CN211259851U - Connecting tool in PP pipeline - Google Patents

Connecting tool in PP pipeline Download PDF

Info

Publication number
CN211259851U
CN211259851U CN201921827082.1U CN201921827082U CN211259851U CN 211259851 U CN211259851 U CN 211259851U CN 201921827082 U CN201921827082 U CN 201921827082U CN 211259851 U CN211259851 U CN 211259851U
Authority
CN
China
Prior art keywords
fixed cover
pipeline
lock cylinder
chain
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921827082.1U
Other languages
Chinese (zh)
Inventor
魏卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Rongde Management Co Ltd
Original Assignee
Zhejiang Rongde Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Rongde Management Co Ltd filed Critical Zhejiang Rongde Management Co Ltd
Priority to CN201921827082.1U priority Critical patent/CN211259851U/en
Application granted granted Critical
Publication of CN211259851U publication Critical patent/CN211259851U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a connecting tool in a PP pipeline, which comprises a first fixing sleeve, wherein the front of the first fixing sleeve is fixedly connected with a fixing sleeve chain, the front of the fixing sleeve chain is respectively fixedly connected with a fixing buckle and a chain frame, the front of the chain frame is welded with a lock cylinder sleeve, a lock cylinder is embedded in the center position of one end of the lock cylinder sleeve, the back of the first fixing sleeve is fixedly connected with a mounting seat, one side of the mounting seat is welded with a fixing clamp, one side of the fixing clamp is penetrated with a clamping opening, the fixing clamp is movably connected with a screw rod through the clamping opening, and the screw rod is fixedly connected with a second fixing sleeve through the mounting seat, the operation and installation of workers are convenient.

