CN211283410U - A hoisting protection device for assembly building - Google Patents

A hoisting protection device for assembly building Download PDF

Info

Publication number
CN211283410U
CN211283410U CN201921440010.1U CN201921440010U CN211283410U CN 211283410 U CN211283410 U CN 211283410U CN 201921440010 U CN201921440010 U CN 201921440010U CN 211283410 U CN211283410 U CN 211283410U
Authority
CN
China
Prior art keywords
flat plate
plate
welded
flat board
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921440010.1U
Other languages
Chinese (zh)
Inventor
高贯伟
张国泉
李慧颋
郭伟
程德强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201921440010.1U priority Critical patent/CN211283410U/en
Application granted granted Critical
Publication of CN211283410U publication Critical patent/CN211283410U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hoist and mount protection device for assembly building, including first flat board, sliding connection has closing device on the first flat board, the both sides on first flat board top all are equipped with the recess, and the bottom of recess installs first rubber pad, the all threaded connection in first flat board both sides has the threaded rod, and the top welding of threaded rod has the third flat board, the bottom welding of threaded rod has the fourth flat board, the top welding of first flat board has the triangle beam, and the last sliding connection of triangle beam has the jib, the bottom welding of jib has the fifth flat board, and the both sides welding on fifth flat board top has first slide bar. The utility model discloses not only can guarantee that the gliding phenomenon of lifting rope can not appear at the in-process that the work piece hoisted, effectively reduced the phenomenon that the work piece slided at hoist and mount in-process, can effectively protect the main lifting rope of being connected with the loop wheel machine moreover and be difficult for appearing crack or cracked phenomenon to protected hoisting machine structure's steadiness, the practicality is strong.

Description

一种装配建筑用吊装保护装置A hoisting protection device for assembly building

技术领域technical field

本实用新型涉及吊装保护装置技术领域,具体为一种装配建筑用吊装保护装置。The utility model relates to the technical field of hoisting protection devices, in particular to a hoisting protection device for assembly buildings.

背景技术Background technique

随着现代工业技术的发展,建造房屋可以像机器生产那样,成批成套地制造,只要把预制好的房屋构件,运到工地装配起来就成了,在房屋搭建的过程中往往使用大型的塔吊将房屋部件向上吊起,供工人安装,但是塔吊机下面多数只是连接两根钢丝绳或较粗的布绳,在吊起的过程中钢丝绳或布绳可能存在移位,断裂,最终造成可能造成所吊起的工件出现晃动碰到其他物件,造成工件不必要的损伤,另外吊绳在吊起工件的一刹那忽然受到向下的重力,长此以往吊绳难免出现裂痕,为此我们提出了一种装配建筑用吊装保护装置来解决上述问题。With the development of modern industrial technology, building houses can be manufactured in batches like machine production. As long as the prefabricated building components are transported to the construction site for assembly, large tower cranes are often used in the process of building houses. Lift the house parts upwards for workers to install, but most of the tower cranes are only connected with two steel wire ropes or thicker cloth ropes. The lifted workpiece shakes and touches other objects, causing unnecessary damage to the workpiece. In addition, the sling is suddenly subjected to downward gravity at the moment when the workpiece is hoisted. In the long run, cracks will inevitably appear on the sling. For this reason, we propose an assembly building. Use hoisting protection devices to solve the above problems.

实用新型内容Utility model content

本实用新型的目的在于提供一种装配建筑用吊装保护装置,以解决上述背景技术中提出的现有的吊装机构中钢丝绳或布绳可能存在移位,断裂,造成工件不必要的损伤,另外吊绳在吊起工件的一刹那忽然受到向下的重力,长此以往吊绳难免出现裂痕的问题。The purpose of this utility model is to provide a hoisting protection device for assembling and building, so as to solve the problem that the wire rope or cloth rope may be displaced and broken in the existing hoisting mechanism proposed in the above-mentioned background technology, causing unnecessary damage to the workpiece. The rope is suddenly subjected to downward gravity at the moment of lifting the workpiece, and the rope will inevitably crack in the long run.

