CN211275769U - Building drainage plastic pipe dredger - Google Patents

Building drainage plastic pipe dredger Download PDF

Info

Publication number
CN211275769U
CN211275769U CN201921732439.8U CN201921732439U CN211275769U CN 211275769 U CN211275769 U CN 211275769U CN 201921732439 U CN201921732439 U CN 201921732439U CN 211275769 U CN211275769 U CN 211275769U
Authority
CN
China
Prior art keywords
supporting rod
reel
drainage
winding drum
plastic pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921732439.8U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Shuguang Weiye Construction Co Ltd
Original Assignee
Xiamen Shuguang Weiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Shuguang Weiye Construction Co Ltd filed Critical Xiamen Shuguang Weiye Construction Co Ltd
Priority to CN201921732439.8U priority Critical patent/CN211275769U/en
Application granted granted Critical
Publication of CN211275769U publication Critical patent/CN211275769U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model relates to a pipe dredge is moulded in building drainage discloses one kind can be in the operation of low department, moulds the pipe middle part through the counter weight ball to the drainage and dredges, clears up peripheral position through the brush, dredges more comprehensive dredge. The operation personnel need not to climb to the eminence and can clear up, and is safe laborsaving. The one end of its characterized in that branch is fixed to be arranged in on the handle, and on the one end of reel was arranged in branch, and was close to the one end of branch, changes the fixed other end of arranging the reel in, and is close to the outside of reel, the reel is rotatable, the reel is an I shape section of thick bamboo, and the one end of mount and the other end of branch are connected perpendicularly, and two gyro wheels are arranged in respectively on the both ends of mount, the gyro wheel is rotatable, and the one end winding of stay cord is arranged in on the reel, the other end of stay cord upwards extends along branch earlier, bypasses the gyro wheel downwardly extending at mount both ends again, and a plurality of stop collar overlaps and arranges in on the stay cord, and is located the top of reel, the stop collar.

Description

Building drainage plastic pipe dredger
Technical Field
The utility model relates to a pipe dredge is moulded in building drainage relates to a dredge of moulding the pipe and carrying out the mediation to building drainage, belongs to the architectural equipment field. In particular to a dredger which can be operated at a low position, dredges the middle part of a drainage plastic pipe through a counterweight ball, cleans the peripheral position through a hairbrush and dredges more comprehensively.
Background
At present, the drain pipe mainly used is led to the mediation of rainwater, when the drain pipe in bungalow carries out the drainage, because the roof is piled up there is fallen leaves, foreign matter such as dust, along with the erodeing entering drain pipe of rainwater, form the jam to the drain pipe easily, therefore need regularly clean, because bungalow floor height 2.5-4m, drain pipe length is shorter, and be vertical pipeline, when cleaning, adopt stick structure pounding mediation usually, bulldoze out the drain pipe with foreign matter such as inside accumulational leaf, above-mentioned mediation mode needs to stand and carries out the operation in the high-order, and the length of stick hardly satisfies the length of drain pipe, the jam appears easily in the mediation, and the stick pounding central point position mediation easily appears, the shutoff is piled up still in the peripheral position, the mediation is incomplete.
Publication No. CN207739343U discloses a drainage pipeline cleaning device, which comprises a cleaning device body, wherein a rotary rod is rotatably installed at the bottom of the cleaning device body, connecting rod grooves are formed in two sides of the rotary rod, a connecting rod is slidably installed in the connecting rod grooves, one end of the connecting rod extends out of the connecting rod grooves, a cleaning head is fixedly installed at one end, located outside the connecting rod grooves, of the connecting rod, a through hole for a sliding rod is formed in the inner wall of the top side of the connecting rod groove, a sliding rod is slidably installed in the through hole for the sliding rod, two ends of the sliding rod extend out of the through hole for the sliding rod, a fixing groove located in the connecting rod groove is formed in the top of the connecting rod, the bottom end of the sliding rod is slidably connected with the fixing groove, a positioning rod groove is formed in the inner wall, located on one side, away from the cleaning head, of the through the sliding rod, when the drainage pipeline, in the clearance process, the operation personnel need make a round trip to pull the device body, nevertheless because device body and clearance head self gravity reason lead to the operation personnel amount of labour great, comparatively hard.
No. CN207597576U discloses a water supply and drainage pipeline cleaning device, including booster pump, delivery port, outlet pipe, high-pressure squirt, telescopic link, motor, pivot, bearing, clearance carousel, bracing piece and clearance brush, delivery port one end is connected with the outlet pipe, outlet pipe one end is connected with high-pressure squirt, the telescopic link is installed to high-pressure squirt bottom, high-pressure squirt internally mounted has the motor, the pivot is installed on the motor top, the pivot top is provided with the bearing, the clearance carousel is installed in the bearing outside, and the clearance carousel inboard passes through the bracing piece with the bearing to be connected, the clearance brush is installed in the clearance carousel outside, but the drainage device volume is great, inconvenient carrying.
Disclosure of Invention
In order to improve the condition, the utility model relates to a pipe dredge is moulded in building drainage provides one kind and can be in the operation of low department, moulds the pipe middle part through the counter weight ball to the drainage and dredges, clears up peripheral position through the brush, dredges more comprehensive dredge. The operation personnel need not to climb to the eminence and can clear up, and is safe laborsaving.
The utility model relates to a pipe dredge is moulded in building drainage is realized like this: the utility model relates to a building drainage plastic pipe dredger, which comprises a roller, a fixing frame, a limiting sleeve, a hanging buckle, a supporting rod, a winding drum, a rotating handle, a counterweight ball, a brush, a fixing sleeve, a connecting rod, a pull rope and a guide sleeve, wherein one end of the supporting rod is fixedly arranged on the handle, one end of the winding drum is arranged on the supporting rod and is close to one end of the supporting rod, the rotating handle is fixedly arranged on the other end of the winding drum and is close to the outer side of the winding drum, the winding drum can rotate, the winding drum is an I-shaped drum, one end of the fixing frame is vertically connected with the other end of the supporting rod, two rollers are respectively arranged on two ends of the fixing frame, the rollers can rotate, one end of the pull rope is wound on the winding drum, the other end of the pull rope extends upwards along the supporting rod firstly and then downwards around the rollers at two ends of the fixing frame, the balance weight ball is arranged at the other end of the pull rope, the fixed sleeve is sleeved on the pull rope and is close to the other end of the pull rope, the fixed sleeve is positioned above the balance weight ball, a plurality of groups of hairbrushes are arranged on the fixed sleeve, one group of hairbrushes consists of a plurality of circumferentially distributed bristles, the guide sleeve is sleeved on the pull rope and is positioned above the fixed sleeve, the connecting rod on the uppermost limiting sleeve penetrates through the supporting rod and is connected with the guide sleeve, one end of the hanging buckle is fixedly arranged on the supporting rod, the other end of the hanging buckle is of a U-shaped plate structure, the U-shaped opening is downward, the hanging buckle is positioned below the fixed frame, and the grip is provided with anti-skid patterns;
further, an arc-shaped ejecting block is additionally arranged on the supporting rod and is connected with the supporting rod through a spring, and the arc-shaped concave surface of the arc-shaped ejecting block faces the drainage plastic pipe;
further, the supporting rod is replaced by a telescopic rod.
Has the beneficial effects.
Firstly, the counter weight ball clears up the drain pipe middle part, and the brush clears up drain pipe peripheral position, and the mediation is more comprehensive.
And secondly, the operator can clean the workpiece without climbing to a high place, and the cleaning is safe and labor-saving.
Thirdly, the use is convenient and the operation is simple.
Fourthly, the structure is simple and the carrying is convenient.
Drawings
Fig. 1 the utility model relates to a three-dimensional structure diagram of a building drainage plastic pipe dredger.
Fig. 2 the utility model relates to a structure sketch of a pipe dredge is moulded in building drainage.
Fig. 3 the utility model relates to a structure sketch map when building drainage is moulded a tub dredge use.
Fig. 4 is a three-dimensional structure diagram of a plastic pipe dredger for building drainage, which is provided with a supporting rod in embodiment 2.
In the attached drawings
Wherein the method comprises the following steps: the device comprises a roller 1, a fixing frame 2, a limiting sleeve 3, a hanging buckle 4, a support rod 5, a winding drum 6, a rotating handle 7, a handle 8, a counterweight ball 9, a hairbrush 10, a fixing sleeve 11, a connecting rod 12, a pull rope 13, a drain pipe 14, an arc-shaped top block 15, a spring 16 and a guide sleeve 17.
The specific implementation mode is as follows:
example 1:
the utility model relates to a building drainage plastic pipe dredger, which comprises a roller 1, a fixed frame 2, a limit sleeve 3, a hanging buckle 4, a support rod 5, a winding drum 6, a rotating handle 7, a handle 8, a counterweight ball 9, a brush 10, a fixed sleeve 11, a connecting rod 12, a pull rope 13 and a guide sleeve 17, wherein one end of the support rod 5 is fixedly arranged on the handle 8, one end of the winding drum 6 is arranged on the support rod 5 and is close to one end of the support rod 5, the rotating handle 7 is fixedly arranged on the other end of the winding drum 6 and is close to the outer side of the winding drum 6, the winding drum 6 can be rotated, the winding drum 6 is an I-shaped drum, one end of the fixed frame 2 is vertically connected with the other end of the support rod 5, two rollers 1 are respectively arranged on two ends of the fixed frame 2, the roller 1 can be rotated, one end of the pull rope 13 is wound on the winding drum 6, the other end of the pull rope 13 firstly extends upwards along, on stay cord 13 was arranged in to a plurality of 3 covers of stop collar, and was located the top of reel 6, stop collar 3 passed through connecting rod 12 and 5 fixed connection of branch, on the other end of stay cord 13 was arranged in to counter weight ball 9, fixed cover 11 cover was arranged in on stay cord 13, and was close to the other end of stay cord 13, fixed cover 11 is located the top of counter weight ball 9, fixed cover 11 overhead has multiunit brush 10, and is a set of brush 10 comprises a plurality of brush hairs that circumference distributes, and 17 covers of uide bushing are arranged in on stay cord 13, and are located the top of fixed cover 11, the top connecting rod 12 on the stop collar 3 is worn out branch 5 and uide bushing 17 and is connected, hangs the one end of detaining 4 and fixes arranging branch 5 in, the other end of detaining 4 is U type plate-shaped structure, and U type opening is downward, it is located the below of mount 2 to hang detaining 4, the grip 8 overhead has.
When the plastic drainage pipe is used and needs to be dredged, an operator firstly holds the handle 8 on the ground to control the supporting rod 5, so that the counterweight ball 9 and the brush 10 fall into the plastic drainage pipe through the pull rope 13, then hangs the hanging buckle 4 on the supporting rod 5 on the pipe wall at the top end of the drainage pipe 14, installs and fixes the dredger and the plastic drainage pipe, then holds the handle 8 on the ground, rotates the rotating handle 7 to loosen the pull rope 13, so that the counterweight ball 9 moves downwards in the plastic drainage pipe under the action of self gravity, cleans foreign matters in the middle of the plastic drainage pipe, moves downwards the counterweight ball 9 to pull the other end of the pull rope 13 to move downwards, moves downwards the brush 10 under the action of the other end of the pull rope 13, extrudes the brush 10 and the inner wall of the plastic drainage pipe due to the fact that the diameter of the brush 10 is larger than the pipe diameter of the plastic drainage pipe, and rubs and cleans the peripheral inner wall of, the counterweight ball 9 moves down to the bottom end of the drain pipe 14, the pull rope 13 is lifted by the rotating handle 7 which rotates reversely by personnel, the rotating handle 7 rotates back and forth by personnel, the pull rope 13 is made to stretch, the counterweight ball 9 is made to ascend and descend in the plastic drain pipe until the cleaning in the pipe is finished, and the personnel can withdraw the counterweight ball 9 and the brush 10 from the plastic drain pipe.
Example 2:
the difference between this example and example 1 is: an arc-shaped ejecting block 15 is additionally arranged on the supporting rod 5, the arc-shaped ejecting block 15 is connected with the supporting rod 5 through a spring 16, and the arc-shaped concave surface of the arc-shaped ejecting block 15 faces the drainage plastic pipe; when the drainage plastic pipe is used, the arc concave surface of the arc ejecting block 15 is attached to the drainage plastic pipe, so that the supporting rod 5 is abutted to the drainage plastic pipe conveniently.
Example 3:
the difference between this example and example 1 is: the supporting rod 5 is replaced by a telescopic rod; when in use, the drainage pipe 14 can adapt to different heights;
the roller 1 is designed to assist the pull rope 13 to loosen and contract;
the diameter of the brush 10 is larger than that of the counterweight ball 9, so that the brush 10 can clean the periphery of the plastic drainage pipe conveniently;
the other end of the hanging buckle 4 is of a U-shaped plate structure, and the U-shaped opening is designed downwards, so that the hanging buckle can be conveniently hung on the wall of the drain pipe 14;
the grip 8 is provided with anti-skid lines, so that the friction force between the hand of a person and the grip 8 is increased, and the grip 8 is convenient to control better;
reach and to operate in the low department, mould tub middle part through counter weight ball 9 and dredge to the drainage, clear up peripheral position through brush 10, dredge more comprehensive purpose.
The above embodiments are the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention. Any person skilled in the art can make some modifications without departing from the scope of the invention, i.e. all equivalent modifications made according to the invention are intended to be covered by the scope of the invention.
It should also be noted that, unless otherwise specifically stated or limited, the terms "disposed on," "mounted on," "connected to" and "connected to" are to be construed broadly and may include, for example, a fixed connection such as a crimped connection, a riveted connection, a pinned connection, an adhesive connection, a welded connection, a removable connection such as a threaded connection, a snap connection, a hinged connection, an integral connection, an electrical connection, a direct connection, an indirect connection through an intermediate medium, and a communication between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.

