CN207277706U - A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system - Google Patents
A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system Download PDFInfo
- Publication number
- CN207277706U CN207277706U CN201721189304.2U CN201721189304U CN207277706U CN 207277706 U CN207277706 U CN 207277706U CN 201721189304 U CN201721189304 U CN 201721189304U CN 207277706 U CN207277706 U CN 207277706U
- Authority
- CN
- China
- Prior art keywords
- roof
- scupper
- frame
- drainage system
- rise building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model discloses a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system, it is related to draining field, more particularly to a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system, its key points of the technical solution are that:A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system, including roofing body, the leak-off chute for being distributed in four side of roofing body, the scupper arranged on corner, the roofing body are equipped with four piece combined triangular shape weather shields, and weather shield is obliquely installed laterally by centre;Each scupper is communicated with rain pipe, and the rain pipe is sector close to the one end on ground.When rainwater is fallen on roofing body, fall on first on weather shield, since the high surrounding in weather shield centre triangular in shape is low, it is obliquely installed again, the rainwater fallen on weather shield can quickly slide along the surface of weather shield to lower diffusion type, so as to fall in leak-off chute, and fallen directly on by the scupper in leak-off chute on ground, so as to achieve the purpose that quickly to discharge rainwater.
Description
Technical field
Draining field is the utility model is related to, more particularly to a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system.
Background technology
With being getting faster for city process, land resource growing tension, therefore the house of people's building is higher and higher, when
It is particularly important that building construction is higher, the draining of house top.
By retrieval, notification number is the Chinese patent of CN204475701U, discloses a kind of building roof drainage system, is wrapped
Include the roof drain being arranged on above roof, the connecting tube being connected with roof drain, the column pipe being connected with connecting tube bottom and connecting tube
And column pipe junction set automatic air intaking valve, the bend pipe between column pipe and standpipe, the pressure in standpipe pass
Sensor, the booster pump arranged on outside.When needing draining, by pressure sensor come the size of induction pressure, so as to change increasing
The size of press pump supercharging, so as to achieve the purpose that Quick drainage.
But there are the following problems for above-mentioned technical proposal:Only it is slow by booster pump supercharging drainage speed.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING draining system
System, has the advantages that rainwater being quickly discharged to ground.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING
Drainage system, including roofing body, the leak-off chute for being distributed in four side of roofing body, the scupper arranged on corner, the roof sheet
Body is equipped with four piece combined triangular shape weather shields, and weather shield is obliquely installed laterally by centre;Each scupper connects
Rain pipe is connected with, the rain pipe is sector close to the one end on ground.
Through the above technical solutions, rainwater is fallen on weather shield first when rainy, due to weather shield centre triangular in shape
High surrounding is low, and is obliquely installed, and the rainwater fallen on weather shield can quickly slide along the surface of weather shield to lower diffusion type,
So as to fall in leak-off chute, and fallen directly on ground by the scupper in leak-off chute, and set at storm outfall
For sector, so as to reach the effect for quickly discharging rainwater.
Preferably, the scupper is equipped with protective cover.
Through the above technical solutions, protective cover can prevent debris big on roofing body from entering in scupper, influence
The flowing velocity of rainwater.
Preferably, the first erecting bed is equipped with the scupper, the first erecting bed is equipped with raised roof drain.
Through the above technical solutions, the rainwater in scupper can be carried out rectification by roof drain, make rainwater quickly from rainwater
Flowed in mouthful on ground, rain pipe be set below roof drain, rain pipe can drain rainwater so that accelerate rainwater from
The speed flowed out in rain pipe.The first erecting bed can intercept a part of debris at the same time, after opening protective cover, can clean.
Preferably, some gutters are evenly equipped with the weather shield.
Through the above technical solutions, set gutter on weather shield, when rainwater is fallen on weather shield, rainwater is along keeping off the rain
Gutter on plate is flowed in leak-off chute, so that accelerating rainwater falls on speed in leak-off chute, improves rainwater from scupper
The speed of middle outflow.
Preferably, the leak-off chute middle part is high, and both sides are low.
Through the above technical solutions, high both sides are low among leak-off chute, can be toward leak-off chute both sides into the rainwater in leak-off chute
Flowing, so as to accelerate the speed that rainwater is fallen from scupper.
Preferably, the shape of the scupper is sector.
Through the above technical solutions, the shape of scupper is sector, the speed that rainwater is fallen from scupper can be improved,
And the flow that rainwater is flowed out from drain gully can be increased.
Preferably, the rain pipe is equipped with protective layer.
Through the above technical solutions, since rain pipe is exposed for a long time outside, summer prolonged exposure, winter is for a long time
Freezing, be easy to cause rain pipe damage, set on rain pipe protective layer to extend the service life of rain pipe.
The technical program gain effect is:The utility model on roofing body by setting weather shield, the rain when rainy
Water is fallen on weather shield first, since the high surrounding in weather shield centre triangular in shape is low, and is obliquely installed, is fallen on the rain on weather shield
Water can quickly slide along the surface of weather shield to lower diffusion type, so that fall in leak-off chute, and by leak-off chute
Scupper is fallen directly on ground, and is arranged to fan-shaped at storm outfall, is accelerated rainwater and is quickly discharged.
Brief description of the drawings
Fig. 1 is a kind of the first visual angle of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system schematic diagram;
Fig. 2 is A portions enlarged drawing in Fig. 1;
Fig. 3 is a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system sectional view;
Fig. 4 is a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system rain pipe sectional view, it is intended to represents protective layer.
Reference numeral:1st, roofing body;2nd, leak-off chute;3rd, scupper;4th, weather shield;5th, gutter;6th, protective cover;7th, rain
Bucket;8th, rain pipe;9th, protective layer.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system as shown in Figure 1, including roofing body 1, pass through assembling on roofing body 1
There are four pieces of weather shields 4, weather shield 4 is triangle, by being obliquely installed laterally among roof on roofing body 1.Assembling mode
Can be bolted, rivet, welding.Preferred bolt connects, and when accumulation has excessive debris, such as during leaf, can tear open respectively
Lower cleaning.Surrounding is provided with leak-off chute 2 on roofing body 1, and 2 intersection of each two leak-off chute, 1 four jiaos of roofing body are provided with a leakage
The mouth of a river 3.A protective cover 6 is welded with scupper 3.
As shown in figure 3, low surrounding is high among weather shield 4, some gutters 5, gutter are also uniformly provided with weather shield 4
5 are connected with leak-off chute 2.The height of leak-off chute 2 is low middle high for both sides.When rainwater is fallen on weather shield 4, rainwater is by keeping off the rain
Gutter 5 on plate 4 is flowed in leak-off chute 2, and the rainwater in leak-off chute 2 is from the centre position of leak-off chute 2 to 2 liang of leak-off chute
Side is flowed, so that rainwater enters in scupper 3, rainwater is fallen from scupper 3, and the port shape of scupper 3 is sector.
As depicted in figs. 1 and 2, the first erecting bed being equipped with scupper 3, the first erecting bed can intercept a part of debris,
After opening protective cover, it can clean.First erecting bed is equipped with a raised roof drain 7, and roof drain can be by scupper
Rainwater carry out rectification, rainwater is quickly flowed to from inlet for stom water on ground.The bottom connection rain pipe 8 of roof drain 7, rainwater
Pipe 8 is connected with ground, and the one end being connected with ground is sector.One layer is also cased with conjunction with shown in Fig. 4, rain pipe 8 is fanned
Protective layer 9.When rainwater is flowed in scupper 3, rainwater flows through roof drain 7 and is flowed to by rain pipe 8 on ground.
It is a kind of course of work of high-rise roof drainage system below:
When rainy, rainwater is first fallen on weather shield 4 before falling on roofing body 1, and rainwater is through the gutter on weather shield 4
5 flow into the leak-off chute 2 being connected with gutter 5.When rainwater reaches leak-off chute 2, rainwater is from 2 centre position of leak-off chute to leak
2 both sides of groove are flowed, and are flowed into scupper 3.When rainwater is flowed at scupper 3, rainwater passes through the roof drain 7 in scupper 3, rainwater
Flow into roof drain 7 and rainwater is discharged to ground by the rain pipe 8 by being connected with roof drain 7.
The above is only the exemplary embodiment of the utility model, the protection model rather than limited the present invention
Enclose, the scope of protection of the utility model is determined by appended claim.
Claims (7)
1. a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system, including roofing body (1), the leak-off chute for being distributed in (1) four side of roofing body
(2), arranged on the scupper (3) of corner, it is characterized in that:The roofing body (1) is equipped with four piece combined triangular shape weather shields
(4), weather shield(4)It is obliquely installed laterally by centre;Each scupper(3)It is communicated with rain pipe(8), the rainwater
Pipe(8)It is sector close to the one end on ground.
2. a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system according to claim 1, it is characterized in that:Set on the scupper (3)
There is protective cover (6).
3. a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system according to claim 2, it is characterized in that:The scupper(3)Inside set
There is the first erecting bed, the first erecting bed is equipped with raised roof drain(7).
4. a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system according to claim 3, it is characterized in that:On the weather shield (4)
It is furnished with some gutters (5).
5. a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system according to claim 4, it is characterized in that:Among the leak-off chute (2)
Position is high, and both sides are low.
6. a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system according to claim 5, it is characterized in that:The shape of the scupper (3)
Shape is sector.
7. a kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system according to claim 6, it is characterized in that:Set on the rain pipe (8)
Matcoveredn (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721189304.2U CN207277706U (en) | 2017-09-15 | 2017-09-15 | A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721189304.2U CN207277706U (en) | 2017-09-15 | 2017-09-15 | A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207277706U true CN207277706U (en) | 2018-04-27 |
Family
ID=61981177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721189304.2U Expired - Fee Related CN207277706U (en) | 2017-09-15 | 2017-09-15 | A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207277706U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031420A (en) * | 2020-09-03 | 2020-12-04 | 贵州汇通申发钢结构有限公司 | Steel structure assembly type building and assembly method thereof |
-
2017
- 2017-09-15 CN CN201721189304.2U patent/CN207277706U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031420A (en) * | 2020-09-03 | 2020-12-04 | 贵州汇通申发钢结构有限公司 | Steel structure assembly type building and assembly method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113235836A (en) | Impervious roofing waterproof drainage structure | |
CN106499041A (en) | A kind of Water Collection Tank in Drainage Pumping Station efficiently cuts dirty system | |
CN203977546U (en) | Gardens dewatering installation | |
CN206591865U (en) | Novel water collecting and draining bus station pavilion | |
CN207277706U (en) | A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING drainage system | |
CN104631313A (en) | Elevated rainwater collection system | |
CN204530462U (en) | Elevated rain gathering system | |
CN104612337B (en) | A kind of anti-eddy current type siphon rainwater head | |
CN209603231U (en) | A kind of mountain area can Seeper discharge device with cambered | |
CN106592687A (en) | Rainwater collection system for container-type movable house | |
CN218323528U (en) | Roof rainwater drainage system | |
CN211523808U (en) | Direct vent outfall waterproof construction | |
CN114753571A (en) | A prevent drainage integration system and hydrocone type rainwater fill for planting roofing | |
CN207499266U (en) | Drainage arrangement | |
CN209162987U (en) | A kind of novel building roof drainage structure | |
CN205875547U (en) | Prevent blockking up formula roof rainwater mouth | |
CN206279606U (en) | A kind of anti-waterlogging drainage arrangement in city | |
CN207048007U (en) | A kind of overflow-type rain collector | |
CN217844142U (en) | Cooling device for eliminating short circuit between heat island and air flow | |
CN222685936U (en) | An internal rainwater pipe external discharge switching device | |
CN209384542U (en) | A kind of siphon drainage roof drain | |
CN220978604U (en) | Novel overflow pipe assembly applied to metal gutter | |
CN205712796U (en) | Block-proof type roof drain | |
CN221741801U (en) | Building design roof cornice watertight fittings | |
CN208363451U (en) | Day ditch water discharge structure in a kind of cold formed steel structure system house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180427 Termination date: 20200915 |
|
CF01 | Termination of patent right due to non-payment of annual fee |