CN211256860U - Cast-in-situ bank protection sheet pile - Google Patents

Cast-in-situ bank protection sheet pile Download PDF

Info

Publication number
CN211256860U
CN211256860U CN201921144705.5U CN201921144705U CN211256860U CN 211256860 U CN211256860 U CN 211256860U CN 201921144705 U CN201921144705 U CN 201921144705U CN 211256860 U CN211256860 U CN 211256860U
Authority
CN
China
Prior art keywords
cast
concrete
pile
outlet
situ
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921144705.5U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201921144705.5U priority Critical patent/CN211256860U/en
Application granted granted Critical
Publication of CN211256860U publication Critical patent/CN211256860U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a cast-in-situ shore protection sheet pile, which comprises a concrete pouring trolley, a rail clamping pulley, a track, a transmission flexible shaft, a vibrating rod, a concrete funnel, an outlet baffle, an outlet steel pipe, a hose joint, a conveying hose, a cast-in-situ plate template, a cast-in-situ plate reinforcing bar, a side supporting die frame, a prefabricated square pile, a pile tip, a vibrator, a winch and a traction device; the bottom end of the prefabricated square pile is provided with a pile tip, and the top end of the prefabricated square pile is provided with two I-shaped rails and fixed on the pile top through bolts; the concrete pouring trolley moves on the rail through a rail clamping pulley at the bottom and a traction device in the trolley; the top of the concrete pouring trolley is provided with a concrete funnel, and the bottom of the concrete funnel is provided with an inclined outlet and is connected with an outlet steel pipe. The utility model has the advantages that: the utility model discloses a concrete track mobile type pours the dolly that vibrates, through export baffle and the hoist engine in adjusting the concrete placement dolly, can control concrete placement speed and the degree of depth of vibrating of the stick that vibrates.

Description

Cast-in-situ bank protection sheet pile
Technical Field
The utility model relates to a shore protection sheet pile especially relates to a cast-in-place shore protection sheet pile.
Background
At present, the sheet pile structure revetment has the advantages of simple structure, low manufacturing cost, simplicity and convenience in construction, light weight, low requirement on foundation bearing capacity and the like, and is more and more widely applied to river revetment construction. The river course flows through the area topography geology various, and the river bank side slope meanders, often can adopt cast-in-place shore protection sheet pile in the construction of river bank protection. The existing revetment sheet pile cast-in-place has the problems of slow construction, insufficient and untimely vibration, incapability of realizing continuous operation and the like.
In summary, it is important to find a cast-in-place revetment sheet pile which is fast, simple and convenient in construction and can be continuously, efficiently, poured, vibrated and formed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the not enough among the prior art, provide a cast-in-place shore protection sheet pile.
The cast-in-situ revetment sheet pile comprises a concrete casting trolley, a rail clamping pulley, a rail, a transmission flexible shaft, a vibrating rod, a concrete funnel, an outlet baffle, an outlet steel pipe, a hose joint, a conveying hose, a cast-in-situ plate template, a cast-in-situ plate reinforcing bar, a side supporting die frame, a prefabricated square pile, a pile tip, a vibrator, a winch and a traction device; the bottom end of the prefabricated square pile is provided with a pile tip, and the top end of the prefabricated square pile is provided with two I-shaped rails and fixed on the pile top through bolts; the concrete pouring trolley moves on the rail through a rail clamping pulley at the bottom and a traction device in the trolley; the top of the concrete pouring trolley is provided with a concrete funnel, the bottom of the concrete funnel is provided with an inclined outlet and is connected with an outlet steel pipe, an outlet baffle is arranged at the joint, and a baffle handle is arranged on the outlet baffle; the conveying hose is connected with the outlet steel pipe opening through a hose connector; the side of the cast-in-place plate formwork facing the water is fixed to the prefabricated square pile in a hoop mode, the side of the cast-in-place plate formwork facing the bank is fixed through a side supporting formwork, and cast-in-place plate reinforcing bars are arranged in the cast-in-place plate formwork; the vibrator and the winch are installed inside the concrete pouring trolley, the vibrator is connected with a transmission flexible shaft, the transmission flexible shaft is wound on a winding drum of the winch, and the lower end of the transmission flexible shaft is connected with a vibrating rod.
Preferably, the method comprises the following steps: the conveying hose is positioned between the cast-in-place plate template on the shore side and the cast-in-place plate reinforcing bars.
Preferably, the method comprises the following steps: the transmission flexible shaft and the vibrating rod are positioned between the cast-in-situ slab reinforcement and the prefabricated square pile.
The utility model has the advantages that: the utility model discloses a concrete track mobile type pours the dolly that vibrates, through export baffle and the hoist engine in adjusting the concrete placement dolly, can control concrete placement speed and the degree of depth of vibrating of the stick that vibrates. Therefore, concrete pouring and vibrating construction operation can be continuously and effectively carried out, and concrete is poured and vibrated at the same time, so that the concrete is vibrated fully and timely, the finished product quality is high, the labor cost is effectively saved, and the construction period is shortened.
Drawings
FIG. 1 is a schematic view of a cast-in-place shore protection sheet pile structure;
FIG. 2 is an enlarged view of the portion B of FIG. 1;
FIG. 3 is a right side view A-A of FIG. 1;
FIG. 4 is an enlarged view of the portion C of FIG. 3 (detail view of the concrete track traveling cast concrete vibration trolley);
fig. 5 is a schematic plan view of a cast-in-place slab form.
Description of reference numerals: 1-concrete pouring trolley; 2-clamping rail pulley; 3-track; 4-bolt; 5-drive the flexible shaft; 6-vibrating rod; 7-concrete funnel; 8-baffle handle; 9-outlet baffle; 10-outlet steel pipe; 11-hose connection; 12-a delivery hose; 13-cast-in-place slab form; 14-reinforcing bars of a cast-in-place slab; 15-side supporting die carrier; 16-prefabricated square pile; 17-pile tip; 18-a vibrator; 19-hoisting machine; 20-a traction device.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
The cast-in-situ revetment sheet pile comprises a concrete casting trolley 1, a rail clamping pulley 2, a track 3, a transmission flexible shaft 5, a vibrating rod 6, a concrete funnel 7, an outlet baffle 9, an outlet steel pipe 10, a hose joint 11, a conveying hose 12, a cast-in-situ plate template 13, cast-in-situ plate reinforcing bars 14, a side support template frame 15, a prefabricated square pile 16, a pile tip 17, a vibrator 18, a winch 19 and a traction device 20; the bottom end of the prefabricated square pile 16 is provided with a pile tip 17, so that the driving construction is facilitated; two I-shaped rails 3 are arranged at the top end of the prefabricated square pile 16 and fixed on the pile top through bolts 4; the concrete pouring trolley 1 moves on the track 3 through a rail clamping pulley 2 at the bottom and a traction device 20 in the trolley; the top of the concrete pouring trolley 1 is provided with a concrete funnel 7, the bottom of the concrete funnel 7 is provided with an inclined outlet and is connected with an outlet steel pipe 10, an outlet baffle 9 is arranged at the joint, and a baffle handle 8 is arranged on the outlet baffle 9 and is used for controlling the concrete to be discharged and poured; the conveying hose 12 is connected with the outlet steel pipe 10 through a hose connector 11; the side of the cast-in-situ slab template 13 facing the water is fixed on the prefabricated square pile 16 through an anchor ear, the side of the cast-in-situ slab template 13 facing the bank is fixed through a side supporting die frame 15, and cast-in-situ slab reinforcing bars 14 are arranged in the cast-in-situ slab template 13; the vibrator 18 and the winch 19 are installed inside the concrete pouring trolley 1, the vibrator 18 is connected with the transmission flexible shaft 5, the transmission flexible shaft 5 is wound on a winding drum of the winch 19, and the lower end of the transmission flexible shaft 5 is connected with the vibrating rod 6.
The conveying hose 12 is positioned between a cast-in-place plate template 13 on the shore side and a cast-in-place plate reinforcing bar 14.
The transmission flexible shaft 5 and the vibrating rod 6 are positioned between the cast-in-situ slab reinforcement 14 and the prefabricated square pile 16.
The construction method of the cast-in-situ revetment plate pile comprises the following steps:
1) according to the engineering design requirement, the reinforced concrete prefabricated square pile 16 meeting the requirement is manufactured in a prefabrication factory and transported to a construction site.
2) And excavating a bank side slope of the construction river reach, and vertically driving the prefabricated square piles 16 to the designed depth on the construction site according to the construction requirement.
3) And installing a cast-in-place plate template 13 and a side supporting template frame 15 according to design requirements, and arranging cast-in-place plate reinforcing bars 14.
4) Two I-shaped rails 3 are erected at the top ends of the prefabricated square piles 16 and fixed by bolts 4, and the concrete pouring trolley 1 which is assembled in advance is installed on the rails 3.
5) By adjusting the outlet baffle 9 and the winch 19 in the concrete pouring trolley 1, the concrete pouring speed and the vibrating depth of the vibrating rod 6 can be controlled, and continuous and effective concrete pouring vibrating construction operation can be carried out.

Claims (3)

1. The utility model provides a cast-in-place shore protection sheet pile which characterized in that: the device comprises a concrete pouring trolley (1), rail clamping pulleys (2), a track (3), a transmission flexible shaft (5), a vibrating rod (6), a concrete funnel (7), an outlet baffle (9), an outlet steel pipe (10), a hose joint (11), a conveying hose (12), a cast-in-place plate template (13), cast-in-place plate reinforcing bars (14), a side supporting formwork (15), a prefabricated square pile (16), a pile tip (17), a vibrator (18), a winch (19) and a traction device (20); the bottom end of the prefabricated square pile (16) is provided with a pile tip (17), and the top end of the prefabricated square pile (16) is provided with two I-shaped rails (3) and fixed on the pile top through bolts (4); the concrete pouring trolley (1) moves on the track (3) through a rail clamping pulley (2) at the bottom and a traction device (20) in the trolley; a concrete funnel (7) is arranged at the top of the concrete pouring trolley (1), an inclined outlet is formed in the bottom of the concrete funnel (7) and connected with an outlet steel pipe (10), an outlet baffle (9) is arranged at the joint, and a baffle handle (8) is arranged on the outlet baffle (9); the conveying hose (12) is connected with the outlet steel pipe (10) through a hose joint (11); the side of the cast-in-situ slab template (13) close to the water is fixed to the prefabricated square pile (16) in a hoop mode, the side of the cast-in-situ slab template (13) close to the shore is fixed through a side supporting die frame (15), and cast-in-situ slab reinforcing steel bars (14) are arranged in the cast-in-situ slab template (13); the concrete pouring trolley is characterized in that the vibrator (18) and the winch (19) are installed inside the concrete pouring trolley (1), the vibrator (18) is connected with the transmission flexible shaft (5), the transmission flexible shaft (5) is wound on a winding drum of the winch (19), and the lower end of the transmission flexible shaft (5) is connected with the vibrating rod (6).
2. A cast-in-place shore protection sheet pile according to claim 1, characterized in that: the conveying hose (12) is positioned between a cast-in-place plate template (13) on the shore side and a cast-in-place plate reinforcing bar (14).
3. A cast-in-place shore protection sheet pile according to claim 1, characterized in that: the transmission flexible shaft (5) and the vibrating rod (6) are positioned between the cast-in-situ slab reinforcement (14) and the prefabricated square pile (16).
CN201921144705.5U 2019-07-19 2019-07-19 Cast-in-situ bank protection sheet pile Active CN211256860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921144705.5U CN211256860U (en) 2019-07-19 2019-07-19 Cast-in-situ bank protection sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921144705.5U CN211256860U (en) 2019-07-19 2019-07-19 Cast-in-situ bank protection sheet pile

Publications (1)

Publication Number Publication Date
CN211256860U true CN211256860U (en) 2020-08-14

Family

ID=71983568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921144705.5U Active CN211256860U (en) 2019-07-19 2019-07-19 Cast-in-situ bank protection sheet pile

Country Status (1)

Country Link
CN (1) CN211256860U (en)

Similar Documents

Publication Publication Date Title
CN109680953B (en) Discharging and mixing vibrating device for self-moving regenerated block
CN108396630A (en) The big box-beam structure of precast concrete with the connection of wet seam direction across bridge
CN109594581B (en) River-crossing pipeline structure and installation method thereof
CN211256860U (en) Cast-in-situ bank protection sheet pile
CN111074893B (en) Construction system and construction method for concrete cushion layer of river dike and dyke
CN108570974A (en) A kind of prefabricated fish pass slot of bottom plate
CN110004959B (en) Quick construction method and template for concrete cofferdam in flowing water environment
CN104480915A (en) Reversal rail hydraulic climbing form for concrete pouring of high and steep slope
CN209907541U (en) Integral pouring template system for trapezoid drainage ditch
CN114561873B (en) Bridge high pier construction method
CN110130271A (en) A kind of construction method of side wall concrete single-sided formwork reinforcement
CN216891925U (en) Wave form steel web combination case girder construction based on arch structure atress
CN211849445U (en) Construction system of river levee dam concrete bed course
CN115142418A (en) Non-vibration pipe-drawing cage-preventing device for immersed cast-in-place pile and construction method thereof
CN105887922B (en) A kind of method that inwall construction is carried out using truss support device
CN110965628A (en) Gravity type slip form system for cast-in-place concrete trapezoid open trench
CN204869175U (en) Y shape precast reinforced concrete stake mould
CN211849855U (en) Gravity type slip form system for cast-in-place concrete trapezoid open trench
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN111827239A (en) Construction method of assembled berthing pier
CN111608248A (en) Cast-in-situ rainwater cover plate channel construction method
JP3951809B2 (en) Construction method of swash plate dyke
CN108643228A (en) A kind of logical construction technology of prefabricated car case
CN109537599A (en) The construction method of deep foundation pit support system support changing structure for use
CN218134690U (en) Movable rainwater box culvert deformation joint steel bar binding jig frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant