CN202927262U - Pipeline installation pillar in oil/gas pipeline tunnel - Google Patents

Pipeline installation pillar in oil/gas pipeline tunnel Download PDF

Info

Publication number
CN202927262U
CN202927262U CN 201220628965 CN201220628965U CN202927262U CN 202927262 U CN202927262 U CN 202927262U CN 201220628965 CN201220628965 CN 201220628965 CN 201220628965 U CN201220628965 U CN 201220628965U CN 202927262 U CN202927262 U CN 202927262U
Authority
CN
China
Prior art keywords
tunnel
pipeline
buttress
oil
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220628965
Other languages
Chinese (zh)
Inventor
王晓峰
郭成华
吴克信
杨守聪
杨晓秋
王进
胡川
胡鸿运
杨成刚
胡道华
李如海
沈选忠
向勇
胡文君
胥杰
谢健
李洪印
亢会明
曾强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Engineering and Construction Corp
Original Assignee
China National Petroleum Corp Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp Engineering Design Co Ltd filed Critical China National Petroleum Corp Engineering Design Co Ltd
Priority to CN 201220628965 priority Critical patent/CN202927262U/en
Application granted granted Critical
Publication of CN202927262U publication Critical patent/CN202927262U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline installation pillar in an oil/gas pipeline tunnel. The pipeline installation pillar comprises a tunnel bottom plate and a concrete pillar arranged on the tunnel bottom plate, wherein the concrete pillar is further provided with a steel pipe clamp; the steel pipe clamp is used for fixing the pipeline through foundation bolts; the concrete pillar is a reinforced concrete pillar; the foundation bolts are steel bolts; the foundation bolts are anchored into basement rock below the tunnel bottom plate; and the surface of the concrete pillar is provided with an arc-shaped groove. The pipeline installation pillar has the advantages that due to the adoption of the pipeline installation pillar, problems caused by direct welding of a steel structure base existing in the conventional installation way of pipelines in tunnels can be solved effectively, construction is easy and convenient, high reliability is realized, and safe operation of pipeline in the tunnel can be ensured; and meanwhile, the using quantity of steel structures is reduced, and expenses are saved.

Description

Oil and gas pipes tunnel interior conduit is installed buttress
Technical field
The utility model relates to a kind of oil and gas pipes tunnel interior conduit installation buttress.
Background technique
At present, along with the development of domestic petroleum Gas Transmission Pipeline Project, heavy caliber, long distance oil-gas pipeline need or natural obstacle artificial by various rivers, the mountain ridge etc. more and more, can adopt the Tunnel Passing mode to pass through in most of situation.Tunnel interior conduit mounting and installation mode is generally that earthing lays or buttress lays.When adopting buttress to lay, need to consider buttress, pipe clamp, basement rock three's connection pattern.
The present mounting type of tunnel interior conduit commonly used, employing be that the pre-embedded steel slab of Steel Pipe Clamp pedestal and pipeline buttress end face carries out the mode of directly welding.Present this mode need to be carried out a large amount of welding jobs in narrow limited space in the tunnel, the preservative treatment of weld joint also is difficult to reach designing requirement, and long-term non-maintaining operation produces certain potential safety hazard for the tunnel interior conduit; Simultaneously, all larger for the Steel Pipe Clamp pedestal weight and volume of larger caliber pipeline, the transportation installation in position in the tunnel is all more difficult.
The model utility content
The utility model has overcome shortcoming of the prior art, and a kind of oil and gas pipes tunnel interior conduit installation buttress is provided.
The technical solution of the utility model is: a kind of oil and gas pipes tunnel interior conduit installation buttress, comprise tunnel floor and the concrete buttress that is arranged on tunnel floor, also be provided with Steel Pipe Clamp on concrete buttress, described Steel Pipe Clamp is fixed pipeline by sill anchor.
Described concrete buttress is the reinforced concrete buttress.
Described sill anchor is the steel crab-bolt.
Described sill anchor anchors in the following basement rock of tunnel floor.
Also be provided with arc groove on the concrete buttress surface.
Compared with prior art, the utility model has the advantages that: can effectively solve the problems referred to above that existing tunnel interior conduit mounting type exists, easy construction, reliability is high, can guarantee the safe operation of pipeline in the tunnel, also reduce the steel structure consumption simultaneously, save expense.
Description of drawings
The utility model will illustrate by example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is structural representation of the present utility model.
Embodiment
A kind of oil and gas pipes tunnel interior conduit is installed buttress, as shown in Figure 1, comprise: tunnel floor 1 and the reinforced concrete buttress 2 that is arranged on tunnel floor 1, be provided with arc groove on reinforced concrete buttress 2 surfaces, in order to support and the constraint oil and gas pipes, also be provided with Steel Pipe Clamp 4 on reinforced concrete buttress 2, described Steel Pipe Clamp 4 fixes oil and gas pipes by the sill anchor 3 that anchors in the following basement rock of tunnel floor 1.
Described sill anchor 3 is the steel crab-bolt.

Claims (5)

1. an oil and gas pipes tunnel interior conduit is installed buttress, it is characterized in that: comprise tunnel floor and be arranged on concrete buttress on tunnel floor, also be provided with Steel Pipe Clamp on concrete buttress, described Steel Pipe Clamp is fixed pipeline by sill anchor.
2. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, and it is characterized in that: described concrete buttress is the reinforced concrete buttress.
3. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, and it is characterized in that: described sill anchor is the steel crab-bolt.
4. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, and it is characterized in that: described sill anchor anchors in the following basement rock of tunnel floor.
5. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, it is characterized in that: also be provided with arc groove on the concrete buttress surface.
CN 201220628965 2012-11-26 2012-11-26 Pipeline installation pillar in oil/gas pipeline tunnel Expired - Lifetime CN202927262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220628965 CN202927262U (en) 2012-11-26 2012-11-26 Pipeline installation pillar in oil/gas pipeline tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220628965 CN202927262U (en) 2012-11-26 2012-11-26 Pipeline installation pillar in oil/gas pipeline tunnel

Publications (1)

Publication Number Publication Date
CN202927262U true CN202927262U (en) 2013-05-08

Family

ID=48217222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220628965 Expired - Lifetime CN202927262U (en) 2012-11-26 2012-11-26 Pipeline installation pillar in oil/gas pipeline tunnel

Country Status (1)

Country Link
CN (1) CN202927262U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104121423A (en) * 2014-07-16 2014-10-29 中国水利水电第七工程局成都水电建设工程有限公司 U-shaped pipe diameter limit clamp and construction method of U-shaped pipe diameter limit clamp in pore way embedment
WO2015158080A1 (en) * 2014-04-14 2015-10-22 黄欣 Reinforced concrete support pier for use in supporting underground water supply steel pipeline conduit construction
CN106247017A (en) * 2016-07-29 2016-12-21 华蓝设计(集团)有限公司 Medium caliber self-bearing type flat shape steel pipe bridge large span bearing method and device
CN107066688A (en) * 2017-02-26 2017-08-18 中国石油天然气集团公司 Bore the anti-floating design methods of GFRP of quick-fried Tunnel Passing pipeline in a kind of waters
CN110096825A (en) * 2019-05-08 2019-08-06 中国石油天然气集团有限公司 The Seismic Design Method of roughing-in is maked somebody a mere figurehead in a kind of oil-gas transportation tunnel

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015158080A1 (en) * 2014-04-14 2015-10-22 黄欣 Reinforced concrete support pier for use in supporting underground water supply steel pipeline conduit construction
CN104121423A (en) * 2014-07-16 2014-10-29 中国水利水电第七工程局成都水电建设工程有限公司 U-shaped pipe diameter limit clamp and construction method of U-shaped pipe diameter limit clamp in pore way embedment
CN104121423B (en) * 2014-07-16 2017-01-11 中国水利水电第七工程局成都水电建设工程有限公司 Construction method of U-shaped pipe diameter limit clamp in pore way embedment
CN106247017A (en) * 2016-07-29 2016-12-21 华蓝设计(集团)有限公司 Medium caliber self-bearing type flat shape steel pipe bridge large span bearing method and device
CN106247017B (en) * 2016-07-29 2019-04-30 华蓝设计(集团)有限公司 Medium caliber self-bearing type flat shape steel pipe bridge large span bearing method and device
CN107066688A (en) * 2017-02-26 2017-08-18 中国石油天然气集团公司 Bore the anti-floating design methods of GFRP of quick-fried Tunnel Passing pipeline in a kind of waters
CN107066688B (en) * 2017-02-26 2020-07-10 中国石油天然气集团有限公司 GFRP anti-floating design method for water area drilling and blasting tunnel crossing pipeline
CN110096825A (en) * 2019-05-08 2019-08-06 中国石油天然气集团有限公司 The Seismic Design Method of roughing-in is maked somebody a mere figurehead in a kind of oil-gas transportation tunnel

Similar Documents

Publication Publication Date Title
CN202927262U (en) Pipeline installation pillar in oil/gas pipeline tunnel
CN107460888B (en) Mounting structure and method for concrete prefabricated pipe gallery
CN204898721U (en) Steel construction city utility tunnel
CN205479706U (en) Push pipe work jing ding advances structure
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN106869174A (en) A kind of U-shaped Combined type concrete prefabricated box culvert
CN105065009A (en) Method for shield expanding construction of subway station
CN104032676B (en) A kind of horizontal drawing cable bridge steel wire rope self-anchored type bridge abutment structure
CN204591306U (en) A kind of combined steel pipe concrete bow member for supporting
CN203393740U (en) Integral reinforced concrete foundation structure for assembling drainage pipelines
CN210397920U (en) Horizontal sliding support system for transporting and supporting pipelines inside underground comprehensive pipe gallery
CN209925003U (en) Built on stilts antidetonation buttress that lays of pipe in shield tunnel
CN209494575U (en) A kind of push pipe portal sealing device under low Water And Earth Pressures
CN203099080U (en) Protecting device of buried gas pipeline
CN202500096U (en) Rain water box culvert crossing underground pipeline protection device
CN206635812U (en) A kind of U-shaped Combined type concrete prefabricated box culvert
CN204941552U (en) A kind of subway station of parallel shield method enlarging construction
CN202047850U (en) Anchor-grouting integrated support plate module
CN203718163U (en) Guide sliding support for laying natural gas pipeline along with bridge
CN103835295B (en) Petroleum pipeline construction method is worn under a kind of deep basal pit soil pipe
CN105908778A (en) Comprehensive pipe rack for corrugated spiral pipe structure
CN202451974U (en) Anti-floating structure of buried pipeline
CN202148496U (en) Open sea inlet channel structure of key wall type box culvert
CN112609741A (en) In-situ protection structure and method for large-diameter pipeline of open cut station of rail transit
CN207597430U (en) A kind of Urban Underground piping lane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180115

Address after: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6

Patentee after: CHINA PETROLEUM ENGINEERING & CONSTRUCTION Corp.

Address before: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6

Patentee before: CNPC ENGINEERING DESIGN Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20130508

CX01 Expiry of patent term