CN211114575U - Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate - Google Patents

Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate Download PDF

Info

Publication number
CN211114575U
CN211114575U CN201921075185.7U CN201921075185U CN211114575U CN 211114575 U CN211114575 U CN 211114575U CN 201921075185 U CN201921075185 U CN 201921075185U CN 211114575 U CN211114575 U CN 211114575U
Authority
CN
China
Prior art keywords
plate
dry
bolt
building
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921075185.7U
Other languages
Chinese (zh)
Inventor
甘霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongmin Zhuyou New Material Co ltd
Original Assignee
Zhongmin Zhuyou New Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongmin Zhuyou New Material Co ltd filed Critical Zhongmin Zhuyou New Material Co ltd
Priority to CN201921075185.7U priority Critical patent/CN211114575U/en
Application granted granted Critical
Publication of CN211114575U publication Critical patent/CN211114575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a connecting component for dry-hanging plates, which is used for fixing the dry-hanging plates on a building and comprises a fixing component and a hanging component, wherein the fixing component comprises a fixing plate, a square tube component and a bolt, and the bolt fixes the fixing plate on the building; the square tube assembly comprises an outer tube and an inner tube, wherein the first end of the outer tube is fixed on the surface of the fixing plate, and the inner tube is inserted into and fixed in the outer tube from the second end of the outer tube; the flying piece comprises a bending plate, a back bolt and a connecting bolt, wherein the first end of the bending plate is fixed on the dry-hanging plate by the back bolt, and the second end of the bending plate is fixedly connected with the inner pipe by the connecting bolt. The adjusting mode of the connecting component in the scheme overcomes the defects of three-dimensional orthogonal adjustment of the connecting component in the prior art; when the coordinate of the connecting assembly on the Z axis is adjusted, the positions of the X axis and the Y axis are not influenced; similarly, when the positions of the X axis and the Y axis are adjusted, the Z axis direction cannot be influenced; the construction is simple, greatly reduced panel hangs the degree of difficulty of installation futilely, improves the installation effectiveness.

Description

Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate
Technical Field
The utility model belongs to the technical field of the construction, specifically speaking, the utility model relates to a hang coupling assembling of panel and hang connection structure of panel futilely.
Background
The plate dry hanging method is widely applied to the fields of decoration and finishing of inner and outer walls of buildings, such as building stone curtain walls, artificial plate curtain walls and the like. The plate dry hanging needs to be fixed on the main structure by a structural connecting piece, and one function of the connecting piece which must be considered in the design process is the function of adjusting the position of the plate. The current widely applied is the three-dimensional adjustment principle, namely the left and right horizontal dimensions, the up and down vertical dimensions, and the in and out dimensions vertical to the wall surface. The decoration panel is placed on the required position by respectively adjusting the three dimensions. The disadvantages are that: the adjustment principle is that the three dimensions are required to be orthogonal to each other during installation, ideal orthogonality is often difficult to achieve in practice, and the position of the other two dimensions which are possibly adjusted is affected when one dimension is adjusted, so that repeated iteration work is caused during installation of workers, the efficiency is low, and the installation cost is increased.
In summary, it is necessary to develop a connecting assembly for dry-hanging plates to solve the technical problems of difficult adjustment and low construction efficiency when the connecting assembly is adjusted in a three-dimensional coordinate during the installation of the dry-hanging plates in the prior art.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: the connecting component for the dry-hanging plate is provided, and polar coordinate separation is adopted to realize mounting adjustment operation so as to overcome the defects of the prior art that the connecting component is adjusted by adopting a three-dimensional orthogonal principle during mounting; still provide a connection structure who hangs panel futilely to the accommodation process is loaded down with trivial details, the low technical problem of efficiency of construction when the panel installation is hung futilely that exists among the prior art is solved.
In order to realize the purpose, the utility model discloses the technical scheme who takes does:
a connecting assembly of a dry hanging plate is used for fixing the dry hanging plate on a building and comprises a fixing piece and a hanging piece, wherein the fixing piece comprises a fixing plate, a square tube assembly and a bolt, and the bolt fixes the fixing plate on the building; the square tube assembly comprises an outer tube and an inner tube, wherein the first end of the outer tube is fixed on the surface of the fixing plate, and the inner tube is inserted into and fixed in the outer tube from the second end of the outer tube; the hanging piece comprises a bending plate, a back bolt and a connecting bolt, wherein the first end of the bending plate is fixed on the dry hanging plate through the back bolt, and the second end of the bending plate is fixedly connected with the inner pipe through the connecting bolt.
Preferably, the fixing plate is provided with a strip-shaped through hole, and the threaded end of the bolt penetrates through the strip-shaped through hole and is fixed on a building.
Preferably, the inner tube has a length greater than the outer tube.
Preferably, the bending plate further comprises a spring plate with adjustable width, and the spring plate is fixed on the connecting bolt between the bending plate and the dry hanging plate.
Preferably, the bending plate is an N-like plate-shaped body, and the first end and the second end are vertical plates parallel to each other and connected together through a horizontal portion in the middle.
Preferably, the second end of the bending plate is provided with an oblong hole, and one end of the connecting bolt penetrates through the oblong hole to be fixedly connected with the inner pipe.
Preferably, the second end edge of the bending plate extends in a direction away from the horizontal portion to form a supporting portion, and the supporting portion is located above the square pipe assembly.
Preferably, the pipe fitting further comprises a support bolt, and one end of the support bolt penetrates through the support part and is pressed on the surface of the inner pipe.
Preferably, the outer tube and the inner tube are fastened together by self-tapping self-drilling nails.
The utility model also provides a hang connection structure of panel futilely, hang panel, building and foretell coupling assembling including at least one futilely, hang first portion of panel futilely and pass through coupling assembling with the building is connected fixedly, the back of the body is tied will the first end of buckling plate is fixed hang the back of panel futilely, the bolt will the fixed plate is fixed the surface of building.
Preferably, the lower half part of the dry-hanging plate is fixedly connected with the building through a lower inserting component, the lower inserting component comprises an N-shaped lower inserting plate, the first end of the lower inserting plate is fixed on the back of the lower half part of the dry-hanging plate through a back bolt, a groove is formed in the second end of the lower inserting plate, and the groove of the lower inserting plate is clamped on a connecting bolt or a supporting strip fixed on the building.
The technical scheme of the utility model the beneficial technological effect who gains is:
the connecting assembly in the scheme is adjusted by utilizing polar coordinates, the first end of the bending plate is fixed on the back of the dry hanging plate through the back bolt, and the second end of the bending plate can rotate and swing in a small range around the back bolt, so that the adjustment of the connecting assembly in a horizontal plane (namely on an X axis and a Y axis) is realized; the second end of the bending plate is provided with the oblong hole, so that the adjustment range of the connecting assembly in the horizontal plane is further enlarged; in the square tube assembly, the insertion depth of the inner tube in the outer tube can be adjusted, so that the adjustment of the connecting assembly in the direction vertical to the surface of a building (Z-axis direction) is realized. The adjusting mode of the connecting component in the scheme overcomes the defects of three-dimensional orthogonal adjustment of the connecting component in the prior art; when the coordinate of the connecting assembly on the Z axis is adjusted, the positions of the X axis and the Y axis are not influenced; and similarly, the Z-axis direction can not be influenced when the positions of the X-axis and the Y-axis are adjusted. In a construction site, workers only need to put the dry-hang plate at a correct position and then fix the dry-hang plate, and complex operation processes such as trial-and-error iteration, repeated adjustment and the like are not needed, so that what you see is the obtained installation idea; greatly reducing the difficulty of dry-hanging and installing the plate and improving the installation efficiency.
Drawings
The accompanying drawings, which form a part hereof, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation.
Fig. 1 is an assembly structure diagram of a connecting assembly in embodiment 1;
FIG. 2 is a partial schematic view of a connecting structure of dry-hang boards in embodiment 1;
FIG. 3 is a schematic back view of a dry-hang board with a connecting assembly and a lower insertion assembly fixed in embodiment 2;
FIG. 4 is a schematic view of two layers of dry-hang boards fixed to a building in example 2;
reference numerals: 1-fixing plate, 2-square tube assembly, 21-outer tube, 22-inner tube, 23-self-tapping self-drilling nail, 3-bolt, 4-bending plate, 5-back bolt, 6-connecting bolt, 7-supporting part, 8-supporting bolt, 9-elastic sheet, 10-lower insertion plate, 01-dry hanging plate, 02-building, 03-connecting assembly and 04-inner hexagon wrench.
Detailed Description
The present invention will be described in detail with reference to the drawings, which are provided for illustrative and explanatory purposes only and should not be construed as limiting the scope of the present invention in any way. Furthermore, features from embodiments in this document and from different embodiments may be combined accordingly by a person skilled in the art from the description in this document.
Example 1
Referring to fig. 1 and 2, the connecting assembly of the present embodiment is used for fixing a dry hanging plate on a building, and includes a fixing member and a hanging member, wherein the fixing member includes a fixing plate, a square tube assembly and a bolt, and the bolt fixes the fixing plate on the building; the square tube assembly comprises an outer tube and an inner tube, wherein the first end of the outer tube is fixed on the surface of the fixing plate through welding, and the inner tube is inserted into and fixed in the outer tube from the second end of the outer tube; the flying piece comprises a bending plate, a back bolt and a connecting bolt, wherein the first end of the bending plate is fixed on the dry-hanging plate by the back bolt, and the second end of the bending plate is fixedly connected with the inner pipe by the connecting bolt.
Referring to fig. 1, a fixing plate in this embodiment is provided with a long through hole, and a threaded end of a bolt passes through the long through hole and is fixed on a building. The position of the fixing plate on the building is convenient to adjust.
Referring to fig. 1, the bending plate in this embodiment is an N-like plate-shaped body, and the first end and the second end are vertical plates parallel to each other and connected together by a horizontal portion therebetween. The height that highly is higher than first end of second end makes things convenient for constructor to operate when buckling the board like this and interior union coupling.
Referring to fig. 1, the second end of the bending plate in this embodiment is provided with an oblong hole, and one end of the connecting bolt penetrates through the oblong hole to be fixedly connected with the inner tube. Thus, the position of the bending plate is adjusted in the vertical direction.
Referring to fig. 1, in the present embodiment, the second end edge of the bending plate extends in a direction away from the horizontal portion to form a supporting portion, and the supporting portion is located above the square pipe assembly; and a round hole is formed in the supporting part, and one end of the supporting bolt penetrates through the round hole of the supporting part and is tightly pressed on the surface of the inner pipe. The bending plate and the inner pipe are fixedly connected in the Z-axis direction, and the stress performance and integrity of the connecting assembly are further guaranteed.
Referring to fig. 1, the outer pipe and the inner pipe in this embodiment are fastened together by self-tapping self-drilling nails. Before assembly, the inner pipe and the outer pipe are separated from each other, so that the position relation of the inner pipe and the outer pipe can be adjusted to determine the vertical distance between the dry hanging plate and the building; when the inner pipe is arranged at a proper position of the outer pipe, the inner pipe is fastened together by self-tapping self-drilling nails. In this embodiment, inner tube and outer tube are square pipe, and the outer tube is the hollow tube, and the first end of outer tube passes through welded fastening on the surface of fixed plate, and the inner tube is the solid tube that length is greater than the outer tube, and the first end of inner tube is inserted in the outer tube, and the second end of inner tube exposes in, also can adopt cylindrical pipe in other embodiments.
Referring to fig. 1 and 2, the steps of installing the connecting assembly in the present embodiment will be briefly described: fixing a fixing plate on the surface of a building through a bolt, inserting an inner pipe into a specified position in an outer pipe, and fixing the inner pipe and the outer pipe through self-tapping self-drilling nails; the first end of the bending plate is fixed on the back of the dry-hanging plate through the back bolt, then the dry-hanging plate is lifted, and the second end of the bending plate is inserted into the connecting bolt and is fixedly connected with the inner pipe through threads. The position of the connecting assembly in a vertical horizontal plane (in the X-axis and Y-axis directions) can be adjusted through rotating the bending plate around the back bolt within a small range, and the position of the connecting assembly in the Y-axis direction can be adjusted through the relative position between the inner pipe and the outer pipe; the adjustment in the vertical horizontal plane and the Z-axis direction is not interfered, and the adjustment efficiency is high due to simple operation.
Example 2
Referring to fig. 4, the present embodiment is a connection structure of dry hanging plates, which includes two dry hanging plates, a building and a connection assembly, wherein the dry hanging plates are hung on the surface of the building through the connection assembly. The connecting assembly in this embodiment is different from the structure in embodiment 1 in that: referring to the attached figure 1, on the basis of the embodiment 1, a spring plate with adjustable width is further arranged and fixed on a connecting bolt between the bending plate and the dry hanging plate. Set up like this, make things convenient for coupling assembling to carry out the micro-adjustment in the Z axle direction of perpendicular to dry-hang panel.
Referring to fig. 3, the upper half of the dry-hang plate is connected and fixed with the building through the connecting assembly, the first end of the bending plate is fixed on the back of the dry-hang plate through the back bolt, and the fixing plate is fixed on the surface of the building through the bolt. The lower half part of the dry-hanging plate is fixedly connected with a building through a lower inserting component, the lower inserting component comprises an N-shaped lower inserting plate, the first end of the lower inserting plate is fixed on the back of the lower half part of the dry-hanging plate through a back bolt, and the second end of the lower inserting plate is provided with a groove. Referring to the attached drawing 4, the lower insert plate groove of the upper dry hanging plate is directly clamped on the connecting bolt of the lower dry hanging plate, so that the mounting mode of hanging the upper half part and limiting the lower half part of each dry hanging plate is realized, and the national standard is met.
Referring to fig. 1, 3 and 4, in this embodiment, the construction steps of the connection structure of the upper dry-hang board are substantially (the lower dry-hang board is already installed):
the hanging plate preparation work I: the fixing plate welded with the outer pipe is fixed on a concrete wall of a building through bolts, the center hole of the outer pipe is ensured to be positioned at a specified horizontal height position (namely Y-axis direction), the error is within plus or minus 2mm, and the error of the hollow hole of the outer pipe at the left and right positions (namely X-axis direction) is allowed to be within plus or minus 30 mm.
Second hanging plate preparation: the two bending plates are installed on the left side and the right side of the upper half part of the dry hanging plate by using the pre-installed back bolts, the two lower inserting plates are installed on the left side and the right side of the lower half part of the dry hanging plate by using the pre-installed back bolts, and the second ends of the bending plates are fixed with the supporting bolts in advance.
Hanging plate work one: the method comprises the following steps of (1) shifting an elastic sheet on a connecting bolt of a lower layer dry hanging plate to a proper position (ensuring that the upper layer dry hanging plate protrudes out 1mm more than the lower layer dry hanging plate), inserting a groove of a lower inserting plate of the upper layer dry hanging plate into the middle of the elastic sheet, and clamping the groove on the connecting bolt; the second end of the bent plate is then fixedly connected to the inner tube by the connecting bolt, and the inner tube is inserted into the outer tube.
Hanging plate work two: moving the dry hanging plate to enable the disposal distance between the dry hanging plate and the building to be proper, and then locking the inner pipe and the outer pipe by using self-tapping self-drilling nails; and screwing the supporting bolt, and finally, stretching an inner hexagonal wrench between the horizontal plate seams of the dry-hanging plates on the upper layer and the lower layer to screw the back bolt, so that the 1mm protrusion of the dry-hanging plates on the upper layer is screwed smoothly, and the dry-hanging plates on the upper layer and the lower layer are positioned on the same vertical horizontal plane.
In other embodiments, when the dry-hang plate is positioned at the lowest layer of the building, the lowest side of the surface of the building is provided with the support strip, and the groove of the lower inserting plate is clamped on the support strip. Such a connection method is the prior art and will not be described herein.
When the coordinate of the connecting assembly on the Z axis is adjusted, the positions of the X axis and the Y axis are not influenced; and similarly, the Z-axis direction can not be influenced when the positions of the X-axis and the Y-axis are adjusted. On the construction site, workers only need to put the dry-hanging plate on the correct position and then fix the plate, and complex operation processes such as trial-and-error iteration, repeated adjustment and the like are not needed, so that the difficulty of dry-hanging and installing the plate is greatly reduced, and the installing efficiency is improved.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (10)

1. A connecting assembly of a dry hanging plate is used for fixing the dry hanging plate on a building, and is characterized by comprising a fixing piece and a hanging piece, wherein the fixing piece comprises a fixing plate, a square pipe assembly and a bolt, the bolt fixes the fixing plate on the building, the square pipe assembly comprises an outer pipe and an inner pipe, the first end of the outer pipe is fixed on the surface of the fixing plate, and the inner pipe is inserted into and fixed in the outer pipe from the second end of the outer pipe; the hanging piece comprises a bending plate, a back bolt and a connecting bolt, wherein the first end of the bending plate is fixed on the dry hanging plate through the back bolt, and the second end of the bending plate is fixedly connected with the inner pipe through the connecting bolt.
2. The connecting assembly of claim 1, wherein the fixing plate has a through hole, and the threaded end of the bolt passes through the through hole and is fixed to a building.
3. The connection assembly of dry hang panels as claimed in claim 1, wherein the inner tube is longer than the outer tube.
4. The connecting assembly of claim 1, wherein the bent plate is an N-like plate, and the first and second ends are parallel vertical plates connected together by an intermediate horizontal portion.
5. The connecting assembly of claim 4, wherein the second end of the bent plate is provided with an oblong hole, and one end of the connecting bolt passes through the oblong hole to be fixedly connected with the inner tube.
6. The connecting assembly of claim 5, wherein the second end edge of the bent plate extends away from the horizontal portion to form a support portion, and the support portion is located above the square tube assembly.
7. The connection assembly of dry hanging board material as claimed in claim 6, further comprising a support bolt having one end passing through the support portion and pressed against the inner pipe surface.
8. A connection assembly of dry-hang panels as claimed in claim 1, wherein the outer and inner tubes are fastened together by self-tapping self-drilling nails.
9. A connection structure of dry hanging plate, characterized in that, it comprises at least one dry hanging plate, a building and the connection assembly of any one of claims 1-8, the upper half of the dry hanging plate is connected and fixed with the building through the connection assembly, the back bolt fixes the first end of the bending plate on the back of the dry hanging plate, the bolt fixes the fixing plate on the surface of the building.
10. The connecting structure of the dry-hang plate as claimed in claim 9, wherein the lower half part of the dry-hang plate is fixedly connected with the building through a lower inserting component, the lower inserting component comprises an N-shaped lower inserting plate, the first end of the lower inserting plate is fixed on the back of the lower half part of the dry-hang plate through a back bolt, the second end of the lower inserting plate is provided with a groove, and the groove of the lower inserting plate is clamped on a connecting bolt or a supporting strip fixed on the building.
CN201921075185.7U 2019-07-10 2019-07-10 Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate Expired - Fee Related CN211114575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921075185.7U CN211114575U (en) 2019-07-10 2019-07-10 Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921075185.7U CN211114575U (en) 2019-07-10 2019-07-10 Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate

Publications (1)

Publication Number Publication Date
CN211114575U true CN211114575U (en) 2020-07-28

Family

ID=71696286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921075185.7U Expired - Fee Related CN211114575U (en) 2019-07-10 2019-07-10 Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate

Country Status (1)

Country Link
CN (1) CN211114575U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127772A (en) * 2023-10-20 2023-11-28 苏州广林建设有限责任公司 Hanging plate structure of porcelain steel plate and assembly method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127772A (en) * 2023-10-20 2023-11-28 苏州广林建设有限责任公司 Hanging plate structure of porcelain steel plate and assembly method thereof
CN117127772B (en) * 2023-10-20 2024-02-06 苏州广林建设有限责任公司 Hanging plate structure of porcelain steel plate and assembly method thereof

Similar Documents

Publication Publication Date Title
CN108842982B (en) Wall leveling assembly and installation method
CN211114575U (en) Connecting assembly for dry-hanging plate and connecting structure for dry-hanging plate
CN110778160A (en) Assembled clean operating room
CN207646965U (en) A kind of secondary connector for construction installation and construction installation structure
CN108797857B (en) Back bolt dry-hanging assembly and back bolt dry-hanging system
CN215889128U (en) Leveling structure convenient to equipment
CN214461678U (en) Assembled furred ceiling mounting member
CN214614963U (en) Ready-package assembly furred ceiling structure
CN108824689B (en) Hyperboloid furred ceiling installation component
CN211341561U (en) Plaque assembly
CN210316296U (en) Adjustable metal square tube construction assembly of suspended ceiling base layer framework
CN113756507A (en) Single-layer keel top-attached assembled ceiling and mounting method
CN211341490U (en) Wall surface leveling assembly
CN214090494U (en) Assembled partition wall fossil fragments mounting
CN214785176U (en) Concrete curtain wall plate dry hanging device
CN220394946U (en) Spliced curtain wall structure
CN220414730U (en) Fast-assembling trinity leveling fossil fragments device
CN218405948U (en) Connecting node for back bolt type curtain wall panel and cross beam
CN212613512U (en) Wallboard fixing assembly
CN212562265U (en) Mounting structure of dry hanging type decoration panel
CN212715578U (en) Curtain wall laying structure
CN210152132U (en) Dry hanging structure for square column
CN211118002U (en) Supporting and fixing part for electromechanical pipeline on steel beam
CN217760129U (en) Auxiliary support for mounting and positioning assembly type building curtain wall
CN210134609U (en) Ceramic tile dry-hanging device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728