Description

Connecting tool in PP pipeline
Technical Field
The utility model relates to a connect frock technical field, specifically be a connect frock in PP pipeline.
Background
The pipeline is a device for conveying gas, liquid or fluid with solid particles, which is formed by connecting pipes, pipe connectors, valves and the like, generally, the fluid flows from a high-pressure part to a low-pressure part of the pipeline after being pressurized by a blower, a compressor, a pump, a boiler and the like, and can also be conveyed by utilizing the pressure or gravity of the fluid, the pipeline has wide application range, and is mainly used for water supply, drainage, heat supply, gas supply, long-distance petroleum and natural gas conveying, agricultural irrigation, water conservancy engineering and various industrial devices.
The connecting tool in the existing PP pipeline is inconvenient to install and connect when the pipeline is connected, when a large pipeline needs to be connected, the pipeline can be moved only by lifting the pipeline through a crane, the pipeline is connected, and the pipeline is also inconvenient to control and connect by workers who use the crane in time, so that the working efficiency of the workers is low.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
An object of the utility model is to provide a connect frock in PP pipeline to propose the erection joint frock of being not convenient for when the connecting tube in solving above-mentioned background art, when connecting large-scale pipeline, also be not convenient for the staff when using the loop wheel machine to remove the pipeline and carry out control connection to the pipeline, lead to the problem that staff work efficiency is low.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a connect frock in PP pipeline, includes first fixed cover, the fixed cover chain of the fixed cover fixedly connected with in front of first fixed cover, fixed knot and the chain frame of fixedly connected with are fixed respectively in the front of fixed cover chain, the front welding of chain frame has the lock cylinder cover, the one end centre position embedding of lock cylinder cover has the lock cylinder, the back fixedly connected with mount pad of first fixed cover.
The welding of one side of mount pad has the fixation clamp, the one side of fixation clamp runs through there is the clamp mouth, the fixation clamp has the screw rod through pressing from both sides mouthful swing joint, the screw rod passes through the fixed cover of mount pad fixedly connected with second.
Furthermore, the outer surfaces of the screw rod and the lock cylinder are both embedded with threads, and the lock cylinder is embedded into one end of the lock cylinder sleeve.
Furthermore, the inner diameter of the clamping opening is matched with the outer diameter of the screw rod, and the screw rod is movably connected with the clamping opening.
Furthermore, the front surfaces of the first fixing sleeve and the second fixing sleeve are provided with fixing sleeve lock chains, the first fixing sleeve and the second fixing sleeve are the same in size, and the fixing sleeve lock chains are fixedly connected with the first fixing sleeve.
Furthermore, the mounting seat is composed of a fixing clamp and a clamping opening which are arranged on the front face of the mounting seat, and the clamping opening penetrates through one side of the fixing clamp.
Furthermore, fixed cover lock chain includes the positive fixed knot of fixed cover lock chain, lock chain frame and the positive lock cylinder cover of lock chain frame and the lock cylinder that links to each other with the lock cylinder cover, lock cylinder and lock cylinder cover swing joint.
(III) advantageous effects
Compared with the prior art, the beneficial effects of the utility model are that:
(1) this kind of connect frock in PP pipeline, first fixed cover through setting up, the fixed cover of second and screw rod, when connecting the large-scale pipeline, the staff installs the one end of pipeline to first fixed cover, on fixing the fixed cover of second to the pipeline that needs removed, then fix the screw rod to the fixation clamp of mount pad, then cup joint the electric drill on the screw rod, the screw rod will rotate when the electric drill moves, the screw rod will move forward, make the fixed cover of first fixed cover and second drive the pipeline and remove, the interval that makes two pipelines reduces, dock, so be convenient for the staff when connecting the large-scale pipeline carries out control connection to the pipeline, thereby staff's work efficiency has been improved.
(2) This kind of connect frock in PP pipeline, through fixed cover chain, chain frame and the lock post that sets up, when erection joint frock, the staff installs the pipeline to first fixed cover and the fixed cover of second on, then fixes in the lock post cover on the chain frame with the lock post, and the lock post is wrench movement to the reuse instrument, and the lock post will drive fixed cover chain inward movement to lock the pipeline, the staff's operation installation of being convenient for more of such mounting means.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of a partial structure of the first fixing sleeve of the present invention;
fig. 3 is a schematic view of a local structure of the mounting base of the present invention.
In the figure: 1. a first fixing sleeve; 101. a mounting seat; 102. a fixing clip; 103. clamping the opening; 2. fixing a sleeve and locking a chain; 3. a fixing buckle; 4. a chain frame; 5. a lock cylinder sleeve; 6. a lock cylinder; 7. a screw; 8. a second fixing sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a connect frock in PP pipeline, includes first fixed cover 1, the fixed cover chain 2 of the positive fixedly connected with of first fixed cover 1, fixed cover chain 2's front respectively fixedly connected with is detained 3 and chain frame 4, the welding of the front of chain frame 4 has lock cylinder cover 5, the positive position embedding of one end of lock cylinder cover 5 has lock cylinder 6, the back fixedly connected with mount pad 101 of first fixed cover 1.
One side welding of mount pad 101 has fixation clamp 102, and the one side of fixation clamp 102 runs through there is a clamp mouth 103, and fixation clamp 102 has screw rod 7 through pressing from both sides mouthful 103 swing joint, and screw rod 7 passes through mount pad 101 fixedly connected with second fixed cover 8.
In this embodiment, it is concrete, the screw 7 all is embedded into with the screw thread with the surface of lock post 6, and lock post 6 is embedded into in the one end of lock post cover 5, and when the installation was connected the frock, the staff installed the pipeline to first fixed cover 1 and the fixed cover 8 of second on, then fixed the lock post cover 5 on the lock chain frame 4 with lock post 6 in, reuse instrument wrench movement lock post 6, lock post 6 will drive fixed cover lock chain 2 and inwards move to lock the pipeline.
In this embodiment, it is concrete, the internal diameter of pressing from both sides mouthful 103 and the external diameter looks adaptation of screw rod 7, screw rod 7 and the swing joint that presss from both sides mouthful 103, when connecting the large-scale pipeline, the staff installs the one end of pipeline to first fixed cover 1, on fixing the pipeline that needs to remove to the fixed cover 8 of second, then fix screw rod 7 to the fixation clamp 102 of mount pad 101 on, then cup joint the electric drill on screw rod 7, screw rod 7 will rotate when the electric drill moves, screw rod 7 will move forward, make the fixed cover 8 of first fixed cover 1 and second drive the pipeline and remove, the interval that makes two pipelines reduces, carry out the butt joint.
In this embodiment, it is concrete, first fixed cover 1 and the front of the fixed cover 8 of second all are provided with fixed cover chain 2, first fixed cover 1 is the same with the fixed cover 8 size of second, fixed cover chain 2 and the fixed cover 1 fixed connection of first, the staff installs the one end of pipeline to first fixed cover 1, fix the fixed cover 8 of second on the pipeline that needs to remove again, then fix in the lock cylinder cover 5 on lock chain frame 4 with lock cylinder 6, reuse instrument wrench movement lock cylinder 6 to fix the connection frock.
In this embodiment, it is concrete, mount pad 101 comprises mount pad 101 positive fixation clamp 102 and double-layered mouth 103, it runs through in one side of fixation clamp 102 to press from both sides mouth 103, the staff installs the one end of pipeline to first fixed cover 1, on fixing the pipeline that needs the removal to the fixed cover 8 of second, then fix screw rod 7 to the fixation clamp 102 of mount pad 101 on, then cup joint the electric drill on screw rod 7, screw rod 7 will rotate when the electric drill moves, screw rod 7 will move forward, make the fixed cover of first fixed cover 1 and the fixed 8 drive pipeline of second can be better remove.
In this embodiment, it is specific, fixed cover chain 2 is including the positive fixed knot 3 of fixed cover chain 2, the positive lock cylinder cover 5 of chain frame 4 and the lock cylinder 6 that links to each other with lock cylinder cover 5, lock cylinder 6 and 5 swing joint of lock cylinder cover, when the erection joint frock, the staff installs first fixed cover 1 and the fixed cover 8 of second on the pipeline, then fix in lock cylinder cover 5 on chain frame 4 with lock cylinder 6, reuse instrument wrench movement lock cylinder 6, lock cylinder 6 will drive fixed cover chain 2 inward movement, thereby lock the pipeline, such mounting means is convenient for the staff to operate more.
The utility model discloses a theory of operation and use flow: after the utility model is installed, firstly, the installation, fixation and safety protection of the utility model are checked, when a large-scale pipeline is connected, a worker installs the first fixing sleeve 1 at one end of the pipeline, then fixes the second fixing sleeve 8 on the pipeline to be moved, then fixes the lock post 6 in the lock post sleeve 5 on the lock post frame 4, then twists the lock post 6 by using a tool, the lock post 6 can drive the fixing sleeve lock chain 2 to move inwards, thereby locking the pipeline, fixes the screw 7 on the fixing clamp 102 of the installation seat 101 again, then sleeves the electric drill on the screw 7, the screw 7 can rotate when the electric drill operates, the screw 7 can move forwards, the first fixing sleeve 1 and the second fixing sleeve 8 can drive the pipeline to move, the distance between the two pipelines is reduced, the butt joint is carried out, after the butt joint is finished, the worker twists out the lock post 6, the first fixing sleeve 1 and the second fixing sleeve 8 can directly loosen the pipeline, just so accomplish right the utility model discloses a use, the utility model discloses simple structure, convenience safe in utilization.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a connect frock in PP pipeline, includes first fixed cover (1), its characterized in that: the front of the first fixed sleeve (1) is fixedly connected with a fixed sleeve chain (2), the front of the fixed sleeve chain (2) is respectively and fixedly connected with a fixed buckle (3) and a chain frame (4), the front of the chain frame (4) is welded with a lock cylinder sleeve (5), a lock cylinder (6) is embedded in the center of one end of the lock cylinder sleeve (5), and the back of the first fixed sleeve (1) is fixedly connected with an installation seat (101);
one side welding of mount pad (101) has fixation clamp (102), one side of fixation clamp (102) is run through and is had a clamp mouth (103), fixation clamp (102) have screw rod (7) through pressing from both sides mouthful (103) swing joint, screw rod (7) are through the fixed cover (8) of mount pad (101) fixedly connected with second.
2. The connecting tool in the PP pipeline, according to claim 1, wherein: the outer surfaces of the screw rod (7) and the lock cylinder (6) are embedded with threads, and the lock cylinder (6) is embedded into one end of the lock cylinder sleeve (5).
3. The connecting tool in the PP pipeline, according to claim 1, wherein: the inner diameter of the clamping opening (103) is matched with the outer diameter of the screw rod (7), and the screw rod (7) is movably connected with the clamping opening (103).
4. The connecting tool in the PP pipeline, according to claim 1, wherein: the front of first fixed cover (1) and the fixed cover of second (8) all is provided with fixed cover chain (2), first fixed cover (1) is the same with the fixed cover of second (8) size, fixed cover chain (2) and first fixed cover (1) fixed connection.
5. The connecting tool in the PP pipeline, according to claim 1, wherein: the mounting seat (101) is composed of a fixing clamp (102) and a clamping opening (103) on the front face of the mounting seat (101), and the clamping opening (103) penetrates through one side of the fixing clamp (102).
6. The connecting tool in the PP pipeline, according to claim 1, wherein: fixed cover chain (2) are including fixed knot (3) that fixed cover chain (2) are positive, lock chain frame (4) and the positive lock cylinder cover (5) of lock chain frame (4) and lock cylinder (6) that link to each other with lock cylinder cover (5), lock cylinder (6) and lock cylinder cover (5) swing joint.
CN201921827082.1U 2019-10-29 2019-10-29 Connecting tool in PP pipeline Active CN211259851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921827082.1U CN211259851U (en) 2019-10-29 2019-10-29 Connecting tool in PP pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921827082.1U CN211259851U (en) 2019-10-29 2019-10-29 Connecting tool in PP pipeline

Publications (1)

Publication Number Publication Date
CN211259851U true CN211259851U (en) 2020-08-14

Family

ID=71959430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921827082.1U Active CN211259851U (en) 2019-10-29 2019-10-29 Connecting tool in PP pipeline

Country Status (1)

Country Link
CN (1) CN211259851U (en)

Similar Documents

Publication Publication Date Title
CN210920557U (en) Valve inlet pipeline junction leaks shutoff sealing fixture
CN202834568U (en) Quick pressurized plugging device for pipeline
CN2752582Y (en) Pipeline non-stop conveying pressured leakage-stopping clamp
CN202176874U (en) Sealing head type leak stopping body for rush-repair of pipeline and pipeline rush-repair clamp
CN211259851U (en) Connecting tool in PP pipeline
CN210731533U (en) Rapid aligning device for large-diameter pipeline installation
CN203343689U (en) Special clamp and welding system applied to pipeline assembly welding
CN209587405U (en) For the small-bore high pressure fast joint structure of steel pipe and pipeline
CN216867811U (en) Connecting piece for repairing pipe
CN202065607U (en) Magnetic force combined type pipeline leaking stopper under pressure
CN102297315A (en) Under-pressure fluid-guiding sealing device for emergency repair of pipe
CN212044399U (en) Quick mounting structure for sewer line connection
CN210830869U (en) Connecting sleeve for steel grade sleeve
CN207873536U (en) Pipeline enternal pipe mouth butt-jointing
CN104625553A (en) Tool for adjusting alignment tolerance of welding junction assembly
CN211074755U (en) Pipe butt joint frock
CN205638291U (en) Clamp mechanism of directional rig of level
CN213088044U (en) Hydraulic support combined multi-way block
CN101832425B (en) Installation method of underwater tee joint of seabed pipeline
CN213332905U (en) Pipeline linking and fastening structure for hydropower construction
CN213871137U (en) Novel casting valve for marine petroleum pipeline and connecting piece thereof
CN210364930U (en) Pipeline transportation fixing device for hydraulic engineering
CN219484628U (en) Reinforcing bar meter welding cooling protection device
CN203517063U (en) Movable joint anti-loosening device
CN205551906U (en) Plumbing pipe welding device that is geared to needs of job

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant