CN211113826U - Novel intelligence pole ground is opened and is expanded device - Google Patents
Novel intelligence pole ground is opened and is expanded device Download PDFInfo
- Publication number
- CN211113826U CN211113826U CN201921860017.9U CN201921860017U CN211113826U CN 211113826 U CN211113826 U CN 211113826U CN 201921860017 U CN201921860017 U CN 201921860017U CN 211113826 U CN211113826 U CN 211113826U
- Authority
- CN
- China
- Prior art keywords
- fixed block
- board
- expanding plate
- thick bamboo
- opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 17
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 17
- 241001330002 Bambuseae Species 0.000 claims abstract description 17
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 17
- 239000011425 bamboo Substances 0.000 claims abstract description 17
- 238000010276 construction Methods 0.000 description 9
- 230000005540 biological transmission Effects 0.000 description 6
- 238000009412 basement excavation Methods 0.000 description 4
- 238000005553 drilling Methods 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- FGRBYDKOBBBPOI-UHFFFAOYSA-N 10,10-dioxo-2-[4-(N-phenylanilino)phenyl]thioxanthen-9-one Chemical compound O=C1c2ccccc2S(=O)(=O)c2ccc(cc12)-c1ccc(cc1)N(c1ccccc1)c1ccccc1 FGRBYDKOBBBPOI-UHFFFAOYSA-N 0.000 description 1
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a novel intelligence pole ground is opened and is expanded device, including setting up at subaerial support, the support middle part is equipped with a rotatory section of thick bamboo, a rotatory section of thick bamboo passes through rotary disk linking bridge, rotatory section of thick bamboo below fixed block, the fixed block top is equipped with the telescopic link, the telescopic link extends the flexible fixed connection supporting shoe of fixed block, and the symmetry is provided with to open between fixed block and supporting shoe expands the board, open and expand board one end swing joint fixed block, open and expand board other end swing joint supporting shoe, the utility model discloses a flexible drive of telescopic link is opened and is expanded the board, makes to open and expand the board and become three horn shapes by vertical form, rotates a rotatory section of thick bamboo, drives through a rotatory section of thick bamboo and expands the board and rotate in the underground, opens and expands a coiled pile space, and the pole increases the underground space of basis.
Description
Technical Field
The utility model relates to an electric power construction technical field, concretely relates to novel intelligence pole ground is opened and is expanded device.
Background
The power transmission network built through the power transmission iron tower provides power for the city and the surrounding areas thereof, ensures the normal life and production power consumption of urban residents, and is a key part in city construction. Because the land resources in the urban area are short, the transmission tower with small occupied area is mostly adopted when the transmission tower is built. The transmission tower comprises a tower body arranged on the ground and a foundation which is buried underground and fixedly connected with the lower end of the tower body at the upper end. The foundation is an important component of the tower, the tower body and the foundation are connected through the foundation, acting force of the tower body on the foundation is stably and smoothly transmitted to the foundation, the foundation instability is avoided, and stable connection of the tower body and the foundation is guaranteed.
In the prior art, the foundation of the transmission tower is mostly an excavation foundation or a pile foundation. The excavation foundation needs to be excavated into a larger foundation pit during construction, then a template is erected in the foundation pit, concrete is poured into the template to form a foundation, and then soil is backfilled into the foundation pit to complete foundation construction. When the pile foundation is built, a columnar hole is drilled by adopting manual operation or mechanical operation, and concrete is poured after reinforcing steel bars are placed in the drilled hole to form the pile foundation. Wherein, when mechanical drilling is utilized, a mud pit for ensuring smooth construction of the drilling hole is required to be arranged.
In realizing the utility model discloses an in-process, the designer discovers that prior art has following problem at least:
the excavation type foundation easily damages the surrounding environment because a larger foundation pit needs to be excavated, and the pile foundation has the defect of long construction period caused by large excavation and drilling construction amount because the pile foundation is deeper drilled by adopting manual drilling.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is pole foundation construction cycle length or to the big defect of surrounding environment influence, for solving above-mentioned problem, the utility model provides a novel intelligence pole ground is opened and is expanded device.
The purpose of the utility model is realized with the following mode:
the utility model provides a novel intelligence pole ground is opened and is expanded device, is equipped with a rotatory section of thick bamboo including setting up at subaerial support, support middle part, a rotatory section of thick bamboo passes through rotary disk linking bridge, rotatory section of thick bamboo below fixed block, the fixed block top is equipped with the telescopic link, the telescopic link extends the flexible end fixed connection supporting shoe of fixed block, and the symmetry is provided with to open between fixed block and supporting shoe and expands the board, open and expand board one end swing joint fixed block, open and expand board other end swing joint supporting shoe.
The opening and expanding plate comprises a first opening and expanding plate and a second opening and expanding plate, one end of the first opening and expanding plate is connected with the hinge base through a pin shaft, one end of the second opening and expanding plate is connected with the supporting block through a pin shaft, and the other end of the first opening and expanding plate is connected with the other end of the second opening and expanding plate through a pin shaft.
The first expanding plate and the second expanding plate are both arc-shaped plates.
The rotating disc is a slewing bearing, the inner ring of the slewing bearing is fixedly connected with the rotating cylinder, and the outer ring of the slewing bearing is fixedly connected with the support.
The top of the rotary cylinder is provided with a rotary handrail.
The telescopic rod is a telescopic hydraulic cylinder which is arranged below the inner part of the rotary cylinder.
Compared with the prior art, the utility model discloses a flexible drive of telescopic link is opened and is expanded the board, makes to open and expands the board and become three horn shapes by vertical form, rotates a rotatory section of thick bamboo, drives through a rotatory section of thick bamboo and opens and expand the board and rotate in the underground, opens and expands a dish stake space, increases the underground space of pole basis, forms stable structure, and work efficiency is high, and pole foundation construction cycle is short.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an operation schematic diagram of the expanding plate in an arc shape.
The device comprises a rotary handrail 1, a rotary cylinder 2, a rotary disc 3, a support 4, a fixing block 5, a telescopic hydraulic cylinder 6, a supporting block 7, an opening and expanding plate 8, a first opening and expanding plate 9 and a second opening and expanding plate 10.
Detailed Description
As shown in fig. 1 to 2, a novel intelligence pole ground is opened and is expanded device, including setting up at subaerial support 4, support 4 middle part is equipped with rotatory section of thick bamboo 2, rotatory section of thick bamboo 2 is through rotary disk 3 linking bridge 4, 2 below fixed blocks 5 of a rotatory section of thick bamboo, 5 tops of fixed block are equipped with the telescopic link, the telescopic link extends the flexible fixed connection supporting shoe 7 of fixed block 5, and the symmetry is provided with between fixed block 5 and supporting shoe 7 and opens and expand board 8, open and expand 8 one end swing joint fixed blocks 5 of board, open and expand 8 other end swing joint supporting shoes 7 of board.
Open and expand board 8 and open and expand board 10 including first opening and expand board 9 and second, first opening expands 9 one end of board and passes through the articulated seat of round pin hub connection, and second is opened and is expanded board 10 one end and pass through round pin hub connection supporting shoe 7, and first opening expands the other end that board 9 opened through the round pin hub connection second and expands board 10, forms the triangle-like form under the shrink of telescopic link drives, increases the space of secret basis.
The rotating disc 3 is a slewing bearing, the inner ring of the slewing bearing is fixedly connected with the rotating cylinder 2, the outer ring of the slewing bearing is fixedly connected with the support 4, and the rotating cylinder 2 rotates in the support 4 through the slewing bearing.
The rotating handrail 1 is arranged on the top of the rotating cylinder 2, and the rotating cylinder 2 is driven by the rotating handrail 1.
The telescopic link is flexible pneumatic cylinder 6, flexible pneumatic cylinder 6 sets up in rotatory section of thick bamboo 2 inside below.
As shown in fig. 2, the first expanding plate 9 and the second expanding plate 10 are both arc-shaped plates.
The working process of the utility model is as follows: starting the telescopic hydraulic cylinder 6, enabling the telescopic end of the telescopic hydraulic cylinder 6 to contract, enabling one end of a first expanding plate 9 to be hinged with a fixed block 5, enabling one end of a second expanding plate 10 to be hinged with a supporting block 7, enabling the first expanding plate 9 to be hinged with the second expanding plate 10, enabling the telescopic hydraulic cylinder 6 to drive the supporting block 7 to move upwards when the telescopic hydraulic cylinder 6 contracts, further driving the second expanding plate 10 hinged with the supporting block to move upwards, enabling one end, far away from the supporting block 7, of the second expanding plate 10 to be hinged with the second expanding plate 10, namely enabling one end, far away from the supporting block 7, of the second expanding plate 10 to deviate from the telescopic end of the telescopic hydraulic cylinder 6, enabling the second expanding plate 10 to drive the first expanding plate 9 to move outwards, enabling the first expanding plate 9 and the second expanding plate 10 to form a similar triangular shape, then enabling a worker to rotate the handrail 1 manually, enabling the handrail 1 to drive a rotary cylinder 2 to rotate, enabling the rotary cylinder 2 to drive the fixed block 5 to rotate, enabling the first expanding plate 9 and, and forming a hollow disc pile underground to finish expanding the foundation.
While the preferred embodiments of the present invention have been described, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the general inventive concept, and it is intended to cover all such changes and modifications as fall within the true spirit and scope of the invention.
Claims (6)
1. The utility model provides a novel intelligence pole ground is opened and is expanded device, includes and sets up subaerial support, its characterized in that: the support middle part is equipped with a rotatory section of thick bamboo, a rotatory section of thick bamboo passes through rotary disk linking bridge, a rotatory section of thick bamboo below fixed block, the fixed block top is equipped with the telescopic link, the telescopic link extends the flexible end fixed connection supporting shoe of fixed block, and the symmetry is provided with between fixed block and supporting shoe and opens the board that expands, open board one end swing joint fixed block that expands, open and expand board other end swing joint supporting shoe.
2. The novel intelligent electric pole foundation expanding device as claimed in claim 1, wherein: the opening and expanding plate comprises a first opening and expanding plate and a second opening and expanding plate, one end of the first opening and expanding plate is connected with the hinge base through a pin shaft, one end of the second opening and expanding plate is connected with the supporting block through a pin shaft, and the other end of the first opening and expanding plate is connected with the other end of the second opening and expanding plate through a pin shaft.
3. The novel intelligent electric pole foundation expanding device as claimed in claim 2, wherein: the first expanding plate and the second expanding plate are both arc-shaped plates.
4. The novel intelligent electric pole foundation expanding device as claimed in claim 1, wherein: the rotating disc is a slewing bearing, the inner ring of the slewing bearing is fixedly connected with the rotating cylinder, and the outer ring of the slewing bearing is fixedly connected with the support.
5. The novel intelligent electric pole foundation expanding device as claimed in claim 1, wherein: the top of the rotary cylinder is provided with a rotary handrail.
6. The novel intelligent electric pole foundation expanding device as claimed in claim 1, wherein: the telescopic rod is a telescopic hydraulic cylinder which is arranged below the inner part of the rotary cylinder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921860017.9U CN211113826U (en) | 2019-10-31 | 2019-10-31 | Novel intelligence pole ground is opened and is expanded device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921860017.9U CN211113826U (en) | 2019-10-31 | 2019-10-31 | Novel intelligence pole ground is opened and is expanded device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211113826U true CN211113826U (en) | 2020-07-28 |
Family
ID=71718431
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921860017.9U Expired - Fee Related CN211113826U (en) | 2019-10-31 | 2019-10-31 | Novel intelligence pole ground is opened and is expanded device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211113826U (en) |
-
2019
- 2019-10-31 CN CN201921860017.9U patent/CN211113826U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107217910A (en) | Supply line's electric pole plants lever apparatus and its plants bar method | |
CN113322963B (en) | Sinking well construction structure and method for ultra-deep water collecting well | |
CN102182180B (en) | Rotary extrusion sleeve anchor rod and construction method thereof | |
CN210888804U (en) | Intelligence pole basis is opened and is expanded device | |
CN112482369A (en) | Static pressure type back support screw pile based on bionics and construction method thereof | |
CN211113826U (en) | Novel intelligence pole ground is opened and is expanded device | |
CN110284508A (en) | A kind of supporting mechanism used based on foundation pit | |
CN114016541A (en) | Anti-freeze-drawing club-footed pile structure and construction method thereof | |
CN109930624A (en) | A kind of embedding petrographic province blower foundation of offshore wind farm and construction method | |
CN102493439A (en) | Building fundamental pile constructional element | |
CN210530738U (en) | Pile system is planted in drilling in groups | |
CN112343045A (en) | Static pressure pipe pile sinking device with recyclable pile tip and construction method | |
CN216515754U (en) | Anti-freeze-drawing club-footed pile structure | |
CN215669558U (en) | Front-mounted inclined pile of foundation pit supporting system | |
CN215057096U (en) | Small-size rotary drilling rig | |
CN205934925U (en) | Pile pressing machine | |
CN112252312B (en) | Construction method for enhancing integral stress performance of PHC pipe pile | |
CN203685036U (en) | Transverse widener | |
CN211397438U (en) | Novel intelligence pole basis punches device | |
CN116005678B (en) | Marine rock-socketed single pile foundation construction excavation device and construction method thereof | |
KR20130113004A (en) | Front edge expanded bulb having internal excavation method used high strength steel pile | |
CN113006051A (en) | Bored pile construction method applicable to drilling and bottom expanding device | |
CN204646091U (en) | A kind of construction equipment of squeezed shaped pile | |
CN102877483A (en) | Foundation structure capable of being prefabricated and assembled and construction method thereof | |
CN202012078U (en) | Bearing support for anchor bar with expanding ends |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200728 |
|
CF01 | Termination of patent right due to non-payment of annual fee |