Claims (5)

1. The utility model provides a pipe dredge is moulded in building drainage which characterized by: the winding device is composed of rolling wheels, a fixing frame, a limiting sleeve, a hanging buckle, a supporting rod, a winding drum, a rotating handle, a counterweight ball, a brush, a fixing sleeve, a connecting rod, a pull rope and a guide sleeve, wherein one end of the supporting rod is fixedly arranged on the handle, one end of the winding drum is arranged on the supporting rod and is close to one end of the supporting rod, the rotating handle is fixedly arranged on the other end of the winding drum and is close to the outer side of the winding drum, the winding drum is an I-shaped drum, one end of the fixing frame is vertically connected with the other end of the supporting rod, the two rolling wheels are respectively arranged on two ends of the fixing frame, one end of the pull rope is wound on the winding drum, the other end of the pull rope extends upwards along the supporting rod firstly and then extends downwards by bypassing the rolling wheels at two ends of the fixing frame, the plurality of limiting sleeve sleeves are arranged on the, and be close to the other end of stay cord, fixed cover is located the top of counter weight ball, fixed sheathe in has put the multiunit brush, and the uide bushing is arranged in on the stay cord, and is located the top of fixed cover, the top connecting rod on the stop collar is worn out branch and uide bushing and is connected, hangs the one end of detaining and fixes on arranging branch in, the other end of hanging the knot is U type plate column structure, and U type opening is down, it is located the below of mount to hang the knot.
2. The building drainage plastic pipe dredger according to claim 1, characterized in that the supporting rod is additionally provided with an arc-shaped ejecting block, the arc-shaped ejecting block is connected with the supporting rod through a spring, and an arc-shaped concave surface of the arc-shaped ejecting block faces towards the drainage plastic pipe.
3. The plastic pipe dredger for building drainage of claim 1, wherein the supporting rod is replaced by a telescopic rod.
4. The plastic pipe dredger for building drainage of claim 1, wherein the set of brushes comprises a plurality of bristles distributed circumferentially.
5. The plastic pipe dredger for building drainage as claimed in claim 1, wherein the grip is provided with anti-slip lines.
CN201921732439.8U 2019-10-16 2019-10-16 Building drainage plastic pipe dredger Active CN211275769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921732439.8U CN211275769U (en) 2019-10-16 2019-10-16 Building drainage plastic pipe dredger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921732439.8U CN211275769U (en) 2019-10-16 2019-10-16 Building drainage plastic pipe dredger

Publications (1)

Publication Number Publication Date
CN211275769U true CN211275769U (en) 2020-08-18

Family

ID=72035308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921732439.8U Active CN211275769U (en) 2019-10-16 2019-10-16 Building drainage plastic pipe dredger

Country Status (1)

Country Link
CN (1) CN211275769U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114798613A (en) * 2021-01-22 2022-07-29 山西潞安煤基清洁能源有限责任公司 Stifled pipeline dredging equipment congeals

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114798613A (en) * 2021-01-22 2022-07-29 山西潞安煤基清洁能源有限责任公司 Stifled pipeline dredging equipment congeals

Similar Documents

Publication Publication Date Title
CN210446885U (en) Automatic cleaning machine for high-rise outer wall glass
CN202104868U (en) Glass curtain wall cleaning system
CN211275769U (en) Building drainage plastic pipe dredger
CN111636708A (en) Crawler-type obstacle-crossing high-rise outer wall cleaning machine
CN111236669B (en) Super high-rise concrete column maintenance layer spraying system
CN205296762U (en) But continuity of operation's emulsion paint brush
CN211558305U (en) Energy-saving municipal garden afforestation watering device
KR100987063B1 (en) Automatic collection apparatus for water supply hose used agriculture
CN112427225A (en) Equipment is applied paint with a brush to trees lime wash for urban afforestation
CN208594905U (en) Oil pipe paraffin removal device and well testing device
CN104878959B (en) A kind of car carwash
CN209003845U (en) External wall of high-rise building air pressure blow wash machine
CN211701248U (en) Foreign matter clearing device for cable between electric power iron tower
CN109441071A (en) A kind of automatic control wall brushing platform
CN212249307U (en) Crawler-type obstacle-crossing high-rise outer wall cleaning machine
CN205100520U (en) Outer wall paint spraying apparatus
CN211877320U (en) Waterproof supervision acceptance device of building
CN111276903A (en) Foreign matter clearing device for cable between electric power iron tower
CN109092583B (en) Lifting type fruit tree branch whitewashing equipment
CN210445121U (en) Auxiliary support of fungus stick for fungus production
CN2547274Y (en) Automatic washing machine capable of washing multi-kinds of plane wall
CN215619140U (en) Electric piping fluting device is used in building electromechanical installation
CN201194780Y (en) Automatic outer wall cleaner for high-rise
CN214515473U (en) Waxing device for tire
CN111059502A (en) Lifting type high-pole street lamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant