CN211114714U - Building scaffold convenient to remove - Google Patents

Building scaffold convenient to remove Download PDF

Info

Publication number
CN211114714U
CN211114714U CN201921138881.8U CN201921138881U CN211114714U CN 211114714 U CN211114714 U CN 211114714U CN 201921138881 U CN201921138881 U CN 201921138881U CN 211114714 U CN211114714 U CN 211114714U
Authority
CN
China
Prior art keywords
support
building scaffold
scaffold convenient
bracket
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921138881.8U
Other languages
Chinese (zh)
Inventor
范启银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nengli Industrial Co Ltd
Original Assignee
Shanghai Nengli Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Nengli Industrial Co Ltd filed Critical Shanghai Nengli Industrial Co Ltd
Priority to CN201921138881.8U priority Critical patent/CN211114714U/en
Application granted granted Critical
Publication of CN211114714U publication Critical patent/CN211114714U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a building scaffold convenient to move, which comprises a bracket, wherein a detachable support plate is arranged on the upper side of the bracket, a groove is arranged in the middle of the upper side of the support plate, a lifting adjusting plate is inserted in the groove through a stand column, a connecting rod is welded in the middle of the bracket, a foot plate is rotatably arranged on the lower side of the bracket through a connecting shaft, a pulley is arranged on the lower side of the foot plate, the foot plate and the bracket are fixedly inserted through a first pin rod, the pulley can rotate 180 degrees relative to the bracket through the connecting shaft for adjustment and use, the stand column is welded at the four corners of the lower side of the lifting adjusting plate, a plurality of positioning holes are arranged on the stand column, the building scaffold convenient to move can adjust the use height of the middle part of the scaffold according to the needs through the lifting adjusting plate, simultaneously, the operation and use of two different heights are met.

Description

Building scaffold convenient to remove
Technical Field
The utility model relates to a central air conditioning technology field specifically is a building scaffolding convenient to remove.
Background
The scaffold is a general term in the building field, and is a scaffold, namely various supports which are erected for workers to operate and solve vertical and horizontal transportation on a construction site. The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
The existing scaffold is sometimes required to be moved away in the use process, but the existing scaffold is inconvenient to move, and the moving process of the scaffold is time-consuming and labor-consuming; and the use height of the existing scaffold is fixed, the use height of the scaffold cannot be adjusted according to needs, and the use flexibility is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a building scaffold convenient to move, so as to solve the problems that the existing scaffold is required to be moved away in the using process, but the existing scaffold is inconvenient to move, and the moving process of the scaffold is time-consuming and labor-consuming; and the use height of the existing scaffold is fixed, the use height of the scaffold can not be adjusted according to needs, and the use flexibility is reduced.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction scaffolding convenient to remove, includes the support, the detachable backup pad is installed to the support upside, the recess is seted up at backup pad upside middle part, the recess inboard is inserted through the stand and is equipped with the lift regulating plate, the welding of support middle part has the connecting rod, the support downside rotates through the connecting axle and installs the sole, the pulley is installed to the sole downside, insert through first pin rod between sole and the support and establish fixedly, and the pulley passes through the connecting axle and can rotate 180 regulation uses of support relatively.
Preferably, the stand welds in four turning of lift regulating plate downside, a plurality of locating holes have been seted up on the stand.
Preferably, a support sleeve is welded on the upper side of the connecting shaft, a through hole is formed in the support sleeve, and the stand column and the support sleeve are fixedly inserted through a second pin rod.
Preferably, stand jacks are formed in the connecting shaft and the grooves, and the diameters of the stand jacks are larger than those of the stand columns.
Preferably, the upper side of the support is welded with a plug socket, four corners of the lower side of the support plate are welded with pins, and the pins are inserted into the plug socket.
Preferably, the welding of support one side has the climbing ladder, and detachable crossbar is installed through the third pin to two support one sides.
Preferably, the length of the upright post is 40cm-60 cm.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a lift regulating plate that backup pad middle part was equipped with, and in lift regulating plate inserted the support sleeve of establishing on the support through the stand, can adjust the use height at scaffold frame middle part as required, can realize the result of use of a pair of heights moreover, satisfy the operation of two kinds of co-altitude simultaneously and use, improved the flexibility of using.
2. The utility model discloses the sole is installed through the connecting axle rotation to the support downside, and the pulley is installed to the sole downside, is convenient for remove scaffold and uses; the foot plate and the bracket are inserted and fixed through the first pin rod, the pulley can rotate 180 degrees relative to the bracket through the connecting shaft for adjustment and use, the pulley turns upwards for 180 degrees when not used so that the lower part of the bracket is supported on the ground, the use stability is improved,
drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the lifting adjusting plate of the present invention when it is used for height adjustment;
FIG. 3 is an enlarged schematic view of the structure at the position A of the present invention;
FIG. 4 is an enlarged schematic view of the structure at B of the present invention;
fig. 5 is an enlarged schematic view of the structure at position C of the present invention;
fig. 6 is a schematic structural view of a second pin of the present invention.
In the figure: 1. a support; 2. a support plate; 3. a lifting adjusting plate; 4. a cross bar; 5. climbing a ladder; 6. a column; 7. a support sleeve; 8. positioning holes; 9. a third pin; 10. a second pin; 11. a socket; 12. a pin; 13. a foot plate; 14. a connecting shaft; 15. a first pin rod; 16. a pulley; 17. a column jack; 18. a connecting shaft; 19. and (4) a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3, 4, 5 and 6, in an embodiment of the present invention, a building scaffold convenient to move comprises a support 1, a detachable support plate 2 is installed on the upper side of the support 1, a groove 19 is formed in the middle of the upper side of the support plate 2, a lifting adjusting plate 3 is inserted into the inner side of the groove 19 through a column 6, the use height of the middle part of the scaffold can be adjusted as required, and the use effect of two heights can be achieved, and the operation and use of two different heights can be satisfied simultaneously, a connecting rod 18 is welded in the middle of the support 1, a foot plate 13 is installed on the lower side of the support 1 through a connecting shaft 14 in a rotating manner, a pulley 16 is installed on the lower side of the foot plate 13, the foot plate 13 and the support 1 are inserted and fixed through a first pin 15, the foot plate 13 is conveniently adjusted and inserted and fixed on one side of the bottom, the pulley 16 is turned upwards by 180 degrees when not in use to support the lower part of the bracket 1 on the ground, the stability of use is improved, the upright 6 is welded at four corners at the lower side of the lifting adjusting plate 3, the upright 6 is provided with a plurality of positioning holes 8, the upper side of the connecting rod 18 is welded with the supporting sleeve 7, the supporting sleeve 7 is provided with a through hole, the upright 6 and the supporting sleeve 7 are inserted and fixed through the second pin rod 10, the second pin rod 10 is arranged into a U shape, the lifting adjusting plate 3 is conveniently inserted and fixed in the supporting sleeve 7 on the bracket 1 through the upright 6, the second pin rod 10 is inserted and fixed, the connecting rod 18 and the groove 19 are both provided with upright jacks 17, the diameters of the upright jacks 17 are larger than those of the upright 6, the upright 6 can conveniently pass through the connecting rod 18 and the groove 19, the middle part is inserted and arranged in the supporting sleeve 7, the upper side of the, and the pins 12 are inserted in the plug sockets 1, so that the support plate 2 can be conveniently disassembled and assembled for use, the climbing ladder 5 is welded on one side of each support 1, the detachable cross rods 4 are installed on one sides of the two supports 1 through the third pins 9, the use stability of the scaffold is improved, and the length of the upright post 6 is 40cm-60cm, so that the use requirements of adjustment of various heights are met.
The utility model discloses a theory of operation and use flow: through the lifting adjusting plate 3 arranged in the middle of the supporting plate 2, the lifting adjusting plate 3 is inserted into the supporting sleeve 7 on the bracket 1 through the upright post 6 and is inserted and fixed through the second pin rod 10, the use height of the middle part of the scaffold can be adjusted as required, the use effect of two heights of one scaffold can be realized, and the operation and use of two different heights can be simultaneously met; a foot plate 13 is rotatably arranged at the lower side of the bracket 1 through a connecting shaft 14, and a pulley 16 is arranged at the lower side of the foot plate 13, so that the scaffold can be conveniently moved for use; and the foot plate 13 and the bracket 1 are inserted and fixed through the first pin rod 15, and the pulley 16 can rotate 180 degrees relative to the bracket through the connecting shaft 14 for adjustment and use, so that the pulley 16 is turned upwards for 180 degrees when not in use, the lower part of the bracket 1 is supported on the ground, and the use stability is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A building scaffold convenient to remove, includes support (1), its characterized in that: detachable backup pad (2) are installed to support (1) upside, recess (19) are seted up at backup pad (2) upside middle part, recess (19) inboard is inserted through stand (6) and is equipped with lifting adjusting plate (3), support (1) middle part welding has connecting rod (18), support (1) downside is rotated through connecting axle (14) and is installed sole (13), pulley (16) are installed to sole (13) downside, insert through first pin rod (15) between sole (13) and support (1) and establish fixedly, and pulley (16) are through connecting axle (14) 180 regulation uses of support (1) rotation relatively.
2. A building scaffold convenient to move according to claim 1 wherein: stand (6) welding is in four turnings of lift regulating plate (3) downside, a plurality of locating holes (8) have been seted up on stand (6).
3. A building scaffold convenient to move according to claim 1 wherein: the support sleeve (7) is welded on the upper side of the connecting rod (18), a through hole is formed in the support sleeve (7), and the stand column (6) and the support sleeve (7) are fixedly inserted through the second pin rod (10).
4. A building scaffold convenient to move according to claim 1 wherein: upright post jacks (17) are formed in the connecting rods (18) and the grooves (19), and the diameters of the upright post jacks (17) are larger than those of the upright posts (6).
5. A building scaffold convenient to move according to claim 1 wherein: the support is characterized in that a plug socket (11) is welded on the upper side of the support (1), pins (12) are welded on four corners of the lower side of the support plate (2), and the pins (12) are inserted into the plug socket (11).
6. A building scaffold convenient to move according to claim 1 wherein: support (1) one side welding has climbing ladder (5), and detachable crossbar (4) are installed through third pin (9) in two support (1) one sides.
7. A building scaffold convenient to move according to claim 1 wherein: the length of the upright post (6) is 40cm-60 cm.
CN201921138881.8U 2019-07-19 2019-07-19 Building scaffold convenient to remove Expired - Fee Related CN211114714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921138881.8U CN211114714U (en) 2019-07-19 2019-07-19 Building scaffold convenient to remove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921138881.8U CN211114714U (en) 2019-07-19 2019-07-19 Building scaffold convenient to remove

Publications (1)

Publication Number Publication Date
CN211114714U true CN211114714U (en) 2020-07-28

Family

ID=71718841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921138881.8U Expired - Fee Related CN211114714U (en) 2019-07-19 2019-07-19 Building scaffold convenient to remove

Country Status (1)

Country Link
CN (1) CN211114714U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182948A (en) * 2021-11-22 2022-03-15 中国一冶集团有限公司 Climbing frame lifting device and climbing frame device
CN114592671A (en) * 2022-05-09 2022-06-07 山西八建集团有限公司 Adjustable easy loading and unloading frustum shape scaffold frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182948A (en) * 2021-11-22 2022-03-15 中国一冶集团有限公司 Climbing frame lifting device and climbing frame device
CN114592671A (en) * 2022-05-09 2022-06-07 山西八建集团有限公司 Adjustable easy loading and unloading frustum shape scaffold frame

Similar Documents

Publication Publication Date Title
CN211114714U (en) Building scaffold convenient to remove
CN210857930U (en) Engineering construction scaffold
CN205955155U (en) Auxiliary stand of portable scaffold frame
CN211396536U (en) Turnover movable scaffold frame that prevents toppling
CN211548713U (en) A suspension type scaffold frame for square chimney
CN210798246U (en) Foldable scaffold
CN207469717U (en) A kind of architectural engineering scaffold bracing means
CN206800958U (en) A kind of movable Scaffold structure
CN216196458U (en) High stability scaffold with leveling mechanism
CN210887997U (en) Building scaffold with adjustable height
CN110821125B (en) Double-layer scaffold for tunnel construction
CN210508313U (en) But height-adjusting's stable form engineering construction scaffold
CN210289043U (en) Anti-toppling scaffold
CN213234215U (en) Lifting point truss for lifting scaffold
CN218205569U (en) Construction scaffold
CN210239082U (en) Temporary hydropower integrated bracket for construction site
CN207130630U (en) A kind of novel bridge construction bracket
CN214090887U (en) Scaffold frame for indoor decoration
CN210997268U (en) Construction elevator cage welding frock
KR20180122533A (en) Stepping board for architectural scaffold
CN214785766U (en) Firm in connection easy dismounting's novel construction scaffold frame
CN220414791U (en) High-stability support frame for building technology construction
CN211172982U (en) Scaffold frame for building decoration that security performance is high for indoor
CN212507288U (en) Combined scaffold for building construction
CN220116176U (en) Elevator base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728