CN202927262U - Pipeline installation pillar in oil/gas pipeline tunnel - Google Patents
Pipeline installation pillar in oil/gas pipeline tunnel Download PDFInfo
- Publication number
- CN202927262U CN202927262U CN 201220628965 CN201220628965U CN202927262U CN 202927262 U CN202927262 U CN 202927262U CN 201220628965 CN201220628965 CN 201220628965 CN 201220628965 U CN201220628965 U CN 201220628965U CN 202927262 U CN202927262 U CN 202927262U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- pipeline
- buttress
- oil
- pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipeline installation pillar in an oil/gas pipeline tunnel. The pipeline installation pillar comprises a tunnel bottom plate and a concrete pillar arranged on the tunnel bottom plate, wherein the concrete pillar is further provided with a steel pipe clamp; the steel pipe clamp is used for fixing the pipeline through foundation bolts; the concrete pillar is a reinforced concrete pillar; the foundation bolts are steel bolts; the foundation bolts are anchored into basement rock below the tunnel bottom plate; and the surface of the concrete pillar is provided with an arc-shaped groove. The pipeline installation pillar has the advantages that due to the adoption of the pipeline installation pillar, problems caused by direct welding of a steel structure base existing in the conventional installation way of pipelines in tunnels can be solved effectively, construction is easy and convenient, high reliability is realized, and safe operation of pipeline in the tunnel can be ensured; and meanwhile, the using quantity of steel structures is reduced, and expenses are saved.
Description
Technical field
The utility model relates to a kind of oil and gas pipes tunnel interior conduit installation buttress.
Background technique
At present, along with the development of domestic petroleum Gas Transmission Pipeline Project, heavy caliber, long distance oil-gas pipeline need or natural obstacle artificial by various rivers, the mountain ridge etc. more and more, can adopt the Tunnel Passing mode to pass through in most of situation.Tunnel interior conduit mounting and installation mode is generally that earthing lays or buttress lays.When adopting buttress to lay, need to consider buttress, pipe clamp, basement rock three's connection pattern.
The present mounting type of tunnel interior conduit commonly used, employing be that the pre-embedded steel slab of Steel Pipe Clamp pedestal and pipeline buttress end face carries out the mode of directly welding.Present this mode need to be carried out a large amount of welding jobs in narrow limited space in the tunnel, the preservative treatment of weld joint also is difficult to reach designing requirement, and long-term non-maintaining operation produces certain potential safety hazard for the tunnel interior conduit; Simultaneously, all larger for the Steel Pipe Clamp pedestal weight and volume of larger caliber pipeline, the transportation installation in position in the tunnel is all more difficult.
The model utility content
The utility model has overcome shortcoming of the prior art, and a kind of oil and gas pipes tunnel interior conduit installation buttress is provided.
The technical solution of the utility model is: a kind of oil and gas pipes tunnel interior conduit installation buttress, comprise tunnel floor and the concrete buttress that is arranged on tunnel floor, also be provided with Steel Pipe Clamp on concrete buttress, described Steel Pipe Clamp is fixed pipeline by sill anchor.
Described concrete buttress is the reinforced concrete buttress.
Described sill anchor is the steel crab-bolt.
Described sill anchor anchors in the following basement rock of tunnel floor.
Also be provided with arc groove on the concrete buttress surface.
Compared with prior art, the utility model has the advantages that: can effectively solve the problems referred to above that existing tunnel interior conduit mounting type exists, easy construction, reliability is high, can guarantee the safe operation of pipeline in the tunnel, also reduce the steel structure consumption simultaneously, save expense.
Description of drawings
The utility model will illustrate by example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is structural representation of the present utility model.
Embodiment
A kind of oil and gas pipes tunnel interior conduit is installed buttress, as shown in Figure 1, comprise: tunnel floor 1 and the reinforced concrete buttress 2 that is arranged on tunnel floor 1, be provided with arc groove on reinforced concrete buttress 2 surfaces, in order to support and the constraint oil and gas pipes, also be provided with Steel Pipe Clamp 4 on reinforced concrete buttress 2, described Steel Pipe Clamp 4 fixes oil and gas pipes by the sill anchor 3 that anchors in the following basement rock of tunnel floor 1.
Described sill anchor 3 is the steel crab-bolt.
Claims (5)
1. an oil and gas pipes tunnel interior conduit is installed buttress, it is characterized in that: comprise tunnel floor and be arranged on concrete buttress on tunnel floor, also be provided with Steel Pipe Clamp on concrete buttress, described Steel Pipe Clamp is fixed pipeline by sill anchor.
2. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, and it is characterized in that: described concrete buttress is the reinforced concrete buttress.
3. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, and it is characterized in that: described sill anchor is the steel crab-bolt.
4. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, and it is characterized in that: described sill anchor anchors in the following basement rock of tunnel floor.
5. oil and gas pipes according to claim 1 tunnel interior conduit is installed buttress, it is characterized in that: also be provided with arc groove on the concrete buttress surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220628965 CN202927262U (en) | 2012-11-26 | 2012-11-26 | Pipeline installation pillar in oil/gas pipeline tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220628965 CN202927262U (en) | 2012-11-26 | 2012-11-26 | Pipeline installation pillar in oil/gas pipeline tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202927262U true CN202927262U (en) | 2013-05-08 |
Family
ID=48217222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220628965 Expired - Lifetime CN202927262U (en) | 2012-11-26 | 2012-11-26 | Pipeline installation pillar in oil/gas pipeline tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202927262U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104121423A (en) * | 2014-07-16 | 2014-10-29 | 中国水利水电第七工程局成都水电建设工程有限公司 | U-shaped pipe diameter limit clamp and construction method of U-shaped pipe diameter limit clamp in pore way embedment |
WO2015158080A1 (en) * | 2014-04-14 | 2015-10-22 | 黄欣 | Reinforced concrete support pier for use in supporting underground water supply steel pipeline conduit construction |
CN106247017A (en) * | 2016-07-29 | 2016-12-21 | 华蓝设计(集团)有限公司 | Medium caliber self-bearing type flat shape steel pipe bridge large span bearing method and device |
CN107066688A (en) * | 2017-02-26 | 2017-08-18 | 中国石油天然气集团公司 | Bore the anti-floating design methods of GFRP of quick-fried Tunnel Passing pipeline in a kind of waters |
CN110096825A (en) * | 2019-05-08 | 2019-08-06 | 中国石油天然气集团有限公司 | The Seismic Design Method of roughing-in is maked somebody a mere figurehead in a kind of oil-gas transportation tunnel |
-
2012
- 2012-11-26 CN CN 201220628965 patent/CN202927262U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015158080A1 (en) * | 2014-04-14 | 2015-10-22 | 黄欣 | Reinforced concrete support pier for use in supporting underground water supply steel pipeline conduit construction |
CN104121423A (en) * | 2014-07-16 | 2014-10-29 | 中国水利水电第七工程局成都水电建设工程有限公司 | U-shaped pipe diameter limit clamp and construction method of U-shaped pipe diameter limit clamp in pore way embedment |
CN104121423B (en) * | 2014-07-16 | 2017-01-11 | 中国水利水电第七工程局成都水电建设工程有限公司 | Construction method of U-shaped pipe diameter limit clamp in pore way embedment |
CN106247017A (en) * | 2016-07-29 | 2016-12-21 | 华蓝设计(集团)有限公司 | Medium caliber self-bearing type flat shape steel pipe bridge large span bearing method and device |
CN106247017B (en) * | 2016-07-29 | 2019-04-30 | 华蓝设计(集团)有限公司 | Medium caliber self-bearing type flat shape steel pipe bridge large span bearing method and device |
CN107066688A (en) * | 2017-02-26 | 2017-08-18 | 中国石油天然气集团公司 | Bore the anti-floating design methods of GFRP of quick-fried Tunnel Passing pipeline in a kind of waters |
CN107066688B (en) * | 2017-02-26 | 2020-07-10 | 中国石油天然气集团有限公司 | GFRP anti-floating design method for water area drilling and blasting tunnel crossing pipeline |
CN110096825A (en) * | 2019-05-08 | 2019-08-06 | 中国石油天然气集团有限公司 | The Seismic Design Method of roughing-in is maked somebody a mere figurehead in a kind of oil-gas transportation tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202927262U (en) | Pipeline installation pillar in oil/gas pipeline tunnel | |
CN107460888B (en) | Mounting structure and method for concrete prefabricated pipe gallery | |
CN204898721U (en) | Steel construction city utility tunnel | |
CN205479706U (en) | Push pipe work jing ding advances structure | |
CN102518300B (en) | Embedded conical bearing joint type steel structure support and construction method thereof | |
CN106869174A (en) | A kind of U-shaped Combined type concrete prefabricated box culvert | |
CN105065009A (en) | Method for shield expanding construction of subway station | |
CN104032676B (en) | A kind of horizontal drawing cable bridge steel wire rope self-anchored type bridge abutment structure | |
CN204591306U (en) | A kind of combined steel pipe concrete bow member for supporting | |
CN203393740U (en) | Integral reinforced concrete foundation structure for assembling drainage pipelines | |
CN210397920U (en) | Horizontal sliding support system for transporting and supporting pipelines inside underground comprehensive pipe gallery | |
CN209925003U (en) | Built on stilts antidetonation buttress that lays of pipe in shield tunnel | |
CN209494575U (en) | A kind of push pipe portal sealing device under low Water And Earth Pressures | |
CN203099080U (en) | Protecting device of buried gas pipeline | |
CN202500096U (en) | Rain water box culvert crossing underground pipeline protection device | |
CN206635812U (en) | A kind of U-shaped Combined type concrete prefabricated box culvert | |
CN204941552U (en) | A kind of subway station of parallel shield method enlarging construction | |
CN202047850U (en) | Anchor-grouting integrated support plate module | |
CN203718163U (en) | Guide sliding support for laying natural gas pipeline along with bridge | |
CN103835295B (en) | Petroleum pipeline construction method is worn under a kind of deep basal pit soil pipe | |
CN105908778A (en) | Comprehensive pipe rack for corrugated spiral pipe structure | |
CN202451974U (en) | Anti-floating structure of buried pipeline | |
CN202148496U (en) | Open sea inlet channel structure of key wall type box culvert | |
CN112609741A (en) | In-situ protection structure and method for large-diameter pipeline of open cut station of rail transit | |
CN207597430U (en) | A kind of Urban Underground piping lane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180115 Address after: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6 Patentee after: CHINA PETROLEUM ENGINEERING & CONSTRUCTION Corp. Address before: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6 Patentee before: CNPC ENGINEERING DESIGN Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20130508 |
|
CX01 | Expiry of patent term |