为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:

一种装配建筑用吊装保护装置,包括第一平板,所述第一平板上滑动连接有压紧装置,所述第一平板顶端的两侧皆设有凹槽,且凹槽的底端安装有第一橡胶垫,所述第一平板的两侧皆螺纹连接有螺纹杆,且螺纹杆的顶端焊接有第三平板,所述螺纹杆的底端焊接有第四平板,所述第一平板的顶端焊接有三角梁,且三角梁的上滑动连接有吊杆,所述吊杆的底端焊接有第五平板,且第五平板顶端的两侧焊接有第一滑杆,所述第一滑杆的顶端焊接有第六平板。A hoisting protection device for assembling and building, comprising a first flat plate on which a pressing device is slidably connected, grooves are provided on both sides of the top of the first flat plate, and a bottom end of the groove is installed with The first rubber pad, both sides of the first flat plate are threadedly connected with threaded rods, and the top end of the threaded rod is welded with a third flat plate, and the bottom end of the threaded rod is welded with a fourth flat plate. The top end is welded with a triangular beam, and the upper part of the triangular beam is slidably connected with a suspension rod, the bottom end of the suspension rod is welded with a fifth flat plate, and the two sides of the top of the fifth flat plate are welded with first sliding rods, and the first sliding rod is welded. The top end of the rod is welded with a sixth plate.

优选的,所述第一平板正面和背面的两侧皆焊接有第二圆弧板,所述第二圆弧板设置有四个,四个所述第二圆弧板分别位于两个凹槽的正面和背面。Preferably, second arc plates are welded on both sides of the front and back of the first flat plate, and four second arc plates are provided, and the four second arc plates are respectively located in two grooves front and back.

优选的,所述压紧装置包括有第二平板、第二滑杆、压板和第二橡胶垫,所述第二平板底端的两侧皆焊接有第二滑杆,所述第二平板的底端的中心处焊接有压板,且压板的底端安装有第二橡胶垫,所述第二滑杆与第一平板滑动连接;第二滑杆与第四平板固定。Preferably, the pressing device includes a second flat plate, a second sliding bar, a pressing plate and a second rubber pad, and both sides of the bottom end of the second flat plate are welded with second sliding bars, and the bottom of the second flat plate is welded with a second sliding bar. A pressure plate is welded at the center of the end, and a second rubber pad is installed at the bottom end of the pressure plate. The second sliding rod is slidably connected with the first flat plate; the second sliding rod is fixed with the fourth flat plate.

优选的,所述螺纹杆和第三平板皆设置有三组,所述螺纹杆和第三平板皆等距安装于第一平板上。Preferably, there are three sets of the threaded rod and the third flat plate, and the threaded rod and the third flat plate are installed on the first flat plate at equal distances.

优选的,所述吊杆上套接有弹簧,且弹簧设置有四个,其中两个所述弹簧的顶端和底端分别与第六平板和三角梁相抵,另外两个所述弹簧的顶端和底端分别与三角梁和第五平板相抵。Preferably, the suspension rod is sleeved with springs, and four springs are provided, wherein the top and bottom ends of two of the springs are in contact with the sixth flat plate and the triangular beam respectively, and the top and bottom ends of the other two springs are The bottom ends are respectively abutted against the triangular beam and the fifth flat plate.

优选的,所述吊杆上开设有穿绳孔,所述吊杆的两侧皆焊接有第一圆弧板,所述第一圆弧板位于穿绳孔的顶端。Preferably, the hanger rod is provided with a rope threading hole, both sides of the hanger rod are welded with a first circular arc plate, and the first circular arc plate is located at the top of the rope threading hole.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

本实用新型设置有螺纹杆、第三平板、压紧装置、第四平板、凹槽和第一橡胶垫,通过转动第三平板带动螺纹杆转动,使得螺纹杆下降后螺纹杆底端能够抵紧第四平板下降,继而带动第二滑杆相对于第一平板下降,进而使得压板和第二橡胶垫能够压紧安装于第二橡胶垫和第一橡胶垫之间的吊绳,在工件吊起的过程中不会出现吊绳滑动的现象,有效减少了了工件在吊装过程中下滑的现象;另外设置有第五平板、第一滑杆、第六平板、弹簧、穿绳孔和第一圆弧板,与吊机连接的主吊绳系在穿绳孔内,当主吊绳受到向下的重力时,在四个弹簧的作用下,能够起到一定缓冲分解力的作用,有效保护与吊机连接的主吊绳不易出现裂痕或断裂的现象,从而保护了吊装机构的稳固性,实用性强。The utility model is provided with a threaded rod, a third flat plate, a pressing device, a fourth flat plate, a groove and a first rubber pad, and the threaded rod is rotated by rotating the third flat plate, so that the bottom end of the threaded rod can be pressed tightly after the threaded rod is lowered. The fourth plate descends, which in turn drives the second sliding rod to descend relative to the first plate, so that the pressing plate and the second rubber pad can press the suspending rope installed between the second rubber pad and the first rubber pad, and the workpiece is hoisted. There will be no hanging rope sliding phenomenon during the lifting process, which effectively reduces the phenomenon that the workpiece slides down during the hoisting process; in addition, there are a fifth flat plate, a first sliding rod, a sixth flat plate, a spring, a rope hole and a first circle. The arc plate, the main hanging rope connected with the crane is tied in the rope hole, when the main hanging rope is subjected to downward gravity, under the action of the four springs, it can play a certain role in buffering the decomposition force, effectively protecting and hoisting. The main hoisting rope connected by the machine is not easy to crack or break, thus protecting the stability of the hoisting mechanism and having strong practicability.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are just some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.

图1为本实用新型的结构正视剖面示意图;Fig. 1 is the structural front sectional schematic diagram of the present utility model;

图2为本实用新型的结构正视示意图;Fig. 2 is the structural front view schematic diagram of the utility model;

图3为本实用新型的压紧装置结构正视示意图;3 is a schematic front view of the structure of the pressing device of the present invention;

图4为本实用新型中的第一平板和第一圆弧板的结构侧视示意图;4 is a schematic side view of the structure of the first flat plate and the first arc plate in the utility model;

图5为本实用新型中的吊杆、穿绳孔和第一圆弧板的结构正视示意图。FIG. 5 is a schematic front view of the structure of the hanger rod, the rope hole and the first arc plate in the utility model.

图中:1、第一平板;2、压紧装置;201、第二平板;202、第二滑杆;203、压板;204、第二橡胶垫;3、凹槽;4、第一橡胶垫;5、螺纹杆;6、第三平板; 7、第四平板;8、三角梁;9、吊杆;10、第五平板;11、第一滑杆;12、第六平板;13、弹簧;14、穿绳孔;15、第一圆弧板;16、第二圆弧板。In the figure: 1, the first plate; 2, the pressing device; 201, the second plate; 202, the second slide bar; 203, the pressure plate; 204, the second rubber pad; 3, the groove; 4, the first rubber pad ;5, threaded rod; 6, third plate; 7, fourth plate; 8, triangular beam; 9, boom; 10, fifth plate; 11, first sliding rod; 12, sixth plate; 13, spring ; 14, rope hole; 15, the first arc plate; 16, the second arc plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-5,本实用新型提供的一种实施例:Please refer to Figures 1-5, an embodiment provided by the present utility model:

一种装配建筑用吊装保护装置,包括第一平板1,第一平板1上滑动连接有压紧装置2,压紧装置2包括有第二平板201、第二滑杆202、压板203和第二橡胶垫204,第二平板201底端的两侧皆焊接有第二滑杆202,第二滑杆202底部与第四平板7固定,第二平板201的底端的中心处焊接有压板203,且压板 203的底端安装有第二橡胶垫204,第二滑杆202与第一平板1滑动连接,第一平板1顶端的两侧皆设有凹槽3,且凹槽3的底端安装有第一橡胶垫4,第一平板1的两侧皆螺纹连接有螺纹杆5,且螺纹杆5的顶端焊接有第三平板6,螺纹杆5的底端焊接有第四平板7,螺纹杆5和第三平板6皆设置有三组,螺纹杆5 和第三平板6皆等距安装于第一平板1上,动第三平板6带动螺纹杆5转动,使得螺纹杆5下降后螺纹杆5底端能够抵紧第四平板7下降,继而带动第二滑杆202下降,进而使得压板203和第二橡胶垫204能够压紧安装于第二橡胶垫 204和第一橡胶垫4之间的吊绳,在工件吊起的过程中不会出现吊绳滑动的现象,有效减少了了工件在吊装过程中下滑的现象;A hoisting protection device for assembling buildings, comprising a first flat plate 1, a pressing device 2 is slidably connected to the first flat plate 1, and the pressing device 2 includes a second flat plate 201, a second sliding rod 202, a pressing plate 203 and a second flat plate 201. The rubber pad 204, the second sliding rod 202 is welded on both sides of the bottom end of the second flat plate 201, the bottom of the second sliding rod 202 is fixed with the fourth flat plate 7, the center of the bottom end of the second flat plate 201 is welded with a pressing plate 203, and the pressing plate A second rubber pad 204 is installed at the bottom end of the 203, the second sliding rod 202 is slidably connected with the first plate 1, grooves 3 are provided on both sides of the top of the first plate 1, and the bottom end of the groove 3 is installed with a first plate 1. A rubber pad 4, both sides of the first flat plate 1 are threadedly connected with threaded rods 5, and the top end of the threaded rod 5 is welded with a third flat plate 6, and the bottom end of the threaded rod 5 is welded with a fourth flat plate 7. The threaded rod 5 and The third flat plate 6 is provided with three groups. The threaded rod 5 and the third flat plate 6 are installed on the first flat plate 1 at equal distances. Moving the third flat plate 6 drives the threaded rod 5 to rotate, so that the bottom end of the threaded rod 5 is lowered after the threaded rod 5 is lowered. It can press down against the fourth flat plate 7, and then drive the second sliding rod 202 to descend, so that the pressing plate 203 and the second rubber pad 204 can press the hanging rope installed between the second rubber pad 204 and the first rubber pad 4, In the process of hoisting the workpiece, there will be no hanging rope sliding phenomenon, which effectively reduces the phenomenon of the workpiece sliding during the hoisting process;

第一平板1的顶端焊接有三角梁8,且三角梁8上滑动连接有吊杆9,吊杆 9上套接有弹簧13,且弹簧13设置有四个,其中两个弹簧13的顶端和底端分别与第六平板12和三角梁8相抵,另外两个弹簧13的顶端和底端分别与三角梁8和第五平板10相抵,吊杆9上开设有穿绳孔14,吊杆9的两侧皆焊接有第一圆弧板15,第一圆弧板15位于穿绳孔14的顶端,第一圆弧板15能够增大主吊绳的受力面积,吊杆9的底端焊接有第五平板10,且第五平板10顶端的两侧焊接有第一滑杆11,第一滑杆11的顶端焊接有第六平板12,可以将与吊机连接的主吊绳系在穿绳孔14内,当主吊绳受到向下的重力时,在四个弹簧13的作用下,能够起到一定缓冲分解力的作用,有效保护与吊机连接的主吊绳不易出现裂痕或断裂的现象,从而保护了吊装机构的稳固性,实用性强;A triangular beam 8 is welded on the top of the first plate 1, and a suspension rod 9 is slidably connected to the triangular beam 8, and a spring 13 is sleeved on the suspension rod 9, and four springs 13 are provided. The bottom end is in contact with the sixth flat plate 12 and the triangular beam 8 respectively, and the top and bottom ends of the other two springs 13 are in contact with the triangular beam 8 and the fifth flat plate 10 respectively. Both sides are welded with a first arc plate 15, the first arc plate 15 is located at the top of the rope hole 14, the first arc plate 15 can increase the stress area of the main suspension rope, the bottom end of the suspension rod 9 A fifth plate 10 is welded, and a first slide bar 11 is welded on both sides of the top of the fifth plate 10, and a sixth plate 12 is welded on the top of the first slide bar 11, which can tie the main hoisting rope connected to the hoist to the hoist. In the rope-piercing hole 14, when the main hanging rope is subjected to downward gravity, under the action of the four springs 13, it can play a certain role of buffering the decomposition force, effectively protecting the main hanging rope connected to the crane from cracks or breaks. phenomenon, thus protecting the stability of the hoisting mechanism and having strong practicability;

作为优选,第一平板1正面和背面的两侧皆焊接有第二圆弧板16,第二圆弧板16设置有四个,四个第二圆弧板16分别位于两个凹槽3的正面和背面,第二圆弧板16能够增大主吊绳的受力面积。Preferably, second arc plates 16 are welded on both sides of the front and the back of the first flat plate 1 , four second arc plates 16 are provided, and the four second arc plates 16 are respectively located in the two grooves 3 . On the front and back, the second circular arc plate 16 can increase the force bearing area of the main hanging rope.

工作原理:使用时,将与吊机连接的主吊绳固定于穿绳孔14上,当主吊绳受到向下的重力时,第一圆弧板15能够增大主吊绳的受力面积,在四个弹簧13 的作用下,位于下方的弹簧13压缩,能够起到一定缓冲分解力的作用,有效保护与吊机连接的主吊绳不易出现裂痕或断裂的现象,从而保护了吊装机构的稳固性,另外将与工件连接的附吊绳的一端穿过第二橡胶垫204和第一橡胶垫4 之间,转动第三平板6带动螺纹杆5转动,使得螺纹杆5下降后螺纹杆5底端能够抵紧第四平板7下降,继而带动第二滑杆202下降,进而使得压板203和第二橡胶垫204能够压紧安装于第二橡胶垫204和第一橡胶垫4之间的附吊绳,用于吊工件连接的附吊绳上可固定连接一些挂钩或其他用于吊装的专用工具,第二圆弧板16能够增大附吊绳的受力面积,吊工件用的附吊绳被牢牢压紧于凹槽3内部,在工件吊起的过程中不会出现吊绳滑动的现象,有效减少了了工件在吊装过程中下滑的现象,以上为本发明的全部工作原理。Working principle: When in use, the main hanging rope connected to the crane is fixed on the rope hole 14. When the main hanging rope is subjected to downward gravity, the first arc plate 15 can increase the stress area of the main hanging rope. Under the action of the four springs 13, the lower spring 13 is compressed, which can play a certain role in buffering the decomposition force, effectively protecting the main sling connected to the hoist from cracks or breaks, thereby protecting the hoisting mechanism. In addition, pass one end of the suspending rope connected to the workpiece between the second rubber pad 204 and the first rubber pad 4, and rotate the third flat plate 6 to drive the threaded rod 5 to rotate, so that the threaded rod 5 is lowered after the threaded rod 5 is lowered. The bottom end can press down against the fourth flat plate 7 , and then drive the second sliding rod 202 to descend, so that the pressing plate 203 and the second rubber pad 204 can press the attachment installed between the second rubber pad 204 and the first rubber pad 4 . Suspension rope, some hooks or other special tools for hoisting can be fixedly connected to the attached suspending rope for hanging the workpiece. The second arc plate 16 can increase the stress area of the attached suspending rope. The attached suspending rope for hanging the workpiece Being firmly pressed inside the groove 3, the hanging rope will not slide during the lifting process of the workpiece, which effectively reduces the sliding phenomenon of the workpiece during the lifting process. The above is the entire working principle of the present invention.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention may be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments are to be considered in all respects as exemplary and not restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is therefore intended that the All changes that come within the meaning and range of the claimed equivalents are encompassed within the invention. Any reference signs in the claims shall not be construed as limiting the involved claim.

Claims (6)

1.一种装配建筑用吊装保护装置,包括第一平板(1),其特征在于:所述第一平板(1)上滑动连接有压紧装置(2),所述第一平板(1)顶端的两侧皆设有凹槽(3),且凹槽(3)的底端安装有第一橡胶垫(4),所述第一平板(1)的两侧皆螺纹连接有螺纹杆(5),且螺纹杆(5)的顶端焊接有第三平板(6),所述螺纹杆(5)的底端焊接有第四平板(7),所述第一平板(1)的顶端焊接有三角梁(8),且三角梁(8)的上滑动连接有吊杆(9),所述吊杆(9)的底端焊接有第五平板(10),且第五平板(10)顶端的两侧焊接有第一滑杆(11),所述第一滑杆(11)的顶端焊接有第六平板(12)。1. A hoisting protection device for assembling buildings, comprising a first flat plate (1), characterized in that: a pressing device (2) is slidably connected to the first flat plate (1), and the first flat plate (1) Both sides of the top end are provided with grooves (3), and a first rubber pad (4) is installed at the bottom end of the groove (3), and both sides of the first flat plate (1) are threadedly connected with threaded rods ( 5), and the top end of the threaded rod (5) is welded with a third flat plate (6), the bottom end of the threaded rod (5) is welded with a fourth flat plate (7), and the top of the first flat plate (1) is welded with There is a triangular beam (8), and a suspension rod (9) is slidably connected to the upper part of the triangular beam (8), the bottom end of the suspension rod (9) is welded with a fifth flat plate (10), and the fifth flat plate (10) A first sliding rod (11) is welded on both sides of the top end, and a sixth flat plate (12) is welded on the top end of the first sliding rod (11). 2.根据权利要求1所述的一种装配建筑用吊装保护装置,其特征在于:所述第一平板(1)正面和背面的两侧皆焊接有第二圆弧板(16),所述第二圆弧板(16)设置有四个,四个所述第二圆弧板(16)分别位于两个凹槽(3)的正面和背面。2. A hoisting protection device for assembly building according to claim 1, characterized in that: both sides of the front and back of the first flat plate (1) are welded with second arc plates (16), and the Four second circular arc plates (16) are provided, and the four second circular arc plates (16) are respectively located on the front and back of the two grooves (3). 3.根据权利要求1所述的一种装配建筑用吊装保护装置,其特征在于:所述压紧装置(2)包括有第二平板(201)、第二滑杆(202)、压板(203)和第二橡胶垫(204),所述第二平板(201)底端的两侧皆焊接有第二滑杆(202),所述第二平板(201)的底端的中心处焊接有压板(203),且压板(203)的底端安装有第二橡胶垫(204),所述第二滑杆(202)与第一平板(1)滑动连接;第二滑杆(202)与第四平板(7)固定。3. A hoisting protection device for assembly building according to claim 1, characterized in that: the pressing device (2) comprises a second flat plate (201), a second sliding rod (202), a pressing plate (203) ) and a second rubber pad (204), both sides of the bottom end of the second flat plate (201) are welded with a second sliding rod (202), and a pressure plate (202) is welded at the center of the bottom end of the second flat plate (201). 203), and a second rubber pad (204) is installed at the bottom end of the pressing plate (203), the second sliding rod (202) is slidably connected with the first flat plate (1); the second sliding rod (202) is connected with the fourth The plate (7) is fixed. 4.根据权利要求1所述的一种装配建筑用吊装保护装置,其特征在于:所述螺纹杆(5)和第三平板(6)皆设置有三组,所述螺纹杆(5)和第三平板(6)皆等距安装于第一平板(1)上。4. A hoisting protection device for assembly building according to claim 1, characterized in that: the threaded rod (5) and the third flat plate (6) are both provided with three groups, and the threaded rod (5) and the third flat plate (6) are provided with three groups. The three flat plates (6) are installed on the first flat plate (1) at equal distances. 5.根据权利要求1所述的一种装配建筑用吊装保护装置,其特征在于:所述吊杆(9)上套接有弹簧(13),且弹簧(13)设置有四个,其中两个所述弹簧(13)的顶端和底端分别与第六平板(12)和三角梁(8)相抵,另外两个所述弹簧(13)的顶端和底端分别与三角梁(8)和第五平板(10)相抵。5. A hoisting protection device for assembling buildings according to claim 1, characterized in that: the suspension rod (9) is sleeved with springs (13), and four springs (13) are provided, of which two The top and bottom ends of each of the springs (13) are in contact with the sixth flat plate (12) and the triangular beam (8), respectively, and the top and bottom ends of the other two springs (13) are in contact with the triangular beams (8) and the triangular beams (8), respectively. The fifth plate (10) is offset. 6.根据权利要求1所述的一种装配建筑用吊装保护装置,其特征在于:所述吊杆(9)上开设有穿绳孔(14),所述吊杆(9)的两侧皆焊接有第一圆弧板(15),所述第一圆弧板(15)位于穿绳孔(14)的顶端。6. A hoisting protection device for assembly construction according to claim 1, characterized in that: the hanging rod (9) is provided with a rope hole (14), and both sides of the hanging rod (9) are A first arc plate (15) is welded, and the first arc plate (15) is located at the top end of the rope threading hole (14).
CN201921440010.1U 2019-09-02 2019-09-02 A hoisting protection device for assembly building Active CN211283410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921440010.1U CN211283410U (en) 2019-09-02 2019-09-02 A hoisting protection device for assembly building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921440010.1U CN211283410U (en) 2019-09-02 2019-09-02 A hoisting protection device for assembly building

Publications (1)

Publication Number Publication Date
CN211283410U true CN211283410U (en) 2020-08-18

Family

ID=72033046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921440010.1U Active CN211283410U (en) 2019-09-02 2019-09-02 A hoisting protection device for assembly building

Country Status (1)

Country Link
CN (1) CN211283410U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110356957A (en) * 2019-09-02 2019-10-22 中建八局第二建设有限公司 A hoisting protection device for assembly building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110356957A (en) * 2019-09-02 2019-10-22 中建八局第二建设有限公司 A hoisting protection device for assembly building
CN110356957B (en) * 2019-09-02 2024-09-10 中建八局第二建设有限公司 A hoisting protection device for assembly building

Similar Documents

Publication Publication Date Title
CN216662272U (en) Bridge crane for material transfer
WO2022111218A1 (en) Pile casing hoisting arm
CN102491204A (en) Auxiliary jib lifting device of crawler crane and crane comprising auxiliary jib lifting device
CN203833540U (en) Movable heavy object hoisting device
CN210620052U (en) Assembled building hoisting accessory
CN203820283U (en) Lifting frame
CN110356957B (en) A hoisting protection device for assembly building
CN204752012U (en) Wall -hanging miniature hoist
CN204689351U (en) A kind of H profile steel structural elements suspender
CN204958320U (en) A construction heavy lifting machine
CN204040598U (en) The two rocker pole of a kind of remote control hydraulic
CN209127874U (en) A kind of concurrent lifting device
CN203769285U (en) Anti-dropping device for attached-type lifting scaffold
CN202063655U (en) Anti-tilting safe device of tower type crane
CN201686393U (en) Grill pole lifting tooling
CN202089683U (en) Three-leg hoisting device
CN204727473U (en) A kind of crane hanger antiswing device
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN110805260A (en) An anti-collision hanging basket for building exterior wall construction
CN205709601U (en) A kind of building tower crane
CN205590168U (en) Overturning lifting device
CN205990181U (en) A kind of light-duty shockproof suspension hook
CN205151618U (en) Safe type hoisting mechanism and hoist
CN205076671U (en) Clamp is transported to aluminium ingot
CN205740111U (en) A kind of electric pole gold utensil stringer used for operation maintenance of ascending a height

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant