick body (51), T shape hole (52) have been seted up to the trailing flank of the brick body (51), and both ends run through the brick body (51) about T shape hole (52), it has T shape structure body (42) to peg graft in T shape hole (52), through-hole (53) have all been run through at both ends about the left surface of the brick body (51), it has horizontal gag lever post (6) to run through in through-hole (53).
4. The ceramic brick curtain wall with the built-in aluminum alloy keel as recited in claim 1, is characterized in that: and a back lining aluminum veneer (3) is fixedly arranged between the adjacent upright columns of the aluminum alloy section keel (1).
5. The ceramic brick curtain wall with the built-in aluminum alloy keel as recited in claim 1, is characterized in that: and a rubber strip (8) is adhered to the contact position of the aluminum alloy beam hanging plate (2) and the aluminum alloy hanging piece (4).
CN201921903481.1U 2019-11-06 2019-11-06 Ceramic brick curtain wall with built-in aluminum alloy keels Active CN211312985U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921903481.1U CN211312985U (en) 2019-11-06 2019-11-06 Ceramic brick curtain wall with built-in aluminum alloy keels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921903481.1U CN211312985U (en) 2019-11-06 2019-11-06 Ceramic brick curtain wall with built-in aluminum alloy keels

Publications (1)

Publication Number Publication Date
CN211312985U true CN211312985U (en) 2020-08-21

Family

ID=72080294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921903481.1U Active CN211312985U (en) 2019-11-06 2019-11-06 Ceramic brick curtain wall with built-in aluminum alloy keels

Country Status (1)

Country Link
CN (1) CN211312985U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033075A (en) * 2021-10-28 2022-02-11 北京城建设计发展集团股份有限公司 Hollow ceramic brick curtain wall structure and construction process
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033075A (en) * 2021-10-28 2022-02-11 北京城建设计发展集团股份有限公司 Hollow ceramic brick curtain wall structure and construction process
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof
CN115370052B (en) * 2022-09-07 2023-09-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Similar Documents

Publication Publication Date Title
CN211312985U (en) Ceramic brick curtain wall with built-in aluminum alloy keels
CN205088823U (en) Hanging piece for stone curtain wall
CN207122081U (en) A kind of dried hanging hang structure and finishing systems
CN210685133U (en) Mounting member for assembled ladder suspended ceiling
CN215977908U (en) Integral light steel keel partition wall structure
CN111287356B (en) Glass curtain wall's sunken wall body system of decorating
CN111519857A (en) Special landscape wall stone-grain-imitating polished brick dry-hanging construction technology
CN210530044U (en) Quick-mounting wallboard, vertical keel and grouting wall for grouting wall
CN210562785U (en) Clip type bridge cut-off connecting piece
CN210316330U (en) Assembled is exterior wallboard keel structure for building
CN209891509U (en) Hanging rack for fixing stone curtain wall
CN113530071A (en) Assembled letter hangs furred ceiling mounting structure
CN216810767U (en) Fast-assembling single face attaches wall light steel skeleton system
CN219840318U (en) Luminous grid wall structure
CN210002970U (en) steel structure factory building convenient for lighting
CN202131694U (en) Steel section system of fire-proof glass curtain wall
CN211172862U (en) Embedded assembly body
CN217027663U (en) Big face hangs ceramic brick connection structure futilely
CN213509353U (en) Novel decorative board is hung futilely device and wall decorative structure
CN216949208U (en) Wall hanging plate system
CN218028666U (en) Connection pendant, outer wall face brick and connection structure of outer wall face brick
CN211396132U (en) Transverse keel and support piece of light steel keel partition wall
CN217949478U (en) Curtain wall mounting structure
CN214696263U (en) Novel sound insulation partition wall
CN220124437U (en) Assembled curtain box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant