CN214614963U - Ready-package assembly furred ceiling structure - Google Patents
Ready-package assembly furred ceiling structure Download PDFInfo
- Publication number
- CN214614963U CN214614963U CN202023150033.4U CN202023150033U CN214614963U CN 214614963 U CN214614963 U CN 214614963U CN 202023150033 U CN202023150033 U CN 202023150033U CN 214614963 U CN214614963 U CN 214614963U
- Authority
- CN
- China
- Prior art keywords
- plate
- plate body
- ready
- ceiling structure
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003780 insertion Methods 0.000 claims description 13
- 230000037431 insertion Effects 0.000 claims description 13
- 238000009434 installation Methods 0.000 abstract description 21
- 239000012634 fragment Substances 0.000 abstract description 15
- 238000005034 decoration Methods 0.000 abstract description 11
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a ready-package assembly furred ceiling structure relates to decoration technical field, it includes the main joist, fossil fragments fastener and decorative board, the fossil fragments fastener passes through the connecting piece and is connected with the main joist, the fossil fragments fastener includes first curb plate, second curb plate and upper plate body, first curb plate passes through the lower plate body and is connected with the second curb plate, the width of lower plate body is less than the width of upper plate body, be provided with first splint on the lower plate body, second splint and joint-filling board, the decorative board tip is provided with inserts the foot, the connecting piece includes the main part board, couple and draw-in groove, the width of draw-in groove is dwindled to the one end of keeping away from the couple by the one end that is close to the couple gradually, be provided with a string post on the main joist. The utility model discloses the installation is simple, and the fossil fragments fastener is integrated into one piece spare, and convenient production saves the cost, and the furred ceiling installation is swift efficient, and it is level and smooth to decorate the face, dismantles simply to effectively improve holistic pleasing to the eye degree of furred ceiling and security.
Description
Technical Field
The utility model relates to the technical field of decoration design,
especially, the utility model relates to a ready-package assembly furred ceiling structure.
Background
The current decoration industry is developing towards the direction of industrialized modularized installation, generally speaking, ceiling board decoration is a commonly adopted decoration method in indoor design, and can increase the layering sense of indoor space and play a role in beautifying decoration.
Industrial assembly technology and assembly decoration are more and more widely applied in decoration industry, and assembly ceiling technology has a very important position in practical application as a technology of indoor decoration, most of the existing assembly ceilings directly install a ceiling board on a keel, then fix the keel on square steel, then integrally lift the square steel and the keel structure, and finally support the square steel to finish the ceiling, for example, Chinese patent invention patent CN110241967A discloses an assembly ceiling, which comprises at least one ceiling component, the ceiling component comprises a plurality of top boards which are mutually overlapped, the top board comprises an installation surface, at least one hanging component used for being connected with a wall top is arranged on the installation surface, the hanging component comprises a fixed seat, a support keel used for supporting the top board, and a hanging piece used for hanging the ceiling component on the wall top, the fixing seat is fixed on the mounting surface, the supporting keel is clamped with the fixing seat, and the hanging piece is clamped with the supporting keel. The utility model discloses a unified die sinking processing roof, fixing base, support fossil fragments and hanger piece in mill, only need during the on-the-spot installation with the fixing base, will support fossil fragments and hanger piece and install on the installation face of roof, form the furred ceiling, realize quick and pollution-free installation, construction cycle is short, the process is simple, artifical consumption is little, and is efficient, and on-the-spot assembled construction is with low costs.
The above ceiling structure still has the following problems: the endurance life is not enough, if panel quality is heavier, lead to the installation complicated and face unevenness, installation effectiveness low, dismantle complicacy, influence whole furred ceiling's pleasing to the eye degree, cost and safety.
Therefore, to solve the above problems, it is necessary to design a reasonably efficient ready-to-assemble suspended ceiling structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation is simple, and the fossil fragments fastener is integrated into one piece spare, and convenient production saves the cost, and the furred ceiling installation is swift efficient, and the decoration face levels, and it is simple to dismantle to effectively improve the holistic pleasing to the eye degree of furred ceiling and the ready-package assembly furred ceiling structure of security.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a quick-assembly suspended ceiling structure comprises a main keel, a keel clamping piece connected with the main keel and a decorative plate connected with the keel clamping piece, wherein the keel clamping piece is connected with the main keel through a connecting piece, the keel clamping piece comprises a first side plate, a second side plate and an upper plate body used for connecting the first side plate and the second side plate, one end of the first side plate far away from the upper plate body is connected with one end of the second side plate far away from the upper plate body through a lower plate body, the width of the lower plate body is smaller than that of the upper plate body, a first clamping plate, a second clamping plate and a caulking plate arranged between the first clamping plate and the second clamping plate are arranged on the lower plate body, the first clamping plate, the second clamping plate and the caulking plate extend towards the direction far away from the upper plate body, and the end part of the decorative plate is provided with an inserting foot extending upwards, the connecting piece includes the main part board, set up in the couple of main part board tip and set up in the main part board is kept away from the draw-in groove of the one end of couple, the width of draw-in groove is by being close to the one end of couple is to keeping away from the one end of couple reduces gradually, be provided with the top on the main joist and hang the post.
