CN211256988U - Foundation ditch fender pile position laying-out device - Google Patents
Foundation ditch fender pile position laying-out device Download PDFInfo
- Publication number
- CN211256988U CN211256988U CN201921875890.5U CN201921875890U CN211256988U CN 211256988 U CN211256988 U CN 211256988U CN 201921875890 U CN201921875890 U CN 201921875890U CN 211256988 U CN211256988 U CN 211256988U
- Authority
- CN
- China
- Prior art keywords
- ruler
- long
- short
- fender pile
- fender
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a foundation ditch enclosure technical field, more specifically say, relate to a foundation ditch enclosure pile position laying-out device. The device is used for positioning a fender pile on a fender structure and comprises a long ruler, a short ruler and a reference point position, wherein the long ruler and the short ruler are connected and fixed to form an angle ruler at an included angle of 90 degrees, scales are marked on the inner sides of the long ruler and the short ruler, and a leveling pipe is respectively arranged in the middle of the long ruler and the short ruler; before construction, lofting two datum points on one side of a fender post to be constructed by using a total station, drawing through lines on the two datum points by using a nylon line system, aligning the outer side of the long edge of the angle square with a straightened nylon rope during lofting, and measuring the center of a pile position by using a short ruler after determining the horizontal distance of the pile position; the utility model discloses simple structure, convenient operation only needs the precision of two reference point positions of rechecking during the construction, has reduced the work load of measuring the laying-out, has improved the efficiency of construction, and the in-process can realize the real-time control to stake position center, has ensured the engineering quality. The utility model discloses mainly use in the aspect of foundation ditch fender pile laying-out.
Description
Technical Field
The utility model relates to a foundation ditch enclosure technical field, more specifically say, relate to a foundation ditch enclosure pile position laying-out device.
Background
The fender pile is a common safety protection structure for foundation pit operation, especially deep foundation pit operation, usually adopts the form of row pile to be arranged along the periphery of the foundation pit at equal intervals, and has the advantages of lower cost, reliable performance and simpler construction process.
SUMMERY OF THE UTILITY MODEL
For overcoming the not enough of existence among the above-mentioned prior art, the utility model provides a foundation ditch fender pile position laying-out device, the device simple structure, convenient operation has also guaranteed the measuring precision when having improved work efficiency.
In order to solve the technical problem, the utility model discloses a technical scheme does:
the utility model provides a foundation ditch fender pile position lofting device, the device are used for fixing a position fender pile on envelope, including long chi, short chi and reference point position, long chi and the perpendicular fixed connection of short chi, the reference point position sets up the one side at the fender pile, be provided with the nylon wire of flare-outing between the reference point position, the long chi outside is connected with the nylon rope.
And leveling air bubbles are arranged in the middle positions of the long ruler and the short ruler.
The long ruler is provided with a sliding groove on the outer side, so that the long ruler is in sliding connection with the nylon rope.
The long ruler and the short ruler are both provided with scales, and the scales at the joint are zero.
And the distance between the datum point position and the central line of the fender post is equal.
The datum point position is a steel nail which is arranged on the upper portion of a wood pile which penetrates the underground for at least 50cm and is slightly higher than the ground in a driving mode.
Compared with the prior art, the utility model discloses the beneficial effect who has does:
the device simple structure, convenient operation only needs the precision of two reference point positions of rechecking during the construction, very big reduction the work load of measuring the lofting, improved the efficiency of construction, and the in-process can realize the real-time control to pile position center, has effectively ensured engineering quality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
in the figure: 1 is a long ruler, 2 is a short ruler, 3 is a leveling bubble, 4 is a datum point, 5 is a fender pile, 6 is a nylon rope, 7 is a chute and 8 is an enclosure structure.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in figure 1, the pile position lofting device of the foundation pit fender pile is used for positioning a fender pile 5 on a building enclosure 8 and comprises a long ruler 1, a short ruler 2 and a datum point 4, wherein the long ruler 1 and the short ruler 2 are vertically and fixedly connected to form an angle ruler in a 90-degree fixed connection mode, the datum point 4 is arranged on one side of the fender pile 5, the outer side of the long ruler 1 is connected with a nylon rope 6, the long ruler 1 can move horizontally along the nylon rope 6, before construction, a total station is used for lofting two datum point 4 on one side of the fender pile to be constructed, a nylon rope 6 with the thickness of 1mm is used for connecting lines on the two datum point 4, the outer side of the long side of the angle ruler is aligned with the straightened nylon rope during lofting, after the horizontal distance of the pile position is determined, the horizontal distance of the pile position is measured by a measuring tape, the pile position center is measured by the short ruler 2, then the next fender pile position is positioned by sliding the long ruler 1, the long ruler 1 and the short ruler 2 are made of light high-strength aluminum alloy materials, the long ruler 1 is 4m long, and the short ruler 2 is 2m long.
Preferably, long chi 1 and 2 intermediate positions of short chi all are provided with level bubble 3, and bubble through adjustment level bubble 3 is placed between two parties, guarantees that the angle square level is placed, accurate control stake position central point.
Preferably, the sliding groove 7 is arranged on the outer side of the long ruler 1, so that the long ruler 1 is in sliding connection with the nylon rope 6, and the linear motion of the angle square is guaranteed.
Preferably, long chi 1 and short chi 2 inboard all are provided with the scale, and the junction scale is zero, according to the central point of scale interval pinpoint fender pile 5.
Preferably, the distance between the datum point position 4 and the central line of the fender post 5 is equal, and the position of the datum point position 4 is determined according to actual conditions.
Preferably, the datum point 4 is a steel nail which is arranged on the upper part of a wood pile penetrating into the ground by at least 50cm and is slightly higher than the ground
The above description has been made in detail only for the preferred embodiment of the present invention, but the present invention is not limited to the above embodiment, and various changes can be made without departing from the spirit of the present invention within the knowledge scope of those skilled in the art, and all such changes are intended to be encompassed by the present invention.
Claims (6)
1. The utility model provides a foundation ditch fender pile position lofting device, the device are used for location fender pile (5) on envelope (8), its characterized in that: including long chi (1), short chi (2) and reference point position (4), long chi (1) and short chi (2) perpendicular fixed connection, reference point position (4) set up the one side at fender post (5), be provided with between reference point position (4) nylon rope (6) of flare-outing, long chi (1) outside is connected with nylon rope (6).
2. The foundation pit fender pile position lofting device of claim 1, characterized in that: and leveling air bubbles (3) are arranged in the middle positions of the long ruler (1) and the short ruler (2).
3. The foundation pit fender pile position lofting device of claim 1, characterized in that: the long ruler (1) is provided with a sliding groove (7) on the outer side, so that the long ruler (1) is in sliding connection with the nylon rope (6).
4. The foundation pit fender pile position lofting device of claim 1, characterized in that: the inner sides of the long ruler (1) and the short ruler (2) are provided with scales, and the scales at the connecting part are zero.
5. The foundation pit fender pile position lofting device of claim 1, characterized in that: the distance between the datum point position (4) and the central line of the fender post (5) is equal.
6. The foundation pit fender pile position lofting device of claim 1, characterized in that: the datum point position (4) is a steel nail which is arranged on the upper portion of a wood pile which penetrates the ground for at least 50cm and is slightly higher than the ground in a driving mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921875890.5U CN211256988U (en) | 2019-11-04 | 2019-11-04 | Foundation ditch fender pile position laying-out device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921875890.5U CN211256988U (en) | 2019-11-04 | 2019-11-04 | Foundation ditch fender pile position laying-out device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211256988U true CN211256988U (en) | 2020-08-14 |
Family
ID=71982135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921875890.5U Active CN211256988U (en) | 2019-11-04 | 2019-11-04 | Foundation ditch fender pile position laying-out device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211256988U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482122A (en) * | 2020-11-12 | 2021-03-12 | 华能澜沧江水电股份有限公司托巴水电工程建设管理局 | Method for forming power station high slope berm |
-
2019
- 2019-11-04 CN CN201921875890.5U patent/CN211256988U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482122A (en) * | 2020-11-12 | 2021-03-12 | 华能澜沧江水电股份有限公司托巴水电工程建设管理局 | Method for forming power station high slope berm |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209636847U (en) | A kind of adjustable tower crane built-in fitting accurate positioning tool | |
CN211256988U (en) | Foundation ditch fender pile position laying-out device | |
WO2020088363A1 (en) | Fast pit marking and lofting method for transmission line foundation | |
CN207180683U (en) | A kind of building construction formwork verticality measuring tool | |
CN206772307U (en) | A kind of measurement apparatus for coordinating total powerstation to check the positioning of concrete steel trolley formwork | |
CN204370409U (en) | A kind of deep foundation ditch or hole stake plumb line unwrapping wire assistor | |
CN105258685A (en) | Locating, measuring and clamping device of steel stand column | |
CN206476578U (en) | A kind of wire releasing disk | |
CN202614235U (en) | Ruler for measuring verticality of vertical member template | |
CN213543541U (en) | Rail surface elevation quoting device for curve section of rail | |
CN214333575U (en) | Measuring point marking positioning ruler for individual household acceptance check | |
CN208887553U (en) | A kind of simple tubular pole testing apparatus for verticality | |
CN112344835A (en) | Detection tool for perpendicularity and lateral bending of template and use method thereof | |
CN215854705U (en) | Accurate monitoring devices of straightness that hangs down of tower crane standard festival | |
CN202188814U (en) | Verticality and flatness detecting device used in installation of shear wall template | |
CN205530263U (en) | A locator for construction of steel pipe retaining pile | |
CN206056479U (en) | A kind of detection rule for verticality | |
CN110823204A (en) | Fixed support for measuring point position projection and using method thereof | |
CN212077935U (en) | River course shore protection stake straightness deviation of hanging down control appurtenance | |
CN206223131U (en) | Device is checked and accepted in a kind of ell measurement | |
CN212866936U (en) | Floor leveling and wall positioning auxiliary tool | |
CN114353764B (en) | Method and device for measuring pile casing parameters | |
CN205066766U (en) | Steel stand location survey screens device | |
CN210893147U (en) | Fixed bolster is thrown to measurement point location | |
CN212743434U (en) | Fixing device for slope embedded bolt set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |