CN207873536U - Pipeline enternal pipe mouth butt-jointing - Google Patents

Pipeline enternal pipe mouth butt-jointing Download PDF

Info

Publication number
CN207873536U
CN207873536U CN201721829915.9U CN201721829915U CN207873536U CN 207873536 U CN207873536 U CN 207873536U CN 201721829915 U CN201721829915 U CN 201721829915U CN 207873536 U CN207873536 U CN 207873536U
Authority
CN
China
Prior art keywords
trim ring
flap trim
flap
time
briquetting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721829915.9U
Other languages
Chinese (zh)
Inventor
陈争
徐振华
华建宝
唐云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai electric power construction and repair Co., Ltd.
Original Assignee
SHANGHAI POWER CONSTRUCTION AND REPAIR AND SPARE PARTS PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI POWER CONSTRUCTION AND REPAIR AND SPARE PARTS PLANT filed Critical SHANGHAI POWER CONSTRUCTION AND REPAIR AND SPARE PARTS PLANT
Priority to CN201721829915.9U priority Critical patent/CN207873536U/en
Application granted granted Critical
Publication of CN207873536U publication Critical patent/CN207873536U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of pipeline enternal pipe mouth butt-jointings comprising:Lock ring frame, it is connected with locking device, it includes flap trim ring on first, flap trim ring, the first connecting cleat, the first briquetting, first time flap trim ring, second time flap trim ring, first axle, the first axis pin, the second briquetting, the second connecting cleat, link block, fixed mounting, second hinge, the second axis pin on second, flap trim ring is connected by multiple first connecting cleats with flap trim ring on second on first, flap trim ring is connected by multiple first briquettings with flap trim ring on first on second, and the first connecting cleat is located at first briquetting side etc..The utility model can improve counterpart quality, increase fastness, facilitate adjusting, easy to operate, easy to use.

Description

Pipeline enternal pipe mouth butt-jointing
Technical field
The utility model is related to a kind of line-up clamps, more particularly to a kind of pipeline enternal pipe mouth butt-jointing.
Background technology
Currently, as national economy technology is fast-developing, the Route Selection of the defeated natural gas line of length is increasingly limited System brings unprecedented challenge to difficulty of construction, how to ensure under the construction environment of confined area and harshness pipe string, The quality of welding is a problem to be solved.Pipeline enternal pipe mouth butt-jointing is applied in pipe-line construction, including cable tubing group to, Extensive use in mouth, even head, the installation of yard process pipe is touched, but various operating mode external opening aligner uses propose different technologies It is required that therefore, the function of external clamp must satisfy actual demands of engineering.For a long time in long-distance transport pipes construction, usually adopt With the endless-ringlock external clamp with jack, it is made of ring type rigidity part and the jack concatenated therewith, operation principle It is to generate power by jack, to make upper and lower two rigidity twisted rotary shafts be inwardly compressed, by the multiple crossbeams being arranged on two rings Nozzle outer surface is squeezed, to correct nozzle distortion, completes pipe string operation.Since this external clamp must be made of two rings Crossbeam on ideal circle is acting on outside nozzle simultaneously, can be only achieved applying working condition purpose, therefore have the following problems:One, it grasps Make dumb, is unable to line up any part and is adjusted;Two, two rings are yielding when used for a long time, influence a group line up quality; Therefore, in the construction process, it is often necessary to carry out strength group to correcting misalignment using drift and sledgehammer, can be only achieved nozzle pair Quality requirement.And use this line-up clamp often time-consuming, laborious, not requiring nothing more than plumber has certain experience, and cannot meet Different caliber pipe groups are to requiring;Especially construct in mountain area area, yard and large diameter pipeline, site operation labor intensity is big, Efficiency is low, group line up quality is difficult to ensure.
Invention content
The technical problem to be solved by the utility model is to provide a kind of pipeline enternal pipe mouth butt-jointings, can improve counterpart matter Amount increases fastness, facilitates adjusting, easy to operate, easy to use.
The utility model is to solve above-mentioned technical problem by following technical proposals:A kind of pipeline enternal pipe mouth butt-jointing, Including:
Lock ring frame, is connected with locking device comprising flap trim ring on first, flap trim ring, the first connection clip on second Plate, the first briquetting, first time flap trim ring, second time flap trim ring, first axle, the first axis pin, the second briquetting, the second connection Clamping plate, link block, fixed mounting, second hinge, the second axis pin, on first flap trim ring by multiple first connecting cleats with Flap trim ring is connected on second, and flap trim ring is connected by multiple first briquettings with flap trim ring on first on second, and first connects Fishplate is located at the first briquetting side, and flap trim ring on first, one end of flap trim ring is all connected with fixed mounting on second, The flap trim ring other end is connected by the second axis pin with second hinge on first, and second hinge is connected with second time flap trim ring, Second time flap trim ring is connected by multiple second briquettings with first time flap trim ring, and first time flap trim ring passes through multiple second Connecting cleat is connected with second time flap trim ring, and the second connecting cleat is located at the second briquetting side, first time flap trim ring and One hinge is connected, and first axle is connected by the first axis pin with flap trim ring on second, first time flap trim ring, second time flap Trim ring is all connected with link block, and link block is located at fixed mounting side;
Locking device comprising pedestal, oil cylinder, oil return valve, piston, limit valve, oil connection, check valve, tapered bar, distant Bar, oil cylinder are mounted on the base, and oil cylinder is connected with oil return valve, and oil return valve is connected with piston, and piston is connected with limit valve, and oil cylinder is logical It crosses oil connection with check valve to be connected, check valve is located at oil return valve side, and check valve is connected by tapered bar with distant bar.
Preferably, the first flap trim ring, the second flap trim ring one end be designed with a circular hole.
Preferably, first briquetting, be designed with a groove on the second briquetting.
Preferably, the fixed mounting is equipped with multiple apertures.
Preferably, hole there are one being set on the tapered bar.
The positive effect of the utility model is:The utility model can improve counterpart quality, increase fastness, Facilitate adjusting, it is easy to operate, it is easy to use.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model lock ring frame.
Fig. 3 is the structural schematic diagram of the utility model locking device.
Specific implementation mode
The utility model preferred embodiment is provided below in conjunction with the accompanying drawings, the technical solution of the utility model is described in detail.
As shown in Figure 1 to Figure 3, the utility model pipeline enternal pipe mouth butt-jointing includes:
Lock ring frame 1 is connected with locking device 2 comprising flap trim ring 12, first on flap trim ring 11, second on first Connecting cleat 13, the first briquetting 14, first time flap trim ring 15, second time flap trim ring 16, first axle 17, the first axis pin 18, the second briquetting 19, the second connecting cleat 110, link block 111, fixed mounting 112, second hinge 113, the second axis pin 114, flap trim ring 11 is connected by multiple first connecting cleats 13 with flap trim ring 12 on second on first, flap pressure on second Circle 12 is connected by multiple first briquettings 14 with flap trim ring 11 on first, and the first connecting cleat 13 is located at the first briquetting 14 1 Side, one end of flap trim ring 12 is all connected with fixed mounting 112 on flap trim ring 11, second on first, flap pressure on first 11 other ends to be enclosed by the second axis pin 114 to be connected with second hinge 113, second hinge 113 is connected with second time flap trim ring 16, Second time flap trim ring 16 is connected by multiple second briquettings 19 with first time flap trim ring 15, and first time flap trim ring 15 passes through Multiple second connecting cleats 110 are connected with second time flap trim ring 16, and the second connecting cleat 110 is located at 19 side of the second briquetting, First time flap trim ring 15 is connected with first axle 17, and first axle 17 passes through the first axis pin 18 and 12 phase of flap trim ring on second Even, first time flap trim ring 15, second time flap trim ring 16 are all connected with link block 111, and link block 111 is located at fixed mounting 112 sides;
Locking device 2 comprising pedestal 21, oil cylinder 22, oil return valve 23, piston 24, limit valve 25, oil connection 26, list To valve 27, tapered bar 28, distant bar 29, oil cylinder 22 is mounted on pedestal 21, and oil cylinder 22 is connected with oil return valve 23, oil return valve 23 and piston 24 are connected, and piston 24 is connected with limit valve 25, and oil cylinder 22 is connected by oil connection 26 with check valve 27, and check valve 27 is located at back 23 side of fuel tap, check valve 27 are connected by tapered bar 28 with distant bar 29.
The first flap trim ring 11, the second flap trim ring 12 one end be designed with a circular hole so that it is convenient to connect.
It is designed with a groove on first briquetting 14, the second briquetting 19, can be improved in this way and the quality of pipeline butt.
The fixed mounting 112 is equipped with multiple apertures so that it is convenient to install.
It is set on the tapered bar 28 there are one hole so that it is convenient to the installation of distant bar 29.
The operation principle of the utility model is as follows:The utility model is adjusted lock ring frame by locking device, in this way It is simple in structure and easy to operate;Lock ring frame is by flap trim ring, the first connecting cleat, the first pressure on flap trim ring on first, second Block, first time flap trim ring, second time flap trim ring, first axle, the first axis pin, the second briquetting, the second connecting cleat, connection Block, fixed mounting, second hinge, the second axis pin form, and flap trim ring passes through multiple first connecting cleats, Duo Ge on first One briquetting is connected with flap trim ring on second, first time flap trim ring by multiple second briquettings, multiple second connecting cleats with Second time flap trim ring is connected, and can increase the fastness of structure in this way, to prevent deforming;In first time flap trim ring, second One end of lower flap trim ring facilitates installation first axle, second hinge, and first axle passes through flap on the first axis pin and second Trim ring is connected, and second hinge is connected by the second axis pin with flap trim ring on first, can improve flexibility in this way, to conveniently make With;On first flap trim ring, flap trim ring is all connected with fixed mounting on second, fixed mounting is filled for installation locking It sets, first time flap trim ring, second time flap trim ring are all connected with link block, can increase contact area in this way, to improve behaviour Make speed;Locking device is made of pedestal, oil cylinder, oil return valve, piston, limit valve, oil connection, check valve, tapered bar, distant bar, Pedestal is for fixing, and for oil return valve for preventing oil cylinder from overflowing, oil cylinder band piston carries out up and down, oil cylinder offer power, limit Position valve for preventing piston from falling off, for connecting oil cylinder to drive tapered bar, and on oil connection install unidirectionally by oil connection Valve can improve installation in this way;When work, distant bar is mounted in tapered bar, and connecting oil cylinder by oil connection makes piston carry out Lower activity can facilitate adjusting tightness in this way to drive link block.
In conclusion the utility model can improve counterpart quality, increases fastness, facilitate adjusting, it is easy to operate, make With conveniently.
Particular embodiments described above, the technical issues of to the solution of the utility model, technical solution and advantageous effect It has been further described, it should be understood that the foregoing is merely specific embodiment of the utility model, not For limiting the utility model, within the spirit and principle of the utility model, any modification for being made, changes equivalent replacement Into etc., it should be included within the scope of protection of this utility model.

Claims (4)

1. a kind of pipeline enternal pipe mouth butt-jointing, which is characterized in that it includes:
Lock ring frame, is connected with locking device comprising flap trim ring on first, flap trim ring, the first connecting cleat, on second One briquetting, first time flap trim ring, second time flap trim ring, first axle, the first axis pin, the second briquetting, the second connecting cleat, Link block, fixed mounting, second hinge, the second axis pin, flap trim ring passes through multiple first connecting cleats and second on first Upper flap trim ring is connected, and flap trim ring is connected by multiple first briquettings with flap trim ring on first on second, the first connection clip Plate is located at the first briquetting side, and flap trim ring on first, one end of flap trim ring is all connected with fixed mounting on second, and first The upper flap trim ring other end is connected by the second axis pin with second hinge, and second hinge is connected with second time flap trim ring, and second Lower flap trim ring is connected by multiple second briquettings with first time flap trim ring, and first time flap trim ring is connected by multiple second Clamping plate is connected with second time flap trim ring, and the second connecting cleat is located at the second briquetting side, first time flap trim ring and the first hinge Chain is connected, and first axle is connected by the first axis pin with flap trim ring on second, first time flap trim ring, second time flap trim ring All it is connected with link block, link block is located at fixed mounting side;
Locking device comprising pedestal, oil cylinder, oil return valve, piston, limit valve, oil connection, check valve, tapered bar, distant bar, oil Cylinder is mounted on the base, and oil cylinder is connected with oil return valve, and oil return valve is connected with piston, and piston is connected with limit valve, and oil cylinder passes through oil Pipe fitting is connected with check valve, and check valve is located at oil return valve side, and check valve is connected by tapered bar with distant bar.
2. pipeline enternal pipe mouth butt-jointing as described in claim 1, which is characterized in that be designed on first briquetting, the second briquetting One groove.
3. pipeline enternal pipe mouth butt-jointing as described in claim 1, which is characterized in that the fixed mounting is equipped with multiple apertures.
4. pipeline enternal pipe mouth butt-jointing as described in claim 1, which is characterized in that hole there are one being set on the tapered bar.
CN201721829915.9U 2017-12-25 2017-12-25 Pipeline enternal pipe mouth butt-jointing Active CN207873536U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721829915.9U CN207873536U (en) 2017-12-25 2017-12-25 Pipeline enternal pipe mouth butt-jointing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721829915.9U CN207873536U (en) 2017-12-25 2017-12-25 Pipeline enternal pipe mouth butt-jointing

Publications (1)

Publication Number Publication Date
CN207873536U true CN207873536U (en) 2018-09-18

Family

ID=63503595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721829915.9U Active CN207873536U (en) 2017-12-25 2017-12-25 Pipeline enternal pipe mouth butt-jointing

Country Status (1)

Country Link
CN (1) CN207873536U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039251A (en) * 2019-02-28 2019-07-23 武汉船用机械有限责任公司 Tubular member welding tooling and welding method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039251A (en) * 2019-02-28 2019-07-23 武汉船用机械有限责任公司 Tubular member welding tooling and welding method
CN110039251B (en) * 2019-02-28 2021-11-16 武汉船用机械有限责任公司 Tubular part welding tool and welding method

Similar Documents

Publication Publication Date Title
CN207873536U (en) Pipeline enternal pipe mouth butt-jointing
CN204201367U (en) A kind of small-bore pipeline on-line production send blocking device
CN204512736U (en) A kind of two flange limit expansion joint
CN208847417U (en) A kind of portable pipe package seal checker
CN204717172U (en) Valve and pipeline connecting head
CN201526353U (en) Booster oil return pipe
CN207971897U (en) A kind of bearing installing tool
CN203948826U (en) A kind of prefabricated direct-buried thermal insulation pipe being connected by connection pipe fitting
CN201237041Y (en) Adaptor for pipeline
CN204852693U (en) Novel high pressure pipeline connecting structure
CN209725276U (en) It is a kind of can on-line maintenance the upper efficient ball valve of dress formula
CN203948821U (en) A kind of good sealing effect, prefabricated direct-buried thermal insulation pipe easy to connect
CN201973390U (en) Articulated mechanism of high-pressure high-flow oil pipes
CN206861099U (en) A kind of Petroleum Pipehead of good seal performance
CN202580438U (en) Groove type connecting piece for middle-pressure steel wire reinforced plastic pipeline
CN204829112U (en) Fixture are rushed to repair to light -duty fast -assembling of high pressure pipeline
CN220452994U (en) High-pressure oil pipe
CN219954583U (en) High pressure-bearing flange plate structure
CN201496694U (en) Gas drainage hose connecting device
CN211547846U (en) Novel bulldozer bow frame
CN216446863U (en) Multi freedom manifold connecting device
CN203363442U (en) Wear-resistant transportation pipeline
CN220870314U (en) Pipeline connection structure for hydraulic engineering
CN211259851U (en) Connecting tool in PP pipeline
CN205806798U (en) A kind of pipeline quickly mends connection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 173 Handan Road, Hongkou District, Shanghai, 200437

Patentee after: Shanghai electric power construction and repair Co., Ltd.

Address before: No. 173 Handan Road, Hongkou District, Shanghai, 200437

Patentee before: Shanghai Power Construction and Repair and Spare Parts Plant