As the utility model discloses a preferred, first splint to being close to the direction slope setting of caulking the board, first splint with minimum distance between the caulking board is not more than insert the width of foot.
As the utility model discloses a preferred, the second splint to being close to the direction slope setting of caulking the board, the second splint with minimum distance between the caulking board is not more than insert the width of foot.
As the utility model discloses a preferred, first splint are kept away from the one end of lower plate body is provided with first cowl.
As the utility model discloses a preferred, the second splint are kept away from the one end of lower plate body is provided with second cowl.
Preferably, the number of the insertion legs is at least one.
As the utility model discloses a preferred, the post lower extreme is hung on the top is provided with the carry hook, and just the quantity of hanging the post on the top is one at least.
Preferably, the length of the joint sealing plate is greater than the lengths of the first clamping plate and the second clamping plate.
Preferably, the joint sealing plate is an elastic member.
The utility model relates to a ready-package assembly furred ceiling structure's beneficial effect lies in: the installation is simple, and the fossil fragments fastener is integrated into one piece spare, and convenient production saves the cost, and the furred ceiling installation is swift efficient, and the decoration face is level and smooth, dismantles simply to effectively improve holistic pleasing to the eye degree of furred ceiling and security.
Drawings
Fig. 1 is a schematic perspective view of the overall structure of an embodiment of a ready-to-assemble suspended ceiling structure of the present invention;
fig. 2 is a schematic front view of the overall structure of an embodiment of the quick-assembly assembled ceiling structure of the present invention;
fig. 3 is a schematic structural view of a keel clip in an embodiment of a quick-fit assembled ceiling structure of the present invention;
fig. 4 is a schematic structural view of a trim panel in another embodiment of a ready-to-assemble ceiling structure of the present invention;
fig. 5 is a schematic structural view of a connecting member in another embodiment of a quick-fit assembled ceiling structure according to the present invention;
in the figure: 1. main joist, 11, top hanging column, 2, keel clamping piece, 21, first side plate, 22, second side plate, 23, upper plate body, 24, lower plate body, 25, first splint, 251, first cowl, 26, second splint, 261, second cowl, 27, caulking plate, 3, decorative board, 31, insert foot, 4, connecting piece, 41, main body board, 42, couple, 43, draw-in groove.
Detailed Description
The following are specific embodiments of the present invention, and the technical solutions of the present invention are further described, but the present invention is not limited to these embodiments.
Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that: the relative arrangement of modules and steps and the steps set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.
Meanwhile, it should be understood that the flows in the drawings are not merely performed individually for convenience of description, but a plurality of steps are performed alternately with each other.
The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
Techniques, methods, and systems known to those of ordinary skill in the relevant art may not be discussed in detail, but are intended to be part of the specification where appropriate.
The first embodiment is as follows: as shown in fig. 1 to 5, which are only one embodiment of the present invention, a quick-assembly suspended ceiling structure includes a main keel 1, a keel clip 2 connected to the main keel 1, and a decorative plate 3 connected to the keel clip 2, wherein the keel clip 2 is connected to the main keel 1 through a connector 4, the keel clip 2 includes a first side plate 21, a second side plate 22, and an upper plate 23 for connecting the first side plate 21 and the second side plate 22, one end of the first side plate 21 away from the upper plate 23 is connected to one end of the second side plate 22 away from the upper plate 23 through a lower plate 24, the width of the lower plate 24 is smaller than that of the upper plate 23, the lower plate 24 is provided with a first clamping plate 25, a second clamping plate 26, and a caulking plate 27 disposed between the first clamping plate 25 and the second clamping plate 26, first splint 25, second splint 26 and joint-filling board 27 all are to keeping away from the direction of going up plate body 23 extends the setting, the decorative board 3 tip is provided with the insertion foot 31 that upwards extends the setting, connecting piece 4 includes main part board 41, set up in the couple 42 of main part board 41 tip and set up in main part board 41 is kept away from the draw-in groove 43 of the one end of couple 42, the width of draw-in groove 43 is by being close to the one end of couple 42 is to keeping away from the one end of couple 42 reduces gradually, be provided with the overhead mast 11 on the main joist 1.
The utility model discloses in, hang post 11 earlier on fixed to the ceiling on the top, then carry main joist 1 on hanging post 11 on the top, then install connecting piece 4 on main joist 1, install fossil fragments fastener 2 to connecting piece 4 on, install decorative board 3 at keel fastener 2 below at last.
Firstly is the structure of fossil fragments fastener 2, fossil fragments fastener 2 pass through connecting piece 4 with main joist 1 is connected, fossil fragments fastener 2 include first curb plate 21, second curb plate 22 and be used for connecting the last plate body 23 of first curb plate 21 and second curb plate 22, first curb plate 21 is kept away from the one end of going up plate body 23 through lower plate body 24 with second curb plate 22 is kept away from the one end of going up plate body 23 is connected, the width of lower plate body 24 is less than the width of going up plate body 23, be provided with first splint 25, second splint 26 on the lower plate body 24 and set up in caulking plate 27 between first splint 25 and the second splint 26, first splint 25, second splint 26 and caulking plate 27 all to keeping away from the direction extension setting of last plate body 23.
In fact, first curb plate 21, second curb plate 22 are the slope setting for first curb plate 21, second curb plate 22, go up plate body 23 and lower plate body 24 form one wide isosceles trapezoid narrow down, and first curb plate 21, second curb plate 22, go up plate body 23 and lower plate body 24 and be the aluminium system board, and the space that encloses between first curb plate 21, second curb plate 22, last plate body 23 and the lower plate body 24 is hollow, can effectively alleviate the quality of fossil fragments fastener 2, and the carry security is higher.
Then, the keel clip 2 is connected with the main keel 1 through a connecting piece 4, the connecting piece 4 comprises a main body plate 41, a hook 42 arranged at the end part of the main body plate 41 and a clamping groove 43 arranged at one end of the main body plate 41 far away from the hook 42, the width of the clamping groove 43 is gradually reduced from one end close to the hook 42 to one end far away from the hook 42, actually, the width of the widest part of the clamping groove 43 is slightly larger than the width of the upper plate body 23, the width of the narrowest part of the clamping groove 43 is slightly smaller than the width of the lower plate body 24, the inclination angles of two sides of the clamping groove 43 are consistent with the inclination angles of the first side plate 21 and the second side plate 22, so that the hook 42 at the upper end of the connecting piece 4 can be hung on the main keel 1, and the isosceles trapezoids with narrow upper and lower parts formed by the first side plate 21, the second side plate 22, the upper plate body 23 and the lower plate body 24 of the keel clip 2 are just clamped in the clamping groove 43, the connection of the keel clamp 2 and the main keel 1 is completed.
Finally, the keel clamp 2 is connected with the decorative plate 3, the end of the decorative plate 3 is provided with an insertion foot 31 extending upwards, and the insertion foot 31 can be inserted between the first clamping plate 25 and the joint strip 27 or between the second clamping plate 26 and the joint strip 27.
Here, the first splint 25 is disposed to be inclined in a direction approaching the caulking plate 27, and a minimum distance between the first splint 25 and the caulking plate 27 is not greater than a width of the insertion foot 31.
Similarly, the second clamping plate 26 is disposed obliquely to the direction approaching the caulking plate 27, and the minimum distance between the second clamping plate 26 and the caulking plate 27 is not larger than the width of the insertion foot 31.
Like this, decorative board 3 simple to operate dismantles simply, the cost and the time of the dismouting of effective saving, and furred ceiling installation overall structure is simple, and the roughness is good after the decorative board 3 installation, and the holistic pleasing to the eye degree of furred ceiling and security improve greatly.
The utility model relates to a ready-package assembly furred ceiling structure installation is simple, and the fossil fragments fastener is integrated into one piece spare, and convenient production saves the cost, and the furred ceiling installation is swift efficient, decorates the face and levels, and it is simple to dismantle to effectively improve holistic pleasing to the eye degree of furred ceiling and security.
Embodiment two, still as shown in fig. 1 to 5, only be one of the embodiments of the present invention, on the basis of embodiment one, in the structure of the present invention, the one end of the lower plate body 24 away from the first clamping plate 25 is provided with a first arc-shaped baffle 251, and the one end of the lower plate body 24 away from the second clamping plate 26 is provided with a second arc-shaped baffle 261. The arc-shaped baffle plates are arranged, so that on one hand, the insertion feet 31 can be inserted between the first clamping plate 25 and the joint filling plate 27 or between the second clamping plate 26 and the joint filling plate 27 conveniently and can not be blocked; and on the other hand, prevents the upper end of the decorative plate 3 from being damaged by contact friction with the bottom end of the first clamping plate 25 or the second clamping plate 26.
And the number of the insertion feet 31 is at least one, the insertion feet 31 are arranged at both ends of one decorative plate 3, and two decorative plates 3 can be arranged below one keel clamping piece 2.
And, top string post 11 lower extreme is provided with the hook of carrying, and the quantity of top string post 11 is at least one, and in fact main joist 1 is carried in the hook department of carrying of top string post 11, and is provided with at least one top string post 11 on one main joist 1, and main joist 1's structural stability is better.
It is noted that the length of the caulk plate 27 is greater than the length of the first and second jaws 25, 26.
Finally, the joint filling plate 27 is an elastic member, and on one hand, the joint filling plate elastically isolates two adjacent decorative plates 3 to avoid the damage of the decorative plates 3; on the other hand, can guarantee that elastic deformation fills between two decorative boards 3 when decorative board 3 expend with heat and contract with cold, the beautiful seam effect is better.
Third, the utility model provides a method for installing of a ready-package assembly furred ceiling structure among above-mentioned all embodiments still is provided, including following step:
s1: snapping a line on the wall surface, setting the installation height of the suspended ceiling, and manufacturing a connecting piece and a keel clamping piece;
s2: installing and fixing a top-mounted column, mounting a main keel on the top-mounted column, installing a connecting piece on the main keel, and hanging a hook of the connecting piece on the main keel;
s3: inserting the keel clamping piece into the clamping groove of the connecting piece from the end part, so that the first side plate and the second side plate of the keel clamping piece are clamped into the clamping groove;
s4: and (3) installing the veneer so that the insertion foot at the end part of the veneer is upwards inserted between the first clamping plate and the joint filling plate or between the second clamping plate and the joint filling plate.
Before step S4 is executed, a first clamping plate, a second clamping plate and a caulking plate are installed on the lower plate body of the keel clamping piece, so that the first clamping plate is obliquely arranged towards the direction close to the caulking plate until the minimum distance between the first clamping plate and the caulking plate is not more than the width of the inserted foot, and similarly, the second clamping plate is obliquely arranged towards the direction close to the caulking plate until the minimum distance between the second clamping plate and the caulking plate is not more than the width of the inserted foot.
And when the step S2 is executed, the upper ends of the top hanging columns are fixed on the ceiling, the main keels are clamped into the hanging hooks arranged at the lower ends of the top hanging columns, and at least one top hanging column is arranged on one main keel.
The utility model relates to a ready-package assembly furred ceiling structure installation is simple, and the fossil fragments fastener is integrated into one piece spare, and convenient production saves the cost, and the furred ceiling installation is swift efficient, decorates the face and levels, and it is simple to dismantle to effectively improve holistic pleasing to the eye degree of furred ceiling and security.
The present invention is not limited to the above-described specific embodiments, and various modifications and changes are possible. Any modification, equivalent replacement, improvement and the like made to the above embodiments according to the technical spirit of the present invention should be included in the scope of protection of the present invention.
Claims (10)
1. The utility model provides a ready-package assembly furred ceiling structure which characterized in that: comprises a main keel (1), a keel clamping piece (2) connected with the main keel (1) and a decorative plate (3) connected with the keel clamping piece (2), wherein the keel clamping piece (2) is connected with the main keel (1) through a connecting piece (4), the keel clamping piece (2) comprises a first side plate (21), a second side plate (22) and an upper plate body (23) used for connecting the first side plate (21) and the second side plate (22), one end of the first side plate (21) far away from the upper plate body (23) is connected with one end of the second side plate (22) far away from the upper plate body (23) through a lower plate body (24), the width of the lower plate body (24) is smaller than that of the upper plate body (23), a first clamping plate (25), a second clamping plate (26) and a filling plate (27) arranged between the first clamping plate (25) and the second clamping plate (26) are arranged on the lower plate body (24), first splint (25), second splint (26) and joint-filling board (27) are all to keeping away from the direction of going up plate body (23) extends the setting, decorative board (3) tip is provided with and upwards extends inserting foot (31) that set up, connecting piece (4) include main part board (41), set up in couple (42) of main part board (41) tip and set up in main part board (41) are kept away from draw-in groove (43) of the one end of couple (42), the width of draw-in groove (43) is by being close to the one end of couple (42) is to keeping away from the one end of couple (42) reduces gradually, be provided with top hanging post (11) on main joist (1).
2. The ready-package assembled ceiling structure of claim 1, wherein: the first clamping plate (25) is obliquely arranged in the direction close to the joint strip (27), and the minimum distance between the first clamping plate (25) and the joint strip (27) is not more than the width of the insertion foot (31).
3. The ready-package assembled ceiling structure of claim 1, wherein: the second clamping plate (26) is obliquely arranged in the direction close to the joint strip (27), and the minimum distance between the second clamping plate (26) and the joint strip (27) is not more than the width of the insertion foot (31).
4. The ready-package assembled ceiling structure of claim 1, wherein: one end, far away from the lower plate body (24), of the first clamping plate (25) is provided with a first arc-shaped baffle plate (251).
5. The ready-package assembled ceiling structure of claim 1, wherein: and a second arc-shaped baffle plate (261) is arranged at one end, far away from the lower plate body (24), of the second clamping plate (26).
6. The ready-package assembled ceiling structure of claim 1, wherein: the number of the insertion feet (31) is at least one.
7. The ready-package assembled ceiling structure of claim 1, wherein: the lower end of the top hanging column (11) is provided with a hanging hook.
8. The ready-package assembled ceiling structure of claim 7, wherein: the number of the top hanging columns (11) is at least one.
9. The ready-package assembled ceiling structure of claim 7, wherein: the number of the mounting hooks is at least one.
10. The ready-package assembled ceiling structure of claim 1, wherein: the joint filling plate (27) is an elastic piece.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202023150033.4U CN214614963U (en) | 2020-12-24 | 2020-12-24 | Ready-package assembly furred ceiling structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202023150033.4U CN214614963U (en) | 2020-12-24 | 2020-12-24 | Ready-package assembly furred ceiling structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN214614963U true CN214614963U (en) | 2021-11-05 |
Family
ID=78431780
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202023150033.4U Active CN214614963U (en) | 2020-12-24 | 2020-12-24 | Ready-package assembly furred ceiling structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN214614963U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112554429A (en) * | 2020-12-24 | 2021-03-26 | 浙江亚厦装饰股份有限公司 | Fast-assembly type assembly ceiling structure and installation method |
-
2020
- 2020-12-24 CN CN202023150033.4U patent/CN214614963U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112554429A (en) * | 2020-12-24 | 2021-03-26 | 浙江亚厦装饰股份有限公司 | Fast-assembly type assembly ceiling structure and installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112554429A (en) | Fast-assembly type assembly ceiling structure and installation method | |
| CN112443130B (en) | Multifunctional suspended ceiling edge-folding structure and installation method | |
| CN214614963U (en) | Ready-package assembly furred ceiling structure | |
| CN113863555B (en) | Multifunctional assembled ceiling and installation method | |
| CN113530071A (en) | Assembled letter hangs furred ceiling mounting structure | |
| CN216075863U (en) | Embedded keel connecting piece and ceiling system | |
| CN2499464Y (en) | Dovetail hanging piece for stone curtain wall | |
| CN102102417A (en) | Exposed keel structural member | |
| CN105507478A (en) | Suspended ceiling mounting component | |
| CN214461678U (en) | Assembled furred ceiling mounting member | |
| CN113530153B (en) | Integrated grade-falling clamping external corner fitting and mounting mode | |
| CN113463822A (en) | Embedded keel connecting piece, ceiling system and mounting method of ceiling system | |
| CN112814252B (en) | Mounting structure and mounting method of drop-level suspended ceiling | |
| CN211714341U (en) | Joint formula furred ceiling device convenient to big board installation | |
| CN216305083U (en) | Full buckle assembled furred ceiling | |
| CN115874753B (en) | Ceiling decoration system of aluminum square tube structure and construction method thereof | |
| CN217353158U (en) | Split type assembled furred ceiling I-shaped piece structure of lengthening | |
| CN219451169U (en) | Assembled partition wall fossil fragments structure | |
| CN217353163U (en) | Furred ceiling I-shaped piece extension structure | |
| CN214995505U (en) | Integrated wallboard dry-hanging system convenient to position | |
| CN215888880U (en) | Assembled letter hangs furred ceiling mounting structure | |
| CN214614968U (en) | Quick installation interlude fossil fragments formula pendant | |
| CN212836199U (en) | Novel independent ceiling structure | |
| CN213806093U (en) | Furred ceiling convenient to dismouting | |
| CN223548800U (en) | Ceiling edge sealing component and ceiling system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |