CN211172389U - Basic base of air film building - Google Patents

Basic base of air film building Download PDF

Info

Publication number
CN211172389U
CN211172389U CN201921842258.0U CN201921842258U CN211172389U CN 211172389 U CN211172389 U CN 211172389U CN 201921842258 U CN201921842258 U CN 201921842258U CN 211172389 U CN211172389 U CN 211172389U
Authority
CN
China
Prior art keywords
air film
wall body
base
fixedly connected
door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921842258.0U
Other languages
Chinese (zh)
Inventor
李严龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Meibo Tensioned Membrane Structure Engineering Co ltd
Original Assignee
Shenzhen Meibo Tensioned Membrane Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Meibo Tensioned Membrane Structure Engineering Co ltd filed Critical Shenzhen Meibo Tensioned Membrane Structure Engineering Co ltd
Priority to CN201921842258.0U priority Critical patent/CN211172389U/en
Application granted granted Critical
Publication of CN211172389U publication Critical patent/CN211172389U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a foundation base of gas film building relates to gas film building technical field, including the gas film main part, the bottom fixedly connected with welding ring of gas film main part, the bottom fixedly connected with wall body of welding ring, one side fixedly connected with base of wall body, the guiding gutter has been seted up to one side of wall body, the chute has been seted up to one side of base, one side of wall body is provided with a control gate. According to the foundation base of the air film building, the air film main body, the welding ring, the wall body, the base, the diversion trench and the chute are arranged in a matched mode, so that the discharge of water at the top can be reasonably controlled, and the problem that water is easy to accumulate around the existing foundation base is solved; through the cooperation setting of wall body, first control door, the door body, air inlet hole, cavity, sealed dog and second control door, can keep building inside atmospheric pressure to keep invariable, solved the current condition that influences the inside stability of air film building that gas flows through the door.

Description

Basic base of air film building
Technical Field
The utility model relates to an air film building technical field specifically is a basic base of air film building.
Background
The air film building refers to a building structure system which uses a special building film material as a shell and is provided with a set of intelligent electromechanical equipment to provide positive pressure of air in the air film building so as to support a building main body. The air film working principle, the complete air film building system, the lighting system and the access control system. 1. The air film supports the whole building by the difference of internal and external air pressure. Due to the flexibility of the material and the inherent effectiveness of the structure and the arcuate shape, there are no members that are bent, twisted and stressed; 2. the interior of the frame is not required to be supported by any frame or beam column, and the span can reach 110 meters; 3. as can be seen from the lower graph, the oxygen content of the environment is increased along with the rise of the atmospheric pressure, so that the air pressure difference between the inside and the outside of the air film does not have any adverse effect on the human body, but is helpful for people to do sports activities or do physical work; the difference between the internal pressure and the external pressure is 250Pa, and the pressure is about 0.0025 atmospheric pressure (corresponding to the pressure difference between 1 floor and 9 floors of a normal building). The air film building has the following characteristics: 1. safety of air film construction; 2. gas film building economics; 3. air film building comfort; and 4, air film building convenience. Application of air film building: 1. the cultural tourism industry; 2. the sports industry; 3. the environmental protection industry; 4. military application industries; 5. other industries. The base and door structure of air film buildings are important components of air film buildings.
The existing foundation base of the air film building has the following defects:
1. the water flow of the air film building can be naturally discharged in rainy and snowy weather, but the excessive water accumulation around the building is easy to influence the surrounding environment;
2. when the air film building enters and exits, air pressure difference exists between the inside and the outside of the building, and a large amount of air flows out when the door is opened and closed, so that the stability of the internal structure is influenced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a basic base of air film building, through the bottom fixedly connected with welding collar in the air film main part, the bottom fixedly connected with wall body of welding collar, the guiding gutter has been seted up to one side of wall body, the chute has been seted up to one side of base, one side of wall body is provided with first control door, the air inlet hole has been seted up at the top of the door body, the bottom of the door body is provided with the cavity, the sealed dog of bottom fixedly connected with of the door body, the bottom swing joint of the door body has the second control door, the problem of proposing among the above-mentioned background art has been solved.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a basic base of air film building, includes the air film main part, the bottom fixedly connected with welding circle of air film main part, the bottom fixedly connected with wall body of welding circle, one side fixedly connected with base of wall body, the guiding gutter has been seted up to one side of wall body, the chute has been seted up to one side of base, one side of wall body is provided with first control door, the top swing joint of first control door has a body, the inlet opening has been seted up at the top of the door body, the bottom of the door body is provided with the cavity, the sealed dog of the bottom fixedly connected with of the door body, the bottom swing joint of the door body has the second control door.
Optionally, the material of the gas film main body is polytetrafluoroethylene, the cross-sectional shape of the gas film main body is arc-shaped, and the gas film main body is fixedly connected with the wall body through a welding ring.
Optionally, the diameter of the wall is greater than the diameter of the air film main body, the height of the wall is greater than the height of the air film main body, and the height of the outer edge of the top of the wall is greater than the height of the inner edge.
Optionally, the cross-sectional shape of the flow guide groove is semicircular, and one side of the flow guide groove and one side of the air film main body are located on the same vertical plane.
Optionally, the base is triangular in cross section, and the diameter of the base is larger than that of the wall.
Optionally, the top of the first control door is fixedly connected with a transmission device, and the first control door is movably connected with the door body through the transmission device.
Optionally, the sealing stopper is adapted to the first control door, and the sealing stopper is adapted to the second control door.
(III) advantageous effects
The utility model provides a basic base of air film building possesses following beneficial effect:
1. the gas film building foundation base is characterized in that the welding ring is fixedly connected at the bottom of the gas film main body, the wall body is fixedly connected at the bottom of the welding ring, the gas film main body and the wall body can be fixedly connected through the welding ring, the diversion trench is arranged on one side of the wall body, the chute is arranged on one side of the base, the cross section of the base is triangular, the wall body can be effectively supported and fixed, rain and snow can be discharged through the diversion trench and the chute, when the air film main body is cleaned, the water flow can be discharged more conveniently, the height of the outer edge of the top of the wall body is greater than that of the inner edge, the water flow can be blocked by the outer edge and is discharged completely through the diversion trench and the chute, through the cooperation setting of gas film main part, welding circle, wall body, base, guiding gutter and chute, can make the emission of top water obtain reasonable control to better earial drainage during the washing has solved the condition of current peripheral easy ponding.
2. The basic base of the air film building is provided with a first control door through one side of a wall body, the first control door is movably connected with a door body through a transmission device, the first control door can be opened firstly when entering the air film building and is closed when entering a cavity body to prevent excessive gas leakage, an air inlet hole is formed in the top of the door body, the bottom of the door body is provided with the cavity body, the cavity body can be inflated after a person enters the cavity body, the air pressure just before the cavity body is recovered and is consistent with the air pressure inside the building, a sealing stop block is fixedly connected to the bottom of the door body, a second control door is movably connected to the bottom of the door body, after the cavity body is inflated, the second control door is opened, the gas inside the building does not flow, the air pressure inside the building is kept constant, and therefore the stability of the air film building is kept, and the air film building is formed by the wall body, the first control door, The cooperation setting of cavity, sealed dog and second control door can keep building inside atmospheric pressure to keep invariable, has solved the condition that current gas flows through the door and influences the inside stability of air film building.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a first view structural diagram of the door of the present invention;
fig. 3 is a schematic view of a second view structure of the door of the present invention.
In the figure: 1-a gas film main body, 2-a welding ring, 3-a wall body, 4-a base, 5-a diversion trench, 6-a chute, 7-a first control door, 8-a door body, 9-an air inlet hole, 10-a cavity body, 11-a sealing stop block and 12-a second control door.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a basic base of air film building, including air film main part 1, the bottom fixedly connected with welding circle 2 of air film main part 1, the bottom fixedly connected with wall body 3 of welding circle 2, one side fixedly connected with base 4 of wall body 3, guiding gutter 5 has been seted up to one side of wall body 3, chute 6 has been seted up to one side of base 4, one side of wall body 3 is provided with first control door 7, the top swing joint of first control door 7 has a door body 8, air inlet hole 9 has been seted up at the top of door body 8, the bottom of door body 8 is provided with cavity 10, the sealed dog 11 of bottom fixedly connected with of door body 8, the bottom swing joint of door body 8 has second control door 12.
As an optimal technical solution of the utility model: the air film main body 1 is made of polytetrafluoroethylene, the cross section of the air film main body 1 is arc-shaped, the air film main body 1 is fixedly connected with a wall body through a welding ring 2, the air film main body 1 is high-temperature resistant, corrosion resistant, non-stick, self-lubricating and easy to clean, the diameter of the wall body 3 is larger than that of the air film main body 1, the height of the outer edge of the top of the wall body 3 is larger than that of the inner edge, the air film main body 1 is used as a top cover to reduce the volume of the air film main body 1 and enhance the wind resistance of a building, the cross section of the diversion trench 5 is semicircular, one side of the diversion trench 5 and one side of the air film main body 1 are positioned on the same vertical plane, rainwater flows down from the top of the air film main body 1 to the top of the wall body 3 firstly and is blocked by the outer edge, flows into the diversion trench 5 and is discharged from, the diameter of base 4 is greater than the diameter of wall body 3, the top fixedly connected with transmission of first control door 7, and first control door 7 passes through transmission and a body 8 swing joint, and sealed dog 11 and first control door 7 looks adaptation, sealed dog 11 and second control door 12 looks adaptation, when the switching of control door, the two parts of control door enter into sealed dog 11.
When the user uses, the surface temperature of air film main part 1 is higher, snow is automatic to become water, flow down from the top of air film main part 1, flow to the top of wall body 3 earlier, be blocked by outer edge, flow to guiding gutter 5, discharge from chute 6, simultaneously when wasing, when getting into the building, open first control door 7 earlier, get into in the cavity 10, aerify cavity 10, make its atmospheric pressure the same with the inside atmospheric pressure of building, open second control door 12 again, get into inside the building, aerify cavity 10 earlier when going out the building, open second control door 12 again, close second control door 12, open first control door 7.
To sum up, when the basic base of the air film building is used, the welding ring 2 is fixedly connected to the bottom of the air film main body 1, the wall body 3 is fixedly connected to the bottom of the welding ring 2, the air film main body 1 and the wall body 3 can be fixedly connected through the welding ring 2, the diversion trench 5 is formed in one side of the wall body 3, the chute 6 is formed in one side of the base 4, the cross-sectional shape of the base 4 is triangular, the wall body 3 can be effectively supported and fixed, rain and snow can be discharged through the diversion trench 5 and the chute 6, when the air film main body 1 is cleaned, water flow can be more conveniently discharged, the height of the outer edge of the top of the wall body 3 is larger than that of the inner edge, the water flow can be blocked by the outer edge and can be completely discharged through the diversion trench 5 and the chute 6, and the air film main body 1, the welding ring 2, the wall body 3, the base 4, the diversion trench 5 and the chute 6 are matched, the discharge of water at the top can be reasonably controlled, and the water can be better drained during cleaning, so that the existing situation that water is easy to accumulate around is solved; the first control door 7 is arranged on one side of the wall body 3, the first control door 7 is movably connected with the door body 8 through the transmission device, when the air film building enters, the first control door 7 can be opened firstly, the air film building enters the cavity 10 to be closed, excessive gas leakage is prevented, the air inlet hole 9 is formed in the top of the door body 8, the cavity 10 is arranged at the bottom of the door body 8, the cavity 10 can be inflated after a person enters the cavity 10, the air pressure of the cavity 10 is recovered to be consistent with the air pressure inside the building, the sealing stop block 11 is fixedly connected to the bottom of the door body 8, the second control door 12 is movably connected to the bottom of the door body 8, after the cavity 10 is inflated, the second control door 12 is opened, the gas inside the building does not flow, the air pressure inside the building is kept constant, and the stability of the air film building is kept, and the air film building can be formed by the wall body 3 and, The door body 8, the air inlet hole 9, the cavity 10, the sealing stop block 11 and the second control door 12 are arranged in a matched mode, so that the air pressure inside the building can be kept constant, and the problem that the stability inside the air film building is influenced by the flowing of the existing gas through the door is solved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a basic base of air film building which characterized in that: including gas film main part (1), bottom fixedly connected with welding collar (2) of gas film main part (1), bottom fixedly connected with wall body (3) of welding collar (2), one side fixedly connected with base (4) of wall body (3), guiding gutter (5) have been seted up to one side of wall body (3), chute (6) have been seted up to one side of base (4), one side of wall body (3) is provided with first control door (7), the top swing joint of first control door (7) has a body (8), air inlet hole (9) have been seted up at the top of the body (8), the bottom of the body (8) is provided with cavity (10), the bottom fixedly connected with sealing stop block (11) of the body (8), the bottom swing joint of the body (8) has second control door (12).
2. The foundation footing of claim 1 wherein: the air film is characterized in that the air film main body (1) is made of polytetrafluoroethylene, the cross section of the air film main body (1) is arc-shaped, and the air film main body (1) is fixedly connected with a wall body through a welding ring (2).
3. The foundation footing of claim 1 wherein: the diameter of the wall body (3) is larger than that of the air film main body (1), the height of the wall body (3) is larger than that of the air film main body (1), and the height of the outer edge of the top of the wall body (3) is larger than that of the inner edge.
4. The foundation footing of claim 1 wherein: the cross section of the flow guide groove (5) is semicircular, and one side of the flow guide groove (5) and one side of the air film main body (1) are positioned on the same vertical plane.
5. The foundation footing of claim 1 wherein: the cross-sectional shape of base (4) is triangle-shaped, the diameter of base (4) is greater than the diameter of wall body (3).
6. The foundation footing of claim 1 wherein: the top of the first control door (7) is fixedly connected with a transmission device, and the first control door (7) is movably connected with the door body (8) through the transmission device.
7. The foundation footing of claim 1 wherein: the sealing stop block (11) is matched with the first control door (7), and the sealing stop block (11) is matched with the second control door (12).
CN201921842258.0U 2019-10-30 2019-10-30 Basic base of air film building Active CN211172389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921842258.0U CN211172389U (en) 2019-10-30 2019-10-30 Basic base of air film building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921842258.0U CN211172389U (en) 2019-10-30 2019-10-30 Basic base of air film building

Publications (1)

Publication Number Publication Date
CN211172389U true CN211172389U (en) 2020-08-04

Family

ID=71796645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921842258.0U Active CN211172389U (en) 2019-10-30 2019-10-30 Basic base of air film building

Country Status (1)

Country Link
CN (1) CN211172389U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814012A (en) * 2021-01-25 2021-05-18 中成空间(深圳)智能技术有限公司 Basic base of air film building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814012A (en) * 2021-01-25 2021-05-18 中成空间(深圳)智能技术有限公司 Basic base of air film building
CN112814012B (en) * 2021-01-25 2022-04-05 中成空间(深圳)智能技术有限公司 Basic base of air film building

Similar Documents

Publication Publication Date Title
CN211172389U (en) Basic base of air film building
CN104594767A (en) Sliding device
CN206529799U (en) A kind of novel buoyant inspection shaft
CN205259333U (en) But self sealing formula floor drain
CN203270764U (en) Floor drain
CN114108693B (en) Ponding prevention pipe gallery well cover based on sponge city and ponding prevention method thereof
CN210636551U (en) Water-sealed well head
CN207017906U (en) A kind of water drainage window frame structure
CN213204738U (en) Go out roofing pipeline waterproof construction
CN107969378A (en) Fish pond automatic protector
CN106212363A (en) Fish pond environmental protection drainage arrangement
CN204252259U (en) The dewatering installation of tool insect protected odor-resistant result
CN208733759U (en) Box-type room use in toilet squatting pan and box-type room toilet
CN202450609U (en) Automatic sewage draining device for preventing sewage from overflowing
CN2934441Y (en) Block-proof cover for roofing rain pipe
CN206143744U (en) Paddy field environmental protection automatic water discharging device
CN207392387U (en) A kind of fast row's odour-proof floor drain
CN220353001U (en) Building drainage structure
CN207277706U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system
CN204677064U (en) Push-pull device at fixed
CN107130901A (en) A kind of forms spray dust prevention system
CN205171650U (en) Heavy pond of pre -buried formula floor floor drain
CN209687209U (en) A kind of windowsill that floats with waterproof construction
CN210483390U (en) Prefabricated windowsill of low antiseep outside high
CN205259334U (en) Draining member of floor drain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant