High-precision guide rail of paver Download PDFInfo
- Publication number
- CN211285146U CN211285146U CN201921678609.9U CN201921678609U CN211285146U CN 211285146 U CN211285146 U CN 211285146U CN 201921678609 U CN201921678609 U CN 201921678609U CN 211285146 U CN211285146 U CN 211285146U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- anchor pad
- fixed plate
- pad fixed
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a paver high accuracy guide rail, including setting up anchor pad fixed plate I and anchor pad fixed plate II at the guide rail both ends, the top of anchor pad fixed plate I and anchor pad fixed plate II all is equipped with stretch-draw lead screw, anchor pad fixed plate I and II tops of anchor pad fixed plate all are equipped with the anchor screw with stretch-draw lead screw matched with, be equipped with the atress steel band between the stretch-draw lead screw at anchor pad fixed plate I and II tops of anchor pad fixed plate, guide rail upper portion bottom surface both ends are equipped with positioning bolt I that is used for compressing tightly location atress steel band both ends, guide rail lower part top surface central point puts and is equipped with positioning bolt II that is used for compressing tightly location atress steel band middle part, guide rail both ends bottom all is equipped with hydraulic jack. The utility model discloses simple structure, the cost is with low costs, circulated use and adjust the reduction error repeatedly, the effectual manpower and the material of having saved.
Description
Technical Field
The utility model belongs to the technical field of road construction appurtenance, concretely relates to paver high accuracy guide rail.
Background
The paver working method becomes an indispensable part in the municipal engineering and highway engineering construction process, and a sensor auxiliary tool in the wire walking method, a walking guide rail is one of essential tools essential for elevation control, the traditional sensor auxiliary tool mostly adopts an aluminum alloy guide rail, the equipment has low hardness, strong ductility, weak pressure resistance and changeability, can not be used once being deformed, the paving of asphalt and stabilized sand mostly adopts a plurality of large-scale pavers and dump trucks for combined operation, the mechanization degree is high, a paver elevation control probe takes the top surface of the guide rail as a datum line to control the paving thickness, the flatness and the gradient of the asphalt and the stabilized sand, and the elevation control of a sensor is determined by the guide rail; at present, a guide rail of a sensor auxiliary tool is mostly made of aluminum alloy, a level gauge is used for measuring, jacks or skid pads are placed at two ends of the guide rail and adjusted to a required height for fixing, generally, a guide rail with five meters is used, when a sensor probe of a paver walks on the guide rail during paving, the probe senses that the plane at the top end of the guide rail is an elevation, but the middle of a new guide rail is limited by the material of the aluminum alloy guide rail, so that the collapse degree of the new guide rail is larger and larger along with time, use times and environment, the paving quality and the flatness of stable sand and asphalt are directly influenced, quality accidents occur, and huge economic losses are caused; through on-the-spot measurement, when using traditional guide rail, because sensor probe through the guide rail intermediate position department of collapsing can cause paver elevation sensing system undulant, the aggregate that traditional guide rail both sides were paved forms local wave (about 4~8 mm), and the roughness receives influence elevation control and appears the deviation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art not enough, provide a strong, safe and reliable, the convenient operation of stability, easy nature is strong, economical and practical's paver high accuracy guide rail.
In order to achieve the above design purpose, the utility model adopts the following technical scheme: the utility model provides a paver high accuracy guide rail, is including setting up anchor pad fixed plate I and anchor pad fixed plate II at the guide rail both ends, the top of anchor pad fixed plate I and anchor pad fixed plate II all is equipped with stretch-draw lead screw, anchor pad fixed plate I and II tops of anchor pad fixed plate all are equipped with the anchor screw with stretch-draw lead screw matched with, be equipped with the atress steel band between the stretch-draw lead screw at anchor pad fixed plate I and II tops of anchor pad fixed plate, guide rail upper portion bottom surface both ends are equipped with positioning bolt I that is used for compressing tightly location atress steel band both ends, guide rail lower part top surface central point puts and is equipped with positioning bolt II that is used for compressing tightly location atress steel band middle part, guide rail both ends bottom all.
The width of the stressed steel belt is consistent with the width of the inner diameter of the guide rail.
And the tensioning screw rods at the tops of the anchor pad fixing plate I and the anchor pad fixing plate II are longitudinally and horizontally uniformly distributed.
The utility model discloses beneficial effect: after two ends of the stressed steel belt are fixedly connected with tensioning screw rods arranged at the tops of the anchor pad fixing plate I and the anchor pad fixing plate II, positioning bolts I used for pressing and positioning two ends of the stressed steel belt are arranged at two ends of the bottom surface of the upper part of the guide rail, and positioning bolts II used for pressing and positioning the middle part of the stressed steel belt are arranged at the center of the top surface of the lower part of the guide rail and are fixed in the guide rail to play a role of stretching; the top ends of the anchor pad fixing plate I and the anchor pad fixing plate II are respectively provided with an anchoring screw matched with the tension screw rod to be tightened, and the stressed steel belt fixed in the guide rail is in a tightened state; and the central position of the top surface of the lower part of the guide rail is provided with a positioning bolt II for compressing and positioning the middle part of the stressed steel belt, and when the stressed steel belt is stressed, an acting force which is upward on the guide rail is generated, so that the phenomenon that the guide rail collapses due to gravity is avoided, the width of the stressed steel belt is consistent with the width of the inner diameter of the guide rail and is connected with the tension lead screws which are longitudinally and horizontally uniformly distributed at the tops of the anchor pad fixing plate I and the anchor pad fixing plate II, and the possibility of horizontal bending of the high-precision prestressed guide rail. The utility model discloses simple structure, the cost is with low costs, circulated use and adjust the reduction error repeatedly, the effectual manpower and the material of having saved.
Drawings
FIG. 1 is a schematic view of a high-precision guide rail of the paver of the present invention;
fig. 2 is the utility model discloses a plurality of high accuracy prestressing force guide rail combination back sketch map.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings. As shown in fig. 1-2: the utility model provides a paver high accuracy guide rail, is including setting up anchor pad fixed plate I2 and anchor pad fixed plate II 3 at 1 both ends of guide rail, the top of anchor pad fixed plate I2 and anchor pad fixed plate II 3 all is equipped with stretch-draw lead screw 4, anchor pad fixed plate I2 and anchor pad fixed plate II 3 top all are equipped with stretch-draw lead screw 4 matched with anchor screw 5, be equipped with atress steel band 6 between the stretch-draw lead screw 4 at anchor pad fixed plate I2 and anchor pad fixed plate II 3 top, 1 upper portion bottom surface both ends of guide rail are equipped with positioning bolt I7 that is used for compressing tightly 6 both ends of location atress steel band, 1 lower part top surface central point of guide rail is equipped with positioning bolt II 8 that is used for compressing tightly location atress steel band 6 middle parts, 1 both ends bottom of guide rail all is equipped with hydraulic jack 9.
The width of the stressed steel belt 6 is consistent with the width of the inner diameter of the guide rail 1.
And the tensioning screw rods 4 at the tops of the anchor pad fixing plate I2 and the anchor pad fixing plate II 3 are longitudinally and horizontally uniformly distributed.
The utility model discloses during the use before, proofread earlier the stretch-draw lead screw 4 at the top of high accuracy prestressing force guide rail anchor pad fixed plate I2 and anchor pad fixed plate II 3 according to the temperature, make the atress steel band 6 between II 3 top stretch-draw lead screw 4 of guide rail anchor pad fixed plate I2 and anchor pad fixed plate reach the production demand, when paving, the paver probe moves on high accuracy prestressing force guide rail, the probe can keep advancing with the height of guide rail top surface.
Claims (3)
1. The utility model provides a paver high accuracy guide rail which characterized in that: including setting up anchor pad fixed plate I and anchor pad fixed plate II at the guide rail both ends, the top of anchor pad fixed plate I and anchor pad fixed plate II all is equipped with stretch-draw lead screw, anchor pad fixed plate I and II tops of anchor pad fixed plate all are equipped with the anchor screw with stretch-draw lead screw matched with, be equipped with the atress steel band between the stretch-draw lead screw at anchor pad fixed plate I and II tops of anchor pad fixed plate, guide rail upper portion bottom surface both ends are equipped with positioning bolt I that is used for compressing tightly location atress steel band both ends, guide rail lower part top surface central point puts and is equipped with positioning bolt II that is used for compressing tightly location atress steel band middle part, guide rail both ends bottom all is equipped with hydraulic.
2. The high-precision guide rail of the paver of claim 1, characterized in that: the width of the stressed steel belt is consistent with the width of the inner diameter of the guide rail.
3. The high-precision guide rail of the paver of claim 1, characterized in that: and the tensioning screw rods at the tops of the anchor pad fixing plate I and the anchor pad fixing plate II are longitudinally and horizontally uniformly distributed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921678609.9U CN211285146U (en) | 2019-10-09 | 2019-10-09 | High-precision guide rail of paver |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921678609.9U CN211285146U (en) | 2019-10-09 | 2019-10-09 | High-precision guide rail of paver |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211285146U true CN211285146U (en) | 2020-08-18 |
Family
ID=72035291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921678609.9U Active CN211285146U (en) | 2019-10-09 | 2019-10-09 | High-precision guide rail of paver |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211285146U (en) |
-
2019
- 2019-10-09 CN CN201921678609.9U patent/CN211285146U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104165807B (en) | Large-deflection destruction testing device and method for prestressed concrete plate beam | |
CN204101361U (en) | A kind of PCslab girder large deflection failure test device | |
CN204849607U (en) | A continuous beam string basket pre -compaction device for bridge construction | |
CN205636496U (en) | A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam | |
CN102677710B (en) | Reaction frame testing method for earth nail drawing tests | |
CN102914470B (en) | Device and method for testing concrete sample beam stiffness | |
CN211285146U (en) | High-precision guide rail of paver | |
CN203583380U (en) | Movable cast-in-situ culvert cover plate template support | |
CN202187257U (en) | Rail distance adjusting device for long steel rails of ballastless track of passenger dedicated line | |
CN103147402B (en) | For bracing or strutting arrangement and the height regulation method of continuous box girder bridge construction | |
CN113776511A (en) | Device for keeping engineering survey mark post vertical in real time | |
CN113373817A (en) | Precise adjusting construction method and device for wedge-shaped blocks of longitudinal and transverse slopes of precast beam | |
CN206986728U (en) | A kind of walking incremental launching construction by multipoint jacking workbench | |
CN205025068U (en) | Height mark adjustable super flat terrace mould | |
CN201794280U (en) | High-accuracy stone terrace laying support structure | |
CN204142243U (en) | Pre-embedded steel slab relative relief measures servicing unit | |
CN202099819U (en) | Treatment device of vertical static load test pile head | |
CN201209251Y (en) | High intensity smooth and round anchor rod | |
CN208140124U (en) | A kind of dedicated regulatable construction survey device of road and bridge | |
CN204780984U (en) | Tower crane basis rag bolt positioning die | |
CN113250465A (en) | A cross scale for pile foundation steel reinforcement cage center location | |
CN202440744U (en) | Steel wire rope adjusting device for elevation control of spreading machine | |
CN105841577B (en) | The method of accurate measurement prestressing force aqueduct circumferential direction or vertical prestressing bar amount of recovery | |
CN219220515U (en) | Rigid support protection device for pressure box resisting lateral pressure | |
CN211340325U (en) | But height-adjusting's horizontal marking pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |