CN211137557U - Concrete sheet pile forming die structure - Google Patents

Concrete sheet pile forming die structure Download PDF

Info

Publication number
CN211137557U
CN211137557U CN201921854479.XU CN201921854479U CN211137557U CN 211137557 U CN211137557 U CN 211137557U CN 201921854479 U CN201921854479 U CN 201921854479U CN 211137557 U CN211137557 U CN 211137557U
Authority
CN
China
Prior art keywords
sheet pile
concrete sheet
mould subassembly
forming die
die structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921854479.XU
Other languages
Chinese (zh)
Inventor
秦裕雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qidong Nihui New Material Technology Co ltd
Original Assignee
Qidong Nihui New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qidong Nihui New Material Technology Co ltd filed Critical Qidong Nihui New Material Technology Co ltd
Priority to CN201921854479.XU priority Critical patent/CN211137557U/en
Application granted granted Critical
Publication of CN211137557U publication Critical patent/CN211137557U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete sheet pile forming die structure, including the installation frame, the inside welding of installation frame has the baffle, the upper portion of baffle is equipped with first mould subassembly, the lower part of baffle is equipped with second mould subassembly, the downside of first mould subassembly and second mould subassembly all is equipped with heating device and square dish, the utility model discloses have the installation frame, through erectting first mould subassembly and second mould subassembly the installation, play the effect of saving mill's area, two arcs and picture peg play the spacing effect of the concrete that will pour, and the circulating pump can extract the hot water of the inside of water tank for hot water gets into the inside circulating pipe of square dish, plays the maintenance effect to the concrete sheet pile in pouring, makes the concrete sheet pile shaping fast.

Description

Concrete sheet pile forming die structure
Technical Field
The utility model relates to a mould technical field specifically is a concrete sheet pile forming die structure.
Background
The concrete sheet pile is a novel concrete prefabricated member applied to the fields of civil engineering such as soil retaining, slope protection and building enclosure, a fixed pedestal method mould is mostly adopted in the existing production process of foreign concrete wave type sheet piles and domestic similar products, but the traditional mould occupies a large area, wastes space and has low capacity, and a thermal curing device is not arranged, so that a concrete sheet pile forming mould structure is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete sheet pile forming die structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete sheet pile forming die structure, includes the installation frame, the inside welding of installation frame has the baffle, the upper portion of baffle is equipped with first mould subassembly, the lower part of baffle is equipped with second mould subassembly, first mould subassembly and second mould subassembly's downside all is equipped with heating device and square dish, heating device's inside is equipped with the circulating pump, the one end of circulating pump is connected with the water tank, the inside of water tank is equipped with the heating rod, the inside fixedly connected with circulating pipe of square dish, circulating pipe's one end is passed through first hose and is connected with the water tank, circulating pipe's the other end passes through the second hose and is connected with the circulating pump.
The purpose that this set up is that this concrete sheet pile forming die structure has the installation frame, through erectting first mould subassembly and second mould subassembly installation, play the effect of saving mill area, two arcs and picture peg play the spacing effect of concrete that will pour, the circulating pump can extract the hot water of the inside of water tank, make hot water get into the inside circulating pipe of square dish, play the maintenance effect to the concrete sheet pile in pouring, make the shaping of concrete sheet pile fast.
Preferably, the first mold assembly comprises an upper supporting plate and a lower supporting plate, and the upper supporting plate and the lower supporting plate are respectively connected with the installation frame through connecting lugs.
Preferably, be equipped with two arcs between last backup pad and the bottom suspension fagging, all the welding has the mounting bracket on the arc, be equipped with the bolt on the mounting bracket.
Preferably, the left side of arc is connected with the drain pipe, be equipped with the picture peg between the arc.
Preferably, the lower supporting plate is provided with a water drainage through hole, and the upper supporting plate is provided with a feed inlet.
Preferably, the first and second mold assemblies are identical in construction.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses have the installation frame, through erectting first mould subassembly and second mould subassembly installation, play the effect of practicing thrift mill area, two arcs and picture peg play the spacing effect of the concrete of will building, and the circulating pump can extract the hot water of the inside of water tank for hot water gets into the inside circulating pipe of square dish, plays the maintenance effect to the concrete sheet pile in pouring, makes the concrete sheet pile shaping fast.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a first mold assembly of the present invention;
fig. 3 is a schematic structural view of the heating device of the present invention.
In the figure: 1. a mounting frame; 2. a first mold assembly; 21. a lower support plate; 22. an upper support plate; 23. a feed inlet; 24. inserting plates; 25. connecting lugs; 26. a drain pipe; 27. a drain through hole; 28. a mounting frame; 29. an arc-shaped plate; 3. a partition plate; 4. a second mold assembly; 5. a heating device; 6. a square plate; 7. a circulating water pipe; 8. a first hose; 9. a second hose; 10. a water tank; 11. a heating rod; 12. and a circulating pump.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a concrete sheet pile forming die structure, includes installation frame 1, the inside welding of installation frame 1 has baffle 3, the upper portion of baffle 3 is equipped with first mould subassembly 2, the lower part of baffle 3 is equipped with second mould subassembly 4, through erectting first mould subassembly 2 and second mould subassembly 4 installation, plays the effect of saving mill's area.
The downside of first mould subassembly 2 and second mould subassembly 4 all is equipped with heating device 5 and square dish 6, heating device 5's inside is equipped with circulating pump 12, the one end of circulating pump 12 is connected with water tank 10, the inside of water tank 10 is equipped with heating rod 11, the inside fixedly connected with circulating pipe 7 of square dish 6, circulating pipe 7's one end is connected with water tank 10 through first hose 8, circulating pipe 7's the other end passes through second hose 9 and is connected with circulating pump 12.
Circulating pump 12 can extract the inside hot water of water tank 10 for hot water gets into square 6 inside circulating pipe 7 of dish, plays the maintenance effect to the concrete sheet pile in pouring, makes the shaping of concrete sheet pile fast.
In order to erect the first mold assembly 2, the first mold assembly 2 comprises an upper support plate 22 and a lower support plate 21, and the upper support plate 22 and the lower support plate 21 are respectively connected with the mounting frame 1 through connecting lugs 25.
Go up and be equipped with two arcs 29 between backup pad 22 and the bottom suspension fagging 21, all weld on the arc 29 and have mounting bracket 28, be equipped with the bolt on the mounting bracket 28.
The left side of the arc-shaped plates 29 is connected with a water discharge pipe 26, and an inserting plate 24 is arranged between the arc-shaped plates 29.
The two arc-shaped plates 29 and the inserting plate 24 play a role in limiting the poured concrete.
In order to facilitate concrete pouring, the lower support plate 21 is provided with a drainage through hole 27, and the upper support plate 22 is provided with a feeding hole 23.
The first and second mold assemblies 2 and 4 are identical in construction.
Specifically, during the use, this concrete sheet pile forming die structure has installation frame 1, erect the installation through with first mould subassembly 2 and second mould subassembly 4, play the effect of practicing thrift mill area, two arcs 29 and picture peg 24 play the spacing effect of concrete that will pour, circulating pump 12 can extract the hot water of the inside of water tank 10, make hot water get into square 6 inside circulating pipe 7 of dish, play the maintenance effect to the concrete sheet pile in pouring, make the shaping of concrete sheet pile fast.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a concrete sheet pile forming die structure, includes installation frame (1), its characterized in that: the inside welding of installation frame (1) has baffle (3), the upper portion of baffle (3) is equipped with first mould subassembly (2), the lower part of baffle (3) is equipped with second mould subassembly (4), the downside of first mould subassembly (2) and second mould subassembly (4) all is equipped with heating device (5) and square dish (6), the inside of heating device (5) is equipped with circulating pump (12), the one end of circulating pump (12) is connected with water tank (10), the inside of water tank (10) is equipped with heating rod (11), the inside fixedly connected with circulating pipe (7) of square dish (6), the one end of circulating pipe (7) is connected with water tank (10) through first hose (8), the other end of circulating pipe (7) is connected with circulating pump (12) through second hose (9).
2. The concrete sheet pile forming die structure according to claim 1, wherein: first mould subassembly (2) are including last backup pad (22) and bottom suspension fagging (21), go up backup pad (22) and bottom suspension fagging (21) and be connected with installation frame (1) through engaging lug (25) respectively.
3. The concrete sheet pile forming die structure according to claim 2, wherein: go up and be equipped with two arc (29) between backup pad (22) and bottom suspension fagging (21), all weld on arc (29) and have mounting bracket (28), be equipped with the bolt on mounting bracket (28).
4. A concrete sheet pile forming die structure according to claim 3, wherein: the left side of arc (29) is connected with drain pipe (26), be equipped with picture peg (24) between arc (29).
5. The concrete sheet pile forming die structure according to claim 2, wherein: be equipped with drainage through hole (27) on lower supporting plate (21), be equipped with feed inlet (23) on last backup pad (22).
6. The concrete sheet pile forming die structure according to claim 1, wherein: the first mould component (2) and the second mould component (4) are identical in structure.
CN201921854479.XU 2019-10-31 2019-10-31 Concrete sheet pile forming die structure Expired - Fee Related CN211137557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921854479.XU CN211137557U (en) 2019-10-31 2019-10-31 Concrete sheet pile forming die structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921854479.XU CN211137557U (en) 2019-10-31 2019-10-31 Concrete sheet pile forming die structure

Publications (1)

Publication Number Publication Date
CN211137557U true CN211137557U (en) 2020-07-31

Family

ID=71767338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921854479.XU Expired - Fee Related CN211137557U (en) 2019-10-31 2019-10-31 Concrete sheet pile forming die structure

Country Status (1)

Country Link
CN (1) CN211137557U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114683381A (en) * 2020-12-30 2022-07-01 无锡嘉盛商远建筑科技有限公司 Novel prefabricated plate mould of automatic guide demolding
CN115648382A (en) * 2022-10-08 2023-01-31 中南大学 High-temperature maintenance device and method for one-way heating of lining structure of high-ground-temperature tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114683381A (en) * 2020-12-30 2022-07-01 无锡嘉盛商远建筑科技有限公司 Novel prefabricated plate mould of automatic guide demolding
CN115648382A (en) * 2022-10-08 2023-01-31 中南大学 High-temperature maintenance device and method for one-way heating of lining structure of high-ground-temperature tunnel
CN115648382B (en) * 2022-10-08 2024-05-17 中南大学 High-temperature maintenance device and method for unidirectional heating of high-ground-temperature tunnel lining structure

Similar Documents

Publication Publication Date Title
CN211137557U (en) Concrete sheet pile forming die structure
CN208668596U (en) A kind of reinforced concrete girder slab system and prefabricated post assembly node
CN218322855U (en) Basement height strides unilateral side formwork reinforced structure
CN204357117U (en) A kind of after-pouring band beam-slab template and lattice column thereof
CN101265704B (en) Underground cast-in-place concrete structure outer wall neck construction method
CN209873811U (en) Subway major structure medium plate also serves as temporary supporting structure
CN215926719U (en) Reinforcing structure of aluminum alloy template reverse ridge hanging die
CN210263906U (en) A regularization template for pouring super deep concave type falls board kitchen bathroom
CN203668971U (en) Waterproof formwork system for open trench tunnel
CN211714006U (en) Basement water-resistant plate and tower crane one-step forming foundation structure
CN208539499U (en) Portable pre-buried electronic box support frame
CN208310404U (en) Unit type suspended moso bamboo ecological enclosing wall
CN208965426U (en) A kind of sound barrier panel installing and connecting apparatus
CN207277516U (en) A kind of FRPP rainwater memory module
CN205804406U (en) Outward-turning type dense-rib energy dissipation type underground comprehensive pipe gallery
CN211290599U (en) Novel solar water heater support
CN221481427U (en) Novel unilateral formwork combined prefabricated formwork system
CN218028979U (en) Concrete reversed bank hanging mould reinforcing structure
CN221741688U (en) Steel wire net rack wallboard with disassembly-free net mold
CN217232180U (en) Quick construction structure of underground concrete pipe ditch
CN216740845U (en) Prefabricated toilet
CN208545773U (en) A kind of pipe gallery is mobile early to tear gang form open
CN211200568U (en) From reinforcing precast concrete water tank module of taking mould
CN221761628U (en) Can have enough to meet need interim fender that encloses of reinforced concrete combination formula
CN210946843U (en) Arch ring support piece for grouted arch slope protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200731

Termination date: 20211031

CF01 Termination of patent right due to non-payment of annual fee