CN211228791U - Heavy pipeline mouth of pipe butt joint mounting bracket - Google Patents

Heavy pipeline mouth of pipe butt joint mounting bracket Download PDF

Info

Publication number
CN211228791U
CN211228791U CN201921640938.4U CN201921640938U CN211228791U CN 211228791 U CN211228791 U CN 211228791U CN 201921640938 U CN201921640938 U CN 201921640938U CN 211228791 U CN211228791 U CN 211228791U
Authority
CN
China
Prior art keywords
pipeline
section
channel steel
fixed section
heavy pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921640938.4U
Other languages
Chinese (zh)
Inventor
肖浪
刘学康
曾大平
唐焕富
李胜
曾左兵
崔云坤
宋学刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Shenzhen Engineering Co Ltd
Original Assignee
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Shenzhen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guangzhou Engineering Group Co Ltd CRECGZ, CRECGZ Shenzhen Engineering Co Ltd filed Critical China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Priority to CN201921640938.4U priority Critical patent/CN211228791U/en
Application granted granted Critical
Publication of CN211228791U publication Critical patent/CN211228791U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joints Allowing Movement (AREA)

Abstract

The utility model discloses a heavy pipeline mouth of pipe butt joint mounting bracket, connect the canned paragraph during construction and fix after the pipeline has been installed, utilize the fastener to block the tail end of planning the installation pipeline, mechanism is gone into on the installation top between first counter-force structure and second counter-force structure, go into mechanism's pressurization through the top and make the movable segment slide to the installed pipeline place direction, and then the drive plans the installation pipeline and slides and make in its socket inserts the bellmouth of installed pipeline, can effectively ensure the inseparable laminating between the tube slot, improve the interface quality, here the utility model is used for pipeline construction technical field.

Description

Heavy pipeline mouth of pipe butt joint mounting bracket
Technical Field
The utility model relates to a pipeline construction technical field especially relates to a heavy pipeline mouth of pipe butt joint mounting bracket.
Background
Along with the change of city construction day by day, in order to meet the requirements of city life and production, the pipe diameter of a city water supply and drainage pipeline is continuously increased, a concrete pipeline is required to be adopted for construction in a soft soil layer in Guangzhou bead and triangle areas, the dead weight of a large-diameter pipeline is large, a joint is difficult to align when the pipeline is installed, the friction force is large due to the excessive dead weight when a socket is inserted into a socket, the joint of the pipeline is difficult to seal tightly, and therefore water leakage, underground water pollution, road surface collapse caused by water and soil loss and other social hazards are caused when the pipeline is used.
Therefore, the pipeline joint must be ensured to be tight during pipeline installation to achieve the use function, but the conventional pipeline installation method is to adopt a crane to hang a specified position, manually pry the specified position by a crowbar to enable the socket to be inserted into the socket, or adopt a chain block to tighten the position. Adopt the crowbar to sled and move and take trouble hard to damage the pipeline easily, the operation causes the pipeline to roll because of the misoperation and causes the operating personnel casualties easily in the foundation ditch moreover, has adopted the taut easy chain fracture that takes place of chain calabash and has hurt people's incident, and complex operation causes construction quality uncontrollable, and the safety risk is big, and work efficiency is low, and construction cost is high.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to solve one of the technical problem that exists among the prior art at least, provide a heavy pipeline mouth of pipe butt joint mounting bracket of the tight problem of seam when effectively solving piping erection.
The utility model adopts the technical proposal that:
a heavy pipe orifice docking mounting bracket comprising:
the fixing section is in a hollow tubular shape, and a notch is formed in the middle upper part of the fixing section;
the head of the movable section is inserted into the fixed section from a port on one side of the fixed section and penetrates through the notch, and a clamping piece for clamping a pipeline is arranged below the tail of the movable section;
the one end that the fixed section is close to the activity section afterbody sets up first reaction structure, the position that the activity section exposes from the notch disposes the second reaction structure, demountable installation has the top to go into the mechanism between first reaction structure and the second reaction structure.
Further conduct the utility model discloses technical scheme's improvement, first counter-force structure, second counter-force structure contain a riser respectively, wherein two piece at least gussets, each of fixed in one side of riser the gusset respectively with riser mutually perpendicular.
Further conduct the utility model discloses technical scheme's improvement, the other end bilateral symmetry of canned paragraph sets up a plurality of couples that are used for detaining string rope, with each of one side the couple is arranged along the length direction equidistance interval of canned paragraph.
Further conduct the utility model discloses technical scheme's improvement, the canned paragraph includes a long channel-section steel, detains respectively and welds a channel-section steel and No. two channel-sections at long channel-section steel both ends, the notch is stayed the sky through the centre of a channel-section steel and No. two channel-sections and is formed.
Further conduct the utility model discloses technical scheme's improvement, the length of a channel-section steel is not less than the length of No. two channel-sections, each the couple is located the both sides of a channel-section steel respectively.
Further conduct the utility model discloses technical scheme's improvement, the activity section forms, each through two piece at least I-steel concatenations I-steel is parallel to each other.
Further conduct the utility model discloses technical scheme's improvement, it is adjacent the both wings flange edge welding of I-steel links to each other.
Further conduct the utility model discloses technical scheme's improvement, the mechanism adopts the jack is gone into in the top.
Further conduct the utility model discloses technical scheme's improvement, the bottom of canned paragraph is equipped with the cushion, the material of cushion is rubber.
Further conduct the utility model discloses technical scheme's improvement, the cushion has been laid towards the surface of canned paragraph to the fastener.
The utility model has the advantages that: this heavy pipeline mouth of pipe butt joint mounting bracket, during the construction with the canned paragraph connect fix after the pipeline has been installed, utilize the fastener to block the tail end of wanting the installation pipeline, install between first counter-force structure and second counter-force structure and push into the mechanism, push into mechanism's pressurization through the top and make the movable segment to the direction slip of installed pipeline place, and then drive to want the installation pipeline to slide and make in its socket inserts the bellmouth of installed pipeline, can effectively ensure the inseparable laminating between the tube gap, improve the interface quality.
Drawings
The present invention will be further explained with reference to the accompanying drawings:
FIG. 1 is a front view of a butt joint mounting frame for pipe orifices of heavy pipelines according to an embodiment of the present invention;
FIG. 2 is a structural top view of a heavy-duty pipeline pipe orifice butt joint mounting frame according to an embodiment of the present invention;
fig. 3 is a schematic diagram of an application of the embodiment of the present invention.
Detailed Description
This section will describe in detail the embodiments of the present invention, preferred embodiments of the present invention are shown in the attached drawings, which are used to supplement the description of the text part of the specification with figures, so that one can intuitively and vividly understand each technical feature and the whole technical solution of the present invention, but they cannot be understood as the limitation of the protection scope of the present invention.
In the description of the present invention, it should be understood that the orientation or positional relationship indicated with respect to the orientation description, such as up, down, front, rear, left, right, etc., is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, a plurality of means are one or more, a plurality of means are two or more, and the terms greater than, less than, exceeding, etc. are understood as not including the number, and the terms greater than, less than, within, etc. are understood as including the number. If the first and second are described for the purpose of distinguishing technical features, they are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of the technical features indicated.
In the description of the present invention, unless there is an explicit limitation, the words such as setting, installation, connection, etc. should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above words in combination with the specific contents of the technical solution.
Referring to fig. 1 to 3, in order to illustrate an embodiment of the present invention, a heavy pipeline pipe orifice butt joint installation frame is described, which includes a fixed section 10, the fixed section 10 is in a hollow square tube shape, and a notch 11 is formed above one end of the middle part of the fixed section 10, which is close to the tail part; the head of the movable section 20 is inserted into the fixed section 10 from a port on one side of the fixed section 10 and penetrates through the notch 11, and a clamping piece 21 for clamping a pipeline is arranged below the tail of the movable section 20; furthermore, a first reaction structure 31 is disposed at one end of the fixed section 10 close to the tail of the movable section 20, a second reaction structure 32 is disposed at a position where the movable section 20 is exposed from the notch 11, the first reaction structure 31 is disposed opposite to the second reaction structure 32, and a pushing mechanism 40 is detachably mounted between the first reaction structure 31 and the second reaction structure 32.
This heavy pipeline mouth of pipe butt joint mounting bracket, connect the fixed segment 10 to fix after the pipeline has been installed during the construction, utilize fastener 21 to block the tail end of wanting to install the pipeline, install between first counter-force structure 31 and second counter-force structure 32 and push into mechanism 40, through pushing into mechanism 40 pressurization messenger movable segment 20 and to installing the pipeline place direction slip, and then drive to want to install the pipeline and slide and make in its socket inserts the bellmouth of installing the pipeline, can effectively ensure the inseparable laminating between the tube seam, improve the interface quality.
Specifically, the fixed section 10 includes a long channel steel, a first channel steel and a second channel steel which are respectively fastened and welded at two ends of the long channel steel, the notch 11 is formed by leaving a space between the first channel steel and the second channel steel, and the first counter-force structure 31 is fixed on the second channel steel by welding; meanwhile, the length of the first channel steel is larger than that of the second channel steel. Further, in order to better enable the connection between the fixing section 10 and the installed pipeline to be firmer during construction and facilitate the hanging, buckling and fixing of the rope, a plurality of hooks 12 for buckling and hanging the rope are symmetrically distributed on two sides of the first channel steel. In order to improve the overall aesthetic appearance, the hooks 12 on the same side are arranged at equal intervals along the length direction of the fixed section 10. In this embodiment, the long channel steel is 18# a channel steel with a length of 3.5m, the first channel steel and the second channel steel are 18# a channel steels with a length of 2.1m and 0.3m respectively, the head end of the first channel steel is flush with the head end of the long channel steel, and the tail end of the second channel steel is flush with the tail end of the long channel steel, so that the length of the notch 11 with a hollow space in the middle is 1.1 m. Furthermore, each hook 12 is made of round steel with a diameter of phi 20, the opening direction of each hook 12 is the same and points to the tail end of the fixed section 10, and the distance between adjacent hooks 12 is set to be 0.2 m.
In this embodiment, specifically, the movable section 20 is formed by splicing two i-beams 22, the two i-beams 22 are arranged in parallel, and edges of two wing plates of the two i-beams 22 are connected by welding. The second reaction structure 32 is connected to the two i-beams 22 at the position where the i-beams leak out of the notch 11 by welding.
The embodiment of the utility model provides an in the middle of, as preferred, first counter-force structure 31, second counter-force structure 32 contain the riser of a rectangle respectively, and wherein one side of riser is fixed with the gusset that two intervals set up, and each gusset is respectively in order to support with riser mutually perpendicular. The surface where the rib plate is located is the back surface of the vertical plate, and the front surfaces of the vertical plates of the first reaction structure 31 and the second reaction structure 32 are opposite. Furthermore, the vertical plates and the rib plates are made of steel plates, and the distance between the two vertical plates is 8.5-97 cm after installation. More specifically, the jacking mechanism 40 of the embodiment adopts a jack, and further adopts a screw jack for better operation, and the screw jack with 10-30 tons can be selectively installed in the interval range of the vertical plates, so that the butting installation of pipelines with different calibers and different weights can be better adapted.
In order to increase the friction between the fixed segment 10 and the installed pipeline, and make the connection and fixation between the fixed segment 10 and the installed pipeline more stable and firm, in the embodiment, a cushion block 50 is laid at the bottom of the fixed segment 10, and the material of the cushion block is rubber, further, the thickness of the cushion block is not less than 2cm, so as to ensure that sufficient friction force can be provided.
In this embodiment, the clip 21 is made of a 0.3m i-shaped steel, the soft pad 211 is laid on the surface of the clip 21 facing the wing plate of the fixed section 10, and the soft pad 211 is made of rubber.
Use this heavy pipeline mouth of pipe butt joint mounting bracket to be under construction, its operation is more simple and convenient, and can guarantee constructor's safe operation, simultaneously, still changed the not tight problem of seam that former pipeline mounting means exists, avoid doing over again, effectively reduce construction cycle, efficiency improves greatly.
Naturally, the invention is not limited to the above-described embodiments, and those skilled in the art can make equivalent modifications or substitutions without departing from the spirit of the invention, and such equivalent modifications or substitutions are included in the scope of the claims of the present application.

Claims (9)

1. The utility model provides a heavy pipeline mouth of pipe butt joint mounting bracket which characterized in that: the method comprises the following steps:
the fixing section is in a hollow tubular shape, and a notch is formed in the middle upper part of the fixing section;
the head of the movable section is inserted into the fixed section from a port on one side of the fixed section and penetrates through the notch, and a clamping piece for clamping a pipeline is arranged below the tail of the movable section;
the one end that the fixed section is close to the activity section afterbody sets up first reaction structure, the position that the activity section exposes from the notch disposes the second reaction structure, demountable installation has the top to go into the mechanism between first reaction structure and the second reaction structure.
2. The heavy pipe orifice docking mount of claim 1, wherein: the first counter-force structure and the second counter-force structure respectively comprise a vertical plate, at least two rib plates are fixed on one surface of the vertical plate, and each rib plate is perpendicular to the vertical plate.
3. The heavy pipe orifice docking mount of claim 1, wherein: the other end both sides symmetry of fixed section sets up a plurality of couples that are used for detaining hanging the rope, with each couple of one side the equidistance interval is arranged along the length direction of fixed section.
4. The heavy pipe nozzle docking mounting bracket of claim 3, wherein: the fixed section comprises a long channel steel, a first channel steel and a second channel steel which are respectively buckled and welded at two ends of the long channel steel, and the notch is formed by reserving a space in the middle of the first channel steel and the second channel steel.
5. The heavy pipe nozzle docking mount of claim 4, wherein: the length of the first channel steel is not less than that of the second channel steel, and the hooks are respectively positioned on two sides of the first channel steel.
6. The heavy pipe orifice docking mount of claim 1, wherein: the movable section is formed by splicing at least two I-shaped steels, the I-shaped steels are parallel to each other, and the edges of two wing plates of the adjacent I-shaped steels are welded and connected.
7. The heavy pipe orifice docking mount of claim 1, wherein: the jacking mechanism adopts a jack.
8. The heavy pipe orifice docking mount of claim 1, wherein: the bottom of the fixed section is provided with a cushion block, and the cushion block is made of rubber.
9. The heavy pipe orifice docking mount of claim 1, wherein: and a soft cushion is paved on the surface of the clamping piece facing the fixed section.
CN201921640938.4U 2019-09-27 2019-09-27 Heavy pipeline mouth of pipe butt joint mounting bracket Active CN211228791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921640938.4U CN211228791U (en) 2019-09-27 2019-09-27 Heavy pipeline mouth of pipe butt joint mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921640938.4U CN211228791U (en) 2019-09-27 2019-09-27 Heavy pipeline mouth of pipe butt joint mounting bracket

Publications (1)

Publication Number Publication Date
CN211228791U true CN211228791U (en) 2020-08-11

Family

ID=71918691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921640938.4U Active CN211228791U (en) 2019-09-27 2019-09-27 Heavy pipeline mouth of pipe butt joint mounting bracket

Country Status (1)

Country Link
CN (1) CN211228791U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593377A (en) * 2019-09-27 2019-12-20 中铁广州工程局集团深圳工程有限公司 Heavy pipeline pipe orifice butt joint mounting frame and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593377A (en) * 2019-09-27 2019-12-20 中铁广州工程局集团深圳工程有限公司 Heavy pipeline pipe orifice butt joint mounting frame and construction method

Similar Documents

Publication Publication Date Title
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN211228791U (en) Heavy pipeline mouth of pipe butt joint mounting bracket
CN203199913U (en) Assembling and disassembling type hoisting truss
CN202927262U (en) Pipeline installation pillar in oil/gas pipeline tunnel
CN220100596U (en) Through type horizontal sliding rail construction hanging basket for building outer wall construction
CN204126238U (en) Steel plate shear force wall operation platform and bracing frame thereof
CN200985250Y (en) Pile leg single slice assembling trolley device
CN112252589A (en) Steel reinforcement cage structure and installation method thereof
CN110593377A (en) Heavy pipeline pipe orifice butt joint mounting frame and construction method
CN111120730A (en) Electric power pipe jacking pipe joint interface connection device
CN203383516U (en) Construction device for installing connecting beam on frame type steel structure
CN216512739U (en) Heavy well lid start-stop equipment of inspection shaft
CN205745642U (en) Large-diameter steel pipe distance passes through culvert pipe constructing device
CN214570413U (en) Special device for underground rapid lifting pipeline of mine
CN111472783B (en) Shield tunneling machine split initial lengthened pipeline extending device and application method
CN211735017U (en) A structure that is used for concrete trailer pump pipe to cross a river
CN111593763B (en) Fixing device for mounting underground pipe gallery and using method thereof
CN204532417U (en) A kind of resistance to deformation fast-escape pipe
CN212801971U (en) Slidable connecting structure
CN210566707U (en) Fixing bracket capable of dragging pipeline
CN204151665U (en) A kind of cable-stayed type opens trestle
CN209781857U (en) Pipeline installation car in piping lane
CN207032001U (en) A kind of bridge structure
CN112061956A (en) Multipurpose large-diameter pipe joint lifting appliance for lifting and turning over
CN217656404U (en) Can splice formula piping lane pipeline fixed bolster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant